CN214786287U - Structure is built in interim room in quick detachable building site - Google Patents
Structure is built in interim room in quick detachable building site Download PDFInfo
- Publication number
- CN214786287U CN214786287U CN202120407068.7U CN202120407068U CN214786287U CN 214786287 U CN214786287 U CN 214786287U CN 202120407068 U CN202120407068 U CN 202120407068U CN 214786287 U CN214786287 U CN 214786287U
- Authority
- CN
- China
- Prior art keywords
- plate
- roof
- wall
- hole
- wallboard
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model relates to a structure is built in interim room in quick detachable building site relates to building structure's field, including bottom plate, roof, wallboard includes first wallboard, the second wallboard that the subtend set up, the top edge of first wallboard rotates and is connected with the shingle, the shingle is the steel sheet material and can bends, the middle part of shingle is equipped with crease in advance, crease extends along the straight line in advance, the length direction of crease is parallel with the top edge line of first wallboard in advance, the tip that first wallboard was kept away from to the shingle is equipped with the stay cord, the top of second wallboard is equipped with the trompil that supplies the stay cord to pass. When the building structure is built, personnel can complete the installation of the roof slab without the help of hoisting equipment, the building structure is convenient, and the installed roof slab is stable enough; all parts can be range upon range of before the installation, convenient transportation.
Description
Technical Field
The application relates to building structure's field especially relates to a structure is built in quick detachable building site temporary room.
Background
The structure is built in interim room is multi-purpose to the building site, compares in travelling comfort, steadiness, and the performance of dismantling of structure is important consideration is built in interim room.
The patent of the utility model discloses a chinese utility model patent of No. CN2386118Y of granting discloses a modular light-duty convenient room, including wallboard, door and window and roof, each part such as roof, door and window, wallboard is the prefab, and the roof has metal crate and inlays the strengthening rib of metal keel, and wallboard, door and window adopt two plywood structures and have the metal to bordure, and each part is inserted the combination with wall body column and wall roof beam all around with having metal slot. This make things convenient for room adopts combination placeable formula structure, and each part of the roof, door and window, the wallboard all around of making things convenient for the room is the prefab, and all parts are placeable the combination with wall body surrounding column and wall roof beam that have the metal slot, make things convenient for the roof of room to adopt the ship shape cover body similar with the tile face roof, and cover body lower extreme even has the eave.
To the correlation technique among the above-mentioned, the inventor thinks when this temporary house is built to the outdoor, because roof liftoff is higher, then the installation degree of difficulty of roof is great, often needs hoisting equipment cooperation to install the roof, and is comparatively inconvenient.
SUMMERY OF THE UTILITY MODEL
In order to facilitate the installation of shingle, the application provides a structure is built in temporary room in quick detachable building site.
The application provides a pair of structure is built in quick detachable building site temporary room adopts following technical scheme:
the utility model provides a structure is built in interim room in quick detachable building site, includes bottom plate, roof, wallboard include first wallboard, the second wallboard that the subtend set up, the top edge of first wallboard rotates and is connected with the shingle, the shingle is the steel sheet material and can bends, the middle part of shingle is equipped with crease in advance, crease in advance extends along the straight line, the length direction of crease in advance is parallel with the top edge line of first wallboard, the tip that first wallboard was kept away from to the shingle is equipped with the stay cord, the top of second wallboard is equipped with the hand-hole that supplies the stay cord to pass.
By adopting the technical scheme, the roof plate is connected with the top edge of the first wall plate in advance, a room is formed after the bottom plate, the top plate and the wall plate are installed during installation, then the pull rope penetrates through the pull hole, a person pulls the pull rope, the pull rope turns over the roof plate to the top plate through pulling force, and the roof plate is bent around the pre-folding mark in a self-adaptive manner by tensioning the pull rope; the roof panel is restrained on the second wall panel by the restraining action of the pull rope. Then the personnel twine the stay cord and fix in arbitrary object, accomplish the installation fixed of shingle. When the structure is built in the building, people do not need to complete the installation of the roof plate by means of hoisting equipment, the building is convenient, and the installed roof plate is stable enough.
Optionally, the roof plate comprises a fixing block arranged on the bottom surface, the fixing block is located at a position close to the second wall plate, and the end of the pull rope is connected to the fixing block; the second wallboard includes the supporting part that extends along the horizontal direction, the supporting part is located to the trompil, fixed block, supporting part pass through the lateral wall butt.
Through adopting above-mentioned technical scheme, the stay cord passes the trompil and is taut back, and the roof board passes through the supporting part of fixed block butt second wallboard, and the supporting part can form firm support to fixed block, roof board.
Optionally, the roof panel has an edge adjacent the second wall panel that is at a lower elevation than the top of the second wall panel.
Through adopting above-mentioned technical scheme, when raining, the rainwater on the shingle is difficult for getting into in the room through second wallboard top.
Optionally, a first hinge block is fixed to the top of the first wall plate, a second hinge block is fixed to the bottom wall of the roof plate, the first hinge block and the second hinge block are rotatably connected through a hinge shaft penetrating through the first hinge block and the second hinge block, and the length direction of the hinge shaft is parallel to the edge line of the top of the first wall plate.
Through adopting above-mentioned technical scheme, the rotation is established through articulated mode to roof board and first wallboard and is connected, and the articulated shaft can carry out the dismouting with articulated piece one, articulated piece two, takes out the back when the articulated shaft from articulated piece one, articulated piece two, and first wallboard can separate with the roof board, transports after making things convenient for both piles.
Optionally, the roof panel has an edge adjacent the first wall panel that is at a lower elevation than the top of the first wall panel.
Through adopting above-mentioned technical scheme, when raining, the rainwater on the shingle is difficult for getting into in the room through first wallboard top.
Optionally, a fixing rod for winding the pull rope is arranged on the second wall plate.
Through adopting above-mentioned technical scheme, the dead lever is used for supplying the stay cord winding specially, makes things convenient for the lower extreme of stay cord to fix.
Optionally, the top plate is provided with a through hole, a support rod penetrates through the through hole, the support rod and the top plate are fixed through a bolt, the support rod and the top plate can be disassembled and assembled, the support rod extends upwards to the roof plate, and the top end of the support rod abuts against the bottom surface of the roof plate.
Through adopting above-mentioned technical scheme, the roof board installation is accomplished the back, and personnel upwards pass the through-hole with the bracing piece from the room, with the fixed back of bracing piece lower extreme and roof, bracing piece upper end butt the middle part bottom surface of roof board just, and the bracing piece provides the support for the roof board, improves the resistance to compression, the anti deformability of roof board.
Optionally, a sealing sleeve is fixed in the through hole, the sealing sleeve establishes sealing with the hole wall of the through hole, the support rod penetrates through a sleeve hole of the sealing sleeve, and the sealing sleeve abuts against a circumferential side wall of the support rod.
By adopting the technical scheme, the sealing sleeve establishes sealing between the supporting rod and the top plate, and accumulated water on the top surface of the top plate is not easy to permeate into a room at the supporting rod.
In summary, the present application includes at least one of the following beneficial technical effects:
1. when the building structure is built, personnel can complete the installation of the roof slab without the help of hoisting equipment, so that the building structure is convenient;
2. the installed roof panel is sufficiently stable;
3. all parts can be range upon range of before the installation, convenient transportation.
Drawings
Fig. 1 is a perspective view of an easily detachable temporary housing structure of a construction site according to an embodiment.
Fig. 2 is a sectional view taken along line a-a of fig. 1.
FIG. 3 is a schematic illustration of an installation process of an embodiment.
Description of reference numerals: 1. a base plate; 2. a top plate; 3. a roof deck; 41. a first wall panel; 42. a second wall panel; 31. pre-creasing; 411. a first hinge block; 32. a second hinge block; 5. hinging a shaft; 33. a fixed block; 421. a support portion; 422. hole drawing; 34. pulling a rope; 412. positioning a first groove; 423. positioning a second groove; 424. fixing the rod; 21. a through hole; 22. sealing sleeves; 6. a support rod.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses structure is built in quick detachable building site temporary room. Referring to fig. 1 and 2, the temporary housing construction structure of the easy-to-detach construction site comprises a bottom plate 1, a top plate 2, wall plates and a roof plate 3, wherein the wall plates are four in total, the wall plates comprise a first wall plate 41 and a second wall plate 42 which are oppositely arranged, the top plate 2, the bottom plate 1 and the four wall plates are combined to form a rectangular room structure, the top plate 2 serves as a ceiling of a room, and the bottom plate 1 serves as a floor of the room. The surface of the roof plate 3 is inclined, the roof plate 3 is positioned above the top plate 2 to be used as a roof, and the top surface of the roof plate 3 is used for dredging rain and snow.
Referring to fig. 2 and 3, the roof panel 3 is a rectangular stainless steel plate, the middle of the roof panel 3 is provided with a pre-folding mark 31, the pre-folding mark 31 extends along a straight line, and the roof panel 3 can be folded at the pre-folding mark 31. The roof plate 3 is bent so that the tip of the formed V-shape is directed vertically upwards.
The first wall plate 41 is rotatably connected with the roof plate 3 through the top, and the concrete structure is as follows: the top of the first wall plate 41 is fixed with a first hinge block 411, the bottom wall of the roof plate 3 is fixed with a second hinge block 32, and the first hinge block 411 and the second hinge block 32 are rotatably connected through a hinge shaft 5 penetrating between the two. The second hinge block 32 is located adjacent the lower edge of the roof panel 3, and the edge of the roof panel 3 adjacent the first wall panel 41 is at a lower elevation than the top of the first wall panel 41. The hinge shaft 5 has a longitudinal direction parallel to the top edge line of the first wall plate 41, and the pre-crease 31 has a longitudinal direction parallel to the top edge line of the first wall plate 41. The hinge shaft 5 can be disassembled and assembled with the first hinge block 411 and the second hinge block 32, and when the hinge shaft 5 is removed from the first hinge block 411 and the second hinge block 32, the first wall plate 41 can be separated from the roof plate 3, so that the two roof plates can be conveniently stacked and then transported.
The roof plate 3 comprises a fixing block 33 arranged on the bottom surface, the fixing block 33 is arranged on the bottom surface of the roof plate 3 far away from the first wall plate 41, the fixing block 33 is close to the second wall plate 42, and the bottom surface of the fixing block 33 is a plane. The second wall plate 42 includes a support portion 421 at the top, the support portion 421 is integrally fixed with the second wall plate 42, the top surface of the support portion 421 extends along the horizontal direction, the support portion 421 is used for abutting against the bottom surface of the fixing block 33, and the edge of the roof plate 3 close to the second wall plate 42 is lower than the top of the second wall plate 42. The supporting portion 421 is provided with a through hole 422 along the vertical direction, the lower end of the hole 422 is located in the room, and the hole 422 is provided with a plurality of holes along the length direction of the second wall plate 42.
The bottom surface of the fixed block 33 is fixed with the pull rope 34, the pull rope 34 is fixed with the fixed block 33 through one end, the pull rope 34 is used for penetrating through the pull hole 422, and the number and the position of the pull rope 34 correspond to the pull hole 422 one by one. The fixing rod 424 for winding the pulling rope 34 is fixed on the second wall plate 42, and the fixing rod 424 is positioned on the surface of the second wall plate 42 facing the first wall plate 41.
The top of first wallboard 41 is equipped with constant head tank 412, and the top of second wallboard 42 is equipped with constant head tank two 423, and the notch of constant head tank one 412, constant head tank two 423 is vertical upwards just to each other along the horizontal direction, and constant head tank one 412, constant head tank two 423 are used for supplying the back of the body both sides edge of roof 2 to imbed respectively and form the location, make roof 2 installation firm. The positioning groove two 423 is located on one side of the supporting portion 421 facing the first wall plate 41, and the top plate 2 does not block the supporting portion 421 and the pull hole 422.
The middle part of the top plate 2 is also provided with a through hole 21, the through hole 21 penetrates through two plate surfaces of the top plate 2, and the through hole 21 is provided with a plurality of through holes at intervals along the extending direction of the pre-folding mark 31. A sealing sleeve 22 made of rubber is fixed in the through hole 21, the sealing sleeve 22 is cylindrical, the sealing sleeve 22 is fixed with the hole wall of the through hole 21 and establishes sealing, the support rod 6 penetrates through the sealing sleeve 22, and the sealing sleeve 22 abuts against the circumferential side wall of the support rod 6 and establishes sealing with the support rod 6. The lower end of the support rod 6 is fixed on the bottom wall of the top plate 2 through a bolt, the upper end of the support rod 6 extends upwards along the vertical direction and abuts against the bottom surface of the roof plate 3, and the support rod 6 supports the middle bottom surface of the roof plate 3.
The implementation principle of the structure is built in quick detachable building site temporary room of this application embodiment does: before the structure installation is built in this room, roof board 3 is the flat board state, and each panel alternate segregation and range upon range of setting are convenient for transport. During installation, the hinge shaft 5 penetrates through the holes of the first hinge block 411 and the second hinge block 32 to enable the first wall plate 41 and the roof plate 3 to be hinged, and then the bottom plate 1, the top plate 2 and the wall plate are installed in a bolt and sealant coating mode respectively to form a room.
The pull rope 34 penetrates through the pull hole 422 in the process of installing a room, after the room is installed, a person pulls the pull rope 34 in the room, the pull rope 34 turns the roof plate 3 to the top plate 2 through pulling force, and the roof plate 3 is bent around the pre-folding mark 31 in a self-adaptive mode by tensioning the pull rope 34, so that the fixing block 33 is attached to the top surface of the supporting portion 421; the fixing block 33 is not separated from the supporting portion 421 by the stopper action of the pulling rope 34. The person then winds the pull cord 34 around the fixing rod 424 to complete the installation and fixing of the roof panel 3. Finally, the support rod 6 penetrates the sealing sleeve 22 upwards from the room, the lower end of the support rod 6 is fixed with the top plate 2, and the upper end of the support rod 6 is just abutted to the bottom surface of the middle of the roof plate 3, so that the compression resistance and the deformation resistance of the roof plate 3 are improved. The sealing sleeve 22 establishes sealing between the support rod 6 and the top plate 2, and accumulated water on the top surface of the top plate 2 is not easy to permeate into a room at the support rod 6.
To sum up, when building this house and building the structure, personnel need not can accomplish the installation of shingle 3 with the help of hoisting equipment, and is comparatively convenient, and shingle 3 after the installation is enough firm.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.
Claims (8)
1. The utility model provides a structure is built in interim room in quick detachable building site, includes bottom plate (1), roof (2), wallboard, its characterized in that: the wall plates comprise a first wall plate (41) and a second wall plate (42) which are oppositely arranged, the top edge of the first wall plate (41) is rotatably connected with a roof plate (3), the roof plate (3) is made of steel plates and can be bent, a pre-folding line (31) is arranged in the middle of the roof plate (3), the pre-folding line (31) extends along a straight line, the length direction of the pre-folding line (31) is parallel to the top edge line of the first wall plate (41), a pull rope (34) is arranged at the end part, far away from the first wall plate (41), of the roof plate (3), and a pull hole (422) for the pull rope (34) to pass through is formed in the top of the second wall plate (42).
2. The temporary housing structure of easy-to-disassemble construction site according to claim 1, wherein: the roof plate (3) comprises a fixed block (33) arranged on the bottom surface, the fixed block (33) is positioned close to the second wall plate (42), and the end part of the pull rope (34) is connected with the fixed block (33); the second wall plate (42) comprises a supporting portion (421) extending along the horizontal direction, the pulling hole (422) is formed in the supporting portion (421), and the fixing block (33) and the supporting portion (421) are abutted through side walls.
3. The temporary housing structure of easy-to-disassemble construction site according to claim 2, wherein: the roof panel (3) has an edge adjacent the second wall panel (42) that is at a lower elevation than the top of the second wall panel (42).
4. The temporary housing structure of easy-to-disassemble construction site according to claim 1, wherein: the top of the first wall plate (41) is fixed with a first hinge block (411), the bottom wall of the roof plate (3) is fixed with a second hinge block (32), the first hinge block (411) and the second hinge block (32) are rotatably connected through a hinge shaft (5) penetrating between the first hinge block and the second hinge block, and the length direction of the hinge shaft (5) is parallel to the top edge line of the first wall plate (41).
5. The temporary housing structure of easy-to-disassemble construction site according to claim 4, wherein: the roof panel (3) has an edge adjacent the first wall panel (41) that is at a lower elevation than the top of the first wall panel (41).
6. The temporary housing structure of easy-to-disassemble construction site according to claim 1, wherein: the second wall plate (42) is provided with a fixing rod (424) for winding the pull rope (34).
7. The temporary housing structure of easy-to-disassemble construction site according to claim 1, wherein: the roof plate (2) is provided with a through hole (21), a support rod (6) penetrates through the through hole (21), the support rod (6) is fixed with the roof plate (2) through a bolt, the support rod (6) can be disassembled and assembled with the roof plate (2), the support rod (6) upwards extends to the position of the roof plate (3), and the top end of the support rod (6) is abutted to the bottom surface of the roof plate (3).
8. The temporary housing structure of easy-to-disassemble construction site according to claim 7, wherein: the supporting rod is characterized in that a sealing sleeve (22) is fixed in the through hole (21), the sealing sleeve (22) is sealed with the hole wall of the through hole (21), the supporting rod (6) penetrates through a sleeve hole of the sealing sleeve (22), and the sealing sleeve (22) abuts against the circumferential side wall of the supporting rod (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120407068.7U CN214786287U (en) | 2021-02-23 | 2021-02-23 | Structure is built in interim room in quick detachable building site |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120407068.7U CN214786287U (en) | 2021-02-23 | 2021-02-23 | Structure is built in interim room in quick detachable building site |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214786287U true CN214786287U (en) | 2021-11-19 |
Family
ID=78754226
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120407068.7U Active CN214786287U (en) | 2021-02-23 | 2021-02-23 | Structure is built in interim room in quick detachable building site |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214786287U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113958010A (en) * | 2021-11-23 | 2022-01-21 | 山东工艺美术学院 | Wall body jointing equipment for indoor design of fabricated building |
CN114961346A (en) * | 2022-07-01 | 2022-08-30 | 中基华工程管理集团有限公司 | Quick-mounting type temporary workshop |
-
2021
- 2021-02-23 CN CN202120407068.7U patent/CN214786287U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113958010A (en) * | 2021-11-23 | 2022-01-21 | 山东工艺美术学院 | Wall body jointing equipment for indoor design of fabricated building |
CN114961346A (en) * | 2022-07-01 | 2022-08-30 | 中基华工程管理集团有限公司 | Quick-mounting type temporary workshop |
CN114961346B (en) * | 2022-07-01 | 2024-03-12 | 中基华工程管理集团有限公司 | Quick-mounting type temporary building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7832151B2 (en) | Prefabricated building structure with collapsible roof sections | |
CN214786287U (en) | Structure is built in interim room in quick detachable building site | |
US8286391B2 (en) | Portable building | |
US7086209B1 (en) | Method for constructing a building and resulting building | |
KR100234841B1 (en) | Connector means for roof panels and a method for installation thereof | |
US5161345A (en) | Method and apparatus for supporting and erecting trusses and other building frame assemblies | |
WO2016037038A1 (en) | Modular building system | |
US20130232886A1 (en) | Static compression building | |
US9487271B2 (en) | Modular boat lift cover | |
US3979862A (en) | Building structure | |
WO2012012688A1 (en) | Building system and method | |
US7325362B1 (en) | Steel roof truss system | |
CN109797863B (en) | Structure is built in quick detachable interim room | |
US20170284081A1 (en) | Gable assembly for use with a modular watercraft lift cover | |
AU2011250683A1 (en) | Method and apparatus for movement of objects between spaced-apart locations | |
US8727759B1 (en) | Fully integrated structural building system | |
US6223476B1 (en) | Retractable ceiling assembly | |
US20070068112A1 (en) | Extruded aluminum building materials | |
JPH06288097A (en) | Foldable all-weather shelter | |
CN115787844A (en) | Simple assembly type building capable of converting forms | |
US3842550A (en) | Air supported metal roof and method of raising and lowering | |
CN1195385A (en) | Three point roof | |
JP2001123673A (en) | Seismic reinforcing method for building and reinforcing apparatus used therefor | |
CN2545279Y (en) | Color steel sandwich plate movable dwellings | |
CN215368700U (en) | Cast-in-place transverse slip form device for reinforced concrete sloping roof panel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |