CN214737205U - Concrete splicing formwork for road and bridge construction - Google Patents

Concrete splicing formwork for road and bridge construction Download PDF

Info

Publication number
CN214737205U
CN214737205U CN202022657659.8U CN202022657659U CN214737205U CN 214737205 U CN214737205 U CN 214737205U CN 202022657659 U CN202022657659 U CN 202022657659U CN 214737205 U CN214737205 U CN 214737205U
Authority
CN
China
Prior art keywords
template
slot
hole
road
screw rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022657659.8U
Other languages
Chinese (zh)
Inventor
李宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022657659.8U priority Critical patent/CN214737205U/en
Application granted granted Critical
Publication of CN214737205U publication Critical patent/CN214737205U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a concrete concatenation template is used in road and bridge construction, include first template and install the second template in first template one side, all be equipped with slot and inserted block in first template and the second template, the inserted block inserts in the slot, is equipped with the connecting hole on the inserted block, and the position that the both sides of slot correspond the connecting hole is equipped with the fixed orifices, and it has the screw rod to alternate in connecting hole and the fixed orifices, and the fixed plate has been installed to the both sides of first template and second template, has laid the through-hole on the fixed plate transversely, and the both ends threaded connection that the through-hole was worn out to the screw rod has the nut. In inserting the slot on the first template through the inserted block slip on the second template, then wear out the through-hole with the both ends that the screw rod wore out connecting hole and fixed orifices, again with the both ends threaded connection nut locking of screw rod, wear out the one end of through-hole with the bolt at last and insert in the fixed slot, the completion is fixed to the concatenation of adjacent template, then carries out the equipment of template in proper order, has improved work efficiency.

Description

Concrete splicing formwork for road and bridge construction
Technical Field
The utility model belongs to the technical field of the road and bridge construction, concretely relates to concrete concatenation template is used in road and bridge construction.
Background
The road and bridge consists of a plurality of parts such as roadbeds, road surfaces, bridges, tunnel engineering, traffic engineering facilities and the like, and the construction process of the road and bridge mainly refers to the contents of bridge construction technology, construction organization, construction management, construction quality and the like.
The concrete pavement is widely applied to road and bridge construction, and with the development of our building industry in China and increasing social demands, the management department has higher standards and requirements on the quality of the concrete pavement. The template is an important construction material in concrete pavement construction, and has the function of ensuring the integrity of a pavement structure and the ornamental value of the exterior. However, the existing common template needs frequent tools to perform positioning and overlapping, and then the pavement is poured in sections, so that time and labor are wasted, and the working efficiency is low.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a concrete concatenation template is used in road and bridge construction to there is the lower problem of work efficiency among the solution prior art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a concrete concatenation template is used in road and bridge construction, includes first template and installs the second template in first template one side, all be equipped with slot and inserted block on first template and the second template, the inserted block inserts in the slot, be equipped with the connecting hole on the inserted block, the position that the both sides of slot correspond the connecting hole is equipped with the fixed orifices, the interlude has the screw rod in connecting hole and the fixed orifices, the fixed plate has been installed to the both sides of first template and second template, transversely laid the through-hole on the fixed plate, the both ends threaded connection that the through-hole was worn out to the screw rod has the nut.
Preferably, the first template and the second template have the same shape and size.
Preferably, the two ends of the first template and the second template are provided with fixing grooves, bolts are inserted into the through holes on the two sides of the fixing plate, and one ends of the bolts penetrating through the through holes are inserted into the fixing grooves.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model provides a concrete concatenation template is used in road and bridge construction, insert the slot on the first template through the inserted block slip on the second template, make two adjacent templates can the overlap joint location, the contact position of two templates closes real back, wear out the both ends of connecting hole and fixed orifices with the screw rod, wear out the through-hole that is located the intermediate position on the fixed plate, lock the both ends threaded connection nut of screw rod again, insert the fixed slot with the one end that the through-hole of fixed plate both sides was worn out to the bolt at last, it is fixed to accomplish the concatenation of adjacent template, then carry out the equipment of template in proper order, accomplish laying on road surface through prefabricated concrete template, and the work efficiency is improved.
The utility model provides a road and bridge construction is with concrete concatenation template carries out the reinforcement of side to first template and second template through the fixed plate of both sides simultaneously, has solved traditional template reinforcement method side form template yielding, the not enough of easy fissure of displacement.
Drawings
Fig. 1 is a schematic front view of the present invention;
fig. 2 is a sectional view of fig. 1.
In the figure: the template comprises a first template 1, a second template 2, slots 3, insertion blocks 4, connecting holes 5, fixing holes 6, screws 7, fixing plates 8, through holes 9, nuts 10, fixing grooves 11 and bolts 12.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
Referring to fig. 1 and 2, a concrete splicing formwork for road and bridge construction includes a first formwork and a second formwork fixedly connected to the left side of the first formwork through bolts and nuts, the first formwork and the second formwork are identical in shape and size, the first formwork 1 and the second formwork 2 are both provided with slots 3 and insertion blocks 4, the insertion blocks 4 on the second formwork 2 are inserted into the slots 3 on the first formwork 1, the slots 3 are of a U-shaped groove structure, the insertion blocks 4 are provided with connecting holes 5, fixing holes 6 are formed in the two sides of the slots 3 corresponding to the positions of the connecting holes 5, screws 7 are inserted into the connecting holes 5 and the fixing holes 6, the two sides of the first formwork 1 and the second formwork 2 are fixedly connected with fixing plates 8 through bolts and nuts, the fixing plates 8 are of a square plate structure and made of stainless steel plates, through holes 9 are transversely formed in the fixing plates, and nuts 10 are connected to the two ends of the screws 7 penetrating through the through holes 9.
Referring to fig. 1 and 2, fixing grooves 11 are formed at upper and lower ends of the first template 1 and the second template 2, bolts 12 are inserted into through holes 9 formed at left and right sides of the fixing plate 8, and one ends of the bolts 12, which penetrate through the through holes 9, are inserted into the fixing grooves 11.
Insert 4 slip through on the second template 2 in inserting slot 3 on the first template 1, make two adjacent templates can the overlap joint location, after the contact position of two templates closes really, wear out the both ends of connecting hole 5 and fixed orifices 6 with screw rod 7, wear out the through-hole 9 that is located the intermediate position on the fixed plate 8, lock the both ends threaded connection nut 10 of screw rod 7 again, wear out the one end of the through-hole 9 of fixed plate 8 both sides with bolt 12 at last and insert in fixed slot 11, the completion is fixed to the concatenation of adjacent template, then carry out the equipment of template in proper order, and convenient for operation is simple, and the work efficiency is improved. And meanwhile, the fixing plates 8 on the two sides are used for reinforcing the side surfaces of the first template 1 and the second template 2, so that the defects that the side template is easy to deform and stagger in the traditional template reinforcing method are overcome.

Claims (3)

1. The utility model provides a concrete concatenation template is used in road and bridge construction, includes first template (1) and installs second template (2) in first template (1) one side, its characterized in that: all be equipped with slot (3) and inserted block (4) on first template (1) and second template (2), inserted block (4) insert in slot (3), be equipped with connecting hole (5) on inserted block (4), the position that the both sides of slot (3) correspond connecting hole (5) is equipped with fixed orifices (6), connecting hole (5) and fixed orifices (6) interlude have screw rod (7), fixed plate (8) have been installed to the both sides of first template (1) and second template (2), transversely laid through-hole (9) on the fixed plate, the both ends threaded connection that through-hole (9) were worn out in screw rod (7) has nut (10).
2. The concrete splicing formwork for road and bridge construction according to claim 1, wherein: the first template (1) and the second template (2) are consistent in shape and size.
3. The concrete splicing formwork for road and bridge construction according to claim 1, wherein: the two ends of the first template (1) and the second template (2) are provided with fixing grooves (11), bolts (12) are inserted into the through holes (9) on the two sides of the fixing plate (8), and one ends, penetrating out of the through holes (9), of the bolts (12) are inserted into the fixing grooves (11).
CN202022657659.8U 2020-11-17 2020-11-17 Concrete splicing formwork for road and bridge construction Expired - Fee Related CN214737205U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022657659.8U CN214737205U (en) 2020-11-17 2020-11-17 Concrete splicing formwork for road and bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022657659.8U CN214737205U (en) 2020-11-17 2020-11-17 Concrete splicing formwork for road and bridge construction

Publications (1)

Publication Number Publication Date
CN214737205U true CN214737205U (en) 2021-11-16

Family

ID=78617597

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022657659.8U Expired - Fee Related CN214737205U (en) 2020-11-17 2020-11-17 Concrete splicing formwork for road and bridge construction

Country Status (1)

Country Link
CN (1) CN214737205U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114477519A (en) * 2021-12-31 2022-05-13 凡贝环境科技(上海)有限公司 Integrated sewage treatment system and application module thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114477519A (en) * 2021-12-31 2022-05-13 凡贝环境科技(上海)有限公司 Integrated sewage treatment system and application module thereof
CN114477519B (en) * 2021-12-31 2023-12-01 凡贝环境科技(上海)有限公司 Integrated sewage treatment system and application module thereof

Similar Documents

Publication Publication Date Title
CN108755333B (en) Road and bridge crack repairing device and method
CN104532985B (en) Shear wall cast with tenon-and-mortise precast concrete blocks replacing formworks and construction method thereof
CN205557302U (en) Section section precast box girder's a seam connection structure is assembled to short line method
CN214737205U (en) Concrete splicing formwork for road and bridge construction
CN112746543A (en) Novel airport assembled pavement system and method
CN207812487U (en) A kind of full assembled subway station twin columns agent structure
CN214301846U (en) Upper and lower block-divided open-cut tunnel prefabricated lining prestress connecting structure
CN205477637U (en) General passageway entrance to a cave of assembled reinforced concrete aliform type
CN115748623A (en) Prefabricated no muscle assembled irrigation canals and ditches
CN111455932B (en) Laying method of separated building blocks applied to reservoir protection slope
CN213014975U (en) Building waste regeneration assembled wallboard
CN115506584A (en) Building templates concatenation locking Assembly
CN113174799A (en) Precast concrete panel connecting structure and method based on bolt connection
CN212507346U (en) Concrete splicing formwork for road and bridge construction
CN210561619U (en) Horizontal construction joint fixed die plate of steady basic unit of water
CN210217761U (en) Device is used in movement joint construction
CN109235497B (en) Fixing structure for externally-attached water stop belt at pipe gallery gap and construction method of fixing structure
CN211973855U (en) Pipe gallery embedded part
CN210238890U (en) High-strength prefabricated floor slab
CN206220482U (en) A kind of cast-in-situ wall template support system
CN215329125U (en) Precast concrete panel connection structure based on bolt connection
CN216193749U (en) Assembly type road structure for construction site
CN220538349U (en) Tool for quickly paving and aligning tiles
CN210341597U (en) End beam structure of steel and concrete composite beam
CN220469205U (en) Assembled structural floor slab

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211116