CN214826515U - Device is changed to long distance belt conveyor conveyer belt - Google Patents

Device is changed to long distance belt conveyor conveyer belt Download PDF

Info

Publication number
CN214826515U
CN214826515U CN202121000514.9U CN202121000514U CN214826515U CN 214826515 U CN214826515 U CN 214826515U CN 202121000514 U CN202121000514 U CN 202121000514U CN 214826515 U CN214826515 U CN 214826515U
Authority
CN
China
Prior art keywords
belt
frame
conveyer belt
new
conveyer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121000514.9U
Other languages
Chinese (zh)
Inventor
赵辉
顾先铭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Zizhao Equipment Co ltd
Original Assignee
Shaanxi Zizhao Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Zizhao Equipment Co ltd filed Critical Shaanxi Zizhao Equipment Co ltd
Priority to CN202121000514.9U priority Critical patent/CN214826515U/en
Application granted granted Critical
Publication of CN214826515U publication Critical patent/CN214826515U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Belt Conveyors (AREA)
  • Heating, Cooling, Or Curing Plastics Or The Like In General (AREA)
  • Structure Of Belt Conveyors (AREA)

Abstract

The utility model provides a device is changed to long distance belt conveyor conveyer belt, including the perpendicular taut mouth that hangs down on the conveyer, be provided with the vulcanization platform of bonding conveyer belt in the below of perpendicular taut mouth, the outside of vulcanizing the platform is provided with the frame, and the next door of frame is provided with new conveyer belt support, is provided with take-up device below the frame, is provided with the spool on the take-up device. The device has solved present new and old conveyer belt and has changed complicacy, changes slow problem, once only changes new conveyer belt, retrieves old conveyer belt to direct vulcanization bonds, has practiced thrift the change time, still uses manpower sparingly simultaneously, has reduced workman's intensity of labour.

Description

Device is changed to long distance belt conveyor conveyer belt
Technical Field
The utility model belongs to the technical field of belt conveyor, it relates to a device is changed to long distance belt conveyor conveyer belt specifically to say so.
Background
In the mining industry, belt conveyors are common mechanical equipment, and conveyor belts on the conveyors need to be replaced after a year of use. The common method adopted on site at present is to hoist a new conveying belt to a vertical tensioning port of a conveyor and place the conveying belt on a rotating frame, wherein the working surface of the conveying belt is close to the ground. And the winch is fixed 20 meters away from the new belt. And cutting off the old conveyer belt 15m below the vertical tensioning port, and pulling out the broken end of the conveyer belt. The broken end of the old conveyer belt is firmly connected with the new conveyer belt by a belt clip, the other broken end is pulled by a steel wire rope of the winding machine, the steel wire rope is slowly wound until the old conveyer belt is tightened, the steel wire rope is continuously wound by the winding machine, the old conveyer belt is pulled off, and meanwhile, the new conveyer belt is also installed on the conveyer. Then, the two ends of the new conveyor belt are fixed by clips and are ready for vulcanization. The method is labor-consuming and time-consuming, and the old conveying belt coil depends on manpower, so that the working strength is high. The method has the advantages of consuming a large amount of manpower and material resources, having low efficiency, often causing long downtime of the conveyor, influencing production and being difficult to meet the requirements of high-strength and rapid modern production.
Disclosure of Invention
In order to overcome the defects existing in the prior art, the utility model provides a device is changed to long distance belt conveyor conveyer belt.
The utility model discloses a realize through following technical scheme: the utility model provides a long distance belt conveyor conveyer belt changes device, includes the perpendicular taut mouth that draws on the conveyer, is provided with the vulcanization platform of bonding conveyer belt in the below of perpendicular taut mouth, and the outside of vulcanization platform is provided with the frame, and the next door of frame is provided with new conveyer belt support, is provided with take-up device below the frame, is provided with the spool on the take-up device.
In the above scheme, a vulcanizer is arranged on the vulcanizing platform, and the upper working surface of the vulcanizer is flush with the upper top surface of the frame.
In the scheme, the frame is provided with two fixed clamping devices which are respectively arranged at the front side and the rear side of the vulcanizer.
In the above scheme, the frame is further provided with a pumping belt device, and when the conveying belt is wound, the conveying belt is wound on a reel of the belt winding device through the pumping belt device.
In the above scheme, the frame is further provided with a plurality of mutually parallel direction-changing rollers.
The utility model relates to a device is changed to long distance belt conveyor conveyer belt compares with prior art, and its beneficial effect is:
1. the device solves the problems of complex replacement and slow replacement of the existing new and old conveyer belts, and the device can replace the new conveyer belt at one time, recover the old conveyer belt, and directly vulcanize and bond the old conveyer belt without auxiliary equipment such as a guide chain and a winch.
2. The device changes the conveyer belt efficiently, has practiced thrift the change time, still uses manpower sparingly simultaneously, has reduced workman's intensity of labour.
Drawings
Fig. 1 is a schematic structural view of the device for replacing the conveying belt of the long-distance belt conveyor of the present invention.
Figure 2 is an enlarged view of member 12 of figure 1.
In the figure: 1. the device comprises a conveyor, 2 parts of an old conveying belt, 3 parts of a clamp, 4 parts of a new conveying belt, 5 parts of a new conveying belt bracket, 6 parts of a pumping belt device, 7 parts of a reel, 8 parts of a belt winding device, 9 parts of a fixed clamping device, 10 parts of a vulcanizing platform, 11 parts of a vulcanizer, 12 parts of a frame, 13 parts of a direction-changing roller and 14 parts of a vertical pulling and tightening opening.
Detailed Description
The device for replacing the conveying belt of the long-distance belt conveyor according to the present invention will be further described with reference to the accompanying drawings and specific embodiments:
fig. 1 is a schematic structural view of a belt changer of a long-distance belt conveyor according to the present invention, and fig. 2 is an enlarged view of a member 12 in fig. 1. In the figure, the long-distance belt conveyor conveying belt replacing device comprises a vertical tensioning port 14 on a conveyor 1, a vulcanization platform 10 for bonding a conveying belt interface is arranged below the vertical tensioning port 14, a frame 12 is arranged on the outer side of the vulcanization platform 10, a new conveying belt support 5 is arranged beside the frame 12, a belt winding device 8 is arranged below the frame 12, a winding shaft 7 is arranged on the belt winding device, and the belt winding device 8 can rotate by 90 degrees. The vulcanizing platform 10 is provided with a vulcanizer 11, the upper working surface of the vulcanizer is flush with the upper top surface of the frame, and the vulcanizer 11 is used for bonding two interfaces of the conveying belt. The frame 12 is provided with two fixed clamping devices 9, the two fixed clamping devices 9 are respectively arranged at the front side and the rear side of the vulcanizer 11, and the two fixed clamping devices 9 are used for clamping and fixing the conveying belt when two interfaces of a new conveying belt are required to be vulcanized and bonded. The frame 12 is further provided with a pumping belt device 6, and when the old conveyor belt 2 is wound up, the old conveyor belt 2 is wound up on a reel 7 of the winding device through the pumping belt device 6. Four direction-changing rollers 13 are respectively arranged at the front end, the rear end and the middle part of the frame 12, and the direction-changing rollers 13 are parallel to each other.
When the old conveyer belt is replaced, the new conveyer belt 4 is hoisted to the new conveyer belt bracket 5 below the vertical tightening opening 14, the old conveyer belt is cut off at a position 15 meters below the vertical tightening opening 14, one broken end of the old conveyer belt is pulled out, the old conveyer belt bypasses the pumping belt device 6 and is wound on a reel 7 of a belt winding device 8, the other broken end of the old conveyer belt and the joint of the new conveyer belt are firmly connected by a clamp 3, and the pumping belt device 6 is operated, so that the end of the old conveyer belt is smoothly connected to a rotating shaft 7 of the belt winding device. The belt winding device 8 is opened to wind out the old conveyor belt 2 and the new conveyor belt is also taken up on the conveyor 1. When the new conveying belt reaches the use length, the joint reserved length is reserved, the new conveying belt is disconnected, the belt coiling device 8 is operated to rotate 90 degrees, and the old conveying belt is coiled out. Then the two joints of the two new conveyor belts are respectively wound around the redirection rollers 13 and lapped on the vulcanizer 11, and the joints of the conveyor belts are clamped by the fixed clamping device 9 for vulcanization lapping. And after the vulcanization lapping of the new conveying belt is finished, tensioning again and putting into use.
The device has solved present new and old conveyer belt and has changed complicacy, changes slow problem, once only changes new conveyer belt, retrieves old conveyer belt to direct vulcanization bonds, has practiced thrift the change time, still uses manpower sparingly simultaneously, has reduced workman's intensity of labour.
The above description is only a preferred embodiment of the present invention, and the present invention is not limited to the above description, and although the present invention has been disclosed with reference to the preferred embodiment, it is not limited to the present invention, and any skilled person in the art can make various changes or modifications equivalent to the above embodiments without departing from the scope of the present invention, but all the modifications, changes and modifications of the above embodiments by the technical spirit of the present invention are within the scope of the present invention.

Claims (5)

1. The utility model provides a long distance belt conveyor conveyer belt changes device, includes the perpendicular tight mouth that draws that hangs down on the conveyer, its characterized in that: a vulcanizing platform for bonding the conveyer belt is arranged below the vertical tensioning port, a frame is arranged on the outer side of the vulcanizing platform, a new conveyer belt support is arranged beside the frame, a belt winding device is arranged below the frame, and a reel is arranged on the belt winding device.
2. The long-reach belt conveyor belt changer of claim 1, wherein: the vulcanizing platform is provided with a vulcanizer, and the upper working surface of the vulcanizer is flush with the upper top surface of the frame.
3. The long-reach belt conveyor belt changer of claim 1, wherein: the frame is provided with two fixed clamping devices which are respectively arranged at the front side and the rear side of the vulcanizer.
4. The long-reach belt conveyor belt changer of claim 1, wherein: the frame is also provided with a pumping belt device, and when the conveying belt is wound, the conveying belt is wound on a reel of the belt winding device through the pumping belt device.
5. The long-reach belt conveyor belt changer of claim 1, wherein: the frame is also provided with a plurality of mutually parallel direction-changing rollers.
CN202121000514.9U 2021-05-11 2021-05-11 Device is changed to long distance belt conveyor conveyer belt Active CN214826515U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121000514.9U CN214826515U (en) 2021-05-11 2021-05-11 Device is changed to long distance belt conveyor conveyer belt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121000514.9U CN214826515U (en) 2021-05-11 2021-05-11 Device is changed to long distance belt conveyor conveyer belt

Publications (1)

Publication Number Publication Date
CN214826515U true CN214826515U (en) 2021-11-23

Family

ID=78773326

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121000514.9U Active CN214826515U (en) 2021-05-11 2021-05-11 Device is changed to long distance belt conveyor conveyer belt

Country Status (1)

Country Link
CN (1) CN214826515U (en)

Similar Documents

Publication Publication Date Title
IT201900001841A1 (en) CABLE RECOVERY MACHINE
CN104590812B (en) Tape replacing machine for replacing belt type conveyor adhesive tape
CN201148278Y (en) Hydraulic belt winding apparatus
CN104909112A (en) Fast replacement process for long-distance steel cord belt
CN112320212A (en) Mechanized continuous quick belt replacing device and process for main inclined shaft belt conveyor
CN101934915A (en) Method for replacing rubber belt by long-distance steel cord rubber belt conveyor
CN101948054A (en) Method for changing long rubber belt of large wide belt of belt conveyer
CN113021699A (en) Method for quickly replacing adhesive tape of long-distance large-bandwidth mining belt conveyor for ten million-ton mine
CN108974772A (en) A kind of method of the main tunnel rubber belt conveyor replacement adhesive tape in underground
IT201900001845A1 (en) CABLE RECOVERY MACHINE
US4416329A (en) Oil well setup and pumping apparatus
CN111605968A (en) Belt replacing method and belt replacing device for belt conveyor
CN103465010A (en) Method for integrally replacing bucket type conveying belt of converter
CN214826515U (en) Device is changed to long distance belt conveyor conveyer belt
CN105904716A (en) Short fiber film cutting and splicing machine
CN111300525A (en) High-efficient nylon tube cutting device
CN206358764U (en) A kind of storage belting for continuous conveyor system
CN205346440U (en) Coiling machine is cut to infantees
CN116513873A (en) Traction system and method for quick replacement of flexible conveying belt of belt conveyor
CN216804504U (en) Cord fabric belt cutting production line
CN217126776U (en) Belt replacing device of belt conveyor for conveying raw coal above silo
CN204416307U (en) For changing the tape swapping machine of conveyor belt running
CN114537994A (en) Device and method for quickly replacing belt
KR100980813B1 (en) Splicer for both overlap joint and butt joint of carcass
CN203545236U (en) Full automatic winding machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant