CN214784178U - Utility tunnel convenient to piping erection - Google Patents
Utility tunnel convenient to piping erection Download PDFInfo
- Publication number
- CN214784178U CN214784178U CN202121184362.2U CN202121184362U CN214784178U CN 214784178 U CN214784178 U CN 214784178U CN 202121184362 U CN202121184362 U CN 202121184362U CN 214784178 U CN214784178 U CN 214784178U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- plate
- column
- utility tunnel
- piping erection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model belongs to the utility model relates to an underground comprehensive pipe gallery field, in particular to an underground comprehensive pipe gallery convenient to pipeline installation, which comprises a bolt post, wherein a support post is fixedly connected below the bolt post, a limiting groove is fixedly connected below the left side of the support post, a groove is fixedly connected in the middle of the limiting groove, a hook mechanism is fixedly connected on the right side of the groove, the hook mechanism comprises a fixed plate, an oblique rod, an arc-shaped plate and a connecting plate, and the oblique rod is fixedly connected above the fixed plate; through the structural design of key post, pillar, restriction groove, recess, couple mechanism, placement mechanism, outstanding post and joint layer, it is faster to have realized the butt joint, improves operating speed and efficiency, and inside placement mechanism can carry out high lift adjustment's function, has solved original installation fast inadequately, connects inseparably enough, leads to the problem of inside junction seepage, has improved the efficiency of operation use, improves the suitability of erection tube simultaneously.
Description
Technical Field
The utility model relates to an underground pipe gallery field specifically is an underground pipe gallery convenient to piping erection.
Background
The utility tunnel is built underground in the city for concentrate on laying the public tunnel of municipal pipeline such as electric power, communication, radio and television, feedwater, the utility tunnel can effectively stop "zip fastener road" phenomenon, lets technical staff need not to excavate the road surface repeatedly, just can salvage, maintain, dilatation transformation etc. all kinds of pipelines in the piping lane, reduces the pipeline time of salvageing simultaneously greatly.
Place the pipeline among the tray of top through inside rack when operating, can carry out height control through inside hydraulic means, make things convenient for the operator to place the pipeline fast, can carry out height control according to the demand to in the improvement operation installation rate and efficiency.
The existing comprehensive pipe gallery is inconvenient to install, when the operation is carried out, the butt joint of the two sides of the pipe gallery is not tight enough, and meanwhile, the internal components cannot be adjusted according to the use requirement, so that the internal pipeline cannot improve the installation speed;
therefore, the utility tunnel convenient to pipe installation is proposed to the above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
In order to remedy prior art's not enough, solve utility tunnel and be not convenient for install, when operating, the butt joint of pipe gallery both sides is inseparable enough, and inside part can not adjust according to the user demand simultaneously, leads to the unable problem that improves the installation rate of inside pipeline, the utility model provides a utility tunnel convenient to pipe installation.
The utility model provides a technical scheme that its technical problem adopted is: a utility tunnel convenient to pipeline installation, including the embolus, the below fixedly connected with pillar of embolus, the left side below fixedly connected with restriction groove of pillar, the middle part fixedly connected with recess of restriction groove, the right side fixedly connected with couple mechanism of recess, couple mechanism includes fixed plate, down tube, arc and connecting plate, the top fixedly connected with down tube of fixed plate, the top fixedly connected with arc of down tube, the top fixedly connected with connecting plate of arc, the below fixedly connected with placement machine of couple mechanism constructs.
The placing mechanism comprises a bearing plate, a bottom column, an extension rod, a hydraulic pump, a fixing screw and a reinforcing plate, the bottom column is fixedly connected below the bearing plate, the extension rod is fixedly connected below the bottom column, the hydraulic pump is fixedly connected below the extension rod, the fixing screw is fixedly connected below the hydraulic pump, the reinforcing plate is fixedly connected below the fixing screw, the right side of the placing mechanism is fixedly connected with a shell, the middle part of the shell is fixedly connected with a protruding column, the inner part of the protruding column is fixedly connected with an anti-corrosion plate, the inner part of the anti-corrosion plate is fixedly connected with a clamping layer, and the inner part of the clamping layer is fixedly connected with a sealing layer. Inside mechanism of placing can carry out high lift adjustment's function, has solved original installation fast inadequately, connects inseparably enough, leads to the problem of inside junction seepage, has improved the efficiency of operation use, improves the suitability of installation pipeline simultaneously.
Preferably, the studs and the support columns are connected through welding, the support columns are symmetrical with the central axis of the limiting groove, external equipment can be conveniently connected through the support columns, and damage to internal components can be avoided.
Preferably, couple mechanism is symmetrical between the axis with the recess, and the quantity of couple mechanism is a plurality of, docks through the recess, makes and to dock the installation fast between the piping lane.
Preferably, be connected through the welding between fixed plate and the down tube, and constitute the angle of forty-five degrees between down tube and the arc, through the angle that fixed plate and down tube formed, improve bearing weight, it is more stable when placing the pipeline.
Preferably, bear and be connected through the block between board and the foundation, and constitute elevation structure between foundation and the extension rod, place the large-scale pipeline through bearing the board, the cooperation extension rod is high going up and down, improves the operation practicality.
Preferably, be connected through the welding between hydraulic pump and the reinforcing plate, and closely laminate between the upper surface of reinforcing plate and the lower surface of fixed screw, carry out the fixed of bottom through the reinforcing plate, the cooperation fixed screw improves installation operating speed.
Preferably, coincide mutually between the axis of casing and outstanding post, and identical between the inside dimension of outstanding post and the anticorrosive board external dimension, dock through outstanding post, make the piping lane junction inseparabler, the leakproofness is stronger.
Preferably, be connected through the block between clamping layer and the sealing layer, and coincide mutually between the axis of clamping layer and sealing layer, connect through inside clamping layer, improve inside intensity, cooperate the sealing layer to make inside structure compacter.
The utility model discloses an useful part lies in:
1. the utility model discloses a stud, pillar, restriction groove, recess, couple mechanism, placement mechanism, outstanding post and the structural design of clamping layer, realized that the butt joint is faster, improve operating speed and efficiency, the placement mechanism of inside can carry out the function of high lift adjustment, solved original installation fast inadequately, connect inseparably enough, lead to the problem of inside junction seepage, improved the efficiency of operation use, improve the suitability of installation pipeline simultaneously;
2. the utility model discloses a structural design of fixed plate, down tube, arc, connecting rod, bearing plate, foundation and extension rod has realized strengthening the function of the inside weight of bearing the pipeline, has solved original bearing capacity and has been big enough, and inside can not carry out the problem of adjusting according to the user demand of pipeline, has improved the adaptability of installation operation.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without inventive exercise.
FIG. 1 is a schematic view of a front view of the full-section structure of the present invention;
fig. 2 is a schematic view of the structure of the present invention;
FIG. 3 is an enlarged view of the hook mechanism structure of the present invention;
FIG. 4 is an enlarged view of the placement mechanism of the present invention;
fig. 5 is a structural anatomy diagram at B in fig. 1 according to the present invention.
In the figure: 1. a stud; 2. a pillar; 3. a limiting groove; 4. a groove; 5. a hooking mechanism; 501. a fixing plate; 502. a diagonal bar; 503. an arc-shaped plate; 504. a connecting plate; 6. a placement mechanism; 601. a bearing plate; 602. a bottom pillar; 603. an extension rod; 604. a hydraulic pump; 605. fixing screws; 606. a reinforcing plate; 7. a housing; 8. a protruding post; 9. an anti-corrosion plate; 10. a clamping layer; 11. and (7) sealing the layer.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
Please refer to fig. 1-5, an utility tunnel convenient to pipeline installation, including the key 1, the below fixedly connected with pillar 2 of key 1, the left side below fixedly connected with restriction groove 3 of pillar 2, the middle part fixedly connected with recess 4 of restriction groove 3, the right side fixedly connected with couple mechanism 5 of recess 4, couple mechanism 5 includes fixed plate 501, down tube 502, arc 503 and connecting plate 504, the top fixedly connected with down tube 502 of fixed plate 501, the top fixedly connected with arc 503 of down tube 502, the top fixedly connected with connecting plate 504 of arc 503, the below fixedly connected with placement mechanism 6 of couple mechanism 5.
The placing mechanism 6 comprises a bearing plate 601, a bottom column 602, an extension rod 603, a hydraulic pump 604, a fixing screw 605 and a reinforcing plate 606, the lower part of the bearing plate 601 is fixedly connected with the bottom column 602, the lower part of the bottom column 602 is fixedly connected with the extension rod 603, the lower part of the extension rod 603 is fixedly connected with the hydraulic pump 604, the lower part of the hydraulic pump 604 is fixedly connected with the fixing screw 605, the lower part of the fixing screw 605 is fixedly connected with the reinforcing plate 606, the right side of the placing mechanism 6 is fixedly connected with a shell 7, the middle part of the shell 7 is fixedly connected with a protruding column 8, the inner part of the protruding column 8 is fixedly connected with an anti-corrosion plate 9, the inner part of the anti-corrosion plate 9 is fixedly connected with a clamping layer 10, and the inner part of the clamping layer 10 is fixedly connected with a sealing layer 11; in operation, the utility model discloses a studded column 1, pillar 2, restriction groove 3, recess 4, couple mechanism 5, placement mechanism 6, the structural design of outstanding post 8 and clamping layer 10, it is faster to have realized the butt joint, improve operating speed and efficiency, inside placement mechanism 6 can carry out high lift adjustment's function, it is not fast enough to have solved original installation, connect inseparably enough, lead to the problem of inside junction seepage, the efficiency of operation use has been improved, the suitability of installing the pipeline is improved simultaneously.
The studs 1 are connected with the struts 2 through welding, and the struts 2 are symmetrical by the central axes of the limiting grooves 3; during operation, the strut 2 is convenient for external equipment to be connected, and the damage to internal components can be avoided.
The hook mechanisms 5 are symmetrical among the central axes of the grooves 4, and the number of the hook mechanisms 5 is multiple; during operation, dock through recess 4, make and can dock the installation fast between the piping lane.
The fixing plate 501 is connected with the oblique rod 502 through welding, and a forty-five degree angle is formed between the oblique rod 502 and the arc-shaped plate 503; during operation, through the angle that fixed plate 501 and down tube 502 formed, improve bearing weight, it is more stable when placing the pipeline.
The bearing plate 601 is connected with the bottom column 602 through clamping, and a lifting structure is formed between the bottom column 602 and the extension rod 603; during operation, place the large-scale pipeline through bearing board 601, the cooperation extension rod 603 is high goes up and down, improves the operation practicality.
The hydraulic pump 604 is connected with the reinforcing plate 606 by welding, and the upper surface of the reinforcing plate 606 is tightly attached to the lower surface of the fixing screw 605; during operation, the reinforcing plate 606 is used for fixing the bottom, and the mounting operation speed is increased by matching with the fixing screw 605.
The central axes of the shell 7 and the protruding column 8 are overlapped, and the inner dimension of the protruding column 8 is matched with the outer dimension of the anti-corrosion plate 9; during operation, dock through outstanding post 8, make the piping lane junction inseparabler, the leakproofness is stronger.
The clamping layer 10 is connected with the sealing layer 11 through clamping, and the central axes of the clamping layer 10 and the sealing layer 11 are overlapped; during operation, the connection is carried out through the clamping layer 10 inside, the strength of the inside is improved, and the sealing layer 11 is matched to enable the structure of the inside to be more compact.
The theory of operation carries out fixed mounting through inside couple mechanism 5, carries out fixed connection with inside connecting plate 504 to outside casing 7 simultaneously, carries out the adjustment of angle through the down tube 502 that will connect, then docks with arc 503, then fixes the mechanism 6 of placing of bottom, after fixed the completion, places the tubule in arc 503 top, places the thick pipe in the board 601 top that bears, then docks recess 4 and outstanding post 8, can operate the completion.
In the description herein, references to the description of "one embodiment," "an example," "a specific example," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention.
Claims (8)
1. The utility model provides an utility tunnel convenient to piping erection, its characterized in that: the hook mechanism comprises a bolt (1), a support column (2) is fixedly connected to the lower portion of the bolt (1), a limiting groove (3) is fixedly connected to the lower portion of the left side of the support column (2), a groove (4) is fixedly connected to the middle of the limiting groove (3), a hook mechanism (5) is fixedly connected to the right side of the groove (4), the hook mechanism (5) comprises a fixing plate (501), an inclined rod (502), an arc-shaped plate (503) and a connecting plate (504), the inclined rod (502) is fixedly connected to the upper portion of the fixing plate (501), the arc-shaped plate (503) is fixedly connected to the upper portion of the inclined rod (502), the connecting plate (504) is fixedly connected to the upper portion of the arc-shaped plate (503), and a placing mechanism (6) is fixedly connected to the lower portion of the hook mechanism (5);
the placing mechanism (6) comprises a bearing plate (601), a bottom column (602), an extension rod (603), a hydraulic pump (604), a fixing screw (605) and a reinforcing plate (606), wherein the bottom column (602) is fixedly connected to the lower part of the bearing plate (601), the extension rod (603) is fixedly connected to the lower part of the bottom column (602), the hydraulic pump (604) is fixedly connected to the lower part of the extension rod (603), the fixing screw (605) is fixedly connected to the lower part of the hydraulic pump (604), the reinforcing plate (606) is fixedly connected to the lower part of the fixing screw (605), a shell (7) is fixedly connected to the right side of the placing mechanism (6), a protruding column (8) is fixedly connected to the middle part of the shell (7), an anti-corrosion plate (9) is fixedly connected to the inner part of the protruding column (8), and a clamping layer (10) is fixedly connected to the inner part of the anti-corrosion plate (9), and the inside of the clamping layer (10) is fixedly connected with a sealing layer (11).
2. The utility tunnel convenient to piping erection of claim 1, characterized in that: the bolt column (1) is connected with the support column (2) through welding, and the support column (2) is symmetrical with the central axis of the limiting groove (3).
3. The utility tunnel convenient to piping erection of claim 1, characterized in that: the hook mechanisms (5) are symmetrical between the central axes of the grooves (4), and the hook mechanisms (5) are multiple in number.
4. The utility tunnel convenient to piping erection of claim 1, characterized in that: the fixing plate (501) is connected with the inclined rod (502) through welding, and a forty-five-degree angle is formed between the inclined rod (502) and the arc-shaped plate (503).
5. The utility tunnel convenient to piping erection of claim 1, characterized in that: the bearing plate (601) is connected with the bottom column (602) through clamping, and a lifting structure is formed between the bottom column (602) and the extension rod (603).
6. The utility tunnel convenient to piping erection of claim 1, characterized in that: the hydraulic pump (604) is connected with the reinforcing plate (606) through welding, and the upper surface of the reinforcing plate (606) is tightly attached to the lower surface of the fixing screw (605).
7. The utility tunnel convenient to piping erection of claim 1, characterized in that: the shell (7) is overlapped with the central axis of the protruding column (8), and the inner size of the protruding column (8) is matched with the outer size of the anti-corrosion plate (9).
8. The utility tunnel convenient to piping erection of claim 1, characterized in that: the clamping layer (10) is connected with the sealing layer (11) through clamping, and the clamping layer (10) and the middle axis of the sealing layer (11) are overlapped.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121184362.2U CN214784178U (en) | 2021-05-28 | 2021-05-28 | Utility tunnel convenient to piping erection |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121184362.2U CN214784178U (en) | 2021-05-28 | 2021-05-28 | Utility tunnel convenient to piping erection |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214784178U true CN214784178U (en) | 2021-11-19 |
Family
ID=78698990
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121184362.2U Active CN214784178U (en) | 2021-05-28 | 2021-05-28 | Utility tunnel convenient to piping erection |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214784178U (en) |
-
2021
- 2021-05-28 CN CN202121184362.2U patent/CN214784178U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN214784178U (en) | Utility tunnel convenient to piping erection | |
CN210006884U (en) | multifunctional roof antenna supporting device with self-counterweight and anti-overturning functions | |
CN214883695U (en) | Foundation pit supporting and reinforcing device convenient to disassemble and assemble | |
CN110468870A (en) | One kind can have enough to meet the need Tower Crane Foundation by Steel Lattice Column structure | |
CN211500011U (en) | Stay wire construction hole clamp for four-angle steel combined iron tower | |
CN210857276U (en) | Piping lane chamfer template braced system | |
CN203905008U (en) | Diagonal brace supporting structure for superior angle of foundation pit | |
CN214776238U (en) | Utility tunnel removes frame convenient to remove | |
CN216586662U (en) | Utility tunnel that leakproofness is high | |
CN210263093U (en) | Highway bridge construction cofferdam device | |
CN208174603U (en) | A kind of stud location device of solar photovoltaic assembly bracket | |
CN219678357U (en) | Photovoltaic bracket | |
CN207314327U (en) | One kind building building built pile | |
CN213805484U (en) | Assembled underground pipe gallery for municipal administration | |
CN218061609U (en) | Repairing and reinforcing device for power transmission iron tower | |
CN215522272U (en) | Engineering building installing support easy to operate | |
CN213390530U (en) | Assembled reinforced concrete post and reinforced concrete roof beam connection structure | |
CN205857260U (en) | A kind of Road Bridge Pile Foundation bracing means | |
CN221989550U (en) | Bolt net rack reinforcing base | |
CN219118855U (en) | Reinforcement device for basement roof returning | |
CN210195040U (en) | Safety protection structure for building engineering | |
CN213929759U (en) | Novel PVC double-layer axial hollow wall pipe | |
CN201074419Y (en) | Combinatorial structure pylon of angle steel and round tube | |
CN217352553U (en) | Cofferdam reinforced structure for water conservancy construction | |
CN221321882U (en) | Civil engineering building structure reinforcing apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |