CN206000018U - A kind of Vatch basin - Google Patents

A kind of Vatch basin Download PDF

Info

Publication number
CN206000018U
CN206000018U CN201620860043.1U CN201620860043U CN206000018U CN 206000018 U CN206000018 U CN 206000018U CN 201620860043 U CN201620860043 U CN 201620860043U CN 206000018 U CN206000018 U CN 206000018U
Authority
CN
China
Prior art keywords
vatch basin
discharge port
pit shaft
floss hole
flood season
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620860043.1U
Other languages
Chinese (zh)
Inventor
许光明
陈俊
陈波
朱迪
宗圆
杨云安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHANGZHOU DRAINAGE MANAGEMENT BUREAU
Original Assignee
CHANGZHOU DRAINAGE MANAGEMENT BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGZHOU DRAINAGE MANAGEMENT BUREAU filed Critical CHANGZHOU DRAINAGE MANAGEMENT BUREAU
Priority to CN201620860043.1U priority Critical patent/CN206000018U/en
Application granted granted Critical
Publication of CN206000018U publication Critical patent/CN206000018U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

This utility model provides a kind of Vatch basin, including pit shaft, water inlet, the mouth that dams, downflow weir;Described water inlet is arranged on described pit shaft, and for connecting the outlet of the interflow water inlet pipe of closure works system, the described mouth that dams is arranged on the bottom of described pit shaft, for connecting the entrance of the sewage vent line of closure works system;Described Vatch basin also includes first discharge port and one-way cock, and described first discharge port is arranged on described pit shaft, and described one-way cock is arranged on outside described first discharge port;The position that the top of described first discharge port is located is not higher than the flood season level line at the position that described Vatch basin is installed, and the position that the bottom of described downflow weir is located is not less than the flood season level line at the position that described Vatch basin is installed.Vatch basin of the present utility model, can carry out the dirty separation of rain, that can farthest reduce upstream coverage floods flooded risk again effectively.

Description

A kind of Vatch basin
【Technical field】
This utility model is related to a kind of Vatch basin.
【Background technology】
At present, urban drainage pipe network system is generally divided into two kinds:Drainage system pipe network and combined flow system pipe network.Interflow Drainage system processed has two major functions, and one is intercepting sewage so as to enter the pipeline of sewage treatment plant, and does not enter river course, In order to avoid causing river water body to pollute.Two is in rainy day flood discharge.When designing Vatch basin, it is generally desirable to during the rainy day, meeting flood discharge Sewage discharge is avoided to enter polluted river water on the premise of condition as far as possible.In existing Vatch basin scheme, typically can accomplish Separate sewage during Rainwater Initial, but the dirty separation of effective rain of rainwater middle and late stage cannot be accomplished, and during heavy rain, presence cannot be timely The problem of flood discharge, leads to the upstream region servicing to occur flooding flooded risk.
【Utility model content】
Technical problem to be solved in the utility model is:Make up above-mentioned the deficiencies in the prior art, propose a kind of Vatch basin, The dirty separation of rain can effectively be carried out, that can farthest reduce upstream coverage floods flooded risk again.
Technical problem of the present utility model is solved by following technical scheme:
A kind of Vatch basin, including pit shaft, water inlet, the mouth that dams, downflow weir;Described water inlet is arranged on described pit shaft, For connecting the outlet of the interflow water inlet pipe of closure works system, the described mouth that dams is arranged on the bottom of described pit shaft, cuts for connecting The entrance of the sewage vent line of streaming system;Described Vatch basin also includes first discharge port and one-way cock, described first discharge Mouth is arranged on described pit shaft, and described one-way cock is arranged on outside described first discharge port;The top of described first discharge port The position being located is not higher than the flood season level line at the position that described Vatch basin is installed, the position at the bottom place of described downflow weir Put the flood season level line being not less than at the position that described Vatch basin is installed.
Preferably in technical scheme,
Described Vatch basin also includes the second floss hole, gate, liquidometer and control system, and described second floss hole is arranged on On described pit shaft, with described first discharge port the same side on pit shaft, the height of described second floss hole setting is less than institute State first discharge port, described gate locating is on described second floss hole;The input of described control system connects described liquid level Meter, outfan connects described gate, and the water level signal for being transmitted according to described liquidometer controls the keying of described gate.
The position that the top of described second floss hole is located is less than the position that the top of described first discharge port is located, and The fine day normal water line at position that the position that the top of the second floss hole is located and described Vatch basin are installed is in sustained height.
The flood season level line at position that the position that the top of described first discharge port is located and described Vatch basin are installed In sustained height.
The flood season level line at position that the position that the bottom of described downflow weir is located and described Vatch basin are installed is same One height.
Described one-way cock is duckbill valve or flap valve.
Described pit shaft is cuboid.
The beneficial effect that this utility model is compared with the prior art is:
Vatch basin of the present utility model, the tip position of the first discharge port of setting is not higher than flood season level line, first row Put setting one-way cock on mouth, when rainwater middle and late stage, the sewage that pollutant siltation connects in wellbore bottom, mouth to be dammed After pumping plant suction in discharge tube, flow out to sewage farm from the mouth that dams, and the rainwater on upper strata then can pass through first row Put mouth, one-way cock is emitted into river course, realize the dirty separation of effective rain during rainwater middle and late stage.And the downflow weir bottom arranging is located Position in the position being not less than described flood season level line, then in rainwater middle and late stage pit shaft, the rainwater of accumulation can cover overflow weir flow Enter river course, the quick flood discharge of achievable middle and late stage, thus that reduces upstream coverage floods flooded risk.Of the present utility model dam Well, by the cooperation of opening and downflow weir, can be operated under various modes, can effectively carry out the dirty separation of rain, again can be That reduces to big degree upstream coverage floods flooded risk.
【Brief description】
Fig. 1 is the side portion structure schematic diagram of the Vatch basin of this utility model specific embodiment;
Fig. 2 is the schematic top plan view of the Vatch basin of this utility model specific embodiment;
Fig. 3 be this utility model specific embodiment Vatch basin in first discharge port position generalized section;
Fig. 4 be this utility model specific embodiment Vatch basin in the second floss hole position generalized section.
【Specific embodiment】
With reference to specific embodiment and compare accompanying drawing this utility model is described in further details.
As shown in figures 1-4, the Vatch basin of this specific embodiment includes pit shaft 1, water inlet 2, the mouth 3 that dams, downflow weir 4, First discharge port 5 and one-way cock 6.Pit shaft 1 is rectangular shape.
Water inlet 2 is arranged on pit shaft 1, and for connecting the outlet of the interflow water inlet pipe 100 of closure works system, the mouth 3 that dams sets Put the bottom in pit shaft 1, for connecting the entrance of the sewage vent line 200 of closure works system.Sewage vent line 200 connects row The pumping plant of dirty system, by the mud in pit shaft 1 via sewage vent line 200 in the presence of pumping plant, pumps into sewage treatment plant. First discharge port 5 is arranged on pit shaft 1, and one-way cock 6 is arranged on the outside of first discharge port 5.One-way cock 6 can be duckbill valve Or flap valve.The position that the top of first discharge port 5 is located below the flood season level line S at the position that Vatch basin is installed, The position that the bottom of downflow weir 4 is located is higher than flood season level line S.
The occurrence of flood season level line is different according to different cities or area.Specifically, for realizing water conservancy For the city of big encirclement or the control of city's freshwater line, flood season level line is the controlled water level in flood season for the river course, exceedes and is subject to During control water level, the water of interior korneforos is pumped to periphery by water conservancy drainage pumping stations.For being not carried out, water conservancy is big to surround or city river For the uncontrolled city in position, flood season level line takes 1 year 1 chance (standard can be different with various places situation) flood level highest Value.Usually, with the height at flood season level line S place as basis reference, it is set to 0m, then height that above-ground route E is located is 2.3m, fine Its normal water line L is then in the lower section of flood season level line S.Different cities or area, both differences are different, need basis to dam The particular location that well is installed determines.For example, fine day normal water line L is probably differed with flood season level line S taking Changzhou as a example 0.3m.Additionally, flood season level line " controlled waterline when really rainy day river water level is controlled.Some cities are in water conservancy management Aspect not using strict control flood season level line by the way of, but typically also have flood level duration curve, then this specific embodiment Flood season level line is also covered by the flood level duration curve in corresponding some cities or area.
Preferably, the flood season level line S at position that the position that the top of first discharge port 5 is located is installed with Vatch basin In sustained height.So, in the case of the top of first discharge port 5 is maintained an equal level with flood season level line S, when rainfall sky, first row The position putting mouth 5 is of a relatively high, thus occurring the time of overflow just relatively more late from first discharge port 5, then overflow generating capacity phase To fewer, such that it is able to reduce overflow discharge as far as possible, reduce the impact to water pollution.
Preferably, the position that the bottom of downflow weir is located is with flood season level line S in sustained height.When rainfall sky occurs, If below flood season level line, easily just there is overflow, polluted river channel at the rainfall initial stage in the position that the bottom of downflow weir is located. If more position more than flood season level line, cannot flood discharge in time, easily make upstream flood flood.When downflow weir bottom with When flood season level line S maintains an equal level, then can improve flood discharge performance as far as possible on the premise of occurring reducing overflow, improve upstream service The prevention waterlogging ability in region.
In addition, the manhole 10 shown in figure is opened in the top of pit shaft 1, enters in pit shaft in order to staff and tieed up Repair or emergency processing.
Sewage or rainwater enter Vatch basin by water inlet pipe 100.During Vatch basin work, in fine day, only sewage enters, By entering sewage lifting pump station after the mouth 3 that dams, reach sewage treatment plant afterwards.During the rainy day, when Rainwater Initial or rapid and short Temporary rain during, enter rainwater less when, the mouth 3 that dams also by pit shaft 1 bottom enters sewage lifting pump station, and obstructed Cross first discharge port and enter river course, in order to avoid polluted river channel.When rainwater mid-term, the rainwater of entrance is more, then pumping plant side stops Work, in order to avoid a large amount of rainwater enters sewage treatment plant.Now, the rainwater of sludgd deposition accumulation in wellbore bottom, pit shaft reaches During the height that first discharge port 5 is located, enter in river course R by after one-way cock 6, thus realizing effective during rainwater middle and late stage Rain is dirty to be separated.When rainwater middle and late stage or heavy rain, in pit shaft, the rainwater of accumulation is more, after reaching the height that downflow weir 4 is located, Cover downflow weir 4 and flow into river course R, then can achieve quick flood discharge, thus that reduces upstream coverage floods flooded risk.
Preferably, Vatch basin also includes the second floss hole 7, gate 8, liquidometer and control system.Second floss hole 7 is arranged On pit shaft 1, with first discharge port 5 the same side on pit shaft 1, the height of the second floss hole 7 setting is less than the first discharge Mouth 5, gate 8 is arranged on the second floss hole 7.In power distribution cabinet 9, the input of control system connects liquid level to set-up of control system Meter (in figure does not illustrate), outfan connects gate 8, the keying of the water level signal regulating gate for transmitting according to liquidometer. During work, when persistent heavy rainfall, the accumulation of rainwater in pit shaft 1 persistently increases, when being also not enough to quick flood discharge by downflow weir 4 When, upstream coverage is flooded flooded risk and is increased.When the liquid level in pit shaft 1 reaches certain altitude, for example nearer apart from above-ground route E When, control system controls opens gate 8, thus passing through this direct flood discharge of gate 8, to reach the quick flood discharge under the state of emergency, That reduces upstream coverage further floods flooded risk.
Preferably, the fine day ordinary water level at position that the position that the top of the second floss hole 7 is located is installed with Vatch basin Line L is in sustained height.During the rainy day, when opening the second floss hole 7, if floss hole position is relatively low, flow velocity is larger, easily will manage In road, the pollutant of deposition wash away out, polluted river channel.If floss hole position higher it is impossible to play dump flood discharge work With.The top of the second floss hole 7 is maintained an equal level with fine day normal water line L, thus dropping as far as possible on the premise of playing flood discharge effect Flow velocity when low second floss hole 7 is opened, reduces and pipeline is washed away, thus reducing the pollution to river course.
The Vatch basin of this specific embodiment, the mouth that dams, first discharge port (one-way cock) and downflow weir are arranged on difference Height at, the mouth that dams is located at bottom, and first discharge port is placed in the middle, and the position highest of downflow weir so, gradually can increase in rainwater When play a role one by one, be combined into four kinds of working conditions:Dam;One-way cock discharges;One-way cock discharge+downflow weir discharges; One-way cock discharge+downflow weir discharge+gate dump.Multiple floss hole series connection play a role, and no matter both can guarantee that at what Under kind of rain fall all will not easily to Drain contamination for river channel, again can in the case of lasting rainwater or heavy rain timely flood discharge, maximum journey Degree ground reduces upstream coverage and floods flooded risk.
Above content be with reference to specific preferred implementation further detailed description of the utility model it is impossible to Identification is of the present utility model to be embodied as being confined to these explanations.Ordinary skill for this utility model art For personnel, make some replacements or obvious modification without departing from the concept of the premise utility, and performance or purposes Identical, all should be considered as belonging to protection domain of the present utility model.

Claims (7)

1. a kind of Vatch basin, including pit shaft, water inlet, the mouth that dams, downflow weir;Described water inlet is arranged on described pit shaft, uses In the outlet of the interflow water inlet pipe connecting closure works system, the described mouth that dams is arranged on the bottom of described pit shaft, dams for connecting The entrance of the sewage vent line of system;It is characterized in that:Described Vatch basin also includes first discharge port and one-way cock, described First discharge port is arranged on described pit shaft, and described one-way cock is arranged on outside described first discharge port;Described first discharge The position that the top of mouth is located is not higher than the flood season level line at the position that described Vatch basin is installed, the bottom of described downflow weir The position being located is not less than the flood season level line at the position that described Vatch basin is installed.
2. Vatch basin according to claim 1 it is characterised in that:Described Vatch basin also includes the second floss hole, gate, liquid Position meter and control system, described second floss hole is arranged on described pit shaft, same with what described first discharge port was located on pit shaft Side, the height of described second floss hole setting is less than described first discharge port, and described gate locating is in described second floss hole On;The input of described control system connects described liquidometer, and outfan connects described gate, for being passed according to described liquidometer Defeated water level signal controls the keying of described gate.
3. Vatch basin according to claim 2 it is characterised in that:The position that the top of described second floss hole is located is less than The position that the top of described first discharge port is located, and the position that the top of the second floss hole is located pacified with described Vatch basin Fine day normal water line at the position of dress is in sustained height.
4. Vatch basin according to claim 1 it is characterised in that:Position and institute that the top of described first discharge port is located State flood season level line at the position that Vatch basin is installed in sustained height.
5. Vatch basin according to claim 1 it is characterised in that:The position that the bottom of described downflow weir is located with described section The flood season level line at position that stream well is installed is in sustained height.
6. Vatch basin according to claim 1 it is characterised in that:Described one-way cock is duckbill valve or flap valve.
7. Vatch basin according to claim 1 it is characterised in that:Described pit shaft is cuboid.
CN201620860043.1U 2016-08-09 2016-08-09 A kind of Vatch basin Active CN206000018U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620860043.1U CN206000018U (en) 2016-08-09 2016-08-09 A kind of Vatch basin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620860043.1U CN206000018U (en) 2016-08-09 2016-08-09 A kind of Vatch basin

Publications (1)

Publication Number Publication Date
CN206000018U true CN206000018U (en) 2017-03-08

Family

ID=58199907

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620860043.1U Active CN206000018U (en) 2016-08-09 2016-08-09 A kind of Vatch basin

Country Status (1)

Country Link
CN (1) CN206000018U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109372085A (en) * 2018-11-12 2019-02-22 北京良乡蓝鑫水利工程设计有限公司 A kind of shunting well
CN112854416A (en) * 2021-03-05 2021-05-28 无锡市政设计研究院有限公司 Backflow-preventing intercepting well and operation method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109372085A (en) * 2018-11-12 2019-02-22 北京良乡蓝鑫水利工程设计有限公司 A kind of shunting well
CN109372085B (en) * 2018-11-12 2024-03-15 北京良乡蓝鑫水利工程设计有限公司 Shunt well
CN112854416A (en) * 2021-03-05 2021-05-28 无锡市政设计研究院有限公司 Backflow-preventing intercepting well and operation method thereof

Similar Documents

Publication Publication Date Title
CN104174191B (en) Integral grit chamber for treating rainwater and treating method
CN209686564U (en) A kind of small sponge urban ecology rainwater storage cell system
CN110965631A (en) Deep tunnel drainage shaft with energy dissipation function
KR101224277B1 (en) Keeping treatment system of primary stage rainwater for separation seeage and valleywater using the water-storage tank
CN106499041A (en) A kind of Water Collection Tank in Drainage Pumping Station efficiently cuts dirty system
CN206000018U (en) A kind of Vatch basin
CN216007201U (en) A cut dirty inspection shaft for confluence blowdown mouthful department
CN210086451U (en) Multiple-effect multiplication regulation and storage tank
CN105178425B (en) Cities and towns water drainage, moisturizing, water-change pump station hinge
CN110158750A (en) Dual-control intelligent Vatch basin
CN208293341U (en) Roadside greening leukorrhagia in conjunction with pipe gallery seeps purification and the reclaiming system of rainwater
CN207582227U (en) A kind of improved road surface drainage device
CN104878823B (en) Converging pipeline initial rainwater intercepting, storing and discharging system and method
CN202730707U (en) Initial-stage rainwater intercepting and shunting as well as later-stage rainwater separating system for flood drainage river channel
CN210857472U (en) Bury formula dispersion regulation storage battery system
CN108360646A (en) Pipe gallery dmp filter blowdown is regulated and stored device
CN210117787U (en) Underground garage drainage system
CN108374471A (en) A kind of drainage pumping plant
CN205637082U (en) Take horizontal grid intercepting device's vatch basin
CN205637032U (en) Burst regulation discharge system that dams
CN210767122U (en) Underground rainwater centralized drainage system for united villas
CN203769036U (en) Initial rainwater cutoff, storage and drainage system of confluence pipeline
CN209227711U (en) Rainwater cabin and pipe gallery with rainwater cabin
CN208202078U (en) Pipe gallery dmp filter blowdown is regulated and stored device
CN207436177U (en) A kind of drainage system with pump row

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant