CN209760436U - Assembled furred ceiling conversion layer of bolt ball node steel construction - Google Patents
Assembled furred ceiling conversion layer of bolt ball node steel construction Download PDFInfo
- Publication number
- CN209760436U CN209760436U CN201920412935.9U CN201920412935U CN209760436U CN 209760436 U CN209760436 U CN 209760436U CN 201920412935 U CN201920412935 U CN 201920412935U CN 209760436 U CN209760436 U CN 209760436U
- Authority
- CN
- China
- Prior art keywords
- steel
- conversion
- bolt
- steel structure
- channel steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Support Devices For Sliding Doors (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及建筑领域、装饰施工技术领域,具体为一种螺栓球节点钢结构组装式吊顶转换层。The utility model relates to the field of construction and the technical field of decoration construction, in particular to a conversion layer of an assembled suspended ceiling of a steel structure with bolt ball joints.
背景技术Background technique
建筑装饰是建筑装饰装修工程的简称。建筑装饰是为保护建筑物的主体结构、完善建筑物的物理性能、使用功能和美化建筑物,采用装饰装修材料或饰物对建筑物的内外表面及空间进行的各种处理过程Architectural decoration is the abbreviation of architectural decoration engineering. Architectural decoration refers to the various treatments of the interior and exterior surfaces and spaces of buildings with decorative materials or ornaments in order to protect the main structure of the building, improve the physical properties of the building, use functions and beautify the building.
随经济及社会发展,建筑节奏加快,螺栓球节点钢结构作为主体结构体系应用越来越多,现有的螺栓球节点钢吊顶施工困难,在钢结构上进行焊接作业通常不被钢结构施工单位允许,采用焊接作业存在安全隐患,从而不方便使用者的使用,增加了施工时间。With the economic and social development, the pace of construction is accelerating, and the bolt ball joint steel structure is used more and more as the main structural system. The existing bolt ball joint steel ceiling is difficult to construct, and welding operations on steel structures are usually not accepted by steel structure construction units. Allowed, there are potential safety hazards in welding operations, which is inconvenient for users and increases construction time.
发明内容Contents of the invention
(一)解决的技术问题(1) Solved technical problems
针对现有技术的不足,本实用新型提供了一种螺栓球节点钢结构组装式吊顶转换层,具备免焊接加工的等优点,解决了现有的螺栓球节点钢结构在使用时通常都是采用焊接作业,这样安全隐患大的问题。Aiming at the deficiencies of the prior art, the utility model provides a bolt ball joint steel structure assembled ceiling transfer layer, which has the advantages of welding-free processing, etc., and solves the problem that the existing bolt ball joint steel structure usually uses Welding operation is a big safety hazard.
(二)技术方案(2) Technical solution
为实现上述免焊接加工的目的,本实用新型提供如下技术方案:In order to achieve the above-mentioned purpose of welding-free processing, the utility model provides the following technical solutions:
一种螺栓球节点钢结构组装式吊顶转换层,包括槽钢,所述槽钢的内腔开设有槽口,所述槽钢的前侧设置有横向稳定拉杆,所述横向稳定拉杆的背侧与槽钢的前侧通过稳定杆固定螺母螺纹连接,所述槽钢的内腔贯穿设置有吊杆,所述吊杆的底部通过螺栓螺纹连接有主吊挂件,所述主吊挂件的内腔卡接有吊顶主龙骨,所述槽钢内腔的前侧贯穿设置有转换螺栓,所述转换螺栓的顶部螺纹连接有支撑块,所述支撑块的顶部固定连接有紧固机构,所述紧固机构的内部卡接有钢结构杆件,所述钢结构杆件的背侧通过螺栓螺纹连接有连接杆,所述连接杆远离钢结构杆件的一侧固定连接有钢结构球节点。A bolt ball joint steel structure assembly type suspended ceiling conversion layer, including channel steel, the inner cavity of the channel steel is provided with a notch, the front side of the channel steel is provided with a transverse stabilizing tie rod, and the back side of the transverse stabilizing tie bar It is threadedly connected with the front side of the channel steel through the fixing nut of the stabilizer bar, the inner cavity of the channel steel is penetrated with a suspender, and the bottom of the suspender is threaded with a main hanging part through bolts, and the inner cavity of the main hanging part The main keel of the suspended ceiling is clamped, the front side of the channel steel inner cavity is penetrated with a conversion bolt, the top of the conversion bolt is threaded with a support block, and the top of the support block is fixedly connected with a fastening mechanism. A steel structural rod is clamped inside the fixing mechanism, the back side of the steel structural rod is threadedly connected with a connecting rod, and the side of the connecting rod far away from the steel structural rod is fixedly connected with a steel structural ball joint.
优选的,所述紧固机构包括箍件下构件、第一固定板、第二固定板和箍件上构件,所述支撑块的顶部与箍件下构件的底部固定连接,所述箍件下构件顶部的两侧均固定连接有第一固定板,所述箍件上构件底部的两侧均固定连接有第二固定板,所述第一固定板和第二固定板的连接处通过箍件固定螺栓连接。Preferably, the fastening mechanism includes a hoop lower member, a first fixing plate, a second fixing plate and an upper hoop member, the top of the support block is fixedly connected to the bottom of the lower hoop member, and the lower hoop member Both sides of the top of the component are fixedly connected with a first fixed plate, and both sides of the bottom of the member on the hoop are fixedly connected with a second fixed plate, and the connection between the first fixed plate and the second fixed plate is passed through a hoop Secure bolted connections.
优选的,所述槽钢的顶部和底部均设置有转换螺母,所述转换螺母的内腔与转换螺栓的表面螺纹连接。Preferably, conversion nuts are provided on the top and bottom of the channel steel, and the inner cavity of the conversion nut is threadedly connected with the surface of the conversion bolt.
优选的,所述钢结构杆件的数量为多个,且多个钢结构杆件的形状大小相同,所述钢结构杆件呈均匀分布于钢结构球节点的外围。Preferably, there are multiple steel structural rods, and the steel structural rods have the same shape and size, and the steel structural rods are evenly distributed on the periphery of the steel structural spherical joint.
优选的,所述吊杆自下而上穿过槽钢并通过上下两个螺母固定,所述吊杆位于转换螺栓的背侧。Preferably, the suspension rod passes through the channel steel from bottom to top and is fixed by two upper and lower nuts, and the suspension rod is located on the back side of the conversion bolt.
在本实用新型的另一实施方式中,一种螺栓球节点钢结构组装式吊顶转换层,包括槽钢,所述槽钢的内腔开设有槽口,所述槽钢的前侧设置有横向稳定拉杆,所述横向稳定拉杆的背侧与槽钢的前侧通过稳定杆固定螺母螺纹连接,所述槽钢的内腔贯穿设置有吊杆,所述吊杆的底部通过螺栓螺纹连接有主吊挂件,所述主吊挂件的内腔卡接有吊顶主龙骨,所述槽钢内腔的前侧贯穿设置有转换螺栓,所述转换螺栓的顶部螺纹连接有钢结构球节点,钢结构球节点的外部螺纹连接有连接杆,连接杆的一侧固定连接有钢结构杆件。In another embodiment of the present utility model, a bolt ball joint steel structure assembled ceiling conversion layer includes a channel steel, the inner cavity of the channel steel is provided with a notch, and the front side of the channel steel is provided with a transverse Stabilizing pull rod, the back side of the horizontally stabilizing pull rod is threaded with the front side of the channel steel through the stabilizer rod fixing nut, the inner cavity of the channel steel is provided with a suspender, and the bottom of the suspender is threaded with a main bolt. Hanging piece, the inner cavity of the main hanging piece is clamped with the main keel of the ceiling, the front side of the channel steel inner cavity is provided with a conversion bolt, and the top of the conversion bolt is threaded with a steel structure ball joint, and the steel structure ball The external thread of the node is connected with a connecting rod, and one side of the connecting rod is fixedly connected with a steel structural member.
(三)有益效果(3) Beneficial effects
与现有技术相比,本实用新型提供了一种螺栓球节点钢结构组装式吊顶转换层,具备以下有益效果:Compared with the prior art, the utility model provides a bolted ball joint steel structure assembled ceiling conversion layer, which has the following beneficial effects:
1、本实用新型通过设置槽钢、槽口、转换螺栓、钢结构球节点、连接杆、钢结构杆件、横向稳定拉杆、吊顶主龙骨、吊杆、主吊挂件、稳定杆固定螺母、转换螺母、支撑块、紧固机构、箍件下构件、第一固定板、第二固定板、箍件上构件和箍件固定螺栓的配合使用,解决了现有的螺栓球节点钢吊顶施工困难,在钢结构上进行焊接作业通常不被钢结构施工单位允许,采用焊接作业存在安全隐患的问题,方便了使用者的使用,缩短了施工时间。1. The utility model is equipped with channel steel, notches, conversion bolts, steel structure ball joints, connecting rods, steel structure rods, laterally stabilizing pull rods, ceiling main keels, booms, main hanging parts, stabilizer rod fixing nuts, conversion The combination of nuts, support blocks, fastening mechanism, hoop lower member, first fixing plate, second fixing plate, hoop upper member and hoop fixing bolts solves the existing difficulties in the construction of bolt ball joint steel ceilings, Welding operations on steel structures are usually not allowed by steel structure construction units. There are potential safety hazards in welding operations, which facilitates the use of users and shortens the construction time.
2、本实用新型通过设置稳定杆固定螺母,提高了横向稳定拉杆的稳定,避免了因缺乏固定装置,导致横向稳定拉杆在工作时会出现晃动的现象,保证了转换层稳定,避免变形。2. The utility model improves the stability of the laterally stabilizing tie rod by setting the fixing nut of the stabilizer rod, avoids the phenomenon that the laterally stabilizing tie rod will shake during work due to the lack of fixing devices, ensures the stability of the transfer layer and avoids deformation.
3、本实用新型通过设置紧固机构,对钢结构杆件起到固定的作用,从而防止钢结构杆件在工作时会出现晃动的现象。3. The utility model fixes the steel structure rods by setting a fastening mechanism, so as to prevent the steel structure rods from shaking during work.
4、本实用新型通过设置转换螺母,提高了转换螺栓工作时的稳定性,防止转换螺栓松动,避免发生脱落。4. The utility model improves the stability of the conversion bolt when it is working by setting the conversion nut, prevents the conversion bolt from loosening, and avoids falling off.
5、本实用新型通过设置箍件固定螺栓,方便了使用者对第一固定板和第二固定板的安装,从而方便了组装。5. The utility model facilitates the installation of the first fixing plate and the second fixing plate by the user by setting the fixing bolts of the hoop, thereby facilitating assembly.
附图说明Description of drawings
图1为本实用新型实施例一的结构示意图;Fig. 1 is the structural representation of the utility model embodiment one;
图2为本实用新型实施例一结构紧固机构连接示意图;Fig. 2 is a schematic diagram of the connection of a structural fastening mechanism of the utility model embodiment;
图3为图1中A处的局部放大示意图;Fig. 3 is the partially enlarged schematic diagram of place A in Fig. 1;
图4是本实用新型实施例二的结构示意图。Fig. 4 is a schematic structural diagram of Embodiment 2 of the utility model.
图中:1槽钢、2槽口、3转换螺栓、4钢结构球节点、5连接杆、6钢结构杆件、7横向稳定拉杆、8吊顶主龙骨、9吊杆、10主吊挂件、11稳定杆固定螺母、12转换螺母、13支撑块、14紧固机构、1401箍件下构件、1402第一固定板、1403第二固定板、1404箍件上构件、15箍件固定螺栓。In the figure: 1 channel steel, 2 notches, 3 conversion bolts, 4 steel structure ball joints, 5 connecting rods, 6 steel structure rods, 7 transverse stabilizing rods, 8 ceiling main keels, 9 suspenders, 10 main hanging parts, 11 stabilizer bar fixing nut, 12 conversion nut, 13 support block, 14 fastening mechanism, 1401 hoop lower member, 1402 first fixing plate, 1403 second fixing plate, 1404 hoop upper member, 15 hoop fixing bolt.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.
在实用新型的描述中,需要说明的是,术语“上”、“下”、“内”、“外”“前端”、“后端”、“两端”、“一端”、“另一端”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。此外,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性。In the description of the utility model, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "another end" The orientation or positional relationship indicated by etc. is based on the orientation or positional relationship shown in the drawings, which is only for the convenience of describing the utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, use a specific The azimuth structure and operation, therefore can not be construed as the limitation of the present utility model. In addition, the terms "first" and "second" are used for descriptive purposes only, and should not be understood as indicating or implying relative importance.
在实用新型的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“设置有”、“连接”等,应做广义理解,例如“连接”,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本实用新型中的具体含义。In the description of the utility model, it should be noted that, unless otherwise clearly stipulated and limited, the terms "installed", "set with", "connected", etc. should be understood in a broad sense, such as "connected", which can be a fixed connection , can also be detachably connected, or integrally connected; can be mechanically connected, can also be electrically connected; can be directly connected, can also be indirectly connected through an intermediary, and can be internal communication between two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present utility model in specific situations.
实施例一Embodiment one
请参阅图1-3,一种螺栓球节点钢结构组装式吊顶转换层,包括槽钢1,槽钢1的内腔开设有槽口2,槽钢1的前侧设置有横向稳定拉杆7,横向稳定拉杆7的背侧与槽钢1的前侧通过稳定杆固定螺母11螺纹连接,通过设置稳定杆固定螺母11,提高了横向稳定拉杆7的稳定,避免了因缺乏固定装置,导致横向稳定拉杆7在工作时会出现晃动的现象,保证了转换层稳定,避免变形,槽钢1的内腔贯穿设置有吊杆9,吊杆9自下而上穿过槽钢1并通过上下两个螺母固定,吊杆9位于转换螺栓3的背侧,吊杆9的底部通过螺栓螺纹连接有主吊挂件10,主吊挂件10的内腔卡接有吊顶主龙骨8,槽钢1内腔的前侧贯穿设置有转换螺栓3,槽钢1的顶部和底部均设置有转换螺母12,转换螺母12的内腔与转换螺栓3的表面螺纹连接,通过设置转换螺母12,提高了转换螺栓3工作时的稳定性,防止转换螺栓3松动,避免发生脱落,转换螺栓3的顶部螺纹连接有支撑块13,支撑块13的顶部固定连接有紧固机构14,紧固机构14的内部卡接有钢结构杆件6,紧固机构14包括箍件下构件1401、第一固定板1402、第二固定板1403和箍件上构件1404,支撑块13的顶部与箍件下构件1401的底部固定连接,箍件下构件1401顶部的两侧均固定连接有第一固定板1402,箍件上构件1404底部的两侧均固定连接有第二固定板1403,第一固定板1402和第二固定板1403的连接处通过箍件固定螺栓15连接,通过设置紧固机构14,对钢结构杆件6起到固定的作用,从而防止钢结构杆件6在工作时会出现晃动的现象,通过设置箍件固定螺栓15,方便了使用者对第一固定板1402和第二固定板1403的安装,从而方便了组装,钢结构杆件6的背侧通过螺栓螺纹连接有连接杆5,钢结构杆件6的数量为多个,且多个钢结构杆件6的形状大小相同,钢结构杆件6呈均匀分布于钢结构球节点4的外围,连接杆5远离钢结构杆件6的一侧固定连接有钢结构球节点4。Please refer to Fig. 1-3, a bolted ball joint steel structure assembly type suspended ceiling conversion layer, including a channel steel 1, the inner cavity of the channel steel 1 is provided with a notch 2, and the front side of the channel steel 1 is provided with a lateral stabilizing tie rod 7, The back side of the laterally stabilizing tie rod 7 is threadedly connected to the front side of the channel steel 1 through the stabilizing rod fixing nut 11. By setting the stabilizing rod fixing nut 11, the stability of the laterally stabilizing tie rod 7 is improved, and the lateral stability caused by the lack of a fixing device is avoided. The tie rod 7 will shake when it is working, which ensures the stability of the transfer layer and avoids deformation. The inner cavity of the channel steel 1 is provided with a suspender 9, and the suspender 9 passes through the channel steel 1 from bottom to top and passes through the upper and lower two. The nut is fixed, the suspender 9 is located on the back side of the conversion bolt 3, the bottom of the suspender 9 is connected with the main hanging part 10 through the bolt thread, the inner cavity of the main hanging part 10 is clamped with the main keel 8 of the ceiling, and the inner cavity of the channel steel 1 The front side is provided with a conversion bolt 3, and the top and bottom of the channel steel 1 are provided with a conversion nut 12. The inner cavity of the conversion nut 12 is threadedly connected with the surface of the conversion bolt 3. By setting the conversion nut 12, the work of the conversion bolt 3 is improved. To prevent the conversion bolt 3 from loosening and falling off, the top of the conversion bolt 3 is threadedly connected with a support block 13, and the top of the support block 13 is fixedly connected with a fastening mechanism 14, and the inside of the fastening mechanism 14 is clamped with a steel The structural bar 6, the fastening mechanism 14 includes a hoop lower member 1401, a first fixing plate 1402, a second fixing plate 1403 and a hoop upper member 1404, the top of the support block 13 is fixedly connected to the bottom of the hoop lower member 1401, Both sides of the top of the hoop lower member 1401 are fixedly connected with a first fixing plate 1402, both sides of the bottom of the hoop upper member 1404 are fixedly connected with a second fixing plate 1403, the first fixing plate 1402 and the second fixing plate 1403 The connection is connected by the fixing bolt 15 of the hoop. By setting the fastening mechanism 14, the steel structure rod 6 can be fixed, so as to prevent the steel structure rod 6 from shaking during work. The bolt 15 facilitates the installation of the first fixed plate 1402 and the second fixed plate 1403 by the user, thereby facilitating assembly. The back side of the steel structure bar 6 is threadedly connected with the connecting rod 5, and the steel structure bar 6 The number is multiple, and the shape and size of the multiple steel structure rods 6 are the same. The steel structure rods 6 are evenly distributed on the periphery of the steel structure ball joint 4, and the side of the connecting rod 5 away from the steel structure rod 6 is fixedly connected with Steel structure ball joints4.
在安装时,先将转换螺栓3通过转换螺母12与槽钢1连接,然后转换螺栓3通过螺母与箍件下构件1401连接,然后将箍件上构件1404和箍件下构件1401通过箍件固定螺栓15固定在钢结构下弦杆上,将横向稳定拉杆7穿过槽钢1的两侧,用双螺母固定,使转换层槽钢1形成稳定整体钢架,避免横向晃动,最后将吊杆9穿过槽钢1上下翼缘,用吊杆9配套的螺母在槽钢1上下翼缘固定即可,吊杆9下用主吊挂件10安装吊顶主龙骨8即完成整个吊顶转换层的施工,也可在钢结构施工时,与钢结构施工单位沟通,提前将紧固机构14、转换螺栓3及转换钢架固定在钢结构杆件上,待钢结构施工完成后,安装横向稳定拉杆7即可完成转换层钢结构施工。When installing, first connect the conversion bolt 3 to the channel steel 1 through the conversion nut 12, then connect the conversion bolt 3 to the lower member 1401 of the hoop through the nut, and then fix the upper member 1404 of the hoop and the lower member 1401 of the hoop through the hoop The bolt 15 is fixed on the lower chord of the steel structure, and the lateral stabilizing rod 7 is passed through both sides of the channel steel 1, and fixed with double nuts, so that the channel steel 1 of the conversion layer forms a stable overall steel frame to avoid lateral shaking, and finally the suspender 9 Go through the upper and lower flanges of the channel steel 1, and fix the nuts on the upper and lower flanges of the channel steel 1 with the supporting nuts of the suspender 9. Install the main keel 8 of the ceiling with the main hanging part 10 under the suspender 9 to complete the construction of the entire ceiling conversion layer. It is also possible to communicate with the steel structure construction unit during steel structure construction, and fix the fastening mechanism 14, the conversion bolt 3 and the conversion steel frame on the steel structure rods in advance. The steel structure construction of the transfer floor can be completed.
综上所述,该螺栓球节点钢结构组装式吊顶转换层,通过槽钢1、槽口2、转换螺栓3、钢结构球节点4、连接杆5、钢结构杆件6、横向稳定拉杆7、吊顶主龙骨8、吊杆9、主吊挂件10、稳定杆固定螺母11、转换螺母12、支撑块13、紧固机构14、箍件下构件1401、第一固定板1402、第二固定板1403、箍件上构件1404和箍件固定螺栓15的配合使用,解决了现有的螺栓球节点钢结构在使用时通常都是采用焊接作业,这样安全隐患大的问题。To sum up, the bolt ball joint steel structure assembly type ceiling conversion layer, through the channel steel 1, the notch 2, the conversion bolt 3, the steel structure ball joint 4, the connecting rod 5, the steel structure rod 6, and the lateral stabilizing rod 7 , Ceiling main keel 8, suspender rod 9, main hanging part 10, stabilizer bar fixing nut 11, conversion nut 12, support block 13, fastening mechanism 14, hoop lower member 1401, first fixing plate 1402, second fixing plate 1403, the cooperative use of the hoop upper member 1404 and the hoop fixing bolt 15 solves the problem that the existing bolt ball joint steel structure usually adopts welding operation when it is in use, so the problem of great safety hazard.
实施例二Embodiment two
请参阅图4,一种螺栓球节点钢结构组装式吊顶转换层,包括槽钢1,槽钢1的内腔开设有槽口2,槽钢1的前侧设置有横向稳定拉杆7,横向稳定拉杆7的背侧与槽钢1的前侧通过稳定杆固定螺母11螺纹连接,通过设置稳定杆固定螺母11,提高了横向稳定拉杆7的稳定,避免了因缺乏固定装置,导致横向稳定拉杆7在工作时会出现晃动的现象,保证了转换层稳定,避免变形,槽钢1的内腔贯穿设置有吊杆9,吊杆9自下而上穿过槽钢1并通过上下两个螺母固定,吊杆9位于转换螺栓3的背侧,吊杆9的底部通过螺栓螺纹连接有主吊挂件10,主吊挂件10的内腔卡接有吊顶主龙骨8,槽钢1内腔的前侧贯穿设置有转换螺栓3,槽钢1的顶部和底部均设置有转换螺母12,转换螺母12的内腔与转换螺栓3的表面螺纹连接,通过设置转换螺母12,提高了转换螺栓3工作时的稳定性,防止转换螺栓3松动,避免发生脱落,转换螺栓3的顶部螺纹连接有钢结构球节点4,钢结构球节点4的外部通过螺栓螺纹连接有连接杆5,连接杆5的一侧固定连接有钢结构杆件6,钢结构杆件6的数量为多个,且多个钢结构杆件6的形状大小相同,钢结构杆件6呈均匀分布于钢结构球节点4的外围。Please refer to Fig. 4, a kind of bolt ball joint steel structure assembly type suspended ceiling conversion layer, including channel steel 1, the inner cavity of channel steel 1 is provided with notch 2, and the front side of channel steel 1 is provided with laterally stabilizing tie rod 7, laterally stable The back side of the tie rod 7 is threadedly connected with the front side of the channel steel 1 through the stabilizer rod fixing nut 11. By setting the stabilizer rod fixing nut 11, the stability of the laterally stabilizing tie rod 7 is improved, and the lack of a fixing device causes the laterally stabilizing tie rod 7 to be stabilized. There will be shaking during work, which ensures the stability of the transfer layer and avoids deformation. The inner cavity of the channel steel 1 is provided with a suspender 9, and the suspender 9 passes through the channel steel 1 from bottom to top and is fixed by two upper and lower nuts , the suspender 9 is located on the back side of the conversion bolt 3, the bottom of the suspender 9 is threadedly connected with the main hanger 10, the inner cavity of the main hanger 10 is clamped with the main keel 8 of the ceiling, and the front side of the inner cavity of the channel steel 1 A conversion bolt 3 is provided throughout, and the top and bottom of the channel steel 1 are provided with a conversion nut 12. The inner cavity of the conversion nut 12 is threadedly connected with the surface of the conversion bolt 3. By setting the conversion nut 12, the performance of the conversion bolt 3 is improved. Stability, preventing the conversion bolt 3 from loosening and falling off, the top of the conversion bolt 3 is threaded with a steel structure ball joint 4, and the outside of the steel structure ball joint 4 is threaded with a connecting rod 5, and one side of the connecting rod 5 is fixed Steel structural rods 6 are connected, and the number of steel structural rods 6 is multiple, and the shape and size of the multiple steel structural rods 6 are the same, and the steel structural rods 6 are evenly distributed on the periphery of the steel structure ball joint 4 .
在安装时,先将转换螺栓3与钢结构球节点4固定,然后将槽钢1翼缘孔对准转换螺栓13插入,安装配套转换螺母12固定,槽钢1安装固定好后,将横向稳定拉杆7穿过槽钢1的两侧,用双螺母固定,使转换层槽钢1形成稳定整体钢架,避免横向晃动,最后将吊杆9穿过槽钢1上下翼缘,用吊杆9配套的螺母在槽钢1上下翼缘固定即可,吊杆9下用主吊挂件10安装吊顶主龙骨8即完成整个吊顶转换层的施工,也可在钢结构施工时,与钢结构施工单位沟通,提前将转换螺栓3及槽钢1固定在钢结构杆件6上,待钢结构施工完成后,安装横向稳定拉杆7即可完成转换层钢结构施工。When installing, first fix the conversion bolt 3 and the steel structure ball joint 4, then align the flange hole of the channel steel 1 with the conversion bolt 13 and insert it, and install the matching conversion nut 12 to fix it. After the channel steel 1 is installed and fixed, the lateral stability The pull rod 7 passes through both sides of the channel steel 1 and is fixed with double nuts so that the channel steel 1 of the conversion layer forms a stable overall steel frame to avoid lateral shaking. Finally, the suspender 9 passes through the upper and lower flanges of the channel steel 1, The supporting nuts can be fixed on the upper and lower flanges of the channel steel 1, and the ceiling main keel 8 is installed with the main hanging part 10 under the suspender 9 to complete the construction of the entire ceiling transfer layer. Communication, fix the conversion bolt 3 and the channel steel 1 on the steel structure rod 6 in advance, and after the steel structure construction is completed, install the lateral stabilizing tie rod 7 to complete the construction of the conversion layer steel structure.
尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those skilled in the art can understand that various changes and modifications can be made to these embodiments without departing from the principle and spirit of the present invention , replacements and modifications, the scope of the present utility model is defined by the appended claims and their equivalents.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920412935.9U CN209760436U (en) | 2019-03-28 | 2019-03-28 | Assembled furred ceiling conversion layer of bolt ball node steel construction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920412935.9U CN209760436U (en) | 2019-03-28 | 2019-03-28 | Assembled furred ceiling conversion layer of bolt ball node steel construction |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209760436U true CN209760436U (en) | 2019-12-10 |
Family
ID=68757174
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201920412935.9U Expired - Fee Related CN209760436U (en) | 2019-03-28 | 2019-03-28 | Assembled furred ceiling conversion layer of bolt ball node steel construction |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209760436U (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113404203A (en) * | 2021-05-11 | 2021-09-17 | 南京银城建设发展股份有限公司 | Hoop connecting structure for connecting grid structure suspended ceiling and conversion layer |
| CN114000640A (en) * | 2021-10-25 | 2022-02-01 | 上海宝冶建筑装饰有限公司 | Connection structure between indoor furred ceiling conversion layer steelframe and steel construction truss |
| CN114033031A (en) * | 2021-11-22 | 2022-02-11 | 中建二局第二建筑工程有限公司 | Exempt from welded spatial grid structure furred ceiling conversion equipment |
| CN115306073A (en) * | 2022-08-11 | 2022-11-08 | 北京中铁装饰工程有限公司 | Three-dimensional multi-angle adjustable switching jib of dysmorphism rack furred ceiling |
| CN115749277A (en) * | 2022-12-09 | 2023-03-07 | 中国十七冶集团有限公司 | A construction method for the transfer layer structure of the grid structure roof ceiling and suspended ceiling |
| CN117090337A (en) * | 2023-08-10 | 2023-11-21 | 上海宝冶建筑装饰有限公司 | Abnormal truss ceiling suspended ceiling installation conversion device and suspender installation method |
-
2019
- 2019-03-28 CN CN201920412935.9U patent/CN209760436U/en not_active Expired - Fee Related
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113404203A (en) * | 2021-05-11 | 2021-09-17 | 南京银城建设发展股份有限公司 | Hoop connecting structure for connecting grid structure suspended ceiling and conversion layer |
| CN114000640A (en) * | 2021-10-25 | 2022-02-01 | 上海宝冶建筑装饰有限公司 | Connection structure between indoor furred ceiling conversion layer steelframe and steel construction truss |
| CN114000640B (en) * | 2021-10-25 | 2023-01-31 | 上海宝冶建筑装饰有限公司 | Connection structure between indoor furred ceiling conversion layer steelframe and steel construction truss |
| CN114033031A (en) * | 2021-11-22 | 2022-02-11 | 中建二局第二建筑工程有限公司 | Exempt from welded spatial grid structure furred ceiling conversion equipment |
| CN115306073A (en) * | 2022-08-11 | 2022-11-08 | 北京中铁装饰工程有限公司 | Three-dimensional multi-angle adjustable switching jib of dysmorphism rack furred ceiling |
| CN115749277A (en) * | 2022-12-09 | 2023-03-07 | 中国十七冶集团有限公司 | A construction method for the transfer layer structure of the grid structure roof ceiling and suspended ceiling |
| CN117090337A (en) * | 2023-08-10 | 2023-11-21 | 上海宝冶建筑装饰有限公司 | Abnormal truss ceiling suspended ceiling installation conversion device and suspender installation method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN209760436U (en) | Assembled furred ceiling conversion layer of bolt ball node steel construction | |
| CN105805112B (en) | A kind of universal joint assembly for the connection of rod piece space structure | |
| CN205804726U (en) | Single-beam back-bolt type stone curtain wall | |
| CN207160376U (en) | A kind of color steel ceiling board for toilet | |
| CN113737987A (en) | Prefabricated high-strength fiber cement formwork superposed shear wall | |
| CN111910829A (en) | A cable-stayed ceiling skeleton system | |
| CN115306073A (en) | Three-dimensional multi-angle adjustable switching jib of dysmorphism rack furred ceiling | |
| CN108894329B (en) | Overhanging type pipe truss and mounting method of supporting rod thereof | |
| CN204983335U (en) | Furred ceiling is staple bolt device for conversion layer | |
| CN216428731U (en) | High strength suspended ceiling conversion layer | |
| CN207847079U (en) | Hanging mould structure | |
| CN217949699U (en) | Civil engineering is with bearing stores pylon sealing joint | |
| CN206737212U (en) | A kind of curtain wall is hung installation gravity self-balancing directional rotating connection hanging piece with point and combined | |
| CN216195708U (en) | Prefabricated high-strength fiber cement formwork superposed shear wall | |
| CN211817324U (en) | Indoor corrugated suspended ceiling external corner installation node structure | |
| CN104499630A (en) | Suspension system | |
| CN204456584U (en) | a hanging system | |
| CN209568537U (en) | A kind of suspension type floor structure | |
| CN212775916U (en) | An adjustable steel beam lower end combined support and hanger | |
| CN209429275U (en) | Boom integral embedded fixed end structure | |
| CN214739114U (en) | A stone curtain wall connector | |
| CN223256277U (en) | Building curtain wall mounting frame with anti-drop structure | |
| CN219060528U (en) | Dry-hanging GRC (glass fiber reinforced plastics) connecting structure | |
| CN111519817A (en) | Construction process of secondary ceiling of integrated floor system | |
| CN221941707U (en) | A building curtain wall installation fixing bracket |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191210 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |