- CN214882983U CN214882983U CN202120073251.8U CN202120073251U CN214882983U CN 214882983 U CN214882983 U CN 214882983U CN 202120073251 U CN202120073251 U CN 202120073251U CN 214882983 U CN214882983 U CN 214882983U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- channel structure
- crawling
- support
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model discloses a steel pipe top access structure of crawling, it sets up on pi formula support and pylon, include: the support assembly is fixed on the upper end surface of the top of the pi-type bracket steel pipe and extends to the adjacent pi-type bracket fulcrum through the pi-type bracket connecting rod; the pedal threaded steel bars are arranged between the two adjacent groups of support assemblies at equal intervals; the protective railing is vertically arranged on the supporting component; and the protective pocket is fixed between the two adjacent groups of supporting components and is positioned below the pedal threaded steel bar. The utility model discloses can satisfy the high altitude between two pi framves and connect the construction needs.
Description
Technical Field
The utility model relates to a construction platform field. More specifically speaking, the utility model relates to a steel pipe top access structure of crawling.
Background
At present, when a large-span and large-square-quantity cable tower cross beam is constructed, the space at the lower part of a cable tower is not occupied by the pi-type support, and the steel box beam pushing can be carried out after the lower tower column is constructed, so that the method has the advantages of short construction period and low cost. When the pi-type support is used for construction, in order to meet the requirement of high-altitude connection construction between two pi-type supports, a creeping channel needs to be arranged on a pi-type support steel pipe.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a steel pipe top access structure of crawling can satisfy between two adjacent pi framves high altitude connection construction needs.
In order to realize according to the utility model discloses these objects and other advantages, a steel pipe top access structure of crawling is provided, and it sets up on pi formula support and pylon, include:
the support assembly is fixed on the upper end surface of the top of the pi-type bracket steel pipe and extends to the adjacent pi-type bracket fulcrum through the pi-type bracket connecting rod;
the pedal threaded steel bars are arranged between the two adjacent groups of support assemblies at equal intervals;
the protective railing is vertically arranged on the supporting component;
and the protective pocket is fixed between the two adjacent groups of supporting components and is positioned below the pedal threaded steel bar.
Preferably, the tower further comprises a platform structure fixed around the inner periphery of the tower column and located at the fulcrum of the pi-shaped bracket.
Preferably, the distance between adjacent treaded rebar is 30 cm.
Preferably, the protection pocket is connected with a connecting plate, and the connecting plate is connected with the collecting tank.
Preferably, both sides of the protection pocket are fixed to the support assembly by knots.
Preferably, the width of one end of the connecting plate, which is connected with the protective pocket, is gradually reduced towards the other end of the connecting plate, and the other end of the connecting plate is connected with the opening of the collecting tank.
Preferably, the guard rail comprises a plurality of upright posts arranged at equal intervals and three horizontal rods arranged at intervals along the length direction of the upright posts.
The utility model discloses at least, include following beneficial effect: four groups of pi-type supports are arranged on the tower column, the supporting assemblies are fixed on the pi-type support steel pipes, operators can climb conveniently through pedal threaded steel bars, and the requirement of high-altitude connection construction between two adjacent pi-type supports is met.
Additional advantages, objects, and features of the invention will be set forth in part in the description which follows and in part will become apparent to those having ordinary skill in the art upon examination of the following or may be learned from practice of the invention.
Drawings
FIG. 1 is a schematic view of the structure of a crawling channel on the top of a steel pipe of the present invention;
FIG. 2 is a side view of the four group of pi-shaped brackets of the present invention;
fig. 3 is a detail view of the structure of the creeping channel on the top of the steel pipe of the utility model.
Description of reference numerals: 1 steel pipe, 2 horizontal ejector pins, 3 connecting rods, 4 protection railing, 5 platform structures, 6 protection pockets, 7 connecting plates, 8 collecting grooves, 9 tower columns, 10 supporting components, 11 pedal twisted steel.
Detailed Description
The present invention is further described in detail below with reference to examples so that those skilled in the art can implement the invention with reference to the description.
In the description of the present invention, the terms "lateral", "longitudinal", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Example 1
As shown in FIGS. 1-3, a steel pipe top creeping channel structure is arranged on a pi-type support and a tower column, and comprises:
the support assembly is fixed on the upper end surface of the top of the pi-type support steel pipe, extends to an adjacent pi-type support fulcrum through a pi-type support connecting rod, and is positioned on the tower column;
the pedal threaded steel bars are arranged between the two adjacent groups of support assemblies at equal intervals;
the protective railing is vertically arranged on the supporting component; preferably, the guard rail comprises a plurality of upright posts arranged at equal intervals and three horizontal rods arranged at intervals along the length direction of the upright posts.
And the protective pocket is fixed between the two adjacent groups of supporting components and is positioned below the pedal threaded steel bar.
And the platform structure is fixed around the inner periphery of the tower column and is positioned at the branch point of the pi-type bracket.
As shown in figure 1, the pi-type bracket comprises steel pipes, horizontal ejector rods and connecting rods arranged between the steel pipes. As shown in fig. 2, four groups of pi-type supports are arranged on the tower column, the supporting assemblies are fixed on the pi-type support steel pipes, operators can climb conveniently through pedal threaded steel bars, and the requirement of high-altitude connection construction between two adjacent pi-type supports is met. In this embodiment, the pitch between adjacent treaded rebar is 30 cm.
Example 2
The difference between this embodiment and embodiment 1 is that, as shown in fig. 3, the protection bag is connected with the connecting plate, two sides of the protection bag are fixed with the supporting component through a knot, and the protection bag is preferably made of fiber cloth. One end that the connecting plate is connected with the protection pocket reduces to other end width gradually, the other end of connecting plate is connected with the opening of collecting vat, the both sides of guard plate are provided with the baffle. Through setting up the protection pocket and preventing operating personnel when the construction of crawling, article or rubble that drop take place danger, also make things convenient for the collection article.
The technical features of the above embodiments 1-2 can be combined arbitrarily, and the combined technical solutions all belong to the scope of protection of the present application. While the embodiments of the invention have been disclosed above, it is not limited to the applications listed in the description and the embodiments, which are fully applicable in all kinds of fields suitable for the invention, and further modifications may be readily made by those skilled in the art, and the invention is therefore not limited to the specific details and embodiments shown and described herein, without departing from the general concept defined by the claims and their equivalents.
Claims (7)
1. The utility model provides a steel pipe top access structure of crawling, it sets up on pi formula support and column, its characterized in that includes:
the support assembly is fixed on the upper end surface of the top of the pi-type bracket steel pipe and extends to the adjacent pi-type bracket fulcrum through the pi-type bracket connecting rod;
the pedal threaded steel bars are arranged between the two adjacent groups of support assemblies at equal intervals;
the protective railing is vertically arranged on the supporting component;
and the protective pocket is fixed between the two adjacent groups of supporting components and is positioned below the pedal threaded steel bar.
2. The steel pipe roof crawling channel structure of claim 1, further comprising a platform structure fixed around the inner circumference of the tower and located at the fulcrum of the pi-type support.
3. The steel pipe roof crawling channel structure of claim 1 or 2, wherein the distance between adjacent pedal threaded bars is 30 cm.
4. The steel pipe roof crawling channel structure of claim 1 or 2, wherein the protection pocket is connected with a connection plate, and the connection plate is connected with a collection tank.
5. The steel pipe roof crawling channel structure of claim 4, wherein two sides of the protection pocket are fixed with the support component by a knot.
6. The steel pipe roof crawling channel structure of claim 4, wherein the width of one end of the connecting plate connected with the protection pocket is gradually reduced towards the other end, and the other end of the connecting plate is connected with the opening of the collecting tank.
7. The steel pipe roof crawling channel structure of claim 1, wherein the guard rail comprises a plurality of vertical rods arranged at equal intervals and three horizontal rods arranged at intervals along the length direction of the vertical rods.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120073251.8U CN214882983U (en) | 2021-01-12 | 2021-01-12 | Steel pipe top creeping channel structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120073251.8U CN214882983U (en) | 2021-01-12 | 2021-01-12 | Steel pipe top creeping channel structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214882983U true CN214882983U (en) | 2021-11-26 |
Family
ID=78864784
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120073251.8U Active CN214882983U (en) | 2021-01-12 | 2021-01-12 | Steel pipe top creeping channel structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214882983U (en) |
-
2021
- 2021-01-12 CN CN202120073251.8U patent/CN214882983U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206071140U (en) | The full association type frame construction of transformer station | |
CN214882983U (en) | Steel pipe top creeping channel structure | |
CN218881677U (en) | Vertical surface protection device for steel structure building construction | |
CN217883275U (en) | Large-span prestressed cable truss photovoltaic support system | |
CN203430009U (en) | Construction hanging basket | |
CN214882984U (en) | Protective construction platform for pier periphery | |
CN215107213U (en) | Improved structure of vertical main frame of attached lifting scaffold | |
CN211447690U (en) | Latticed construction platform with material storage space | |
CN220122848U (en) | Photovoltaic support and photovoltaic power generation equipment | |
CN217388580U (en) | Horizontal supporting cable rod structure, photovoltaic support and photovoltaic system | |
CN220605521U (en) | Simple bracket for preventing construction cable from mopping | |
CN212029583U (en) | Water-cooled wall boiler construction mounting table | |
CN214741848U (en) | Novel wind power generation tower | |
CN218293462U (en) | Container room is with dismantling external cat ladder handrail | |
CN214658780U (en) | Climbing formwork system leading truck | |
CN218912779U (en) | Double-row crawling ladder | |
CN212611977U (en) | Protective shed frame crossing railway line | |
CN216948008U (en) | Guardrail device for roadside safety clean area | |
CN219910101U (en) | Cantilever scaffold frame layer construction face limit protection architecture that encorbelments | |
CN219672224U (en) | Safety net for high-protection-performance building construction | |
CN217027449U (en) | Assembled steel bar processing shed | |
CN212535265U (en) | Microwave tower with regular triangle structure | |
CN210178264U (en) | Novel protection cat ladder | |
CN217000485U (en) | L-shaped assembled latticed column | |
CN214033511U (en) | Rotary guardrail |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |