CN214826883U - Deep basal pit concrete conveying equipment - Google Patents

Deep basal pit concrete conveying equipment Download PDF

Info

Publication number
CN214826883U
CN214826883U CN202121488287.9U CN202121488287U CN214826883U CN 214826883 U CN214826883 U CN 214826883U CN 202121488287 U CN202121488287 U CN 202121488287U CN 214826883 U CN214826883 U CN 214826883U
Authority
CN
China
Prior art keywords
foundation pit
conveying equipment
concrete
hopper
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121488287.9U
Other languages
Chinese (zh)
Inventor
郑洲灯
郑正
方家其
苏士尊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Dejie Construction Engineering Co ltd
Original Assignee
Zhejiang Dejie Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Dejie Construction Engineering Co ltd filed Critical Zhejiang Dejie Construction Engineering Co ltd
Priority to CN202121488287.9U priority Critical patent/CN214826883U/en
Application granted granted Critical
Publication of CN214826883U publication Critical patent/CN214826883U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a deep basal pit concrete conveying equipment relates to building construction technical field. Technical scheme is a deep basal pit concrete conveying equipment, including the foundation ditch body, subaerial being fixed with outside the foundation ditch body is used for catching the hopper that connects of concrete, connect and be connected with the conveyer pipe on the hopper, the one end of conveyer pipe with connect intercommunication in the hopper, the other end extends to the bottom of the hole of foundation ditch body. This application is rational in infrastructure, can be directly with the outer concrete input of foundation ditch in, when the pump of pouring usefulness damages, application conveying equipment pours, avoids concrete placement to break.

Description

Deep basal pit concrete conveying equipment
Technical Field
The utility model relates to a construction technical field, in particular to deep basal pit concrete conveying equipment.
Background
The deep foundation pit refers to an engineering with the excavation depth of more than 5 meters (including 5 meters), or the excavation depth of less than 5 meters, but the geological conditions, the surrounding environment and the underground pipelines are particularly complex, because the foundation pit is deep, a support needs to be arranged on the wall of the foundation pit, or a concrete retaining wall needs to be poured, and concrete needs to be poured at the bottom of the foundation pit.
Conventional deep basal pit concrete placement is mostly the pumping, is mostly the sky pump or ground pump, when pumping equipment breaks down unable in time to restore, can lead to concrete placement construction to break off, and unable continuous concreting very easily arouses construction quality problems such as cold joint, fault.
Aiming at the problems, the deep foundation pit concrete conveying equipment is provided.
SUMMERY OF THE UTILITY MODEL
In order to avoid concrete placement construction when pumping equipment damages to be interrupted, the application provides a deep basal pit concrete conveying equipment.
The application provides a deep basal pit concrete conveying equipment adopts following scheme:
the utility model provides a deep basal pit concrete conveying equipment, includes the foundation ditch body, subaerial being fixed with outside the foundation ditch body is used for catching the hopper that connects of concrete, connect and be connected with the conveyer pipe on the hopper, the one end of conveyer pipe with connect intercommunication in the hopper, the other end extends to at the bottom of the hole of foundation ditch body.
Through adopting above-mentioned scheme, when pumping equipment damaged, the concrete transport vechicle can directly pour the concrete into this external hopper that connects of foundation ditch, connects the concrete rethread conveyer pipe in the hopper and carries the foundation ditch body bottom to lead to concrete placement construction to interrupt when avoiding pumping equipment to damage.
Optionally, a circle of guide rail arranged around the foundation pit body is fixed on the ground outside the foundation pit body, and the material receiving hopper is connected to the guide rail in a sliding manner.
Through adopting above-mentioned scheme, connect the hopper can adjust the position as required for the concrete conveying range of equipment is wider.
Optionally, the conveyer pipe includes the flexible section of rigidity setting to and the flexible hose section of flexibility setting, the one end fixed connection of flexible section in connect the hopper, the one end of hose section connect in flexible section deviates from connect the one end of hopper.
Through adopting above-mentioned scheme, flexible section makes the conveying range of conveyer pipe wider, and the hose section makes the output position of conveyer pipe can adjust more in a flexible way.
Optionally, the telescopic section is in threaded connection with the material receiving hopper, and the flexible pipe section is in flanged connection with the telescopic section.
By adopting the scheme, the telescopic section and the hose section are convenient to mount and dismount.
Optionally, a control valve is arranged at one end of the flexible pipe section, which is far away from the telescopic section.
By adopting the scheme, the control valve can control whether the concrete is output or not.
Optionally, the outer wall of the telescopic section is further fixedly connected with a support frame, a waist beam is arranged on the inner wall of the foundation pit body, and the support frame is supported on the waist beam.
Through adopting above-mentioned scheme, the support frame plays the supporting role to the conveyer pipe, strengthens the bearing strength of conveyer pipe.
Optionally, a support wheel is fixed on the support frame, and the support wheel is supported on the wale.
Through adopting above-mentioned scheme, when connecing the hopper to remove, the conveyer pipe takes place thereupon to remove, so the support frame also need follow to remove just can keep supporting, sets up the supporting wheel for the support frame removes on the waist rail better.
Optionally, the supporting wheels are universal wheels, the waist rail is provided with a guide groove, and the supporting wheels are limited in the guide groove.
Through adopting above-mentioned scheme, the guide way plays the spacing effect of direction to the supporting wheel, avoids the carriage to break away from the waist rail in the removal process.
In summary, the present application has the following beneficial effects:
1. when the pumping equipment is damaged, the concrete transported by the concrete transport vehicle outside the foundation pit can be directly transported to the bottom of the foundation pit, so that the concrete pouring construction is prevented from being interrupted;
2. connect the hopper can remove to the peripheral each position of foundation ditch body, pour the wide range.
Drawings
Fig. 1 is a schematic view of the overall structure of the embodiment.
Reference numerals: 1. a foundation pit body; 2. a receiving hopper; 3. a delivery pipe; 4. a guide rail; 5. a telescopic section; 6. a hose section; 7. a control valve; 8. a support frame; 9. a wale; 10. a support wheel; 11. a guide groove.
Detailed Description
The present application is described in further detail below with reference to fig. 1.
The embodiment of the utility model discloses deep basal pit concrete conveying equipment, as shown in figure 1, including foundation ditch body 1, foundation ditch body 1 wholly is cylindrically in this embodiment, before concrete placement, foundation ditch body 1 has dug, and fixed hopper 2 that connects that is used for catching the concrete on the bottom surface outside foundation ditch body 1, the bottom position that connects hopper 2 is connected with the conveyer pipe 3 of carrying the concrete in the directional foundation ditch body 1, conveyer pipe 3 with connect the inside intercommunication of hopper 2 and extend to the bottom of foundation ditch body 1. When the upper pump or the ground pump for pouring concrete is damaged and cannot work, the concrete transport vehicle is arranged outside the foundation pit body 1, the concrete transport vehicle directly pours concrete into the material receiving hopper 2, the concrete poured into the material receiving hopper 2 is conveyed into the foundation pit body 1 through the conveying pipe 3 to be poured, and the concrete pouring construction interruption is effectively avoided.
The foundation pit is characterized in that a circle of guide rail 4 arranged around the foundation pit body 1 is further arranged outside the foundation pit body, the guide rail 4 can be directly fixed on the ground through long screws, and can also be fixed on a retaining wall of the foundation pit body 1, fixing modes are various, and actual selection is carried out.
Connect hopper 2 sliding connection on guide rail 4, more specifically say, rotate on connecing hopper 2 and be connected with the wheel, wheel support and roll connection on guide rail 4, connect hopper 2 and take conveyer pipe 3 together to remove the in-process, and the scope that conveyer pipe 3 covered at the removal in-process is wide for the pouring scope of concrete is wider.
Conveyer pipe 3 is including being flexible section 5 of rigidity setting to and being flexible hose section 6 of setting, flexible section 5 be the steel pipe, and hose section 6 is the plastic tubing. The thick pipe end of flexible section 5 with connect 2 threaded connection of hopper, the tubule end of flexible section 5 and the one end flange joint of hose section 6, and hose section 6 deviates from the one end of flexible section 5 and is provided with control flap 7, whether control flap 7 come the discharge of control concrete, avoid the concrete constantly discharge and pour on need not the position of pouring.
In the process of carrying the concrete, the atress of flexible section 5 is great, so still fixed support frame 8 on the outer wall of flexible section 5 in order to support flexible section 5, on the inner wall of foundation ditch body 1, poured waist rail 9 in advance, support frame 8 supports on waist rail 9 in order to support flexible section 5.
At flexible section 5 along with the in-process that connects hopper 2 to remove, support frame 8 needs remove thereupon, so can be directly with support frame 8 fixed connection on connecing hopper 2 to, installation fixed stay wheel 10 on support frame 8, support wheel 10 is the universal wheel, and support frame 8 supports on waist rail 9 through support wheel 10, thereby avoids support frame 8 to block on waist rail 9 along with connecing butt when hopper 2 removes. In addition, a guide groove 11 is further formed in the wale 9, and the supporting wheels 10 are supported on the wale 9 in the guide groove 11, so that the supporting wheels 10 are effectively prevented from being separated from the wale 9 in the moving process of the supporting frame 8.
The present embodiment is only for explaining the present application, and it is not limited to the present application, and those skilled in the art can make modifications of the present embodiment without inventive contribution as needed after reading the present specification, but all of them are protected by patent law within the scope of the claims of the present application.

Claims (8)

1. The utility model provides a deep basal pit concrete conveying equipment, includes foundation ditch body (1), its characterized in that: the concrete foundation pit is characterized in that a receiving hopper (2) used for receiving concrete is fixed on the ground outside the foundation pit body (1), a conveying pipe (3) is connected to the receiving hopper (2), one end of the conveying pipe (3) is communicated with the receiving hopper (2), and the other end of the conveying pipe extends to the bottom of the foundation pit body (1).
2. The deep foundation pit concrete conveying equipment of claim 1, wherein: the ground outside the foundation pit body (1) is fixed with a circle of guide rail (4) surrounding the foundation pit body (1), and the receiving hopper (2) is connected on the guide rail (4) in a sliding manner.
3. The deep foundation pit concrete conveying equipment of claim 1, wherein: conveyer pipe (3) are including flexible section (5) that the rigidity set up to and flexible hose section (6) that set up, the one end fixed connection of flexible section (5) in connect hopper (2), the one end of hose section (6) connect in flexible section (5) deviate from connect the one end of hopper (2).
4. The deep foundation pit concrete conveying equipment of claim 3, wherein: the telescopic section (5) is in threaded connection with the material receiving hopper (2), and the hose section (6) is in flange connection with the telescopic section (5).
5. The deep foundation pit concrete conveying equipment of claim 4, wherein: and a control valve (7) is arranged at one end of the hose section (6) deviating from the telescopic section (5).
6. The deep foundation pit concrete conveying equipment of claim 5, wherein: the outer wall of the telescopic section (5) is fixedly connected with a support frame (8), a waist beam (9) is arranged on the inner wall of the foundation pit body (1), and the support frame (8) is supported on the waist beam (9).
7. The deep foundation pit concrete conveying equipment of claim 6, wherein: and a supporting wheel (10) is fixedly arranged on the supporting frame (8), and the supporting wheel (10) is supported on the waist beam (9).
8. The deep foundation pit concrete conveying equipment of claim 7, wherein: the supporting wheels (10) are universal wheels, guide grooves (11) are formed in the waist beam (9), and the supporting wheels (10) are limited in the guide grooves (11).
CN202121488287.9U 2021-07-01 2021-07-01 Deep basal pit concrete conveying equipment Active CN214826883U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121488287.9U CN214826883U (en) 2021-07-01 2021-07-01 Deep basal pit concrete conveying equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121488287.9U CN214826883U (en) 2021-07-01 2021-07-01 Deep basal pit concrete conveying equipment

Publications (1)

Publication Number Publication Date
CN214826883U true CN214826883U (en) 2021-11-23

Family

ID=78811999

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121488287.9U Active CN214826883U (en) 2021-07-01 2021-07-01 Deep basal pit concrete conveying equipment

Country Status (1)

Country Link
CN (1) CN214826883U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115434325A (en) * 2022-09-28 2022-12-06 中国电建集团河南工程有限公司 Material guide device for construction of foundation pit retaining wall of power transmission line and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115434325A (en) * 2022-09-28 2022-12-06 中国电建集团河南工程有限公司 Material guide device for construction of foundation pit retaining wall of power transmission line and construction method

Similar Documents

Publication Publication Date Title
CN101982688B (en) Construction system of large-aperture long-distance steel jacking pipe
CN104089089B (en) Pressure backfill type elasticity pipe laying method of construction
CN110454223B (en) Reverse slope TBM tunneling tunnel drainage construction method
CN104989873B (en) Penstock oblique-pulling inversion assembling method
CN214826883U (en) Deep basal pit concrete conveying equipment
CN106594388A (en) Pipe working platform and method for laying pipes by applying pipe working platform
CN110864162B (en) Construction process of argillaceous sandstone geological pipe jacking
CN207621488U (en) Adjustable limited support auxiliary device
CN111173528A (en) Large-diameter long-interval tunnel shield construction method for water-rich sandy gravel stratum
CN105736012A (en) Concrete grouting device for tunnel lining
CN105442610A (en) Feed device of distributing machine
CN112228088A (en) Construction method of vertical shaft starting device for top-down pipe jacking construction in shield tunnel
CN105863673B (en) Pusher fuselage can return to formula pipe jacking construction method and constructing structure
CN104534168B (en) A kind of deep pipeline burying machine
CN114634130B (en) Device and method for transporting, adjusting and installing flexible plastic pipeline in circular-section tunnel
CN207093920U (en) A kind of reinforced concrete pipiline installs positioning stablity structure
CN206347202U (en) Pipeline work platform
CN114754194A (en) Storage tank top pipe installation device and construction method thereof
CN212297912U (en) Reinforcing structure for outlet of pipe jacking receiving well
CN113417291B (en) Concrete pouring process for deep foundation pit
CN204663574U (en) The portable dewatering installation of roadway
CN208441846U (en) A kind of vertical shaft shield machine constructed upwards by underground
CN210141370U (en) Adjustable support of steel pipe for pipe jacking construction
JP2575940B2 (en) Conduit construction method
CN111910731A (en) Construction method of urban drainage underground culvert sinking groove

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant