CN214738752U - Mounting structure of jumbo size crossbeam on integrated shaped steel - Google Patents

Mounting structure of jumbo size crossbeam on integrated shaped steel Download PDF

Info

Publication number
CN214738752U
CN214738752U CN202120208463.2U CN202120208463U CN214738752U CN 214738752 U CN214738752 U CN 214738752U CN 202120208463 U CN202120208463 U CN 202120208463U CN 214738752 U CN214738752 U CN 214738752U
Authority
CN
China
Prior art keywords
steel
tenon
reinforcement cage
brake iron
mounting structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120208463.2U
Other languages
Chinese (zh)
Inventor
易书云
易仕桂
陆照俊
周越华
殷科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUXI GUANGCAI MACHINERY MANUFACTURING CO LTD
Original Assignee
WUXI GUANGCAI MACHINERY MANUFACTURING CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUXI GUANGCAI MACHINERY MANUFACTURING CO LTD filed Critical WUXI GUANGCAI MACHINERY MANUFACTURING CO LTD
Priority to CN202120208463.2U priority Critical patent/CN214738752U/en
Application granted granted Critical
Publication of CN214738752U publication Critical patent/CN214738752U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a mounting structure of jumbo size crossbeam on integrated shaped steel, the tip of jumbo size crossbeam is provided with the steel reinforcement cage tenon, the arch has spacing edge on the steel reinforcement cage tenon, be provided with the support interface on the integrated shaped steel, be formed with the erection joint on the support interface, when steel reinforcement cage tenon and support interface assemble, spacing edge imbeds simultaneously in two upper and lower erection joints, and insert first brake iron and second brake iron in corresponding the erection joint clearance, the steel reinforcement cage tenon is supported by the bottom plate, and it is provided with tensioning bolt to pass the bottom plate, tensioning bolt and second brake iron threaded connection, be provided with spacing apron above that on the first brake iron, it is provided with fastening bolt to pass the apron, fastening bolt and the upper end threaded connection of steel reinforcement cage tenon. The mounting structure fully ensures the reliable fixation of the tenon, eliminates the connection gap, improves the pretightening force, ensures the connection strength and reduces the field assembly difficulty.

