CN214883736U CN202120466407.9U CN202120466407U CN214883736U CN 214883736 U CN214883736 U CN 214883736U CN 202120466407 U CN202120466407 U CN 202120466407U CN 214883736 U CN214883736 U CN 214883736U
Authority
CN
China
Prior art keywords
soil layer
side slope
slope
ecological
top platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120466407.9U
Other languages
Chinese (zh)
Inventor
马根朝
胡邦
佘步存
段腾腾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaxin Design Group Co ltd
Original Assignee
Wuxi Municipal Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Municipal Design Institute Co Ltd filed Critical Wuxi Municipal Design Institute Co Ltd
Priority to CN202120466407.9U priority Critical patent/CN214883736U/en
Application granted granted Critical
Publication of CN214883736U publication Critical patent/CN214883736U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model provides an ecological bank protection in landfill yard sealing renovation, includes top platform and side slope, has the afforestation on top platform and the side slope and covers the soil layer, still has the bank protection brick on the side slope afforestation covers the soil layer, and top platform periphery has the anchor gird, and the side slope bottom has the escape canal, still includes a plurality of drawknot reinforcing bars, and the both ends of drawknot reinforcing bar are fixed respectively on anchor gird and escape canal, and the drawknot reinforcing bar runs through the bank protection brick. The bank protection brick is upper and lower open-ended hollow regular hexagonal prism, and the drawknot reinforcing bar passes from bank protection brick middle part. The drawknot steel bars in the slope protection brick are also provided with two steel bar ring buckles, and the steel bar ring buckles are positioned at the joint of the drawknot steel bars and the slope protection brick. The utility model discloses an ecological bank protection can effective maintenance side slope stability and can satisfy ecological greening, the requirement of distribution of rain and sewage, and each part of ecological bank protection makes up into unified whole, and is high to the supporting performance of top platform and side slope.

Description

Ecological slope protection in landfill yard closing renovation
Technical Field
The utility model relates to a landfill closure renovation field, concretely relates to ecological bank protection in landfill closure renovation.
Background
Along with the rapid development of cities and the continuous improvement of the living standard of people, the garbage yield is increased year by year, meanwhile, the urban land resources become more and more valuable, and the heightening and burying of garbage landfill sites become the common practice of various large garbage landfill sites in order to meet the increasing garbage yield, so that the problems of steep side slopes of garbage piles, insufficient stability, easy instability of sealing green soil layers, water and soil loss and the like are caused. The traditional slope shaping has the problems of large garbage excavation and transportation amount, reduction of the existing storage capacity, incapability of ensuring the stability of the slope and the like. Therefore, a multifunctional ecological slope protection which can meet the requirements of garbage pile stability, field sealing and soil covering enclosing, slope greening and rain and sewage diversion is urgently needed.
SUMMERY OF THE UTILITY MODEL
[ problem ] to
The technical problem of the utility model is that: the traditional slope shaping has the problems of large garbage excavation and transportation amount, reduction of the existing storage capacity, incapability of ensuring the stability of the slope and the like.
[ solution ]
An object of the utility model is to provide an ecological bank protection in landfill closure renovation that can effective maintenance side slope stability and can satisfy ecological greening, the reposition of redundant personnel of rain and sewage's requirement.
In order to achieve the above object, the technical solution of the present invention is specifically as follows:
the utility model provides an ecological bank protection in landfill yard sealing renovation, includes top platform and side slope, has the afforestation on top platform and the side slope and covers the soil layer, still has the bank protection brick on the side slope afforestation covers the soil layer, and top platform periphery has the anchor gird, and the side slope bottom has the escape canal, still includes a plurality of drawknot reinforcing bars, and the both ends of drawknot reinforcing bar are fixed respectively on anchor gird and escape canal, and the drawknot reinforcing bar runs through the bank protection brick.
Further, the bank protection brick is the hollow regular hexagonal prism of upper and lower open-ended, and the drawknot reinforcing bar passes from bank protection brick middle part.
Furthermore, still have two reinforcing bar latch closures on the drawknot reinforcing bar in the slope protection brick, the reinforcing bar latch closure is located drawknot reinforcing bar and slope protection brick junction mutually.
Furthermore, a plurality of short drainage pipes are further arranged in the anchoring ring beam, two ends of each short drainage pipe are communicated with the top platform greening covering soil layer and the side slope greening covering soil layer, and one end, close to the side slope greening covering soil layer, of each short drainage pipe is lower than one end, close to the top platform greening covering soil layer.
Furthermore, a reverse filter bag is buried outside one end of the drainage short pipe close to the greening covering soil layer of the top platform.
Further, the reverse filter bag is formed by wrapping broken stones with geotextile.
Furthermore, square piles are further arranged on the outer side of the drainage ditch at certain intervals.
Further, the square pile is a reinforced concrete square pile.
Further, one side that the escape canal is close to side slope afforestation cover soil layer is provided with a plurality of drainage nozzle stub, the both ends UNICOM side slope afforestation cover soil layer and the escape canal of drainage nozzle stub, the drainage nozzle stub is close to side slope afforestation cover soil layer one end and is higher than the one end that is close to the escape canal recess, the drainage nozzle stub is close to side slope afforestation cover soil layer one end and still buries anti-package of straining outward, anti-package of straining is formed by geotextile parcel rubble.
[ advantageous effects ]
The utility model discloses an ecological bank protection can effectively solve the shut-in side slope steepness, the shut-in covers the soil layer unstability, soil erosion and water loss, side slope afforestation, the problem of rainwater drainage guide, through setting up the anchor collar tie beam, enclose the top platform cover soil layer of shut-in, and the upper portion of slope protection brick is fixed, the full spread slope protection brick on the rethread side slope, it consolidates to side slope cover soil layer, prevent side slope unstability and soil erosion and water loss, and satisfy the demand of afforestation, at last through the combination of square pile and escape canal, guarantee side slope stability, and realize the drainage guide of rainwater, this ecological slope protection simple structure, high combinability, when satisfying stability, can reach the demand of shut-in afforestation.
Drawings
Fig. 1 is a front view of an ecological slope protection in the sealing treatment of the refuse landfill;
FIG. 2 is a cross-sectional view A-A of FIG. 1;
fig. 3 is a partial detail view, which sequentially shows, from left to right, a schematic view in which a tie bar penetrates through a slope protection brick, a schematic view in which one end of the tie bar is fixed to an anchor ring beam, and a schematic view in which the other end of the tie bar is fixed to a drainage ditch;
in the figures 1-3, an anchoring ring beam 1, tie bars 2, slope protection bricks 3, a drainage ditch 4, square piles 5, drainage short pipes 6, a reverse filter bag 7, a greening covering soil layer 8, an original landfill reservoir area 9 and a steel bar buckle 10.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and examples.
Examples
As shown in fig. 1-3, an ecological slope protection in the landfill yard sealing treatment comprises a top platform and a side slope, wherein a greening covering soil layer 8 is arranged on the top platform and the side slope, slope protection bricks 3 are further arranged on the surface layer of the greening covering soil layer of the side slope, and planting soil is filled in the slope protection bricks 3 for greening. The periphery of the top platform is provided with an anchoring ring beam 1, and the anchoring ring beam 1 can enclose a greening soil layer covered by the top platform. Side slope bottom has escape canal 4, still including the drawknot reinforcing bar 2 that runs through revetment brick 3, and the both ends of drawknot reinforcing bar 2 are fixed respectively on anchor gird 1 and escape canal 4.
Slope protection brick 3 is the hollow regular hexagonal prism of upper and lower open-ended, and tie bar 2 passes from slope protection brick 3 middle part. Still have two reinforcing bar latch closure 10 on the drawknot reinforcing bar 2 in the slope protection brick 3, reinforcing bar latch closure 10 is located the department that meets of drawknot reinforcing bar 2 and slope protection brick 3. The drawknot steel bars 2 can reinforce the slope protection bricks and improve the stability of the side slope.
An HDPE film is arranged between the original landfill reservoir area 9 and the greening covering soil layer 8 and is used for realizing the rain and sewage diversion of the whole reservoir area. And short drainage pipes 6 are further arranged at intervals on the inner sides of the anchoring ring beam 1 and the drainage ditch 4, two ends of each short upper drainage pipe are communicated with the top platform greening covering soil layer and the side slope greening covering soil layer, and one end, close to the side slope greening covering soil layer, of each short upper drainage pipe is lower than one end, close to the top platform greening covering soil layer. Both ends UNICOM side slope afforestation cover soil layer and escape canal 4 of lower part drainage nozzle stub, lower part drainage nozzle stub is close to side slope afforestation cover soil layer one end and is higher than the one end that is close to the escape canal recess, and the one end that upper portion drainage nozzle stub is close to top platform afforestation cover soil layer and lower part drainage nozzle stub are close to side slope afforestation cover soil layer one end and still bury outward and prevent straining package 7, and it is formed by geotechnological cloth parcel rubble to prevent straining package 7. Drainage nozzle 6 can realize leading of epimembranal rainwater and arrange, collects top platform and side slope rainwater to escape canal 4 in, realizes the distribution of rain and sewage of whole reservoir area. The reverse filter bag 7 can prevent the short drainage pipe 6 from being blocked and prevent the water and soil loss of the greening covering soil layer 8.
And reinforced concrete square piles 5 are further arranged at intervals outside the drainage ditch 4, and the square piles 5 are reinforced concrete square piles. The square piles 5 can support the whole side slope and maintain the stability of the side slope.
The protection scope of the present invention is not limited to the above embodiments, and any modifications, equivalent replacements, and improvements that can be made by a person skilled in the art within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (9)

1. The utility model provides an ecological bank protection in landfill yard sealing renovation, includes top platform and side slope, has the afforestation on top platform and the side slope and covers the soil layer, still has the bank protection brick on the side slope afforestation covers the soil layer, its characterized in that, top platform periphery has the anchor gird, and the side slope bottom has the escape canal, still includes a plurality of drawknot reinforcing bars, and the both ends of drawknot reinforcing bar are fixed respectively on anchor gird and escape canal, and the drawknot reinforcing bar runs through the bank protection brick.
2. The ecological slope protection in the landfill yard sealing renovation of claim 1, characterized in that the slope protection brick is a hollow regular hexagonal prism with an upper opening and a lower opening, and the tie bar passes through the middle of the slope protection brick.
3. The ecological slope protection in the landfill yard renovation of claim 1, wherein the tie bars in the slope protection bricks are further provided with two bar ring buckles, and the bar ring buckles are positioned at the joint of the tie bars and the slope protection bricks.
4. The ecological slope protection in the landfill yard sealing reclamation of claim 1, wherein the anchoring ring beam is further provided with a plurality of short drainage pipes, two ends of the short drainage pipes are communicated with the top platform greening covering soil layer and the side slope greening covering soil layer, and one end of the short drainage pipe close to the side slope greening covering soil layer is lower than one end close to the top platform greening covering soil layer.
5. The ecological slope protection in the landfill yard sealing renovation of claim 4, wherein the drainage short pipe is buried with a reverse filter bag outside the end near the top platform greening covering soil layer.
6. The ecological slope protection in the landfill yard remediation of claim 5, wherein the reverse filter bag is made of geotextile wrapped gravel.
7. The ecological slope protection in the landfill yard renovation of claim 1, wherein square piles are further arranged at regular intervals outside the drainage ditches.
8. The ecological slope protection in the landfill yard remediation of claim 7, wherein the square pile is a reinforced concrete square pile.
9. The ecological slope protection in the landfill yard sealing renovation of claim 1, wherein one side of the drainage ditch close to the side slope greening covering soil layer is provided with a plurality of short drainage pipes, two ends of the short drainage pipes are communicated with the side slope greening covering soil layer and the drainage ditch, one end of the short drainage pipe close to the side slope greening covering soil layer is higher than one end close to the groove of the drainage ditch, the other end of the short drainage pipe close to the side slope greening covering soil layer is embedded with a reverse filter bag, and the reverse filter bag is formed by wrapping crushed stones with geotextile.
CN202120466407.9U 2021-03-03 2021-03-03 Ecological slope protection in landfill yard closing renovation Active CN214883736U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120466407.9U CN214883736U (en) 2021-03-03 2021-03-03 Ecological slope protection in landfill yard closing renovation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120466407.9U CN214883736U (en) 2021-03-03 2021-03-03 Ecological slope protection in landfill yard closing renovation

Publications (1)

Publication Number Publication Date
CN214883736U true CN214883736U (en) 2021-11-26

Family

ID=78856443

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120466407.9U Active CN214883736U (en) 2021-03-03 2021-03-03 Ecological slope protection in landfill yard closing renovation

Country Status (1)

Country Link
CN (1) CN214883736U (en)

Similar Documents

Publication Publication Date Title
CN204456052U (en) The ecology closing structure of the solid soil of reinforcement
CN212714828U (en) Rubbish heap body soil and rock retaining dam reinforcing system
CN213867863U (en) General industrial solid waste storage and disposal site structure based on abandoned mine
CN111335100A (en) Embankment structure suitable for coastal region and construction method thereof
CN111962459A (en) Urban debris flow channel type comprehensive treatment system for abandoned slag yard and construction method thereof
CN103643689A (en) Pipe type underground water drainage blind ditch and construction technology and application thereof
CN212561384U (en) Ecological slope protection for river bank protection
CN212223948U (en) Multi-stage reinforced retaining wall comprehensive protection system suitable for large-scale abandoned slag yard
CN214883736U (en) Ecological slope protection in landfill yard closing renovation
CN210177294U (en) Mountain area highway subgrade
CN215165533U (en) Anchoring structure for side slope of solid waste landfill
CN211816750U (en) Sponge city rainwater recycling system
CN109403356B (en) Side slope supporting structure
CN210658236U (en) Slag stacking structure
CN210262772U (en) Anti-seepage embankment structure for gully section
CN113106940A (en) Flood drainage method for reservoir area type waste slag yard
CN208777319U (en) A kind of mound field structure kept suitable for soil quality
CN209810895U (en) Horizontal drainage guide system of refuse landfill
CN208039324U (en) A kind of landfill yard density polyethylene film with high rain sewage diversion drainage ditch
CN111997009A (en) Lining method of farmland ecological drainage ditch
CN211848684U (en) Structure is absorbed to embankment section abandon sediment
CN216640693U (en) Flood interception mechanism for sealing landfill
CN218643098U (en) Mountain area is filled out and is dug interface connection structure
CN218666959U (en) Construction waste filling roadbed
CN220202720U (en) Seepage-proofing cofferdam structure and cofferdam structure of reservoir

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 901-2, yinxiu Road, Wuxi, Jiangsu 214100

Patentee after: Huaxin Design Group Co.,Ltd.

Address before: 214000 901-2, yinxiu Road, Binhu District, Wuxi City, Jiangsu Province

Patentee before: WUXI MUNICIPAL DESIGN INSTITUTE Co.,Ltd.