CN214739912U - Template for building construction concrete solidification - Google Patents

Template for building construction concrete solidification Download PDF

Info

Publication number
CN214739912U
CN214739912U CN202022572866.3U CN202022572866U CN214739912U CN 214739912 U CN214739912 U CN 214739912U CN 202022572866 U CN202022572866 U CN 202022572866U CN 214739912 U CN214739912 U CN 214739912U
Authority
CN
China
Prior art keywords
template
port
templates
bolt
cantilever
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022572866.3U
Other languages
Chinese (zh)
Inventor
陈洪伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Quandong Construction Engineering Co ltd
Original Assignee
Shandong Tiantuo Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Tiantuo Construction Co ltd filed Critical Shandong Tiantuo Construction Co ltd
Priority to CN202022572866.3U priority Critical patent/CN214739912U/en
Application granted granted Critical
Publication of CN214739912U publication Critical patent/CN214739912U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to a concrete setting template technical field just discloses a building construction concrete sets and uses template, including a template and No. two templates, the fixed welding of top port department of a template has No. two cantilevers, the fixed welding of top port department of No. two templates has a cantilever, two thread grooves have been seted up to the other end at a template and No. two template tops, the thread groove that a template and No. two template tops set up is located opposite one end respectively. This template for building construction concrete setting becomes a integrated configuration through the fixed connection between template, No. two templates and the port template, directly inside pouring into the concrete under the brush has the release agent, waits for after the concrete sets, directly will fix the bolt on the template and demolish in proper order and can demolish the template, and the process of installation and demolition is very convenient, and can be according to the length and the height of construction requirement arbitrary adjustment plank, possesses general suitability.

Description

Template for building construction concrete solidification
Technical Field
The utility model relates to a concrete setting template technical field specifically is a building construction concrete sets and uses template.
Background
When the existing construction site is constructed, the used concrete pouring mode is that a template for pouring concrete is built up, then the concrete is poured into an inner cavity of the template, and after the concrete is solidified, the wood board is disassembled.
However, the existing concrete pouring formwork cannot be used after being used and detached once, and is a disposable formwork, but a large amount of waste and environmental pollution are caused, a lot of garbage and waste materials appear on a construction site, the waste and the waste need to be cleaned manually, manpower is consumed, resources are wasted, recycling is not achieved, the construction cost is improved, the process is very complicated when the formwork is installed and detached, time and construction speed are delayed, and the construction process is slowed down.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art, the utility model provides a construction concrete solidifies and uses template possesses recycling and easy dismounting's advantage, has solved the problem that above-mentioned background art provided.
The utility model provides a following technical scheme: a template for concrete solidification in building construction comprises a first template and a second template, wherein a second cantilever is fixedly welded at the top port of the first template, a first cantilever is fixedly welded at the top port of the second template, two thread grooves are arranged at the other ends of the tops of the first template and the second template, the thread grooves arranged at the tops of the first template and the second template are respectively positioned at the opposite ends, the first cantilever and the second cantilever arranged at the tops of the first template and the second template are respectively positioned at the opposite ends, the outer side surfaces of the bottoms of the first template and the second template are fixedly welded with supporting seats, the tops of the first template and the second template are provided with a first bolt and a second bolt, the first bolt and the second bolt are used for connecting the first cantilever with the thread groove on the top of the first template in a threaded manner, the first bolt and the second bolt are used for connecting the second cantilever with the thread groove at the top of the second template in a threaded manner.
Preferably, No. one template and No. two template port departments all are provided with No. two fixed blocks, the port department of No. one template and No. two templates is provided with the port template, the inboard port department of port template is provided with No. two fixed blocks, the inboard of No. two fixed blocks is provided with No. three bolts, No. two fixed block fixed connection on No. two fixed blocks of No. three bolts on with the port template and No. two fixed block fixed connection on No. one template, No. two templates and the port template, the equal fixed welding of both sides face has a fixed block around the top of a template, No. two templates and port template.
Preferably, the bottom surfaces of the supporting seats are flush with the bottom surfaces of the first template and the second template, and the supporting seats are located in the middle of the bottoms of the side surfaces of the first template and the second template and are shorter than the first template and the second template.
Preferably, the first fixing block is provided with two fixing blocks at the tops of the first template and the second template, the two fixing blocks are symmetrical in position, and a threaded through hole is formed in the center of the first fixing block.
Preferably, the top of screw thread groove all has seted up two in template one and No. two templates, cantilever one and No. two cantilevers all set up two screw thread logical grooves and vertical position aligns with the screw thread groove.
Preferably, No. two fixed blocks have respectively been seted up on template, No. two templates and have all been seted up four, four No. two fixed blocks divide into two parts on average and are located the both ends side of template and No. two templates respectively, the tie is divided into two parts and is located the left and right sides face respectively before being provided with four No. two fixed block in the port template, No. two fixed block levels on template, No. two templates and the port template align, and both ends realize extension through No. three bolt fixed mounting on No. two fixed blocks around template and No. two templates and connect, and specific elongated length increases and decreases according to specific construction requirements, and the picture example uses two templates, No. two templates and port template to connect as the example.
Compared with the prior art, the utility model discloses possess following beneficial effect:
1. this template for building construction concrete setting becomes a integrated configuration through the fixed connection between template, No. two templates and the port template, directly inside pouring into the concrete under the brush has the release agent, waits for after the concrete sets, directly will fix the bolt on the template and demolish in proper order and can demolish the template, and the process of installation and demolition is very convenient, and can be according to the length and the height of construction requirement arbitrary adjustment plank, possesses general suitability.
2. This construction concrete solidifies and uses template, through the assembled structure of this template, make it still can keep the independence between each accessory complete after demolising, still can assemble when using next time, assemble simply and the subassembly is nimble, and the convenient burden that has reduced the workman of transport has improved work efficiency.
Drawings
FIG. 1 is a top view of the present invention;
FIG. 2 is a side view of the structure of the present invention;
fig. 3 is an enlarged schematic view of a part a of the structure of the present invention.
In the figure: 1. a first template; 2. a second template; 3. a first cantilever; 4. a second cantilever; 5. a support base; 6. a first fixed block; 7. a first bolt; 8. a second bolt; 9. a second fixed block; 10. a port template; 11. a third bolt; 12. a thread groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, a formwork for concrete solidification in building construction comprises a first formwork 1 and a second formwork 2, a second cantilever 4 is fixedly welded at the top port of the first formwork 1, a first cantilever 3 is fixedly welded at the top port of the second formwork 2, two thread grooves 12 are formed at the other ends of the tops of the first formwork 1 and the second formwork 2, the thread grooves 12 formed at the tops of the first formwork 1 and the second formwork 2 are respectively located at opposite ends, a first cantilever 3 and a second cantilever 4 respectively arranged at the tops of the first formwork 1 and the second formwork 2 are respectively located at opposite ends, supporting seats 5 are fixedly welded on the outer side surfaces of the bottoms of the first formwork 1 and the second formwork 2, a first bolt and a second bolt 8 are respectively arranged at the tops of the first formwork 1 and the second formwork 2, the first bolt and the second bolt 8 are used for connecting the first cantilever 3 with the thread groove 12 at the top of the first formwork 1 in a threaded manner, the first bolt and the second bolt 8 are used for connecting the second cantilever 4 with a thread groove 12 on the top of the second template 2 in a threaded manner.
Wherein, No. 1 template and No. 2 template port departments all are provided with No. two fixed blocks 9, the port department of No. 1 template and No. 2 template is provided with port template 10, the inboard port department of port template 10 is provided with No. two fixed blocks 9, the inboard of No. two fixed blocks 9 is provided with No. three bolt 11, No. three bolt 11 with No. two fixed blocks 9 and No. 1 template on the port template 10, No. two fixed block 9 fixed connection on No. 2 template, No. 1 template, No. 2 template and port template 10's top front and back both sides face all fixed welding have fixed block 6 No. one.
The bottom surfaces of the supporting seats 5 are flush with the bottom surfaces of the first template 1 and the second template 2, and the supporting seats 5 are located in the middle of the bottoms of the side surfaces of the first template 1 and the second template 2 and are shorter than the first template 1 and the second template 2.
Wherein, fixed block 6 all is provided with two and position symmetry at the top of template 1 and No. two templates 2, and the central point of fixed block 6 has seted up threaded through-hole.
Wherein, thread groove 12 has all seted up two at the top of template 1 and No. 2 template, and cantilever 3 and No. two cantilevers 4 have all seted up two screw thread through grooves and vertical position aligns with thread groove 12.
Wherein, No. two fixed block 9 has respectively seted up four on template 1, No. two template 2, four No. two fixed block 9 equally divide into two parts and are located the both ends side of template 1 and No. two template 2 respectively, port template 10 is provided with four No. two fixed block 9 front ties and is divided into two parts and is located the left and right sides face respectively, No. one template 1, No. two fixed block 9 levels on template 2 and the port template 10 align, both ends realize extension connection through No. three bolt 11 fixed mounting on No. two fixed block 9 around template 1 and No. two template 2, specific elongated length increases and decreases according to specific construction requirements, the example of figure 1 uses two templates 1, No. two template 2 and port template 10 to connect the example as the example.
The working principle is as follows:
the inner side surfaces of a first template 1, a second template 2 and a port template 10 are brushed with a release agent, the first template 1 and the second template 2 are aligned, the first template 1 and the second template 2 are fixedly installed on a thread groove 12 by penetrating through a first cantilever 3 and a second cantilever 4, therefore, the first template 1 and the second template 2 are fixedly connected, the first template 1 and the second template 2 which are connected are provided with left and right side baffles and front and rear side hollows, the front and rear side hollows can be fixedly installed on the position limit of concrete through the port template 10, the periphery of the port template 10 is provided with one side hollow and three sides closed, one hollow side of the port template is connected with the first template 1 and the second template 2 to form a port for closing, concrete is poured into the port after the side and the end are finished, and the concrete is waited to be solidified.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a construction concrete solidifies and uses template, includes template (1) and No. two templates (2), its characterized in that: fixed welding has cantilever No. two (4) in the top port department of a template (1), fixed welding has cantilever No. one (3) in the top port department of No. two template (2), two thread groove (12) have been seted up to the other end at template (1) and No. two template (2) tops, thread groove (12) that template (1) and No. two template (2) tops set up are located opposite one end respectively, cantilever (3) and No. two cantilever (4) that template (1) and No. two template (2) tops set up respectively are located opposite one end respectively, the equal fixed welding of bottom lateral surface of template (1) and No. two template (2) has supporting seat (5), template (1) and No. two template (2) tops all are provided with bolt No. two bolt (8), bolt No. two bolt (8) are with cantilever (3) and thread groove (12) at template (1) top And the first bolt and the second bolt (8) are used for connecting the second cantilever (4) with the thread groove (12) at the top of the second template (2) in a threaded manner.
2. The form for setting concrete in building construction according to claim 1, characterized in that: template (1) and No. two template (2) port department all are provided with No. two fixed blocks (9), the port department of template (1) and No. two template (2) is provided with port template (10), the medial extremity department of port template (10) is provided with No. two fixed blocks (9), the inboard of No. two fixed blocks (9) is provided with No. three bolt (11), No. two fixed blocks (9) and No. two fixed block (9) fixed connection on template (1), No. two template (2) on No. three bolt (11) will port template (10), the top front and back both sides face of template (1), No. two template (2) and port template (10) all fixed welding have fixed block (6).
3. The form for setting concrete in building construction according to claim 1, characterized in that: the bottom surface of supporting seat (5) and the bottom surface of a template (1) and No. two templates (2) keep level, supporting seat (5) are located the middle part of a template (1) and No. two templates (2) side bottom and its length is less than the length of a template (1) and No. two templates (2).
4. The form for setting concrete in building construction according to claim 2, characterized in that: the top of a first template (1) and the top of a second template (2) are provided with two fixing blocks (6) which are symmetrical in position, and a threaded through hole is formed in the center of the first fixing block (6).
5. The form for setting concrete in building construction according to claim 1, characterized in that: two thread grooves (12) are formed in the tops of the first template (1) and the second template (2), two thread through grooves are formed in the first cantilever (3) and the second cantilever (4), and the vertical positions of the two thread through grooves are aligned with the thread grooves (12).
6. The form for setting concrete in building construction according to claim 2, characterized in that: no. two fixed block (9) respectively seted up on template (1), No. two templates (2) and all seted up four, four No. two fixed block (9) are equally divided into two parts and are located the both ends side of template (1) and No. two templates (2) respectively, be provided with No. two fixed block (9) preceding average on port template (10) and divide into two parts and be located the left and right sides face respectively, No. two fixed block (9) horizontal alignments on template (1), No. two templates (2) and port template (10).
CN202022572866.3U 2020-11-10 2020-11-10 Template for building construction concrete solidification Expired - Fee Related CN214739912U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022572866.3U CN214739912U (en) 2020-11-10 2020-11-10 Template for building construction concrete solidification

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022572866.3U CN214739912U (en) 2020-11-10 2020-11-10 Template for building construction concrete solidification

Publications (1)

Publication Number Publication Date
CN214739912U true CN214739912U (en) 2021-11-16

Family

ID=78575008

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022572866.3U Expired - Fee Related CN214739912U (en) 2020-11-10 2020-11-10 Template for building construction concrete solidification

Country Status (1)

Country Link
CN (1) CN214739912U (en)

Similar Documents

Publication Publication Date Title
CN214739912U (en) Template for building construction concrete solidification
CN209482709U (en) A kind of in-situ concrete wall subsiding crack typified form
CN211622610U (en) Sizing constructional column dustpan opening device
CN208293370U (en) A kind of highway bridge concreting steel form
CN212506641U (en) Drainage ditch regularization mould
CN210483751U (en) Highway tunnel drainage french drain reserved groove template device
CN211250567U (en) Pouring die for balcony
CN215947922U (en) Bridge concrete guardrail expansion joint box filling template
CN216766233U (en) Node suitable for regional concrete placement is watered after assembled PEC post
CN210316538U (en) Aluminum mold supporting system for floor lower extension lintel
CN207863189U (en) A kind of secondary structure metope leak-proof device
CN2184038Y (en) Wood-bamboo plywood formwork with steel section frame
CN212925806U (en) Bridge formwork with supporting structure
CN206467999U (en) A kind of construction formwork for placing
CN210622312U (en) Movable column base concrete forming and reinforcing template device
CN111021726A (en) Post-cast strip and construction joint position assembled aluminum alloy template
CN205908019U (en) Prefabricated staircase mould of removable template
CN217897270U (en) Forming template device
CN218596803U (en) Steep slope section step type rapid trough steel formwork supporting structure
CN212611980U (en) Prestressed concrete continuous beam bridge construction structure
CN215406603U (en) Assembly structure of precast concrete beam and steel core concrete column
CN220451429U (en) Post-pouring strip supporting template
CN218028977U (en) Combined aluminum mould for shaping caisson type toilet
CN214885516U (en) Stair template of draw-in groove instrument formula that can have enough to meet need use
CN211079938U (en) Crack reinforcing equipment for roads and bridges

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20211221

Address after: 250000 room 105, building 3, pharmaceutical industrial park, No. 369, qusuo Road, Qudi Town, Jiyang District, Jinan City, Shandong Province

Patentee after: Shandong Quandong Construction Engineering Co.,Ltd.

Address before: No.16, Guodian Third District, Licheng District, Jinan City, Shandong Province

Patentee before: Shandong tiantuo Construction Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211116

CF01 Termination of patent right due to non-payment of annual fee