CN214737433U - Portable reinforcement platform of cable-stay bridge creeping formwork construction - Google Patents

Portable reinforcement platform of cable-stay bridge creeping formwork construction Download PDF

Info

Publication number
CN214737433U
CN214737433U CN202120628750.9U CN202120628750U CN214737433U CN 214737433 U CN214737433 U CN 214737433U CN 202120628750 U CN202120628750 U CN 202120628750U CN 214737433 U CN214737433 U CN 214737433U
Authority
CN
China
Prior art keywords
cable
movable
platform
creeping formwork
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120628750.9U
Other languages
Chinese (zh)
Inventor
邵嘉兵
王生涛
吴向飞
杨庆
王鑫
余刚
宋风宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Road and Bridge Engineering Co Ltd
Original Assignee
Anhui Road and Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Road and Bridge Engineering Co Ltd filed Critical Anhui Road and Bridge Engineering Co Ltd
Priority to CN202120628750.9U priority Critical patent/CN214737433U/en
Application granted granted Critical
Publication of CN214737433U publication Critical patent/CN214737433U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to the technical field of cable-stayed bridge creeping formwork construction, in particular to a movable reinforcement binding platform for cable-stayed bridge creeping formwork construction, which comprises a travelling car, wherein the basal plane of the travelling car is provided with a shear type lifting frame, the upper side of the shear type lifting frame is provided with a lower bearing platform, the first moving component and the second moving component respectively comprise a mounting plate, a first mounting seat, a second mounting seat, a first guide slide rail, a second guide slide rail, a slide seat, a slide block, a lead screw and a driving motor, the upper side of the second moving component is provided with an upper bearing platform, the basal plane of the upper bearing platform is provided with a fence, the platform can be lifted according to the construction height of the cable-stayed bridge creeping formwork through the shear type lifting frame, the construction is convenient, the use position of the upper bearing platform can be adjusted through the first moving component and the second moving component, so that the position fine adjustment can be carried out in the construction process, the convenience ligature to the reinforcing bar, improves construction quality and efficiency of construction, and holistic practicality is high.

Description

Portable reinforcement platform of cable-stay bridge creeping formwork construction
Technical Field
The utility model relates to a cable-stay bridge creeping formwork construction technical field specifically is a portable reinforcement platform of cable-stay bridge creeping formwork construction.
Background
The hydraulic pressure of cable-stay bridge creeping formwork is from the hydraulic pressure jacking system of creeping formwork itself, and hydraulic pressure jacking system includes hydraulic cylinder and upper and lower switching-over box, and the steerable lifting guide rail of switching-over box or promotion support body can make form each other between template support body and guide rail through hydraulic system and climb to make hydraulic pressure from climbing formwork steady step upwards climb, hydraulic pressure need not other hoisting equipment in the work progress from the creeping formwork, convenient operation, climbing speed is fast, factor of safety is high. Is the preferred template system in the construction of high-rise buildings.
The construction platform in the current cable-stay bridge creeping formwork work progress is inconvenient to be moved, makes workman's ligature more difficult in the reinforcement work progress, influences the efficiency of construction, consequently needs a portable reinforcement platform of cable-stay bridge creeping formwork construction to make the improvement to above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a portable reinforcement platform of cable-stay bridge creeping formwork construction to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
a movable reinforcement binding platform for cable-stayed bridge creeping formwork construction comprises a movable trolley, wherein a shear type lifting frame is arranged on the base surface of the movable trolley, a lower bearing platform is arranged on the upper side of the shear type lifting frame, a first moving assembly is arranged on the base surface of the lower bearing platform, a second moving assembly is arranged on the upper side of the first moving assembly, the first moving assembly and the second moving assembly respectively comprise a mounting plate, a first mounting seat, a second mounting seat, a first guide slide rail, a second guide slide rail, a slide seat, a slide block, a lead screw and a driving motor, the first mounting seat is arranged in the middle of the right side of the base surface of the mounting plate, the driving motor is arranged in the middle of the left side of the base surface of the mounting plate, the second mounting seat is arranged on the right side of the driving motor, and the lead screw is rotatably arranged between the first mounting seat and the second mounting seat, the base face front side of mounting panel is provided with first direction slide rail, the base face rear side of mounting panel is provided with second direction slide rail, the slider is installed to the upside of first direction slide rail and second direction slide rail, the outer wall of lead screw is provided with the slide, the upside that the second removed the subassembly is provided with load-bearing platform, the base face of going up load-bearing platform is provided with the rail.
Preferably, the moving trolley is an electric moving type push-pull trolley.
Preferably, the driving end of the driving motor is connected with the screw rod through a coupling.
Preferably, the first moving assembly and the second moving assembly are arranged in an X-axis direction and a Y-axis direction.
Preferably, the second moving assembly is connected with the first moving assembly in a sliding mode through a sliding seat and a sliding block, and the upper bearing platform is connected with the second moving assembly in a sliding mode through the sliding seat and the sliding block.
Preferably, the slide is in threaded connection with the lead screw.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses in, can fix a position the removal wholly according to the construction position of cable-stay bridge creeping formwork through the travelling car that sets up, it is higher to make holistic removal convenience, the better uses, can go up and down to the platform according to the construction height of cable-stay bridge creeping formwork through the formula crane of cutting that sets up, the going on of convenient construction, can adjust last load-bearing platform's service position through the first removal subassembly and the second removal subassembly that set up, position fine setting can be carried out in making the work progress, conveniently ligature the reinforcing bar, construction quality and efficiency are improved, holistic practicality is high.
Drawings
FIG. 1 is a front view of the present invention;
FIG. 2 is a partial structure diagram of the present invention;
fig. 3 is a partial structure diagram of the present invention.
In the figure: 1. moving the trolley; 2. a scissor type lifting frame; 3. a lower load-bearing platform; 4. a first moving assembly; 5. a second moving assembly; 6. mounting a plate; 7. a first mounting seat; 8. a second mounting seat; 9. a first guide rail; 10. a second guide slide rail; 11. a slide base; 12. a slider; 13. a screw rod; 14. a drive motor; 15. an upper load-bearing platform; 16. and (4) fencing.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, rather than all embodiments, and all other embodiments obtained by a person of ordinary skill in the art without creative work belong to the protection scope of the present invention based on the embodiments of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution:
a movable reinforcement binding platform for cable-stayed bridge creeping formwork construction comprises a movable trolley 1, wherein a shear type lifting frame 2 is arranged on the base surface of the movable trolley 1, a lower bearing platform 3 is arranged on the upper side of the shear type lifting frame 2, a first movable assembly 4 is arranged on the base surface of the lower bearing platform 3, a second movable assembly 5 is arranged on the upper side of the first movable assembly 4, the first movable assembly 4 and the second movable assembly 5 respectively comprise a mounting plate 6, a first mounting seat 7, a second mounting seat 8, a first guide slide rail 9, a second guide slide rail 10, a slide seat 11, a slide block 12, a screw rod 13 and a driving motor 14, a first mounting seat 7 is arranged in the middle of the right side of the base surface of the mounting plate 6, the driving motor 14 is arranged in the middle of the left side of the base surface of the mounting plate 6, a second mounting seat 8 is arranged on the right side of the driving motor 14, and the screw rod 13 is rotatably arranged between the first mounting seat 7 and the second mounting seat 8, a first guide slide rail 9 is arranged on the front side of the base surface of the mounting plate 6, a second guide slide rail 10 is arranged on the rear side of the base surface of the mounting plate 6, a slide block 12 is arranged on the upper sides of the first guide slide rail 9 and the second guide slide rail 10, a slide seat 11 is arranged on the outer wall of a screw rod 13, an upper bearing platform 15 is arranged on the upper side of a second moving component 5, a fence 16 is arranged on the base surface of the upper bearing platform 15, the moving trolley 1 adopts an electric moving type push-pull trolley, the driving end of a driving motor 14 is connected with the screw rod 13 through a coupler, the first moving component 4 and the second moving component 5 are arranged in the X-axis and Y-axis directions, the second moving component 5 is connected with the first moving component 4 through the slide seat 11 and the slide block 12, the upper bearing platform 15 is connected with the second moving component 5 through the slide seat 11 and the slide block 12, the slide seat 11 is connected with the screw rod 13 in a threaded manner, and the moving trolley 1 can position and move the whole according to the construction position of the cable-stayed bridge creeping formwork, make holistic removal convenience higher, the better uses, can go up and down to the platform according to the construction height of cable-stay bridge creeping formwork through the formula crane 2 of cutting that sets up, the going on of convenient construction, can adjust the service position who goes up load-bearing platform 15 through the first removal subassembly 4 and the second removal subassembly 5 that set up, can carry out the position fine setting in making the work progress, conveniently ligature the reinforcing bar, improve construction quality and efficiency of construction, holistic practicality is high.
The utility model discloses work flow: when in use, the movable trolley 1 is moved to a designated position, the platform is lifted by the scissor type lifting frame 2 for use, the first movable component 4 is used for moving in the X axis direction, the upper bearing platform 15 is moved in the X axis direction along with the movable trolley, the second movable component 5 is used for moving in the Y axis direction along with the movable trolley, the upper bearing platform 15 is used for binding steel bars along with the movable trolley, the whole body can be positioned and moved according to the construction position of the cable-stayed bridge creeping formwork by the arranged movable trolley 1, so that the whole body is high in moving convenience and better in use, the platform can be lifted according to the construction height of the cable-stayed bridge creeping formwork by the arranged scissor type lifting frame 2, the construction is convenient to carry out, the use position of the upper bearing platform 15 can be adjusted by the arranged first movable component 4 and the arranged second movable component 5, and the position fine adjustment can be carried out in the construction process, the convenience ligature to the reinforcing bar, improves construction quality and efficiency of construction, and holistic practicality is high.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a portable reinforcement platform of cable-stay bridge creeping formwork construction, includes removal dolly (1), its characterized in that: the base surface of the movable trolley (1) is provided with a shear type lifting frame (2), the upper side of the shear type lifting frame (2) is provided with a lower bearing platform (3), the base surface of the lower bearing platform (3) is provided with a first movable assembly (4), the upper side of the first movable assembly (4) is provided with a second movable assembly (5), the first movable assembly (4) and the second movable assembly (5) respectively comprise a mounting plate (6), a first mounting seat (7), a second mounting seat (8), a first guide slide rail (9), a second guide slide rail (10), a slide seat (11), a slide block (12), a screw rod (13) and a driving motor (14), the middle of the right side of the base surface of the mounting plate (6) is provided with the first mounting seat (7), the middle of the left side of the base surface of the mounting plate (6) is provided with the driving motor (14), the base surface of the mounting plate (6) and the right side of the driving motor (14) are provided with the second mounting seat (8), lead screw (13) are installed in the rotation between first mount pad (7) and second mount pad (8), the base face front side of mounting panel (6) is provided with first direction slide rail (9), the base face rear side of mounting panel (6) is provided with second direction slide rail (10), slider (12) are installed to the upside of first direction slide rail (9) and second direction slide rail (10), the outer wall of lead screw (13) is provided with slide (11), the upside of second removal subassembly (5) is provided with load-bearing platform (15), the base face of going up load-bearing platform (15) is provided with rail (16).
2. The movable reinforcement binding platform for cable-stayed bridge creeping formwork construction according to claim 1, characterized in that: the movable trolley (1) adopts an electric movable push-pull trolley.
3. The movable reinforcement binding platform for cable-stayed bridge creeping formwork construction according to claim 1, characterized in that: the driving end of the driving motor (14) is connected with the screw rod (13) through a coupler.
4. The movable reinforcement binding platform for cable-stayed bridge creeping formwork construction according to claim 1, characterized in that: the first moving assembly (4) and the second moving assembly (5) are arranged in the X-axis direction and the Y-axis direction.
5. The movable reinforcement binding platform for cable-stayed bridge creeping formwork construction according to claim 1, characterized in that: the second moving assembly (5) is in sliding connection with the first moving assembly (4) through a sliding seat (11) and a sliding block (12), and the upper bearing platform (15) is in sliding connection with the second moving assembly (5) through the sliding seat (11) and the sliding block (12).
6. The movable reinforcement binding platform for cable-stayed bridge creeping formwork construction according to claim 1, characterized in that: the sliding seat (11) is in threaded connection with the screw rod (13).
CN202120628750.9U 2021-03-29 2021-03-29 Portable reinforcement platform of cable-stay bridge creeping formwork construction Active CN214737433U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120628750.9U CN214737433U (en) 2021-03-29 2021-03-29 Portable reinforcement platform of cable-stay bridge creeping formwork construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120628750.9U CN214737433U (en) 2021-03-29 2021-03-29 Portable reinforcement platform of cable-stay bridge creeping formwork construction

Publications (1)

Publication Number Publication Date
CN214737433U true CN214737433U (en) 2021-11-16

Family

ID=78597536

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120628750.9U Active CN214737433U (en) 2021-03-29 2021-03-29 Portable reinforcement platform of cable-stay bridge creeping formwork construction

Country Status (1)

Country Link
CN (1) CN214737433U (en)

Similar Documents

Publication Publication Date Title
CN209741912U (en) Rail type movable formwork support
CN109694024A (en) A kind of self-propelled lifting hoisting platform device
CN214737433U (en) Portable reinforcement platform of cable-stay bridge creeping formwork construction
CN213203817U (en) Movable door type hoisting equipment for box girder installation
CN206144163U (en) A slip dolly that is used for wall body to print machine people
CN112030777A (en) Descending movable formwork support bracket crossing type transfer construction method
CN111980392A (en) Crown block sliding contact line installation device and construction method thereof
CN108972918A (en) A kind of precast beam self-propelled hinge seam dabbing machine
CN213592755U (en) Oblique wheel is to installation frock
CN211521390U (en) Bridge sidewalk accessory facility hoisting equipment
CN209854571U (en) Highway concrete bridge deck pavement napping trolley
CN211922706U (en) Adjusting structure of side wall trolley and side wall trolley applied by adjusting structure
CN210217757U (en) Overlength lining cutting platform truck
CN217678642U (en) Prestressed tensioning trolley for precast beam
CN217839746U (en) Movable reinforcement binding platform for hydraulic creeping formwork construction of rigid frame bridge
CN220789454U (en) Crane crown block for bridge girder erection machine
CN216038037U (en) Novel frame base for fixing elevator guide rail
CN214573347U (en) T roof beam construction equipment
CN212837818U (en) Liftable workbench for tunnel construction trolley
CN218407470U (en) Novel ditch cable duct platform truck
CN212323574U (en) Integral cable laying vehicle
JP2927731B2 (en) PC girder transfer device
CN212445714U (en) A device and equipment of polishing for PC component production line
CN212072390U (en) Electronic supplementary gallows of T roof beam stretch-draw
CN220467374U (en) Double-beam bridge crane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant