CN214741323U - Tunnel bores and explodes construction work rack high pressure tuber pipe repacking device - Google Patents

Tunnel bores and explodes construction work rack high pressure tuber pipe repacking device Download PDF

Info

Publication number
CN214741323U
CN214741323U CN202121225611.8U CN202121225611U CN214741323U CN 214741323 U CN214741323 U CN 214741323U CN 202121225611 U CN202121225611 U CN 202121225611U CN 214741323 U CN214741323 U CN 214741323U
Authority
CN
China
Prior art keywords
water pipe
pressure
pipe
pressure water
pressure air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121225611.8U
Other languages
Chinese (zh)
Inventor
李广伟
李洪斌
夏鹏
刘松
刘秀利
刘光烨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Design Corp
Original Assignee
China Railway Design Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Design Corp filed Critical China Railway Design Corp
Priority to CN202121225611.8U priority Critical patent/CN214741323U/en
Application granted granted Critical
Publication of CN214741323U publication Critical patent/CN214741323U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model discloses a tunnel bores and explodes construction operation rack high pressure tuber pipe repacking device, including boring to explode rack, high-pressure tuber pipe and high-pressure water pipe, bore to explode the rack last portal and adopt H shaped steel butt welding portal, H shaped steel butt welding portal both ends adopt steel sheet welding shutoff, make H shaped steel butt welding portal middle formation high-pressure tuber pipe, place high-pressure water pipe in the groove department of H shaped steel butt welding portal one side to fix high-pressure water pipe and high-pressure tuber pipe together through a plurality of staple bolts; the bottom of the high-pressure water pipe is provided with a high-pressure water pipe main valve, and a plurality of high-pressure water pipe sub-valves are uniformly distributed on the high-pressure water pipe along the length direction of the high-pressure water pipe; the bottom of the high-pressure air pipe is provided with a main valve of the high-pressure air pipe, and a plurality of branch valves of the high-pressure air pipe are uniformly distributed on the high-pressure air pipe along the length direction of the high-pressure air pipe. The utility model discloses on-the-spot processing is convenient, simple structure, and convenient to use has greatly improved workman operating efficiency, and the tuber pipe should not destroy, applicable different tunnel country rock structural style, and application prospect is big.

Description

Tunnel bores and explodes construction work rack high pressure tuber pipe repacking device
Technical Field
The utility model relates to a tunnel construction technical field especially relates to a tunnel bores and explodes construction operation rack high pressure tuber pipe repacking device.
Background
In tunnel construction, the rack air gun is still a wide operation mode at present, the mode has strong adaptability, soft rock and hard rock can be constructed, and the structure size can be flexibly adjusted. However, the former wind-water pipe is independently arranged, is generally placed on the ground or temporarily placed on a rack, is easy to damage, is concentrated by branch valves, frequently causes pipe winding and pipe explosion due to the mutual intersection of the lengths of connecting pipes, and is complicated to arrange after construction is completed.
Disclosure of Invention
The utility model discloses a solve the problem that prior art exists, provide a tunnel bores and explodes construction operation rack high pressure tuber pipe repacking device, through repacking high pressure tuber pipe setting, divide the valve to control fixed setting, take over the short circuit, make the air gun bore and explode more convenient and fast in the work progress, put in order after the completion and place fixed position, be convenient for next time quick construction.
The utility model discloses a realize like this, a tunnel bores and explodes construction operation rack high pressure tuber pipe repacking device, explode rack, high-pressure tuber pipe and high-pressure water pipe including boring, the last portal that bores and explode the rack adopts H shaped steel butt welding portal, the both ends of H shaped steel butt welding portal adopt steel sheet welding shutoff, make the middle formation of H shaped steel butt welding portal the high-pressure tuber pipe, place high-pressure water pipe in the recess department of H shaped steel butt welding portal one side to fix high-pressure water pipe and high-pressure tuber pipe together through a plurality of staple bolts; the bottom of the high-pressure water pipe is provided with a high-pressure water pipe main valve, and a plurality of high-pressure water pipe branch valves are uniformly distributed on the high-pressure water pipe along the length direction of the high-pressure water pipe; the bottom of high-pressure tuber pipe is provided with high-pressure tuber pipe main valve, set up a plurality of high-pressure tuber pipe branch valves along high-pressure tuber pipe length direction equipartition on the high-pressure tuber pipe.
Preferably, the high-pressure water pipe main valve, the high-pressure water pipe branch valve and the high-pressure air pipe main valve are located on the same side, and the high-pressure air pipe branch valve is located on the other side and is arranged in bilateral symmetry with the high-pressure water pipe branch valve.
Preferably, the H-shaped steel butt welding portal frame is formed by butt welding two H22-shaped steels in parallel, and the thickness of a welding line is not less than 6 mm.
Preferably, the high-pressure water pipe is formed by welding steel plates at two ends of a seamless steel pipe with the diameter of 108mm for plugging, and the wall thickness is not less than 6 mm.
Preferably, the diameter of the main valve of the high-pressure air pipe is not less than 10cm, and the diameter of the branch valve of the high-pressure air pipe is matched with the air gun access port.
Preferably, the diameter of the main valve of the high-pressure water pipe is not less than 8cm, and the diameter of the branch valve of the high-pressure water pipe is matched with the inlet of the air gun.
Preferably, the length of the high-pressure water pipe is 50-60 cm shorter than that of the H-shaped steel butt welding portal.
Preferably, the hoops are uniformly arranged at intervals of 60-80 cm/channel along the length direction of the high-pressure water pipe.
The utility model has the advantages of it is following and beneficial effect:
the utility model provides a tunnel bores and explodes construction operation rack high pressure tuber pipe repacking device compares with traditional high pressure tuber pipe, and this structure field processing is convenient, simple structure, and convenient to use has greatly improved workman operating efficiency, and tuber pipe should not destroy, applicable different tunnel country rock structural style, and application prospect is big.
Drawings
Fig. 1 is a schematic structural view of a high-pressure air-water pipe modification device of a tunnel drilling and blasting construction operation platform provided by an embodiment of the invention;
fig. 2 is a schematic structural view of a high-pressure air and water pipe provided by an embodiment of the present invention;
fig. 3 is a schematic cross-sectional view of a high-pressure wind pipe and a high-pressure water pipe according to an embodiment of the present invention.
In the figure: 1. drilling and blasting a rack; 2. a high pressure air duct; 3. a high pressure water pipe; 4. a main valve of the high-pressure air pipe; 5. a high-pressure air duct branch valve; 6. a main valve of the high-pressure water pipe; 7. a high-pressure water pipe branch valve; 8. h-shaped steel butt welding portal frames; 9. and (5) hooping.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention will be further described in detail with reference to the following embodiments and accompanying drawings. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. In the description of the present invention, "a plurality" means two or more unless specifically limited otherwise.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "connected" and "connected" are to be interpreted broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; may be a mechanical connection; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1 ~ 3, the embodiment of the utility model provides a construction operation rack high pressure tuber pipe repacking device is exploded to tunnel brill, explode rack 1, high-pressure tuber pipe 2 and high-pressure water pipe 3 including the brill, the brill is exploded last portal of rack 1 and is adopted H shaped steel butt welding portal 8, and all the other portals adopt I-steel welding to form, and the brill is exploded rack 1 height and width and is according to tunnel excavation section size and excavation worker method dynamic adjustment size, and the brill is exploded rack 1 operation platform length and is considered drilling rod, air gun air leg length and personnel operating space etc. and factor not less than 6 m.
The H-shaped steel butt welding portal frame 8 is formed by two H22-shaped steels through parallel butt welding, the thickness of a welding seam is not smaller than 6mm, two ends of the H-shaped steel butt welding portal frame 8 are sealed through steel plate welding, the middle of the H-shaped steel butt welding portal frame 8 is formed into the high-pressure air pipe 2, the high-pressure water pipe 3 is placed in a groove on one side of the H-shaped steel butt welding portal frame 8, the high-pressure water pipe 3 is fixed to the front side of the H-shaped steel butt welding portal frame 8 through the hoop 9, the length of the high-pressure water pipe 3 is 50-60 cm shorter than that of the H-shaped steel butt welding portal frame 8, and the hoop 9 is arranged at an interval of 60-80 cm per channel in an evenly distributed mode.
A high-pressure air pipe main valve 4 is arranged at the bottom of the high-pressure air pipe 2, and a plurality of high-pressure air pipe branch valves 5 are uniformly distributed on the high-pressure air pipe 2 along the length direction of the high-pressure air pipe 2; high-pressure tuber pipe main valve 4, high-pressure tuber pipe divide valve 5 to install respectively at H shaped steel butt welding portal 8 openly and the back, high-pressure tuber pipe main valve 4, high-pressure tuber pipe divide valve 5 to weld through professional welder fixed, and high-pressure tuber pipe main valve 4 diameter is not less than 100mm, and high-pressure tuber pipe divides valve 5 diameters to be not less than 40mm, is equipped with the reasonable high-pressure tuber pipe of reserving of air gun quantity according to excavation section size and every layer of operation platform space and divides valve 5 numbers, and the interval sets up 60 ~ 100cm and is suitable.
The high-pressure water pipe 3 is formed by welding steel plates at two ends of a seamless steel pipe with the diameter of 108mm for plugging, and the wall thickness is not less than 6 mm. A high-pressure water pipe main valve 6 is arranged at the bottom of the high-pressure water pipe 3, and a plurality of high-pressure water pipe branch valves 7 are uniformly distributed on the high-pressure water pipe 3 along the length direction of the high-pressure water pipe 3; the high-pressure water pipe main valve 6 and the high-pressure water pipe branch valve 7 are both installed on the front face of the high-pressure water pipe 3, the high-pressure water pipe main valve 6 and the high-pressure water pipe branch valve 7 are welded and fixed by a professional welder, the diameter of the high-pressure water pipe main valve 6 is not smaller than 80mm, the diameter of the high-pressure water pipe branch valve 7 is not smaller than 20mm, the high-pressure water pipe branch valve 7 is the same as the high-pressure water pipe branch valve 5 in number, and the high-pressure water pipe branch valve are arranged symmetrically and uniformly.
The high-pressure air and water pipes are comprehensively considered according to various sections and construction methods of the operation surface, and frequent size change is avoided as much as possible.
The main valve and the branch valve are reasonably arranged according to the construction position of the air gun, and pipelines are shortened as much as possible.
The utility model discloses when implementing, at first processing except H shaped steel butt welding portal 8 and bore other portals of exploding rack 1, the portal processing is accomplished the back, carry out vertical erection joint and operation platform installation, high pressure water pipe 3 installs high pressure water pipe main valve 6 and high pressure water pipe branch valve 7 in advance, utilize staple bolt 9 to fix high pressure water pipe 3 on H shaped steel butt welding portal 8 again, high pressure water pipe branch valve 5 corresponds the installation according to high pressure water pipe branch valve 7 position, high pressure water pipe main valve 4 is installed in high pressure water pipe main valve 6 below, form into one at last and bore exploding rack 1.
To sum up, the utility model provides a tunnel bores and explodes construction operation rack high pressure tuber pipe repacking device compares with traditional high pressure tuber pipe, and this structure field processing is convenient, simple structure, and convenient to use has greatly improved workman operating efficiency, and tuber pipe should not destroy, applicable different tunnel country rock structural style, and application prospect is big.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: it is also possible to modify the solutions described in the foregoing embodiments or to substitute some or all of the technical features of the foregoing embodiments with equivalents, without departing from the scope of the embodiments of the present invention.

Claims (8)

1. A high-pressure air-water pipe modification device for a tunnel drilling and blasting construction operation rack comprises a drilling and blasting rack, a high-pressure air pipe and a high-pressure water pipe, and is characterized in that the last portal of the drilling and blasting rack is an H-shaped steel butt welding portal, two ends of the H-shaped steel butt welding portal are welded and blocked by steel plates, the high-pressure air pipe is formed in the middle of the H-shaped steel butt welding portal, the high-pressure water pipe is placed in a groove in one side of the H-shaped steel butt welding portal, and the high-pressure water pipe and the high-pressure air pipe are fixed together through a plurality of hoops; the bottom of the high-pressure water pipe is provided with a high-pressure water pipe main valve, and a plurality of high-pressure water pipe branch valves are uniformly distributed on the high-pressure water pipe along the length direction of the high-pressure water pipe; the bottom of high-pressure tuber pipe is provided with high-pressure tuber pipe main valve, set up a plurality of high-pressure tuber pipe branch valves along high-pressure tuber pipe length direction equipartition on the high-pressure tuber pipe.
2. The device for modifying the high-pressure air-water pipe of the tunnel drilling and blasting construction operation rack according to claim 1, wherein the main high-pressure water pipe valve, the branch high-pressure water pipe valve and the main high-pressure air pipe valve are located on the same side, and the branch high-pressure air pipe valve is located on the other side and is arranged in bilateral symmetry with the branch high-pressure water pipe valve.
3. The device for modifying the high-pressure air-water pipe of the tunnel drilling and blasting construction operation rack according to claim 1, wherein the H-shaped steel butt welding portal is formed by butt welding two H22-shaped steels in parallel, and the thickness of a welding seam is not less than 6 mm.
4. The device for modifying the high-pressure air-water pipe of the tunnel drilling and blasting construction operation rack according to claim 1, wherein the high-pressure water pipe is formed by welding steel plates at two ends of a seamless steel pipe with a diameter of 108mm and is blocked, and the wall thickness is not less than 6 mm.
5. The device for modifying the high-pressure air-water pipe of the tunnel drilling and blasting construction operation rack according to claim 1, wherein the diameter of the main valve of the high-pressure air pipe is not less than 10cm, and the diameter of the branch valve of the high-pressure air pipe is matched with the access port of an air gun.
6. The device for modifying the high-pressure air-water pipe of the tunnel drilling and blasting construction operation rack according to claim 1, wherein the diameter of a main valve of the high-pressure water pipe is not less than 8cm, and the diameter of a branch valve of the high-pressure water pipe is matched with the access port of an air gun.
7. The device for modifying the high-pressure air-water pipe of the tunnel drilling and blasting construction operation rack according to claim 1, wherein the length of the high-pressure water pipe is 50-60 cm shorter than that of an H-shaped steel butt welding portal.
8. The device for modifying the high-pressure air-water pipe of the tunnel drilling and blasting construction operation rack according to claim 1, wherein the hoops are uniformly arranged along the length direction of the high-pressure water pipe at intervals of 60-80 cm/channel.
CN202121225611.8U 2021-06-02 2021-06-02 Tunnel bores and explodes construction work rack high pressure tuber pipe repacking device Active CN214741323U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121225611.8U CN214741323U (en) 2021-06-02 2021-06-02 Tunnel bores and explodes construction work rack high pressure tuber pipe repacking device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121225611.8U CN214741323U (en) 2021-06-02 2021-06-02 Tunnel bores and explodes construction work rack high pressure tuber pipe repacking device

Publications (1)

Publication Number Publication Date
CN214741323U true CN214741323U (en) 2021-11-16

Family

ID=78627571

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121225611.8U Active CN214741323U (en) 2021-06-02 2021-06-02 Tunnel bores and explodes construction work rack high pressure tuber pipe repacking device

Country Status (1)

Country Link
CN (1) CN214741323U (en)

Similar Documents

Publication Publication Date Title
CN214741323U (en) Tunnel bores and explodes construction work rack high pressure tuber pipe repacking device
CN206503608U (en) A kind of contractibility assembled steel board mount
CN206346737U (en) A kind of supporting major diameter curve pipe curtain
CN209811582U (en) Large diameter pipeline aligning deviation processing positioning device
CN113404518B (en) Shield tunnel segment repairing process
CN213174153U (en) Improved beam-column connecting structure for steel structure building
CN105782576B (en) Fluted tube line guard method is excavated below interim pipeline
CN209162799U (en) Underground continuous wall connector leakage-resistant device
CN106677809A (en) Contractible fabricated steel plate support
CN115045686B (en) Method for reinforcing subway shield tunnel by corrugated steel
CN106051452B (en) A kind of energy storage being arranged in pile foundation and detecting system
CN212376670U (en) Broken roof supporting device of underground mine
CN211524871U (en) Mining variable cross-section air duct structure
CN218563661U (en) Tunnel high-pressure wind-water conveying excavation trolley
CN211397599U (en) Steel pipe and tunnel for laying steel pipe
CN201228815Y (en) Pipe-laying guider for pipe tamping hammer
CN114635718B (en) Double-layer inner overlapped pipe shed supporting mode for tunnel
CN107747655A (en) A kind of double-deck supply tube-connecting part of generator for LNG surface units
CN220101280U (en) Centralized water and air supply system for tunnel primary support trolley
CN212868807U (en) Steel cylinder concrete pipe suitable for curve jacking
CN114922635B (en) Parallel freezing system for shield underground butt joint and abandoned shell disassembly and construction method
CN215166525U (en) Steel construction of fast assembly
CN111305852B (en) Construction method for excavating guide pits in double-track tunnel in advance and in back
CN220979514U (en) Temporary reinforcing structure of shield tunnel lining structure
CN221237312U (en) Protective airtight structure for pipeline passing through civil air defense wall