CN214739114U - Stone curtain wall connecting piece - Google Patents

Stone curtain wall connecting piece Download PDF

Info

Publication number
CN214739114U
CN214739114U CN202120917874.9U CN202120917874U CN214739114U CN 214739114 U CN214739114 U CN 214739114U CN 202120917874 U CN202120917874 U CN 202120917874U CN 214739114 U CN214739114 U CN 214739114U
Authority
CN
China
Prior art keywords
plate
piece
supporting
curtain wall
stone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120917874.9U
Other languages
Chinese (zh)
Inventor
杜春迎
庄萌萌
祝秋娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Arang Decoration Co ltd
Original Assignee
Arang Decoration Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Arang Decoration Co ltd filed Critical Arang Decoration Co ltd
Priority to CN202120917874.9U priority Critical patent/CN214739114U/en
Application granted granted Critical
Publication of CN214739114U publication Critical patent/CN214739114U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a stone material curtain connecting piece, include flying piece, strutting piece and the mounting of being connected with the stone material board, upper and lower sliding connection between flying piece and the strutting piece, left and right sliding connection between strutting piece and the mounting, preceding, back sliding connection between mounting and the fossil fragments. The utility model discloses a flying piece and support piece carry out altitude mixture control, control between support piece and the mounting and adjust, carry out the front and back regulation between mounting and the fossil fragments, thereby realize the regulation to stone plate mounted position, because the connecting piece can carry out diversified regulation, thereby the installation accuracy requirement of fossil fragments has been reduced, thereby the regulation through the connecting piece has guaranteed stone plate mounted position's accuracy and has ensured the suitability of fixed position, thereby guarantee to connect fixed fastness and stability, installation convenience and efficiency of construction have been improved.

Description

Stone curtain wall connecting piece
Technical Field
The utility model relates to a stone material curtain technical field specifically is a stone material curtain connecting piece.
Background
The stone curtain wall is generally composed of stone panels and supporting structures (beams, columns, steel structures, connecting pieces and the like), and does not bear the load of a main structure and is used as a building envelope structure.
To the riding plate formula mode of hanging, mainly hang the upper and lower both ends of stone material board through the connecting piece at present, use the installation of elastic rubber mat, can realize flexonics, improve anti-seismic performance. In order to ensure the overall aesthetic property and consistency after suspension, the stone plates need to be repeatedly adjusted in the suspension process. Present connecting piece is the hook plate structure of being connected with the cross keel directly, and the connecting piece can only carry out fore-and-aft direction's adjustment, and in the work progress, has strict requirement to the installation accuracy of crossbeam, just can guarantee that the stone material board that hangs aligns, because adjust more difficult, leads to the efficiency of construction lower.
SUMMERY OF THE UTILITY MODEL
The utility model discloses it is not enough to be the above-mentioned to prior art existence, a stone material curtain connecting piece is provided, carry out altitude mixture control through flying piece and strutting piece, adjust about going on between strutting piece and the mounting, adjust around going on between mounting and the fossil fragments, thereby realize the regulation to stone material board mounted position, because the connecting piece can carry out diversified regulation, thereby the installation required precision of fossil fragments has been reduced, thereby the regulation through the connecting piece has guaranteed the accuracy of stone material board mounted position and has ensured the suitability of fixed position, thereby guarantee to connect fixed fastness and stability, installation convenience and efficiency of construction have been improved.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a stone material curtain wall connecting piece, includes the flying piece of being connected with the stone material board, still includes strutting piece and mounting, upper and lower sliding connection between flying piece and the strutting piece, left and right sliding connection between strutting piece and the mounting, preceding, back sliding connection between mounting and the fossil fragments.
Preferably, the hanging member includes a pulling plate connected to the cradling member, and an upper hook plate and a lower hook plate are vertically connected to one end of the pulling plate.
Preferably, support piece includes lagging and connecting plate, the lagging is connected with the connecting plate is perpendicular, one side that the connecting plate was kept away from to the lagging is equipped with first double-screw bolt, the one end that the hook plate was kept away from down to the arm-tie is equipped with parallel outer splint and interior splint, the upper end of lagging is located between outer splint and the interior splint, the upper end screw thread of arm-tie even has the adjusting bolt who is connected with the lagging upper end, the cover has lock nut on the adjusting bolt, the vertical spacing hole with first double-screw bolt complex that is equipped with on the outer splint, the cover has gland nut on the first double-screw bolt.
Preferably, the fixing part comprises a fixing plate and a supporting plate, a backup plate is vertically connected to one end of the supporting plate, the fixing plate is vertically connected with the backup plate, a vertical connecting hole is formed in the fixing plate, a second stud is arranged at the upper end of the supporting plate, a transverse connecting hole matched with the second stud is formed in the connecting plate, and a compression nut is sleeved on the second stud.
Preferably, the lower end of the connecting plate is connected with a top plate through a supporting plate, and the top plate is pressed on one side of the backup plate.
Preferably, a rib plate is arranged at one end of the supporting plate far away from the backup plate.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a flying piece and support piece carry out altitude mixture control, control between support piece and the mounting and adjust, carry out the front and back regulation between mounting and the fossil fragments, thereby realize the regulation to stone plate mounted position, because the connecting piece can carry out diversified regulation, thereby the installation accuracy requirement of fossil fragments has been reduced, thereby the regulation through the connecting piece has guaranteed stone plate mounted position's accuracy and has ensured the suitability of fixed position, thereby guarantee to connect fixed fastness and stability, installation convenience and efficiency of construction have been improved.
2. The utility model discloses even there is the roof at the lower extreme of connecting plate through the fagging, and the roof is pressed in one side of backup plate, and the roof withstands the lower extreme of connecting plate, plays the effect of supporting and preventing buckling, strengthens support piece's fastness, has ensured stability.
3. The utility model discloses set up adjusting bolt and first double-screw bolt, not only improved the convenience and the precision that the flying piece was adjusted, can ensure the reliability that flying piece and support piece are connected moreover.
Drawings
FIG. 1 is a schematic view of the structure of the present invention;
FIG. 2 is a schematic view of a suspension member;
FIG. 3 is a schematic structural view of a support member;
fig. 4 is a schematic structural view of the fixing member.
In the figure: 1-stone board; 2-a suspension member; 201-upper hook plate; 202-lower hook plate; 203-outer splint; 204-a limiting hole; 205-inner splint; 206-adjusting bolts; 207-lock nut; 208-pulling a plate; 3-a support; 301-deck; 302-a first stud; 303-a connecting plate; 304-transverse connection hole; 305-a top plate; 306-a stay plate; 4-a fixing piece; 401-fixing plate; 402-vertical connection holes; 403-a second stud; 404-a pallet; 405-rib plate; 406-a backup plate; 5-keel.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1, a stone curtain wall connecting piece comprises a suspension member 2 connected with a stone plate 1, a support member 3 and a fixing member 4, wherein the suspension member 2 and the support member 3 are in up-and-down sliding connection for adjusting the suspension height, the support member 3 and the fixing member 4 are in left-and-right sliding connection for adjusting the left-and-right position, the fixing member 4 and a keel 5 are in front-and-back sliding connection for adjusting the front-and-back distance, so that the adjustment in the three-dimensional direction is realized, and the concrete structure is as follows:
as shown in fig. 2, the hanger 2 includes a pulling plate 208, the pulling plate 208 is connected to the cradling member 3, one end of the pulling plate 208 is vertically connected with an upper hook plate 201 and a lower hook plate 202, the upper hook plate 201 is adapted to be engaged with a lower end of the stone plate 1 located above, and the lower hook plate 202 is adapted to be engaged with an upper end of the stone plate 1 located below.
In order to realize the matching between the suspension member 2 and the supporting member 3, as shown in fig. 3, the supporting member 3 comprises a supporting member 301 and a connecting plate 303, the supporting member 301 is vertically connected with the connecting plate 303, a first stud 302 is arranged on one side of the supporting member 301 far away from the connecting plate 303, an outer clamping plate 203 and an inner clamping plate 205 which are parallel to each other are arranged on one end of the pulling plate 208 far away from the lower hook plate 202, the upper end of the supporting member 301 is positioned between the outer clamping plate 203 and the inner clamping plate 205, an adjusting bolt 206 connected with the upper end of the supporting member 301 is screwed on the upper end of the pulling plate 208, a locking nut 207 is sleeved on the adjusting bolt 206, a limiting hole 204 matched with the first stud 302 is vertically arranged on the outer clamping plate 203, a compression nut is sleeved on the first stud 302, the locking nut 207 can be rotated to adjust the height of the suspension member 2, after the height is fixed, the hanger 2 is fixed by turning the lock nut 207 and the compression nut on the first stud 302.
The fixing mode between the supporting part 3 and the fixing part 4 is as follows: as shown in fig. 4, the fixing member 4 includes a fixing plate 401 and a supporting plate 404, a backup plate 406 is vertically connected to one end of the supporting plate 404, the fixing plate 401 is vertically connected to the backup plate 406, a vertical connecting hole 402 is formed in the fixing plate 401, a bolt matched with the vertical connecting hole 402 is formed in the keel 5, the vertical connecting hole 402 is arranged so that the fixing member 4 can be adjusted in the front-back direction without detaching the bolt, only the bolt is loosened, the fixing member 4 can be adjusted in the front-back direction, a second stud 403 is arranged at the upper end of the supporting plate 404, a transverse connecting hole 304 matched with the second stud 403 is formed in the connecting plate 303, a compression nut is sleeved on the second stud 403, the left-right position of the supporting member 3 can be adjusted by loosening the compression nut, and transverse adjustment is achieved.
In order to increase the stability and firmness of the structure, the lower end of the connecting plate 303 is connected with the top plate 305 through the supporting plate 306, the top plate 305 is pressed on one side of the backup plate 406, the lower end of the connecting plate 303 is propped against by the top plate 305, the effect of supporting and preventing bending is achieved, and the firmness of the supporting piece 3 is enhanced. In addition, a rib plate 405 is arranged at one end of the supporting plate 404 far away from the backup plate 406, so that the strength of the supporting plate 404 is increased.
As shown in fig. 1, during installation, the fixing member 4 is connected with the keel 5 according to a preset position, the supporting member 3 is connected with the fixing member 4, the hanging member 2 is connected with the stone plate 1, then the hanging member 2 is connected with the supporting member 3, the position to be adjusted is determined according to the position of the stone plate 1, after the position is determined, all bolts are connected in sequence, and the hanging member 2 and the supporting member 3, the supporting member 3 and the fixing member 4, and the fixing member 4 and the keel 5 are screwed and fixed.
It will be apparent to those skilled in the art that various changes and modifications may be made without departing from the spirit and scope of the invention. Thus, if such modifications and variations of the present invention fall within the scope of the claims and their equivalents, the present invention is also intended to include such modifications and variations.

Claims (6)

1. The utility model provides a stone material curtain wall connecting piece, includes the flying piece of being connected with the stone material board, its characterized in that: the keel structure is characterized by further comprising a supporting piece and a fixing piece, wherein the hanging piece is in up-and-down sliding connection with the supporting piece, the supporting piece is in left-and-right sliding connection with the fixing piece, and the fixing piece is in front-and-back sliding connection with the keel.
2. The stone curtain wall connector as claimed in claim 1, wherein: the suspension part comprises a pulling plate, the pulling plate is connected with the support part, and one end of the pulling plate is vertically connected with an upper hook plate and a lower hook plate.
3. The stone curtain wall connector as claimed in claim 2, wherein: support piece includes lagging and connecting plate, the lagging is connected with the connecting plate is perpendicular, one side that the connecting plate was kept away from to the lagging is equipped with first double-screw bolt, the one end that the hook plate was kept away from down to the arm-tie is equipped with parallel outer splint and interior splint, the upper end of lagging is located between outer splint and the interior splint, the upper end screw thread of arm-tie even has the adjusting bolt who is connected with the lagging upper end, the cover has lock nut on the adjusting bolt, the vertical spacing hole with first double-screw bolt complex that is equipped with on the outer splint, the cover has gland nut on the first double-screw bolt.
4. The stone curtain wall connector as claimed in claim 3, wherein: the fixing piece comprises a fixing plate and a supporting plate, wherein a backup plate is vertically connected to one end of the supporting plate, the fixing plate is vertically connected with the backup plate, a vertical connecting hole is formed in the fixing plate, a second stud is arranged at the upper end of the supporting plate, a transverse connecting hole matched with the second stud is formed in the connecting plate, and a compression nut is sleeved on the second stud.
5. The stone curtain wall connector as claimed in claim 4, wherein: the lower end of the connecting plate is connected with a top plate through a supporting plate, and the top plate is pressed on one side of the backup plate.
6. The stone curtain wall connector as claimed in claim 4, wherein: and a rib plate is arranged at one end of the supporting plate far away from the backup plate.
CN202120917874.9U 2021-04-29 2021-04-29 Stone curtain wall connecting piece Active CN214739114U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120917874.9U CN214739114U (en) 2021-04-29 2021-04-29 Stone curtain wall connecting piece

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120917874.9U CN214739114U (en) 2021-04-29 2021-04-29 Stone curtain wall connecting piece

Publications (1)

Publication Number Publication Date
CN214739114U true CN214739114U (en) 2021-11-16

Family

ID=78615445

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120917874.9U Active CN214739114U (en) 2021-04-29 2021-04-29 Stone curtain wall connecting piece

Country Status (1)

Country Link
CN (1) CN214739114U (en)

Similar Documents

Publication Publication Date Title
CN209760436U (en) Assembled furred ceiling conversion layer of bolt ball node steel construction
CN207905358U (en) A kind of beam building template
CN214739114U (en) Stone curtain wall connecting piece
CN206279748U (en) A kind of civil engineering load-bearing hanger
CN209742174U (en) Mounting structure of curtain
CN214462094U (en) Portable dry pendant combined installation system
CN109372161A (en) Hung type division wall
CN213087179U (en) Composite fixing device for heavy ceiling lamp
CN212317547U (en) Novel shear force wall reinforcing and supporting system
CN212026701U (en) Prefabricated shear wall horizontal connection structure with W-shaped joint
CN114412046A (en) Anti-deformation anti-falling assembled buckle suspended ceiling
CN206245694U (en) A kind of construction and decoration ceiling mounting bracket
CN205617656U (en) Head tree for construction keel
CN204983510U (en) Seat is hung to convenient to use's stone material
CN218758150U (en) Acrylic assembled plate
CN214246621U (en) Novel aluminum-wood connecting structure
CN217949500U (en) Aluminum plate mounting structure
CN220790527U (en) Support structure for cantilever frame
CN213979471U (en) Connecting hanging seat for glass curtain wall
CN215167534U (en) High-stability over-specification stone reverse-hanging type design dry-hanging structure
CN209146691U (en) A kind of antidetonation connecting elements and antidetonation suspension and support
CN217812519U (en) Beam reinforcing structure for building structure design
CN211830102U (en) Bus duct vertical installation structure
CN220954084U (en) Curtain wall mounting mechanism
CN210193138U (en) Self-balancing adjustment elevator frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant