Vibrating pile hammer for building construction Download PDFInfo
- Publication number
- CN214883643U CN214883643U CN202022503263.8U CN202022503263U CN214883643U CN 214883643 U CN214883643 U CN 214883643U CN 202022503263 U CN202022503263 U CN 202022503263U CN 214883643 U CN214883643 U CN 214883643U
- Authority
- CN
- China
- Prior art keywords
- sound
- vibrator
- connecting column
- proof
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009435 building construction Methods 0.000 title claims description 10
- 239000004575 stone Substances 0.000 claims abstract description 25
- 238000010276 construction Methods 0.000 claims abstract description 17
- 230000000694 effects Effects 0.000 claims abstract description 11
- 239000006096 absorbing agent Substances 0.000 claims description 13
- 230000008878 coupling Effects 0.000 abstract description 4
- 238000010168 coupling process Methods 0.000 abstract description 4
- 238000005859 coupling reaction Methods 0.000 abstract description 4
- 230000002349 favourable effect Effects 0.000 abstract description 4
- 238000007789 sealing Methods 0.000 description 5
- 235000008733 Citrus aurantifolia Nutrition 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 235000011941 Tilia x europaea Nutrition 0.000 description 1
- 230000006978 adaptation Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 239000004571 lime Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Images
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The utility model discloses a vibrohammer for construction relates to construction technical field, specifically is a vibrohammer for construction, including the bump leveller, bump leveller top fixed mounting has the crossbeam, the lifting rope has been cup jointed in the top activity of crossbeam, the below fixedly connected with vibrator of bump leveller, the fixed mounting has the triangle connecting block about the vibrator. This vibrating pile hammer for construction, connect vibrator and spliced pole through the triangle connecting block, be favorable to preventing droing of vibrator and spliced pole, design through the grip ring utilizes coupling spring and fixed plate to fix the grip ring simultaneously, conveniently fix the grip ring through the bolt, the design of grip ring has increased the area of contact of device with the stone stake, the area of contact that is favorable to making the stone stake is bigger, prevent the landing of stone stake, coupling spring and fixed plate play the effect of supplementary centre gripping simultaneously.
Description
Technical Field
The utility model relates to a construction technical field specifically is a vibratory pile hammer for construction.
Background
The vibrating pile hammer is a kind of equipment which can generate strong exciting force to drive the object into the ground after being electrified, belongs to the pile foundation construction machinery used in the construction engineering, is used for the construction of the concrete cast-in-place pile, and can sink the concrete cast-in-place pile, the concrete club-footed pile, the lime pile, the sand pile and the gravel pile after being matched with the pile frame; after the pile clamping device is matched, the concrete precast pile and various steel piles can be sunk and pulled, the pile clamping device is ideal equipment for foundation construction of highways, bridges, airports, buildings and the like, and the vibrating pile hammer can also be used as a pile driving hammer of machines such as a vibrating pipe-sinking pile machine, a plate inserting machine and the like.
The building construction field can extensive application by the vibratory pile hammer, in the use of current vibratory pile hammer, can have some problems, need carry out the centre gripping back with the stone pile when the use of vibratory pile hammer, vibrations through the high frequency make the stone pile squeeze into underground, current centre gripping mode, adopt two points to add the both sides of holding at the stone pile usually, its centre gripping mode has certain potential safety hazard, under high frequency vibrations, be difficult to guarantee the security of centre gripping, and can have some noises in the course of the work of vibratory pile hammer, can cause environmental pollution to the surrounding environment, for this we propose a vibratory pile hammer for construction.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art, the utility model provides a vibratory pile hammer for construction has solved the problem of proposing among the above-mentioned background art.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: a vibrating pile hammer for building construction comprises a vibration absorber, wherein a cross beam is fixedly installed above the vibration absorber, a lifting rope is movably sleeved above the cross beam, a vibrator is fixedly connected below the vibration absorber, triangular connecting blocks are fixedly installed at the left and right ends of the vibrator, connecting columns are fixedly connected below the vibrator and the triangular connecting blocks, a movable groove is clamped inside the connecting columns, a clamping ring is movably sleeved inside the movable groove, a fixing plate is fixedly installed at the front and rear ends below the vibration absorber, a connecting spring is fixedly connected inside the fixing plate, screw holes are fixedly formed at the left and right ends of the clamping ring, bolts are fixedly installed at the front and rear ends of the screw holes, a sound-proof cover is movably sleeved outside the connecting columns and the fixing plate, a locking bolt is fixedly sleeved above the sound-proof cover through the screw holes, a connecting groove is formed above the sound-proof cover, fixed cover has been cup jointed in the outside activity of sound-proof housing lower extreme, the inside activity of fixed cover bottom has been cup jointed and has been sealed the soundboard, the inside fixed mounting of grip ring has the stone pile.
Optionally, the lower part of the lifting rope is sleeved outside the cross beam through a movable ring, and the upper part of the lifting rope is fixedly connected with the crane.
Optionally, the upper end of the movable groove is a columnar groove, the lower end of the movable groove is an annular groove, and the height value above the movable groove is the same as the height value of the upper wall of the clamping ring.
Optionally, the fixed plate is in an annular sheet shape with the same radius value as that of the connecting column, and two fixed plates are fixedly mounted in the front and at the back of the lower portion of the connecting column.
Optionally, screw holes matched with the locking bolts are formed in the upper portion of the sound-proof cover and the upper portion of the connecting column, and the outer diameter value of the sound-proof cover is identical to that of the sound-sealing plate and the fixed sleeve.
The utility model provides a vibratory pile hammer for construction possesses following beneficial effect:
1. this vibrating pile hammer for construction, connect vibrator and spliced pole through the triangle connecting block, be favorable to preventing droing of vibrator and spliced pole, design through the grip ring utilizes coupling spring and fixed plate to fix the grip ring simultaneously, conveniently fix the grip ring through the bolt, the design of grip ring has increased the area of contact of device with the stone stake, the area of contact that is favorable to making the stone stake is bigger, prevent the landing of stone stake, coupling spring and fixed plate play the effect of supplementary centre gripping simultaneously.
2. This vibrating pile hammer for construction sets up the sound-proof housing through the outside at the spliced pole, sets up in the below of sound-proof housing simultaneously and seals the soundboard, has seted up the screw thread in the outside of sound-proof housing bottom and the outside of sealing the soundboard, and the design through fixed cover is convenient will seal soundboard and sound-proof housing and fix and prevent the sound-proof housing and seal droing of soundboard, and the convenient contact position to pile hammer and stone stake of cooperation through the sound-proof housing and sealing the soundboard gives sound insulation and falls the noise.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of the clamp ring of the present invention;
fig. 3 is a schematic structural diagram of the sound-sealing plate of the present invention.
In the figure: 1. a vibration absorber; 2. a cross beam; 3. a lifting rope; 4. a vibrator; 5. a triangular connecting block; 6. connecting columns; 7. a movable groove; 8. a clamp ring; 9. a connecting spring; 10. a fixing plate; 11. a bolt; 12. a sound-proof housing; 13. locking the bolt; 14. connecting grooves; 15. a sound sealing plate; 16. fixing a sleeve; 17. and (5) piling the stone.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 3, the present invention provides a technical solution: a vibrating pile hammer for building construction comprises a vibration absorber 1, a cross beam 2 is fixedly installed above the vibration absorber 1, a lifting rope 3 is movably sleeved above the cross beam 2, the lower portion of the lifting rope 3 is connected to the outer portion of the cross beam 2 in a sleeved mode through a movable ring, the upper portion of the lifting rope 3 is fixedly connected with a crane, the cross beam 2 and the lifting rope 3 are designed to play a role of connecting the crane, the vibrating pile hammer and a stone pile are conveniently brought together through the cooperation of the cross beam 2, the lifting rope 3 and the crane to be perpendicular to the ground, meanwhile, the stone pile can be conveniently moved through the cooperation of the cross beam 2 and the lifting rope 3, the lifting rope 3 is movably sleeved outside the cross beam 2 to enable the cross beam 2, the lifting rope 3 and the vibration absorber 1 to be always kept on the same vertical line, a vibrator 4 is fixedly connected below the vibration absorber 1, triangular connecting blocks 5 are fixedly installed on the left end and the right end of the vibrator 4, a connecting column 6 is fixedly connected below the vibrator 4 and the triangular connecting blocks 5, the inside of the connecting column 6 is clamped with a movable groove 7, a clamping ring 8 is movably sleeved inside the movable groove 7, the upper end of the movable groove 7 is a columnar groove, the lower end of the movable groove 7 is an annular groove, the height value above the movable groove 7 is the same as the height value of the upper wall of the clamping ring 8, the movable groove 7 plays a role of movably sleeving the clamping ring 8, the design of the movable groove 7 enables the clamping ring 8 to move back and forth inside the movable groove 7, meanwhile, the movable groove 7 plays a role of fixing the clamping ring 8 to prevent the clamping ring 8 from falling off, when the clamping ring 8 clamps a stone pile, the stone pile cannot fall off due to the driving of the stone pile, meanwhile, the movable connecting spring 9 of the clamping ring 8 is convenient to clamp in cooperation with the clamping ring 8, a fixed plate 10 is fixedly installed at the front and back ends below the vibration absorber 1, and the inner side of the fixed plate 10 is fixedly connected with the connecting spring 9, the left end and the right end of the clamping ring 8 are fixedly provided with screw holes, the front end and the rear end of each screw hole are fixedly provided with bolts 11, the outer parts of the connecting column 6 and the fixing plates 10 are movably sleeved with a sound-proof cover 12, the fixing plates 10 are in an annular sheet shape with the radius value identical to that of the connecting column 6, the front part and the rear part below the connecting column 6 are fixedly provided with two fixing plates 10, the fixing plates 10 play a role of fixing and clamping the auxiliary column, the connecting springs 9 are arranged on the inner sides of the fixing plates 10, the clamping springs 9 clamp the clamping ring 8 through the elasticity of the connecting springs, the clamping area of the clamping ring 8 is larger through the clamping ring 8, the clamping rings can be stably clamped, stone piles are prevented from falling off, meanwhile, the bolts 11 play a role of fixing and locking, the clamping ring 8 can be effectively fixed through the design of the bolts 11, the locking bolts 13 are fixedly sleeved on the upper part of the sound-proof cover 12 through the screw holes, and the connecting grooves 14 are formed in the upper part of the sound-proof cover 12, fixed cover 16 has been cup jointed in the outside activity of sound-proof housing 12 lower extreme, sound-proof board 15 has been cup jointed in the inside activity of fixed cover 16 bottom, the inside fixed mounting of grip ring 8 has stone stake 17 sound-proof housing 12's top and spliced pole 6's top to set up the screw of adaptation locking bolt 13, the external diameter value of sound-proof housing 12 is the same with the external diameter value of fixed cover 16 with the external diameter value of sound-proof board 15, sound-proof effect of making an uproar of falling is played in the cooperation of sound-proof housing 12 and sound-proof board 15, through to the source of a noise, the contact point of vibration stake hammer and stone stake carries out syllable-dividing method, noise when preventing high-frequency vibration inserts the outside, noise pollution can be effectively reduced, it is less to the environmental impact of early taste when the construction, fixed cover 16 plays the effect of auxiliary connection sound-proof board 15 and locking bolt 13.
In summary, when the vibrating pile hammer for building construction is used, after the bolts 11 are loosened, the two clamping rings 8 can be separated, the distance between the two clamping rings 8 is enlarged, then a stone pile is placed inside the clamping rings 8, the bottom of the top of the stone pile is clamped at the bottom of the clamping ring 8, then the two clamping rings 8 are closed under the pushing of the connecting springs 9 and the fixing plate 10, then the two clamping rings 8 are fixed through the bolts 11, then the device is driven to ascend through the lifting ropes 3 and the cross beam 2, so that the device drives the stone pile to be vertical to the ground, the upper portion of the sound-proof cover 12 is fixed with the connecting column 6 through the locking bolts 13, the sound-proof plate 15 is installed below the locking bolts 13, the sound-proof plate 15 is driven through the fixing sleeve 16, the vibrator 4 is started, and the vibrator 4 drives the stone pile to vibrate.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (5)
1. The utility model provides a vibratory pile hammer for construction, includes bump leveller (1), its characterized in that: a cross beam (2) is fixedly mounted above the vibration absorber (1), a lifting rope (3) is movably sleeved on the top of the cross beam (2), a vibrator (4) is fixedly connected to the bottom of the vibration absorber (1), triangular connecting blocks (5) are fixedly mounted on the left side and the right side of the vibrator (4), a connecting column (6) is fixedly connected to the bottoms of the vibrator (4) and the triangular connecting blocks (5), a movable groove (7) is clamped inside the connecting column (6), a clamping ring (8) is movably sleeved inside the movable groove (7), a fixing plate (10) is fixedly mounted on the front side and the rear side of the bottom of the vibration absorber (1), a connecting spring (9) is fixedly connected to the inner side of the fixing plate (10), screw holes are fixedly formed in the left side and the right side of the clamping ring (8), bolts (11) are fixedly mounted on the front side and the rear side of the screw holes, and a sound-insulating cover (12) is movably sleeved outside the connecting column (6) and the fixing plate (10), the top of sound-proof housing (12) has been cup jointed dead bolt of lock (13) through the screw is fixed, spread groove (14) have been seted up to the top of sound-proof housing (12), fixed cover (16) have been cup jointed in the outside activity of sound-proof housing (12) lower extreme, the inside activity of fixed cover (16) bottom has been cup jointed and has been sealed soundboard (15), the inside fixed mounting of grip ring (8) has stone stake (17).
2. The vibrohammer for building construction according to claim 1, characterized in that: the lower part of the lifting rope (3) is sleeved outside the cross beam (2) through a movable ring, and the upper part of the lifting rope (3) is fixedly connected with a crane.
3. The vibrohammer for building construction according to claim 1, characterized in that: the upper end of the movable groove (7) is a columnar groove, the lower end of the movable groove (7) is an annular groove, and the height value above the movable groove (7) is the same as that of the upper wall of the clamping ring (8).
4. The vibrohammer for building construction according to claim 1, characterized in that: the fixed plate (10) is in an annular sheet shape with the radius value being the same as that of the connecting column (6), and two fixed plates (10) are fixedly installed on the front portion and the rear portion of the lower portion of the connecting column (6).
5. The vibrohammer for building construction according to claim 1, characterized in that: screw holes matched with the locking bolts (13) are formed in the upper portion of the sound-proof cover (12) and the upper portion of the connecting column (6), and the outer diameter value of the sound-proof cover (12) is identical to that of the sound-proof plate (15) and the fixed sleeve (16).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022503263.8U CN214883643U (en) | 2020-11-03 | 2020-11-03 | Vibrating pile hammer for building construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022503263.8U CN214883643U (en) | 2020-11-03 | 2020-11-03 | Vibrating pile hammer for building construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214883643U true CN214883643U (en) | 2021-11-26 |
Family
ID=78950570
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022503263.8U Expired - Fee Related CN214883643U (en) | 2020-11-03 | 2020-11-03 | Vibrating pile hammer for building construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214883643U (en) |
-
2020
- 2020-11-03 CN CN202022503263.8U patent/CN214883643U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203007952U (en) | Concrete vibrating equipment for super-deep major-diameter cast-in-place pile | |
CN103161155A (en) | Pile machine special for immersed tube pressure filling pile, using method thereof and application thereof | |
CN214883643U (en) | Vibrating pile hammer for building construction | |
CN201109911Y (en) | Shake pile pressing machine | |
KR101000866B1 (en) | Vibro hammber | |
CN102392449A (en) | Device and method for settling concrete precast pipe pile by combined action of vibration and impact | |
CN202247888U (en) | Device for sinking concrete precast pipe pile under combined action of vibration and impact | |
CN202369992U (en) | Hydraulic vibrating pile hammer | |
CN205224038U (en) | Novel play pile pulling device | |
CN211948416U (en) | Immersed tube pile extruding machine | |
CN2284813Y (en) | Multi-functional vibrating pile driver | |
CN112281837A (en) | Pile driving device for precast pile construction | |
CN220768055U (en) | Building vibration pile hammer | |
KR20030055704A (en) | The tamping method which uses the vibrating hammer and that system | |
CN111058439B (en) | Construction method of immersed tube rock-socketed cast-in-place pile | |
CN212642646U (en) | Cover for construction of drilling bored concrete pile impactor | |
CN203334264U (en) | Static pressure rammer slant preventing rammer head | |
JP3554901B2 (en) | How to pile well | |
CN217378840U (en) | Practical small-scale vibrating rammer for foundation rammer | |
CN110306552B (en) | Method for breaking hard underwater layer | |
CN210636418U (en) | Convenient building civil engineering who removes is with device of ramming | |
CN219710297U (en) | Electric pile body clamping device of hydraulic vibrating hammer | |
CN114657987B (en) | Construction method for inserting cement soil pile into steel pipe without shock sensation | |
CN220128705U (en) | Hydraulic pick | |
CN211690377U (en) | Compaction device for backfilling pipeline groove |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211126 |