CN214781643U - Temporary ash discharging device of primary dry quenching dust remover - Google Patents

Temporary ash discharging device of primary dry quenching dust remover Download PDF

Info

Publication number
CN214781643U
CN214781643U CN202120165261.4U CN202120165261U CN214781643U CN 214781643 U CN214781643 U CN 214781643U CN 202120165261 U CN202120165261 U CN 202120165261U CN 214781643 U CN214781643 U CN 214781643U
Authority
CN
China
Prior art keywords
ash
ash discharge
dry quenching
pipe
dust remover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120165261.4U
Other languages
Chinese (zh)
Inventor
李春燕
卢培山
王晓峻
骆春嘉
赵磊
刘子虎
马有冬
王英杰
杜杰
李月英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baotou Iron and Steel Group Co Ltd
Original Assignee
Baotou Iron and Steel Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baotou Iron and Steel Group Co Ltd filed Critical Baotou Iron and Steel Group Co Ltd
Priority to CN202120165261.4U priority Critical patent/CN214781643U/en
Application granted granted Critical
Publication of CN214781643U publication Critical patent/CN214781643U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Coke Industry (AREA)

Abstract

The utility model discloses an interim dust discharging device of dust remover of dry quenching coke sets up the ash chute in the manhole door department from the two trouble chutes in water-cooling jacket pipe upper portion, the ash chute lower extreme is connected the ash discharge funnel, the ash discharge pipe is connected to ash discharge funnel lower extreme, the lower extreme of ash discharge pipe extends to by enclosing the burnt powder device that the fender circle becomes, and one of them encloses and is provided with the drain pipe on keeping off, the one end of drain pipe is located the burnt powder device that encloses that the retaining ring becomes, and the other end is used for connecting the water source. The utility model aims at providing a temporary ash discharge device of a coke dry quenching primary dust remover, which solves the difficult problem that the primary dust remover can not normally discharge ash but can not stop production for maintenance and replacement due to special reasons such as brick falling of the primary dust remover caused by a retaining wall; the phenomenon that the service life of the furnace tube and the normal production of the coke dry quenching are influenced because part of coke powder enters a boiler system to scour the furnace tube when the ash is not discharged in time due to special reasons such as retaining walls and brick dropping of a primary dust remover.

Description

Temporary ash discharging device of primary dry quenching dust remover
Technical Field
The utility model relates to a coking industry dry quenching field especially relates to a dust remover interim ash discharging device of dry quenching.
Background
At present, steel-coated coal coking division companies have 5 sets of dry quenching devices, a new area has 2 sets of dry quenching devices, and the processing capacity is 200 t/h; 3 sets of dry quenching devices are arranged in an old area, the processing capacity is 125t/h, each set of dry quenching device is provided with 1 set of primary dust remover device, and each set of primary dust remover in a new area is respectively provided with 2 water cooling sleeves; each set of primary dust remover in the old area is provided with 4 water-cooling sleeves and corresponding ash discharge valves.
The temporary ash discharging device of the primary coke dry quenching dust remover mainly aims at the phenomenon that the primary coke remover cannot normally discharge ash but cannot stop production for maintenance and replacement due to the special reasons such as brick falling caused by a primary coke remover retaining wall in the daily production of the coke dry quenching, breaks through the mode that the production must be stopped for maintenance and replacement in the past, realizes on-site manual periodic ash discharging of the primary coke remover, meets the ash discharging requirement of the primary coke remover in normal production, prevents the phenomenon that the production is stopped or large-particle coke powder is carried into a boiler due to the abnormal ash discharging of the primary coke remover, causes serious abrasion to a boiler pipe, seriously influences the normal production of the coke dry quenching and the service life of the boiler, has the hidden trouble of pipe explosion of the boiler, and causes unnecessary loss.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a temporary ash discharge device of a coke dry quenching primary dust remover, which solves the difficult problem that the primary dust remover can not normally discharge ash but can not stop production for maintenance and replacement due to special reasons such as brick falling of the primary dust remover caused by a retaining wall; the phenomenon that the service life of the furnace tube and the normal production of the coke dry quenching are influenced because part of coke powder enters a boiler system to scour the furnace tube when the ash is not discharged in time due to special reasons such as retaining walls and brick dropping of a primary dust remover.
In order to solve the technical problem, the utility model adopts the following technical scheme:
the utility model provides an interim ash discharging device of dust remover of dry quenching, sets up the ash discharge chute in the manhole door department from the two trouble chutes in water-cooling jacket pipe upper portion, the ash discharge funnel is connected to ash discharge chute lower extreme, the ash discharge pipe is connected to ash discharge funnel lower extreme, the lower extreme of ash discharge pipe extends to by enclosing the fine coke device that the fender circle becomes, and one of them encloses to be provided with the drain pipe on keeping off, the one end of drain pipe is located the fine coke device that encloses that the retaining ring becomes, and the other end is used for connecting the water source.
Furthermore, a drain valve is arranged on the drain pipe.
Furthermore, one of the enclosing barriers is hinged and detachably connected with the two adjacent enclosing barriers to serve as an openable and closable door, so that the enclosing barriers are opened periodically and the coke powder is pulled and transported periodically.
Furthermore, one end of the water discharge pipe, which is positioned in the coke powder device formed by the enclosing check ring, is connected with a spray head.
Furthermore, the water discharge pipes are arranged in all the enclosure barriers except the enclosure barrier serving as the door in an interpenetration mode, wherein the tail end of each water pipe is a closed end, and the head end of each water pipe is used for being connected with a water source; and the inner side walls of all the enclosing barriers except the enclosing barrier serving as the door are provided with drainage spray heads communicated with the drainage pipe.
Compared with the prior art, the utility model discloses a beneficial technological effect:
add the drain pipe and cool off for exhaust red ash, the red ash of discharging the scene is patrolled and examined and is in time sprayed through the water pipe, and the cooling of cooling down in time is obtained to guaranteeing the red ash of discharge to the preparation encloses the fender temporarily and carries out the fixed point to the burnt powder after the discharge cooling and deposit, prevents that burnt powder is excessive and pollutes all ring edge border sanitation. And then the maintenance personnel carry out regular hauling on the coke powder by using a forklift. The ash is discharged manually on site in an ash discharge mode after 1DC transformation, the using effect is good, 1DC normal ash discharge can be completely met, and the problem that the normal ash discharge of dry quenching is influenced by special reasons such as brick falling of a 1DC retaining wall is solved.
The device has the advantages of unique innovativeness, such as simple manufacture and installation, convenient use, good use effect and the like. The problem of because of the special reasons such as the barricade takes place to fall the brick phenomenon because of a dust remover leads to a dust remover can not normally arrange the ash, but can't stop production and overhaul the change is solved.
Drawings
The present invention will be further explained with reference to the following description of the drawings.
FIG. 1 is a front view of a temporary ash discharge device of a coke dry quenching primary dust collector of the utility model;
description of reference numerals: 1. a manhole door; 2. a double-fork chute; 3. ash discharge chute; 4. an ash discharge funnel; 5. an ash discharge pipe; 6. fencing; 7. and a water discharge pipe.
Detailed Description
As shown in figure 1, the temporary ash discharging device of the primary dust remover for dry quenching is characterized in that an ash discharging chute 3 is arranged at a manhole door 1 of a double-fork chute 2 arranged at the upper part of a water-cooling sleeve, an ash discharging funnel 4 is connected to the lower end of the ash discharging chute 3, an ash discharging 5 pipe is connected to the lower end of the ash discharging funnel 4, the lower end of the ash discharging pipe 5 extends to a coke powder device enclosed by a baffle 6, a drain pipe 7 is arranged on the baffle 6, one end of the drain pipe 7 is located in the coke powder device enclosed by the baffle 6, and the other end of the drain pipe is used for connecting a water source.
And a drain valve is arranged on the drain pipe 7.
In one embodiment, one of the enclosing barriers 6 is hinged and detachably connected with two adjacent enclosing barriers 6 respectively to be used as an openable and closable door, so that the enclosing barriers 6 are opened periodically to carry the coke powder in a pulling mode.
In one embodiment, one end of the water discharge pipe, which is positioned in the coke powder device formed by the enclosing ring, is connected with a spray head.
In another embodiment, the water discharge pipes 7 are arranged in sequence in all the other enclosures 6 (which are built by bricks) except for the enclosure (which is a baffle, such as a steel plate, etc.) of the door, wherein the tail end of the water pipe 7 is a closed end, and the head end is used for connecting a water source; and the inner side walls of all the barriers 6 except the barriers 6 serving as the doors are provided with drainage nozzles communicated with the drainage pipe 7.
Manual and manual ash discharge is carried out regularly, bricks are found to fall off and are timely removed clearly, a manual ash discharge plan is formulated to carry out ash discharge regularly, and normal ash discharge of 1DC is guaranteed. Near ash discharge chute connects a root water pipe and cools down for the red ash of exhaust, and the preparation encloses the fender temporarily and deposits the fixed point to the burnt powder after the discharge cooling, carries out the hauling to the burnt powder regularly. Solves the problem that the normal ash discharge of the coke dry quenching is influenced by special reasons such as brick falling of a 1DC retaining wall and the like.
The above-mentioned embodiments are only intended to describe the preferred embodiments of the present invention, but not to limit the scope of the present invention, and those skilled in the art should also be able to make various modifications and improvements to the technical solution of the present invention without departing from the spirit of the present invention, and all such modifications and improvements are intended to fall within the scope of the present invention as defined in the appended claims.

Claims (5)

1. The utility model provides an interim dust discharging device of dust remover of dry quenching, its characterized in that sets up the ash discharge chute in the manhole door department from the two trouble chutes in water-cooling jacket pipe upper portion, the ash discharge funnel is connected to ash discharge chute lower extreme, the ash discharge pipe is connected to ash discharge funnel lower extreme, the lower extreme of ash discharge pipe extends to by enclosing the fine coke device that the fender circle becomes, and one of them encloses to be provided with the drain pipe on keeping off, the one end of drain pipe is located the fine coke device that encloses the retaining ring and becomes, and the other end is used for connecting the water source.
2. The temporary ash discharge device of a dry quenching primary dust collector as claimed in claim 1, wherein a drain valve is provided on the drain pipe.
3. The temporary ash discharger of a dry quenching primary dust collector as claimed in claim 1, wherein one of the barriers is hinged and detachably connected to two adjacent barriers as an openable and closable door, respectively, so that the barrier is periodically opened to periodically carry out the hauling of the coke powder.
4. The temporary ash discharge device of the coke dry quenching primary dust collector as claimed in claim 1, wherein one end of the drain pipe positioned in the circling coke powder device is connected with a spray nozzle.
5. The temporary ash discharge device of a dry quenching primary dust collector as claimed in claim 3, wherein the water discharge pipes are arranged in sequence in all the enclosures except for the enclosure of the door in an interpenetration manner, wherein the tail end of the water pipe is a closed end, and the head end of the water pipe is used for connecting a water source; and the inner side walls of all the enclosing barriers except the enclosing barrier serving as the door are provided with drainage spray heads communicated with the drainage pipe.
CN202120165261.4U 2021-01-21 2021-01-21 Temporary ash discharging device of primary dry quenching dust remover Active CN214781643U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120165261.4U CN214781643U (en) 2021-01-21 2021-01-21 Temporary ash discharging device of primary dry quenching dust remover

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120165261.4U CN214781643U (en) 2021-01-21 2021-01-21 Temporary ash discharging device of primary dry quenching dust remover

Publications (1)

Publication Number Publication Date
CN214781643U true CN214781643U (en) 2021-11-19

Family

ID=78748867

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120165261.4U Active CN214781643U (en) 2021-01-21 2021-01-21 Temporary ash discharging device of primary dry quenching dust remover

Country Status (1)

Country Link
CN (1) CN214781643U (en)

Similar Documents

Publication Publication Date Title
CN210117386U (en) Steel slag thermal crushing and waste heat recovery device
CN214781643U (en) Temporary ash discharging device of primary dry quenching dust remover
CN114606352A (en) Environment-friendly ironmaking slag treatment system
CN213656760U (en) Rotary furnace
CN211284423U (en) Movable slag trap device under converter
CN114410857A (en) Electric furnace slag granulation treatment device and treatment process thereof
CN218665900U (en) Device for online cleaning retaining wall collapsed bricks of primary dry quenching dust remover
CN115627176A (en) Method and device for online cleaning retaining wall collapsed bricks of coke dry quenching primary dust remover
CN217635688U (en) Automatic ash discharging equipment for water-cooled fire grate
CN211713013U (en) Put out stove furnace roof water seal arrangement futilely
CN214991314U (en) Material conveying device of coke loading platform
CN109084595A (en) A kind of smelting furnace cleaner
CN110591736A (en) Online replacement method for dry quenching primary dust removal water-cooling sleeve by adopting auxiliary device
CN211003565U (en) Coke pusher scraper conveyor
CN215782534U (en) Novel active burnt discharge device that collects
CN220317911U (en) Clean slag discharging system
CN219239574U (en) Automatic dust discharging device of dry quenching dust removing pipeline
CN213739543U (en) Closed dust excluding hood in iron notch area of blast furnace front cast house
CN215638856U (en) Blanking pipeline structure of grate cooler
CN218989297U (en) Reducing flue for blast furnace slag flushing water flue gas air cooling white tower
CN220555697U (en) Metallurgical slag treatment system capable of preventing slag accumulation inside
CN218954903U (en) Waste discharging device of slag drier
CN213021006U (en) Slag falling pipe structure for full-automatic slag discharging and removing of heating furnace
CN217324147U (en) Conveying structure for blast furnace slag
CN219589461U (en) Dredging device for yellow phosphorus electric furnace material pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant