CN214738651U - Cut transformation structure of dirty box culvert vatch basin - Google Patents

Cut transformation structure of dirty box culvert vatch basin Download PDF

Info

Publication number
CN214738651U
CN214738651U CN202022893322.7U CN202022893322U CN214738651U CN 214738651 U CN214738651 U CN 214738651U CN 202022893322 U CN202022893322 U CN 202022893322U CN 214738651 U CN214738651 U CN 214738651U
Authority
CN
China
Prior art keywords
intercepting
box culvert
culvert
vatch basin
gate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022893322.7U
Other languages
Chinese (zh)
Inventor
周梅芳
楼少华
唐颖栋
周欣星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN202022893322.7U priority Critical patent/CN214738651U/en
Application granted granted Critical
Publication of CN214738651U publication Critical patent/CN214738651U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model provides a cut transformation structure of dirty box culvert vatch basin, including the box culvert that cuts of vatch basin and following the river course setting, its characterized in that: the inlet of the intercepting well is connected with an upstream water inlet pipe culvert, the intercepting well is communicated with the sewage intercepting box culvert through a first outlet, a first gate is arranged at the first outlet, the upper part of the intercepting well is communicated with an external river channel through an overflow channel or a current situation open mouth, a water quality monitoring device is arranged in the intercepting well, and the water quality monitoring device and the first gate are in signal connection with a controller; the utility model provides a present rainwater pipe culvert that goes into the river and cut dirty box culvert along the river and meet the problem after engineering implementation such as distribution of rain and sewage engineering, positive this clear source, have the advantage that the transformation cost is low and treatment effect is good.

Description

Cut transformation structure of dirty box culvert vatch basin
Technical Field
The utility model relates to a drainage technology field, concretely relates to cut dirty box culvert vatch basin's transformation structure.
Background
Along with the rapid development of cities, the water quality of riverways is deteriorated and the black and odorous condition is increasingly serious due to a combined drainage mode. In recent years, treatment of black and odorous water bodies achieves remarkable effect all over the country, source control and sewage interception are taken as one of the most important treatment measures, a large number of engineering examples are adopted, intercepting wells and sewage interception pipe culverts-large interception and drainage systems are arranged on the riverway coasts, and a mixed flow port and a sewage port along the riverway are all connected into the sewage interception pipe culverts, so that sewage cannot enter the river in sunny days, and the water quality reaches the standard in sunny days. However, the problem of rain and sewage caused by the large intercepting and draining system is that the inflow water volume of the sewage plant is increased rapidly in rainy seasons, the inflow water concentration is low, the treatment efficiency of the sewage treatment plant is affected, and the impact on the sludge of the plant is easy to cause. Meanwhile, due to the fact that the plant station processing capacity is effective, the problems of combined system overflow pollution and the like are caused, rain and sewage are discharged into a river in a mixed mode, and the river channel environment is seriously impacted.
Therefore, some cities begin to develop comprehensive black elimination, just this clear source etc. and carry out thorough distribution of rain and sewage from the source gradually, will directly discharge the sewer pipe and insert municipal sewer nearby, peel off the sewage in the mixed flow pipe culvert in the current situation upper reaches and become the rainwater pipe culvert, consequently intercept dirty box culvert and define as first rain box culvert to realize that real meaningful sewage does not go into the river. However, the following problems are encountered in practical engineering: 1. the problem of accurate interception of the initial rain; 2. the problem of clear water peeling off, the current situation upper reaches rainwater canal conflicts with the elevation of intercepting box culvert, and when clear water peeling off, the upper reaches rainwater passageway is blocked by intercepting box culvert. When the initial rain sewage interception port in the intercepting well is closed, the water level rises, and the upstream area is caused to waterlog; 3. the problem of sewage backflow in the sewage intercepting box culvert results in long-term black and odorous open channels of upstream rainwater pipe culverts; meanwhile, the landscape requirements of the shoreline of some urban river channels require that the upper part of the intercepting well is modified to meet the requirements of beauty and safety. Therefore, higher requirements are required for the reconstruction of the sewage interception box culvert intercepting well.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a cut transformation structure of dirty box culvert vatch basin, the utility model provides a go into the river rainwater pipe culvert at present and cut the problem that dirty box culvert meets after engineering implementation such as rain and sewage reposition of redundant personnel engineering, positive this clear source, have the advantage with low and the treatment effect is good of transformation cost.
Therefore, the utility model adopts the following technical scheme:
the utility model provides a cut transformation structure of dirty box culvert vatch basin which characterized in that: including vatch basin and the box culvert that cuts that sets up along the river course, the import and the upper reaches of vatch basin intake pipe culvert are connected, by first export intercommunication between vatch basin and the box culvert that cuts, first exit sets up first gate, and the mouth is opened wide with outside river course intercommunication through overflow channel or current situation on vatch basin upper portion, sets up the monitoring water quality device in the vatch basin, monitoring water quality device and first gate and controller signal connection.
Further: cut and dirty box culvert in set up and wear the culvert canal, cut off the well and cut and set up the second export between the dirty box culvert, the second export is less than overflow channel or the current situation and opens spaciously the mouth, and the second export is for wearing the import of culvert canal, wears the export and the outside river course intercommunication of culvert canal.
Further: the first gate is an upper opening gate and is arranged on one side of the intercepting well.
Further: the first gate is a lower open gate and is arranged on one side of the sewage intercepting box culvert.
Further: the top of the intercepting well is provided with an intercepting well top cover, and the overflow channel is provided with a safety protection plate.
Further: the sewage intercepting box culvert is internally provided with a first liquid level meter, the intercepting well is internally provided with a second liquid level meter and a lifting device, the bottom of the intercepting well is provided with a water collecting pit, and the first liquid level meter and the second liquid level meter are in signal connection with a controller.
Further: the lifting device is connected with the first valve and the second valve, and the lifting device, the first valve and the second valve are in signal connection with the controller.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. the utility model is provided with the overflow channel, and when the rain is in fine days and in the first rains, the controller controls the first outlet to be opened through the water quality monitoring device, thereby realizing the effect of intercepting the first rain and avoiding the first rain (sewage) from being mixed with the rainwater; when rainy day, first export is closed, and middle and later stage rainwater is through wearing culvert canal, and the rainwater releases the river course, reduces because shutoff cuts dirty mouthful, and the vatch basin water level risees, leads to the regional waterlogging in upper reaches, realizes cutting dirty box culvert clear water and effectively peels off.
2. The utility model discloses add hoisting device, first valve, second valve, level gauge, water quality monitoring device and controller, discern the liquid level condition, the quality of water condition to signal transmission to controller, the controller is automatic according to the control logic who sets for and is carried out, and control is accurate, realizes the control linkage of liquid level and gate, prevents to dampe sewage in the pipe culvert and flows backward. Water quality monitoring links with gate control, can accurate separation just rain and middle and later stage rainwater, effectively carries out the clear water and peels off.
3. The utility model discloses to the transformation of damming well lid, reduce safe risk, increase pleasing to the eye effect, satisfy the river course view requirement. The existing intercepting well is not greatly improved, the improvement cost is low, and the remediation effect is good.
Drawings
Fig. 1 is a schematic structural diagram of a first embodiment of the present invention;
fig. 2 is a schematic structural diagram of a second embodiment of the present invention;
fig. 3 is a schematic structural diagram of a third embodiment of the present invention;
fig. 4 is a schematic structural diagram of a fourth embodiment of the present invention.
The labels in the figures are: 1-a first outlet; 2-a second outlet; 3-an overflow channel; 4-sewage intercepting box culvert overflow port; 5-an inlet; 6-safety protection plate; 7-upper open gate; 8-intercepting well top cover; 9-passing a culvert and a pipe channel; 10-a fixture; 11-a first level gauge; 12-a second level gauge; 13-a water quality monitoring device; 14-a first valve; 15-a second valve; 16-upstream water inlet pipe culvert; 17-a lifting device; 18-a sump; 19-intercepting well; 20-sewage intercepting box culvert; 21-a lower open gate; 22-a service aisle; 23-safe ladder stand.
Detailed Description
The following description is made with reference to the accompanying drawings and examples, but not to be construed as limiting the invention.
As shown in fig. 1-4, the utility model provides a pair of cut dirty box culvert reconstruction structure of vatch basin, including vatch basin 19 and the box culvert 20 that cuts dirty that sets up along the river course, the import 5 and the upper reaches of vatch basin 19 are intake the pipe culvert 16 and are connected, by 1 intercommunication in first export between vatch basin 19 and the box culvert 20 that cuts dirty, 1 department in first export sets up first gate, and the opening is opened wide with outside river course intercommunication through overflow channel 3 or current situation on vatch basin 19 upper portion, sets up monitoring water quality device 13 in the vatch basin 19, monitoring water quality device and first gate and controller signal connection. The first gate is an upper opening gate 7 and is arranged on one side of the intercepting well 19. The top of the intercepting well 19 is provided with an intercepting well top cover 8, the overflow channel 3 is provided with a safety protection plate 6, the safety protection plate 6 is made of metal materials or other composite materials, the sun-proof and pressure-resistant functions are achieved, water is discharged through the water pressure function during rainwater overflow, the water is closed through the gravity function during sunny days, and pedestrians are prevented from falling. The intercepting well 19 is provided with an overhaul channel 22, a safety ladder 23 and a later operation and maintenance inlet and outlet.
Example 1:
as shown in fig. 1, when a small amount of sewage or early rains are produced in a sunny day, the water quality monitoring device reaches a set threshold value, namely water quality difference, the controller controls the upper open gate 7 to be opened, and the sewage or the early rains are all connected to the sewage interception box culvert; in the middle and later period rainwater, the water quality monitoring device reaches a set threshold value, namely the water quality is good, the controller controls the upper open gate 7 to be closed, and the middle and later period rainwater overflows to a river channel from the overflow channel; embodiment 1 is applicable to and intercepts 20 liquid levels of dirty box culvert and be less than the bottom elevation H2 that dams for a long time, and fine day sewage and first rain can flow into certainly and intercept dirty box culvert, and middle and later stage rainwater under the condition that first export 1 was closed, along with the water level risees from intercepting dirty box culvert top and turning over to the river course, can not lead to the condition of rainwater pipe culvert upper reaches regional waterlogging.
Example 2:
as shown in fig. 2, based on embodiment 1, a second outlet 2 is additionally arranged between the catch basin 19 and the sewage intercepting box culvert, the second outlet 2 is lower than the overflow channel or the current open mouth, a culvert penetrating pipe channel 9 is arranged in the sewage intercepting box culvert 20, the second outlet 2 is an inlet 5 of the culvert penetrating pipe channel 9, and an outlet of the culvert penetrating pipe channel 9 is communicated with an external river channel. Wear culvert pipe canal 9 and be metal material pipeline or reinforced concrete structure, structure or material are durable safely relatively, wear culvert pipe canal 9 and carry out fixed connection through fixing device 10 and cut dirty box culvert 20, and carry out the stagnant water and handle, and fixing device 10 is the ferrule of taking the support, and the ferrule is connected with wearing culvert pipe canal 9, and through support and cut dirty box culvert 20 fixed connection.
The working principle of the embodiment is similar to that of the embodiment 1, but in the middle and later periods of rainwater, the water quality monitoring device 13 reaches a set threshold value, namely the water quality is good, the controller controls the upper open gate 7 to be closed, and the rainwater is firstly drained into a river through the culvert pipe 9; when the rainfall is larger, the water flows to the river channel from the overflow channel or the current situation open; embodiment 2 is applicable to the condition that the liquid level of the sewage intercepting culvert 20 is lower than the intercepting bottom hole elevation H2 for a long time, and the upper open gate 7 is closed, and the upstream area can cause waterlogging.
Example 3:
as shown in fig. 3, on the basis of embodiment 1, the first gate is set as a lower open gate 21, and is arranged at one side of the sewage intercepting culvert 20. A first liquid level meter 11 is arranged in the sewage intercepting box culvert, a second liquid level meter 12 and a lifting device 17 (comprising a grating for filtering) are arranged in the intercepting well 19, a sump 18 is formed in the bottom of the intercepting well 19, and the first liquid level meter 11 and the second liquid level meter 12 are in signal connection with a controller. 19 bottoms of vatch basin adopt the secondary to pour the elevation of raising the water inlet to unanimous with the elevation of upper reaches inlet pipe culvert, 19 bottoms of vatch basin are the slope form, and the slope sets up sump pit 18. The lifting device 17 is connected with the first valve 14 and the second valve 15, and the lifting device 17, the first valve 14 and the second valve 15 are in signal connection with the controller.
The working principle of the embodiment is as follows: when a small amount of sewage is produced in fine days or rains are in the beginning, the water quality monitoring device 13 reaches a set threshold value, namely water quality difference, and the water level H of the first liquid level meter 11 in the sewage intercepting box culvert 20 is measured; the controller controls the lower open type gate 21 to open, the opening height of the valve cannot be lower than H, and sewage of the sewage intercepting box culvert is prevented from flowing backwards; when the liquid level of the sewage interception box culvert is more than or equal to the liquid level in the intercepting well, the lifting device 17 is started, the second valve 15 is opened, the first valve 14 is closed, and the sewage or the initial small rain is completely lifted to the sewage interception box culvert; when ecological torrent exists in an upstream pipe canal on a sunny day, the water quality monitoring device 13 reaches a set threshold value, namely the water quality is good, the controller controls the lower open gate 21 to be closed, the lifting device 17 is started, the first valve 14 is opened, the second valve 15 is closed, and the ecological torrent is discharged to a river channel; in the middle and later period of rainwater, the water quality monitoring device 13 reaches a set threshold value, namely the water quality is good, the controller controls the lower open gate 21 to be closed, the lifting device 17 is started, the first valve 14 is opened, the second valve 15 is closed, the lifting device 17 discharges the middle and later period rainwater to the river channel, and meanwhile, the middle and later period rainwater overflows to the river channel through the overflow channel 3;
the difference between the embodiment 1 and the embodiment 3 is that in the embodiment 3, on the basis of the embodiment 1, an original upper open gate 7 is changed into a lower open gate 21 in a sewage intercepting box culvert, a first liquid level meter 11, a second liquid level meter 12 and a valve lifting device are additionally arranged, and a backflow preventing function is mainly additionally arranged; if ecological torrent (or other water reaching the standard) exists in the water inlet pipe culvert 16 at the upstream of the inlet all the year round, the first valve 14 and the second valve 15 are arranged, and the function of discharging clear water in sunny days is added, so that the problem that the rainwater quality of a rainwater pipe canal is black and smelly due to the fact that a small amount of spring water is accumulated for too long time is solved. Embodiment 3 is applicable to the case that the liquid level of the intercepting box culvert 20 is higher than the elevation of the intercepting well bottom for a long time, sewage flows backward, the pollution of upstream non-point source is serious, or the upstream water inlet pipe culvert 16 has ecological torrent (or other water reaching the standard).
Example 4:
the reference numerals are the same as those of embodiment 4, the meaning is also the same as that of embodiment 4, as shown in fig. 4, on the basis of embodiment 3, a second outlet 2 and a culvert penetrating pipe channel 9 are additionally arranged, embodiment 4 is suitable for the situation that the liquid level of a sewage intercepting box culvert 20 is higher than the elevation of the bottom of a intercepting well for a long time, sewage flows backwards, meanwhile, a lower opening type gate 21 is closed, the upstream area can cause serious waterlogging, and the water level is reduced and accumulated water is timely discharged by increasing the culvert penetrating pipe channel 9.
The above embodiments are merely preferred technical solutions of the present invention, and it should be understood by those skilled in the art that modifications or substitutions of technical solutions or parameters in the embodiments can be made without departing from the principles and essential conditions of the present invention, and all the modifications or substitutions should be covered within the protection scope of the present invention.

Claims (8)

1. The utility model provides a cut transformation structure of dirty box culvert vatch basin, includes the box culvert that cuts of vatch basin and edge river course setting, its characterized in that: the import and the upper reaches of vatch basin are intake the pipe culvert and are connected, by first export intercommunication between vatch basin and the box culvert that cuts dirty, first exit sets up first gate, and the vatch basin upper portion is opened wide the mouth through overflow path or current situation and is communicate with outside river course, sets up the monitoring water quality device in the vatch basin, monitoring water quality device and first gate and controller signal connection.
2. The improved structure of the intercepting box culvert intercepting well according to claim 1, characterized in that: cut and dirty box culvert in set up and wear the culvert canal, cut off the well and cut and set up the second export between the dirty box culvert, the second export is less than overflow channel or the current situation and opens spaciously the mouth, and the second export is for wearing the import of culvert canal, wears the export and the outside river course intercommunication of culvert canal.
3. The improved structure of the intercepting box culvert intercepting well according to claim 1, characterized in that: the first gate is an upper opening gate and is arranged on one side of the intercepting well.
4. The improved structure of the intercepting box culvert intercepting well according to claim 1, characterized in that: the first gate is a lower open gate and is arranged on one side of the sewage intercepting box culvert.
5. The improved structure of the intercepting box culvert intercepting well according to claim 1, characterized in that: the top of the intercepting well is provided with an intercepting well top cover, and the overflow channel is provided with a safety protection plate.
6. The improved structure of the intercepting box culvert intercepting well according to claim 1, characterized in that: the sewage intercepting box culvert is internally provided with a first liquid level meter, the intercepting well is internally provided with a second liquid level meter and a lifting device, the bottom of the intercepting well is provided with a water collecting pit, and the first liquid level meter and the second liquid level meter are in signal connection with a controller.
7. The improved structure of the intercepting box culvert intercepting well according to claim 6, wherein: the vatch basin bottom adopts the secondary to pour the elevation of raising the water inlet to unanimous with the elevation of upper reaches inlet pipe culvert, and the vatch basin bottom is the slope form, and the slope sets up the sump pit.
8. The improved structure of the intercepting box culvert intercepting well according to claim 6, wherein: the lifting device is connected with the first valve and the second valve, and the lifting device, the first valve and the second valve are in signal connection with the controller.
CN202022893322.7U 2020-12-03 2020-12-03 Cut transformation structure of dirty box culvert vatch basin Active CN214738651U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022893322.7U CN214738651U (en) 2020-12-03 2020-12-03 Cut transformation structure of dirty box culvert vatch basin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022893322.7U CN214738651U (en) 2020-12-03 2020-12-03 Cut transformation structure of dirty box culvert vatch basin

Publications (1)

Publication Number Publication Date
CN214738651U true CN214738651U (en) 2021-11-16

Family

ID=78619162

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022893322.7U Active CN214738651U (en) 2020-12-03 2020-12-03 Cut transformation structure of dirty box culvert vatch basin

Country Status (1)

Country Link
CN (1) CN214738651U (en)

Similar Documents

Publication Publication Date Title
KR101224277B1 (en) Keeping treatment system of primary stage rainwater for separation seeage and valleywater using the water-storage tank
CN203334416U (en) Multifunctional sewage intercepting device
CN211817483U (en) Automatic rainwater shunting and filtering bucket for building
CN106499041A (en) A kind of Water Collection Tank in Drainage Pumping Station efficiently cuts dirty system
CN207003629U (en) A kind of sewage treatment shunting well
CN216475468U (en) Cut dirty main pipe and prevent flowing backward reposition of redundant personnel well
CN112227501A (en) Initial rainwater intelligent collecting and distributing gutter inlet and distributing method
CN210562502U (en) Integrated hydraulic intercepting well
CN214738651U (en) Cut transformation structure of dirty box culvert vatch basin
CN112064755A (en) Accurate reposition of redundant personnel of inlet for stom water initial stage rainwater and processing system
CN209686557U (en) A kind of Vatch basin with debris retaining function
CN102518200A (en) Slab culvert sewage intercepting well
CN113152637B (en) Integrated automatic intercepting well and intercepting method
CN206000018U (en) A kind of Vatch basin
CN215759479U (en) Integrated automatic intercepting well
CN212358883U (en) Green roof
CN210857471U (en) Novel vatch basin
CN212453031U (en) Three-stage intercepting well
CN210857472U (en) Bury formula dispersion regulation storage battery system
CN211571912U (en) Urban rainwater collection water level control system
CN104878823A (en) Combined pipeline initial rainwater interception, storage and drainage system and storage and drainage method
CN209227667U (en) A kind of rainwater saves system
CN209011283U (en) A kind of sponge novel urban rainwater separate system
CN202380570U (en) Slab culvert sewage intercepting well
CN115110470A (en) Flood-running river channel storage device