Description

Mounting structure of jumbo size crossbeam on integrated shaped steel
Technical Field
The utility model relates to an integrated shaped steel technical field especially relates to a mounting structure of jumbo size crossbeam on integrated shaped steel.
Background
At present, steel structures are used more and more in the field of building structures, various novel steel structure forms are continuously emerged, the steel structures are applied to the field of engineering, the number of the steel structures is continuously increased, and the steel structures have wide prospects. The integrated steel is one of steel structures, and the splicing welding connection mode in the height direction is particularly superior, so that the field construction difficulty is reduced, and the construction efficiency is improved.
When installing the crossbeam on the integrated steel type building, the current mode is to link firmly through the bolt earlier, and weld the shaping again. In the mode, the bolt connection has a connection gap, the field welding workload is large, the welding smoke discharge amount is large, the labor intensity is high, and the construction efficiency is low. In addition, due to the bearing requirement, the size of some cross beams is large, particularly the size in the height direction, a plurality of bolts need to be installed, otherwise, the installation reliability can be greatly reduced, and the construction difficulty is further increased. Therefore, it is desirable to provide a new beam mounting structure or construction method that improves the convenience of site construction.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a mounting structure of jumbo size crossbeam on integrated shaped steel to jumbo size crossbeam design connected mode, realizes the simple and convenient installation of crossbeam, avoids on-the-spot a large amount of welding jobs, and guarantees to connect the reliability.
In order to achieve the purpose, the utility model adopts the following technical proposal:
a mounting structure of a large-size beam on integrated steel is disclosed, wherein a reinforcing cage tenon is arranged at the end part of the large-size beam, a limiting edge is protruded on the reinforcing cage tenon, a supporting interface is arranged on the integrated steel and comprises a bottom plate and two side plates, an upper fixing block and a lower fixing block are arranged on the inner walls of the two side plates, mounting seams which are gradually narrowed from top to bottom are respectively formed on the two fixing blocks, when the reinforcing cage tenon is assembled with the supporting interface, the limiting edge is simultaneously embedded into the upper mounting seam and the lower mounting seam, a first brake iron which compresses the limiting edge is inserted into a gap of the mounting seam of the upper fixing block, a second brake iron which compresses the limiting edge is inserted into a gap of the mounting seam of the lower fixing block, the reinforcing cage tenon is supported by the bottom plate, a tensioning bolt is arranged through the bottom plate, and is in threaded connection with the second brake iron, so as to provide downward wedging force for the second brake iron, be provided with on the first brake iron to its upper limit's apron, pass the apron and be provided with fastening bolt, fastening bolt and the upper end threaded connection of steel reinforcement cage tenon to provide wedge power down for first brake iron.
Particularly, the both sides on spacing edge all are provided with first brake iron, and threaded connection has adjusting bolt on the apron, and the apron directly exerts the pressure and acts on one of them side first brake iron, and adjusting bolt top is pressed on the first brake iron of opposite side.
In particular, the two sides of the limiting edge are provided with second brake irons, and each second brake iron is independently connected through a single tensioning bolt.
Particularly, the upper layer fixed block and the lower layer fixed block are composed of two wedge blocks arranged in a clearance mode, and inclined planes matched with the wedge blocks are formed on the first brake iron and the second brake iron.
Particularly, a limiting hole is formed in the tenon of the steel reinforcement cage, a first locking bolt is connected between the two side plates and penetrates through the limiting hole, and therefore the tenon of the steel reinforcement cage is locked.
Particularly, a second locking bolt is connected between the two side plates and located above the tenon of the steel reinforcement cage assembled in place, and the tenon of the steel reinforcement cage is limited upwards.
Especially, jumbo size crossbeam includes the thin-wall channel-section steel, reinforcing bar and staple bolt, a plurality of reinforcing bar is arranged in the vallecular cavity of thin-wall channel-section steel along thin-wall channel-section steel length direction, a plurality of staple bolt circumference spot welding is in the outer lane of each reinforcing bar, the bottom setting that the steel reinforcement cage tenon leaned on the thin-wall channel-section steel, and the outer wall of steel reinforcement cage tenon pastes with the reinforcing bar and welds even, the staple bolt is the narrowband, twist connecting screw outward from the thin-wall channel-section steel and link firmly with the staple bolt, with each staple bolt locking, concrete has been pour in the vallecular cavity, thereby with the thin-wall channel-section steel, the reinforcing bar, the staple bolt, the steel reinforcement cage tenon condenses as whole.
In particular, a dovetail groove for sinking the connecting screw into is arranged on the thin-wall channel steel corresponding to the screwing position of the connecting screw.
In particular, the thin-wall channel steel is of a split structure and comprises a first half part and a second half part, and at least one dovetail groove of the two half parts is overlapped and nested and is simultaneously fixed by a connecting screw so as to be combined.
To sum up, the beneficial effects of the utility model are that, compared with the prior art, the mounting structure of jumbo size crossbeam on integrated steel adds the brake shoe chucking mode through the support interface concatenation with the steel reinforcement cage tenon of crossbeam and integrated steel, has replaced original bolted connection and has added welded fixed knot structure, has realized the on-the-spot quick installation, and to jumbo size crossbeam structural design upper and lower floor fixed knot construct, increase the reliable fixed of wedge power fully assurance tenon through increasing each brake shoe simultaneously, has eliminated the joint gap, the pretightning force has been improved, the joint strength has been guaranteed, the on-the-spot assembly degree of difficulty has been reduced, assembly crossbeam provides a new thinking on the integrated shaped steel.
Drawings
FIG. 1 is a schematic view of an installation structure of a large-sized beam on integrated steel provided by an embodiment of the present invention;
FIG. 2 is a top view of a mounting structure of a large-sized beam on integrated steel according to an embodiment of the present invention;
FIG. 3 is an enlarged view at A in FIG. 1;
FIG. 4 is an enlarged view at B of FIG. 1;
fig. 5 is a structural side view of a large-sized cross beam provided by an embodiment of the present invention;
fig. 6 is an enlarged view at C in fig. 5.
Detailed Description
The technical solution of the present invention is further explained by the following embodiments with reference to the accompanying drawings.
Referring to fig. 1 to 6, in the present embodiment, an installation structure of a large-sized beam on integrated steel is provided, wherein a reinforcement cage tenon 2 is disposed at an end of the large-sized beam 1, and a limiting edge 21 protrudes from the reinforcement cage tenon 2. Jumbo size crossbeam 1 includes thin wall channel-section steel 11, reinforcing bar 12 and staple bolt 13, a plurality of reinforcing bar 12 is arranged in the vallecular cavity of thin wall channel-section steel 11 along 11 length direction of thin wall channel-section steel, the spot welding of 13 circumference of a plurality of staple bolt is in the outer lane of each reinforcing bar 12, reinforcement cage tenon 2 leans on the bottom setting of thin wall channel-section steel 11, and the outer wall of reinforcement cage tenon 2 pastes with reinforcing bar 12 and leans on to weld even, staple bolt 13 is the narrowband form, twist connecting screw 14 outward from thin wall channel-section steel 11 and link firmly with staple bolt 13, lock each staple bolt 13, concrete has been pour in the vallecular cavity, thereby with thin wall channel-section steel 11, reinforcing bar 12, staple bolt 13, reinforcement cage tenon 2 condenses to whole.
Particularly, a dovetail groove 15 for sinking the connecting screw 14 into the thin-wall channel 11 is formed in a screwing position of the connecting screw 14, and the dovetail groove 15 can ensure the bonding force between the thin-wall channel 11 and concrete and can hide the connecting screw 14.
According to the bearing requirements, some cross beams have large sizes, in order to reduce the forming difficulty and the production conveying pressure of the thin-wall channel 11, the thin-wall channel 11 can be designed into a split structure which can comprise a first half part and a second half part, at least one dovetail groove 15 of the two half parts is overlapped and nested, and is simultaneously fixed by a connecting screw 14 so as to be integrated, as shown in fig. 6. On the basis, more combination possibilities can be developed.
Be provided with support interface 4 on integrated shaped steel 3, specifically can weld when integrated shaped steel 3 leaves the factory and reserve. The support interface 4 comprises a bottom plate 41 and two side plates, an upper fixing block 42 and a lower fixing block 43 are arranged on the inner walls of the two side plates, and installation seams which are gradually narrowed from top to bottom are formed on the two fixing blocks respectively.
When steel reinforcement cage tenon 2 and support interface 4 assemble, spacing along 21 imbed two mounting joints about simultaneously, and insert in the clearance of the mounting joint of upper fixed block 42 and compress tightly spacing first brake iron 44 along 21, insert in the clearance of the mounting joint of lower fixed block 43 and compress tightly spacing second brake iron 45 along 21.
Preferably, the upper fixing block 42 and the lower fixing block 43 are both composed of two wedge blocks arranged at intervals, and inclined planes matched with the wedge blocks are formed on the first brake iron 44 and the second brake iron 45.
The steel reinforcement cage tenon 2 is supported by the bottom plate 41, and passes the bottom plate 41 and be provided with tie bolt 46, and tie bolt 46 and second brake iron 45 threaded connection to provide the downward wedging power for second brake iron 45, be provided with on the first brake iron 44 to its spacing apron 47, pass apron 47 and be provided with fastening bolt 48, fastening bolt 48 and the upper end threaded connection of steel reinforcement cage tenon 2, thereby provide the downward wedging power for first brake iron 44.
The two sides of the limiting edge 21 are provided with first brake irons 44, the cover plate 47 is in threaded connection with an adjusting bolt 49, the cover plate 47 directly presses the first brake iron 44 on one side, and the adjusting bolt 49 presses the first brake iron 44 on the other side, so that the wedging force of the first brake iron 44 can be further finely adjusted.
The two sides of the limiting edge 21 are provided with second brake irons 45, and each second brake iron 45 is independently connected through a single tensioning bolt 46.
Seted up spacing hole 22 on the steel reinforcement cage tenon 2, be connected with first locking bolt 5 between two curb plates, first locking bolt 5 passes spacing hole 22 to lock steel reinforcement cage tenon 2. And a second locking bolt 6 is connected between the two side plates, the second locking bolt 6 is positioned above the steel reinforcement cage tenon 2 assembled in place, and the steel reinforcement cage tenon 2 is limited upwards.
It should be noted that, the tenon and the brake iron can eliminate the connection gap caused by the manufacturing tolerance, the welding is not needed in the field, the pretightening force can be generated, and the connection reliability is improved.
The cross beam mounting structure is suitable for the linear integrated section steel, is also suitable for the integrated section steel with other shapes, such as L-shaped, T-shaped and the like, and only needs to be adaptively provided with the interfaces on the integrated section steel. In addition, the structure of the cross beam and the tenon is not limited, and the tenon with other shapes such as the eave beam can be similarly used.
Therefore, the embodiment further provides a construction method of the large-size cross beam on the integrated steel, and based on the installation structure of the large-size cross beam on the integrated steel, the construction method comprises the following steps:
1) pre-forming a support interface 4 on the integrated steel 3;
2) designing a large-size cross beam 1 structure, and arranging a reinforcement cage tenon 2 at the end part of the large-size cross beam;
3) during field construction, horizontally suspending the large-size beam 1, and simultaneously embedding the tenon 2 of the reinforcement cage at the end part into the upper mounting seam and the lower mounting seam of the support interface 4 to finish pre-assembly;
4) a first brake iron 44 and a second brake iron 45 are respectively inserted into the gaps of the two mounting seams, downward wedging force is provided for the second brake iron 45 by screwing a tensioning bolt 46 on the second brake iron 45, downward wedging force is provided for the first brake iron 44 by screwing a fastening bolt 48 at the upper end of the steel bar cage tenon 2, and therefore the steel bar cage tenon 2 is fastened, and pre-tightening force is generated;
5) screwing a first locking bolt 5 and a second locking bolt 6 into the support interface 4 to lock and limit the steel reinforcement cage tenon 2;
6) concrete is integrally poured in the integrated steel 3 and the supporting interface 4 thereof, the large-size cross beam 1 and the reinforcement cage tenon 2 thereof.
In conclusion, the mounting structure of the large-size beam on the integrated section steel replaces the original fixing structure of bolt connection and welding by splicing the tenon of the reinforcement cage of the beam and the support interface of the integrated section steel and clamping the brake irons, realizes on-site quick mounting, designs an upper-layer fixing structure and a lower-layer fixing structure aiming at the large-size beam structure, fully ensures the reliable fixation of the tenon by increasing the clamping force of each brake iron, eliminates the connection gap, improves the pretightening force, ensures the connection strength, reduces the on-site assembly difficulty, and provides a new idea for assembling the beam on the integrated section steel.
The above embodiments have been merely illustrative of the basic principles and features of the present invention, and the present invention is not limited by the above embodiments, and does not depart from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (9)

1. The utility model provides a mounting structure of jumbo size crossbeam on integrated shaped steel, its characterized in that, the tip of jumbo size crossbeam is provided with the steel reinforcement cage tenon, the arch has spacing edge on the steel reinforcement cage tenon, be provided with the support interface on the integrated shaped steel, the support interface includes bottom plate and two curb plates, be provided with upper fixed block and lower floor's fixed block on the inner wall of two curb plates, be formed with the installation seam that narrows from top to bottom respectively on the two-layer fixed block, the steel reinforcement cage tenon with during the support interface assembly, spacing edge imbeds simultaneously in two installation seams from top to bottom, and in the first brake iron that compresses tightly spacing edge is inserted in the clearance of the installation seam of upper fixed block, in the clearance of the installation seam of lower floor's fixed block insert the second brake iron that compresses tightly spacing edge, the steel reinforcement cage tenon by the bottom plate supports, and passes the bottom plate is provided with tension bolt, the tie bolt with second brake iron threaded connection to provide the downward wedging power for the second brake iron, be provided with on the first brake iron to its spacing apron, pass the apron is provided with fastening bolt, fastening bolt with the upper end threaded connection of steel reinforcement cage tenon, thereby provide the downward wedging power for first brake iron.
2. The mounting structure of a large-sized cross member on integrated steel according to claim 1, wherein: the first brake irons are arranged on two sides of the limiting edge, the cover plate is connected with an adjusting bolt in a threaded mode, the cover plate directly exerts pressure on the first brake iron on one side, and the adjusting bolt is pressed on the first brake iron on the other side in a propping mode.
3. The mounting structure of a large-sized cross member on integrated steel according to claim 1, wherein: the both sides on spacing edge all are provided with the second brake iron, and every second brake iron is by single straining bolt independent connection.
4. The mounting structure of a large-sized cross member on integrated steel according to claim 1, wherein: the upper fixed block with the lower floor fixed block comprises the wedge block that two clearances set up, be formed with the inclined plane with the wedge block adaptation on first brake iron, the second brake iron.
5. The mounting structure of a large-sized cross member on integrated steel according to claim 1, wherein: the steel reinforcement cage tenon is provided with a limiting hole, a first locking bolt is connected between the two side plates and penetrates through the limiting hole, and therefore the steel reinforcement cage tenon is locked.
6. The mounting structure of a large-sized cross member on integrated steel according to claim 1, wherein: and a second locking bolt is connected between the two side plates and is positioned above the tenon of the steel reinforcement cage which is assembled in place, so that the tenon of the steel reinforcement cage is limited upwards.
7. The mounting structure of a large-sized cross member on integrated steel according to claim 1, wherein: the large-size cross beam comprises thin-wall channel steel, reinforcing steel bars and a plurality of hoops, the reinforcing steel bars are arranged in the groove cavities of the thin-wall channel steel along the length direction of the thin-wall channel steel, the hoops are welded to the outer rings of the reinforcing steel bars in a circumferential direction in a spot mode, the steel bar cage tenons lean against the bottoms of the thin-wall channel steel, the outer walls of the steel bar cage tenons are attached to the reinforcing steel bars in a welding mode, the hoops are narrow-band-shaped, the thin-wall channel steel is screwed in by connecting screws to be fixedly connected with the hoops, the hoops are locked, concrete is poured in the groove cavities, and the thin-wall channel steel, the reinforcing steel bars, the hoops and the steel bar cage tenons are coagulated into a whole.
8. The mounting structure of a large-sized cross member on integrated steel according to claim 7, wherein: and dovetail grooves for enabling the connecting screws to sink into are formed in the thin-wall channel steel corresponding to the screwing positions of the connecting screws.
9. The mounting structure of a large-sized cross member on integrated steel according to claim 7, wherein: the thin-wall channel steel is of a split structure and comprises a first half part and a second half part, and at least one dovetail groove of the two half parts is overlapped and nested and is simultaneously fixed by a connecting screw so as to be combined.
CN202120208463.2U 2021-01-25 2021-01-25 Mounting structure of jumbo size crossbeam on integrated shaped steel Active CN214738752U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120208463.2U CN214738752U (en) 2021-01-25 2021-01-25 Mounting structure of jumbo size crossbeam on integrated shaped steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120208463.2U CN214738752U (en) 2021-01-25 2021-01-25 Mounting structure of jumbo size crossbeam on integrated shaped steel

Publications (1)

Publication Number Publication Date
CN214738752U true CN214738752U (en) 2021-11-16

Family

ID=78641549

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120208463.2U Active CN214738752U (en) 2021-01-25 2021-01-25 Mounting structure of jumbo size crossbeam on integrated shaped steel

Country Status (1)

Country Link
CN (1) CN214738752U (en)

Similar Documents

Publication Publication Date Title
KR101834006B1 (en) Roll forming steel plates built-up beam and steel frame using the same
CN112779985A (en) Installation structure and construction method of large-size cross beam on integrated steel
KR101636246B1 (en) Steel-PC hybrid beam and manufacturing method thereof
CN214738752U (en) Mounting structure of jumbo size crossbeam on integrated shaped steel
CN215563831U (en) European book truss and beam mounting structure
KR20090050778A (en) Steel beam assembly structure without welding
KR102212695B1 (en) Long span steel concrete composite beam
KR20020021747A (en) Composite beam with prestressed precast concrete panel
JP2008007950A (en) Embedded metal fitting and precast concrete member
CN214738709U (en) Mounting structure of balcony on integrated shaped steel class building
KR200386508Y1 (en) Prestressed steel beam composed by coupling the lower girder imtroduced with compressive force and the upper girder introduced with tensile force
CN212129617U (en) Assembled floor dry-type connected node
CN112779979A (en) Mounting structure and construction method of integrated steel type building upper balcony
CN210508035U (en) Assembly type combination beam secondary beam structure
KR200384805Y1 (en) Continuous Beam Construction Structure of Prestressed Concrete Beam
CN208733836U (en) A kind of connection structure of girder and secondary beam
CN214402195U (en) Mounting structure of integrated shaped steel and crossbeam
KR101419906B1 (en) Construction Method of tubular diagrid system
KR20120010430A (en) Joint unit structure of space truss with zigzag ends & temporary assembly and construction of space truss bridge
RU2380494C1 (en) Butt joint of precast concrete columns with solid flooring
CN214739266U (en) Combined cross beam structure
CN110485565A (en) A kind of standardization light steel frame beam-column connection and its installation method
CN214402143U (en) Connecting structure of integrated section steel and cross beam
CN214272422U (en) Connection node of assembled steel structure stand and precast concrete roof beam
JP2012132176A (en) Support metal fitting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant