CN214740033U - Construction equipment of prefabricated building based on BIM - Google Patents

Construction equipment of prefabricated building based on BIM Download PDF

Info

Publication number
CN214740033U
CN214740033U CN202120618248.XU CN202120618248U CN214740033U CN 214740033 U CN214740033 U CN 214740033U CN 202120618248 U CN202120618248 U CN 202120618248U CN 214740033 U CN214740033 U CN 214740033U
Authority
CN
China
Prior art keywords
motor
threaded rod
bim
bases
support frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120618248.XU
Other languages
Chinese (zh)
Inventor
高海通
李鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Technical College of Construction
Original Assignee
Henan Technical College of Construction
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Technical College of Construction filed Critical Henan Technical College of Construction
Priority to CN202120618248.XU priority Critical patent/CN214740033U/en
Application granted granted Critical
Publication of CN214740033U publication Critical patent/CN214740033U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a construction equipment of assembly type structure based on BIM, base including two parallel arrangement, first spout has been seted up at the base top, two the base top is provided with the standing groove, and the standing groove is located two bases and leans on near side, one of them each other the base position is provided with first motor, and first motor and base fixed connection, the first threaded rod of first motor drive end fixedly connected with. The utility model drives the first threaded rod to rotate by starting the first motor, and drives the support frame to slide along the first chute, so that the workpiece close to the position of the placing plate is transported to the mounting position; simultaneously through starting the second motor, drive the second threaded rod and rotate to drive the slider and slide along the second spout, make the work piece transport to the concrete position of installation, promote the installation effectiveness, the cooperation pneumatic cylinder carries out the lift task, accomplishes the work piece and hangs and get and place, and it promotes the installation effectiveness greatly.

Description

Construction equipment of prefabricated building based on BIM
Technical Field
The utility model relates to a construction field especially relates to a construction equipment of assembly type structure based on BIM.
Background
The assembly type building transfers most of the work in the traditional building mode to a factory for carrying out, the components and accessories (such as floor slabs, wall boards, stairs, balconies and the like) for the building are processed and manufactured in the factory and are transported to a building construction site, the building is assembled and installed on the site in a reliable connection mode, the BIM technology quoted in the assembly type building can carry out information tracking and recording on the house type configuration and the component presetting of a building body in real time, the building cost analysis, the intelligent assembly and disassembly of the assembly type building and the like and is synchronized to a BIM model, the coordination of site construction is convenient, and the accessories and the components need to be hoisted in the construction process of the device type building.
The existing hoisting equipment is large in frame size, poor in installation convenience and inconvenient to install and transport due to the fact that the existing hoisting equipment is transported in a parallel mode, and therefore a construction device based on the BIM assembly type building is provided.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that current building lifting device frame is great, and the installation convenience is relatively poor, is not convenient for install and transport.
In order to solve the technical problem, the utility model discloses a technical scheme be:
the BIM-based construction device for the fabricated building comprises two bases arranged in parallel, wherein first sliding grooves are formed in the tops of the bases, placing grooves are formed in the tops of the two bases and are located close to the two bases, a first motor is arranged at one position of the base and is fixedly connected with the bases, a first threaded rod is fixedly connected with a driving end of the first motor, the first motor and the first threaded rod are disassembled along the bases, the device is convenient to transport, the first threaded rod is located in the first sliding groove of the bases, a support frame is arranged in the first sliding groove of the two bases and is in sliding connection with the first sliding groove, the first threaded rod is in threaded connection with the support frame, the first motor is started to drive the first threaded rod to rotate, and the support frame is driven to slide along the first sliding groove, transporting the workpiece adjacent to the place where the plate is placed to the installation position;
a second chute is formed in the top of the support frame, a second motor is arranged on the top of the support frame, a second threaded rod is fixedly connected to the driving end of the second motor and is located in the second chute, the end, away from the second motor, of the second threaded rod is rotatably connected with the support frame, a sliding block is connected to the second threaded rod in a threaded mode and is slidably connected with the second chute, a hydraulic cylinder is fixedly connected to the top of the sliding block in a penetrating mode, a connecting rope is fixedly connected to the driving end of the hydraulic cylinder, and a sucker is arranged on the connecting rope, away from the driving end of the hydraulic cylinder; through starting the second motor, drive the second threaded rod and rotate to drive the slider and slide along the second spout, make the processing work piece transport to the concrete position of installation, promote the installation effectiveness, the cooperation pneumatic cylinder carries out the lift task, accomplishes the work piece and hangs and get and place, and it promotes the installation effectiveness greatly.
Preferably, the support frame is U-shaped.
Preferably, the connecting rope is matched with a lifting hook far away from the driving end of the hydraulic cylinder.
Preferably, a placing plate is arranged in the placing groove.
Preferably, be provided with a plurality of spliced poles between two bases, and the spliced pole passes through fastening bolt and base fixed connection, through the spliced pole, is convenient for dismantle the device, promotes the convenience and the security of transportation.
Preferably, the end face, far away from the first motor, of the first threaded rod is rotatably connected with the base.
The supporting frame sliding along the first sliding groove and the sliding block sliding along the second sliding groove are arranged to drive the workpiece to be transported, so that the high supporting frame and the high risk of the traditional one-way transportation are avoided
The utility model has the advantages as follows:
1. the utility model provides a construction device of an assembly type building based on BIM, which drives a first threaded rod to rotate by starting a first motor, drives a support frame to slide along a first chute, so that a workpiece close to a placing plate position is transported to an installation position; meanwhile, the second motor is started to drive the second threaded rod to rotate, so that the sliding block is driven to slide along the second sliding groove, the workpiece is conveyed to a specific mounting position, the mounting efficiency is improved, the lifting task is performed by matching with a hydraulic cylinder, the workpiece lifting and placing are completed, and the mounting efficiency is greatly improved;
2. the utility model provides a construction device of an assembly type building based on BIM, which drives a workpiece to transport by arranging a support frame sliding along a first chute and a slide block sliding along a second chute, thereby avoiding the large size and high danger of the traditional one-way transportation support frame; meanwhile, the device is convenient to disassemble through the connecting column, and the convenience and the safety of transportation are improved.
Drawings
Fig. 1 is a front view of a construction apparatus for a prefabricated building based on BIM according to the present invention;
fig. 2 is a top view of the present invention, which provides a construction apparatus for a prefabricated building based on BIM;
fig. 3 is the utility model provides a construction equipment lifting hook's based on BIM's assembly type structure schematic diagram.
In the figure: 1. a base; 11. a first chute; 12. a placement groove; 13. a first motor; 14. a first threaded rod; 15. connecting columns; 16. placing the plate; 2. a support frame; 21. a second chute; 22. a second motor; 23. a second threaded rod; 24. a slider; 25. a hydraulic cylinder; 26. a suction cup; 3. and (4) a lifting hook.
Detailed Description
The following detailed description of the preferred embodiments of the present invention will be provided in conjunction with the accompanying drawings, so as to enable those skilled in the art to more easily understand the advantages and features of the present invention, and thereby define the scope of the invention more clearly and clearly.
Referring to fig. 1 and 2, a construction device for a prefabricated building based on BIM is provided, which includes two bases 1 arranged in parallel, a plurality of connection columns 15 are arranged between the two bases 1, the connection columns 15 are fixedly connected with the bases 1 through fastening bolts, the device is conveniently disassembled through the connection columns 15, the convenience and safety of transportation are improved, a first chute 11 is arranged at the top of each base 1, a placing groove 12 is arranged at the top of each base 1, a placing plate 16 is arranged in the placing groove 12, the placing plate 16 is arranged to perform workpiece installation work, the placing groove 12 is located at the side where the two bases 1 are close to each other, a first motor 13 is arranged at one base 1, the first motor 13 is fixedly connected with the bases 1, a first threaded rod 14 is fixedly connected to a driving end of the first motor 13, an end face of the first threaded rod 14 far away from the first motor 13 is rotatably connected with the bases 1, the first motor 13 and the first threaded rod 14 are detached along the base 1, so that the device is convenient to transport, the first threaded rod 14 is located in the first sliding grooves 11 of the base 1, the supporting frames 2 are arranged in the first sliding grooves 11 of the two bases 1, the supporting frames 2 are arranged in a U shape, the supporting frames 2 are in sliding connection with the first sliding grooves 11, the first threaded rod 14 is in threaded connection with the supporting frames 2, the first motor 13 is started to drive the first threaded rod 14 to rotate, the supporting frames 2 are driven to slide along the first sliding grooves 11, and a workpiece close to the position of the placing plate 16 is transported to an installation position;
a second chute 21 is arranged at the top of the support frame 2, a second motor 22 is arranged at the top of the support frame 2, a driving end of the second motor 22 is fixedly connected with a second threaded rod 23, the second threaded rod 23 is positioned in the second chute 21, the end, far away from the second motor 22, of the second threaded rod 23 is rotatably connected with the support frame 2, the second threaded rod 23 is in threaded connection with a sliding block 24, the sliding block 24 is in sliding connection with the second chute 21, a hydraulic cylinder 25 is fixedly connected to the top of the sliding block 24 in a penetrating manner, a connecting rope is fixedly connected to the driving end of the hydraulic cylinder 25, and a sucking disc 26 is arranged on the connecting rope, far away from the driving end of the hydraulic cylinder 25; through starting second motor 22, drive second threaded rod 23 and rotate to drive slider 24 and slide along second spout 21, make the work piece transport to the concrete position of installation, promote the installation effectiveness, cooperation pneumatic cylinder 25 carries out the lift task, accomplishes the work piece and hangs and get and place, promotes the installation effectiveness greatly.
As shown in fig. 3, the connecting rope is provided with a hook 3 at the end far away from the hydraulic cylinder 25.
The supporting frame 2 sliding along the first sliding groove 11 and the sliding block 24 sliding along the second sliding groove 21 are arranged to drive the workpiece to be transported, and the large size and high danger of the traditional supporting frame for one-way transportation are avoided.
The utility model discloses when using, at first adsorb the work piece or collude the selection through sucking disc 26 or lifting hook 3, start first motor 13 afterwards and drive first threaded rod 14 and rotate, it slides along first spout 11 to drive support frame 2, make and be close to the work piece transportation to the mounted position who places 16 positions of board, rethread starts second motor 22, it rotates to drive second threaded rod 23, thereby it slides along second spout 21 to drive slider 24, make the work piece transportation to the concrete position of installation, promote the installation effectiveness, cooperation pneumatic cylinder 25 carries out the task of going up and down, accomplish the work piece and hang and get and place, promote the installation effectiveness greatly, the work piece of accomplishing the installation is whole to be transported out through sucking disc 26 or lifting hook 3 and place board 16.
The above only is the embodiment of the present invention, not limiting the patent scope of the present invention, all the equivalent structures or equivalent processes that are used in the specification and the attached drawings or directly or indirectly applied to other related technical fields are included in the patent protection scope of the present invention.

Claims (6)

1. The utility model provides a construction equipment of prefabricated building based on BIM, includes two parallel arrangement's base (1), its characterized in that: the top of the base (1) is provided with a first sliding groove (11), the tops of the two bases (1) are provided with a placing groove (12), the placing groove (12) is located at the position where the two bases (1) are close to each other, one of the bases (1) is provided with a first motor (13), the first motor (13) is fixedly connected with the bases (1), the driving end of the first motor (13) is fixedly connected with a first threaded rod (14), the first threaded rod (14) is located in the first sliding groove (11) of the base (1), a support frame (2) is arranged in the first sliding groove (11) of the two bases (1), the support frame (2) is in sliding connection with the first sliding groove (11), and the first threaded rod (14) is in threaded connection with the support frame (2);
support frame (2) top is provided with second spout (21), support frame (2) top is provided with second motor (22), second motor (22) drive end fixedly connected with second threaded rod (23), and second threaded rod (23) are located second spout (21), second motor (22) end is kept away from in second threaded rod (23) and support frame (2) rotate and are connected, second threaded rod (23) threaded connection has slider (24), slider (24) and second spout (21) sliding connection, fixedly connected with pneumatic cylinder (25) are run through at slider (24) top, pneumatic cylinder (25) drive end fixedly connected with connects the rope, and connects the rope and keep away from pneumatic cylinder (25) drive end and be provided with sucking disc (26).
2. The BIM-based assembly building construction device of claim 1, wherein: the support frame (2) is arranged in a U shape.
3. The BIM-based assembly building construction device of claim 1, wherein: the connecting rope is away from the driving end of the hydraulic cylinder (25) and is provided with a lifting hook (3) in a matching way.
4. The BIM-based assembly building construction device of claim 1, wherein: a placing plate (16) is arranged in the placing groove (12).
5. The BIM-based assembly building construction device of claim 1, wherein: a plurality of connecting columns (15) are arranged between the two bases (1), and the connecting columns (15) are fixedly connected with the bases (1) through fastening bolts.
6. The BIM-based assembly building construction device of claim 1, wherein: the end face, far away from the first motor (13), of the first threaded rod (14) is rotatably connected with the base (1).
CN202120618248.XU 2021-03-26 2021-03-26 Construction equipment of prefabricated building based on BIM Expired - Fee Related CN214740033U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120618248.XU CN214740033U (en) 2021-03-26 2021-03-26 Construction equipment of prefabricated building based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120618248.XU CN214740033U (en) 2021-03-26 2021-03-26 Construction equipment of prefabricated building based on BIM

Publications (1)

Publication Number Publication Date
CN214740033U true CN214740033U (en) 2021-11-16

Family

ID=78597217

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120618248.XU Expired - Fee Related CN214740033U (en) 2021-03-26 2021-03-26 Construction equipment of prefabricated building based on BIM

Country Status (1)

Country Link
CN (1) CN214740033U (en)

Similar Documents

Publication Publication Date Title
US20190316421A1 (en) Drilling rig
CN212127258U (en) Hoisting accessory for construction
CN214740033U (en) Construction equipment of prefabricated building based on BIM
CN209740562U (en) Unit curtain wall hoisting device
CN208603319U (en) A kind of plasterboard processing transport device
CN112897328B (en) Fixing tool for pipeline and supporting and hanging frame
CN209762971U (en) Mounting device for street lamp pole
CN212315477U (en) Assembled is exterior wallboard production upset platform for building
CN218371549U (en) Concrete slab construction conveying equipment
CN218539002U (en) Various steel sheet construction installation hoist and mount frame with prevent empting function
CN219973589U (en) Green partition structure of hidden LED lamp in exhibition hall
CN212743422U (en) Supplementary splicing apparatus convenient to building steel structure installation
CN219730456U (en) Simple prefabricated cover plate construction device
CN221051370U (en) Fan hoist device
CN220116014U (en) Rotatable lifting tool
CN218968706U (en) Simple light wallboard lifting tool
CN110242026B (en) Manual loop wheel machine of ceramic tile for building
CN217530603U (en) Supporting device for multi-degree-of-freedom adjustment for auxiliary installation of water heating pipeline
CN219136270U (en) Automatic lifting and installing device for pipeline support
CN220150927U (en) Reinforcing apparatus of platform of unloading
CN219603046U (en) Hoisting tool
CN214326947U (en) Wall body module auxiliary installation device
CN204136215U (en) Automatic plate putting machine
CN216583938U (en) Vertical transportation device for buildings
CN214314414U (en) Novel cable support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211116