CN214734060U CN202120051193.9U CN202120051193U CN214734060U CN 214734060 U CN214734060 U CN 214734060U CN 202120051193 U CN202120051193 U CN 202120051193U CN 214734060 U CN214734060 U CN 214734060U
Authority
CN
China
Prior art keywords
pipeline
hoisting
gallows
hoisting device
traction device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120051193.9U
Other languages
Chinese (zh)
Inventor
郑丽丽
周东升
陆茂
李兰飞
刘绿秘
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Guangxi Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Guangxi Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202120051193.9U priority Critical patent/CN214734060U/en
Application granted granted Critical
Publication of CN214734060U publication Critical patent/CN214734060U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a major diameter pipeline poling construction structures based on steel construction gallows, put and pull including the first hoisting device that is used for hoisting the pipeline the draw gear of pipeline, the first hoisting device is fixed in upper floor, draw gear with have certain horizontal interval and locate between the first hoisting device on upper floor or the lower floor, be equipped with in the horizontal interval and be located on the upper floor, supply draw gear pulls a plurality of gallows that the pipeline was walked, looks interval one two of gallows interval between the gallows is less than the length of pipeline. The utility model discloses utilize the rigidity and the stability of steel construction gallows, realized quick batch poling operation, have easy to operate, the expense is low, the flexibility is strong, the risk is low and is equivalent to the effect, can save a large amount of manual works and time, the time limit for a project benefit is obvious.

Description

Major diameter pipeline poling construction structures based on steel construction gallows
Technical Field
The utility model relates to a piping erection technical field especially relates to a major diameter pipeline poling construction structures based on steel construction gallows.
Background
Usually, 2 gallows of earlier installation are hoisted the pipeline that corresponds length again to indoor major diameter pipeline hoist and mount, so circulate, hoist and mount each time all need set up a plurality of hoisting points to the hoist is demolishd in the installation, need spend more manual work and time, and the safety risk also improves in step.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome prior art's defect, provide a major diameter pipeline poling construction structures based on steel construction gallows, realized quick batch poling operation.
In order to achieve the above object, the utility model adopts the following technical scheme: the utility model provides a major diameter pipeline poling construction structures based on steel construction gallows, is including the first hoisting device that is used for hoisting the pipeline and drags the draw gear of pipeline, first hoisting device is fixed in upper floor, draw gear with have certain horizontal interval and locate between the first hoisting device on upper floor or lower floor, be equipped with in the horizontal interval and be located on the upper floor, supply draw gear drags a plurality of gallows that the pipeline passed, interval one between two of gallows is less than the length of pipeline.
Optionally, the pipeline hoisting device further comprises a second hoisting device for hoisting the pipeline, wherein the second hoisting device is positioned on one side of the first hoisting device away from the plurality of the hangers.
Optionally, the second lifting device is an electric hoist.
Optionally, the first hoisting device and the traction device are hoists.
Optionally, the traction device is arranged on the lower floor slab, a pulley fixedly arranged on the upper floor slab is arranged above the traction device, the traction device comprises a winding mechanism and a cable which is retracted and extended through the winding mechanism, and the cable is slidably arranged on the pulley and then penetrates through the hanger to drag the pipeline.
Optionally, hooks for connecting the first hoisting device and the traction device are fixedly arranged at two ends of the pipeline respectively.
The utility model discloses owing to adopt above-mentioned technical scheme, make it have following beneficial effect: the rigidity and the stability of the steel structure hanging bracket are utilized, the quick batch pipe penetrating operation is realized, the effects of easy operation, low cost, strong flexibility, low risk and the like are achieved, a large amount of labor and time can be saved, and the construction period benefit is obvious.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings needed to be used in the description of the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings without creative efforts.
Fig. 1 shows the utility model discloses major diameter pipeline poling construction structures based on steel construction gallows lifts by crane the structure schematic diagram of pipeline when using.
Fig. 2 shows the utility model discloses structural schematic behind the major diameter pipeline poling construction structures based on steel construction gallows hoists the pipeline when using.
Fig. 3 shows the utility model discloses a structure schematic diagram of pipeline is dragged when using to major diameter pipeline poling construction structures based on steel construction gallows.
Detailed Description
The following description of the embodiments of the present invention is provided for illustrative purposes, and other advantages and effects of the present invention will be readily apparent to those skilled in the art from the disclosure herein. The present invention can also be implemented or applied through other different specific embodiments, and various details in the present specification can be modified or changed based on different viewpoints and applications without departing from the spirit of the present invention.
The present invention will be described in further detail with reference to the accompanying drawings and specific embodiments.
As shown in fig. 2, the utility model discloses major diameter pipeline poling construction structures based on steel construction gallows, including being used for hoisting pipeline 2's first hoisting device 3 and draw gear 4 of dragging pipeline 2, first hoisting device 3 is fixed in upper floor, draw gear 4 and first hoisting device have certain horizontal interval between 3 and locate upper floor or lower floor on, be equipped with in the horizontal interval and be located upper floor, supply draw gear 4 to drag a plurality of gallows 1 that pipeline 2 walked, interval between two gallows 1 of a gallows 1 of looks interval is less than pipeline 2's length.
In this embodiment, form the construction structures of installation pipeline 2 after installing a plurality of gallows 1 and hoist and mount piece in advance, make a plurality of pipelines 2 can walk and remove to the design position on gallows 1 one by one, and need not to install gallows 1, install and demolish hoist and mount piece circularly and reciprocally, this structure utilizes the good rigidity of steel construction gallows 1, stability and suitable interval, utilize and drag the construction to realize pipe in batches, improve the speed of pipeline 2 hoist and mount by a wide margin, and the safe risk also improves in step, only need set up a small amount of hoisting points when the structure is laid, and need not to circulate the installation and demolish hoist and mount piece, the setting of a lot of hoisting points has been reduced, reduce the destruction to the floor, and a large amount of manpowers and time have been practiced thrift.
The structure further comprises a second lifting device 7 used for lifting the pipeline 2 away from one end of the traction device 4, the second lifting device 7 is located on one side, away from the plurality of lifting frames 1, of the first lifting device 3, the second lifting device 7 is connected to one end, away from the traction device 4, of the pipeline 2 and lifts the pipeline 2, and the stability of the lifting pipeline 2 is guaranteed by matching the first lifting device 3 and the traction device 4 as shown in fig. 3. In this embodiment, the second hoisting device 7 is used as an auxiliary hoisting member, and the second hoisting device 7 can be an electric hoist with low cost.
In this embodiment, the first hoisting device 3 and the traction device 4 are hoists, and each hoist includes a winding mechanism and a cable that is wound and unwound by the winding mechanism.
Draw gear 4 locates the floor of lower floor, and the top of draw gear 4 is equipped with the pulley 9 that sets firmly on the floor of upper floor, and draw gear 4's cable 6 is slided and is located and wear to locate again on pulley 9 and draw pipeline 2 in gallows 1, changes draw gear 4's cable 6's direction through this pulley 9, and pulley 9 has also reduced the frictional force with the cable, and the resistance is littleer when making and dragging pipeline 2. In some other embodiments, the traction device may be installed on the upper floor, so that the traction direction does not need to be changed by using the pulley, and the traction device 4 is installed on the lower floor, which is more convenient to install than the traction device installed on the upper floor, thereby avoiding the risk of dropping.
The two ends of the pipeline 2 are respectively and fixedly provided with a hook for connecting the first hoisting device 3 and the traction device 4, so that the connection of the guy cable 5 of the first hoisting device 3 and the guy cable 6 of the traction device 4 with the pipeline 2 is facilitated.
In the structure, the pipeline 2 is installed after all the hangers 1 are installed, so that the circular cross operation does not exist. When the pipeline lifting device is used, as shown in fig. 1, the stay cable 5 of the first lifting device 3 is connected to the 1/3 position of the first end of the pipeline 2, the stay cable 6 of the traction device 4 is connected to the hook at the first end of the pipeline 2, the first end of the pipeline 2 is lifted by the first lifting device 3, the pipeline 2 is dragged by the traction device 4, the first end of the pipeline 2 is placed on the side-most lifting frame 1, and the stay cable 6 of the traction device 4 is tensioned to prevent the pipeline 2 from falling; as shown in fig. 2, the first hoisting device 3 is placed at the second end of the pipeline 2 to raise the second end of the pipeline 2, in the process, if the pipeline 2 is too long, the first hoisting device 3 is hoisted unchanged, the guy cable 8 of the second hoisting device 7 can be connected to the second end of the pipeline 2, the first hoisting device 3 and the second hoisting device 7 are used for hoisting together, and after the second end of the pipeline 2 is hoisted, the guy cable 6 of the traction device 4 is gradually contracted for hoisting in a matching manner, so that the pipeline 2 gradually enters the hoisting frame 1; as shown in fig. 3, when the pipe 2 enters the hanger 1 for a sufficient length, the connection between the second lifting device 7 and the pipe 2 can be disconnected, and because the distance between the two hangers 1 spaced by one hanger 1 is less than the length of the pipe 2, the pipe 2 is positioned on the two hangers 1 at any time when passing through the hangers 1, so that the pipe 2 is ensured not to fall when passing through the hangers 1, and the pipe 2 can be set to a position by only using the contraction of the guy cable in the traction device 4 to drag the pipe 2.
After 2 hoists the completion, fix a position according to the trompil position on the gallows 1, 2 groups of pipelines are fixed to the first spot welding after accomplishing, lead to long 2 axialities of inspection pipeline and the mouth of pipe whether the wrong limit, use the parallels to eliminate the difference in height to the mouth of pipe of wrong limit, accomplish the mouth of pipe full weld at last, 2 welding of pipeline should be strictly carried out according to design and standard requirement to accomplish the installation of pipeline.
It should be noted that the structure, ratio, size and the like shown in the drawings attached to the present specification are only used for matching with the content disclosed in the specification, so as to be known and read by those skilled in the art, and are not used for limiting the limit conditions that the present invention can be implemented, so that the present invention has no technical essential meaning, and any structure modification, ratio relationship change or size adjustment should still fall within the scope that the technical content disclosed in the present invention can cover without affecting the efficacy and the achievable purpose of the present invention. Meanwhile, the terms such as "upper", "lower", "left", "right", "middle" and "one" used in the present specification are for convenience of description, and are not intended to limit the scope of the present invention, and changes or adjustments of the relative relationship thereof may be made without substantial technical changes, and the present invention is also regarded as the scope of the present invention.
The above description is only a preferred embodiment of the present invention, and the present invention is not limited to the above description, and although the present invention has been disclosed with the preferred embodiment, it is not limited to the present invention, and any skilled person can make modifications or changes equivalent to the equivalent embodiment without departing from the scope of the present invention, but all the technical matters of the present invention are within the scope of the present invention.

Claims (6)

1. The large-diameter pipeline pipe penetrating construction structure based on the steel structure hanging frame is characterized by comprising a first hoisting device and a traction device, wherein the first hoisting device is used for hoisting a pipeline, the traction device is fixed on an upper floor slab, a certain horizontal interval is arranged between the traction device and the first hoisting device and is arranged on the upper floor slab or a lower floor slab, a plurality of hanging frames are arranged in the horizontal interval and are used for the traction device to drag the pipeline to pass through, and the interval between two hanging frames of one hanging frame at intervals is smaller than the length of the pipeline.
2. The large-diameter pipe threading construction structure based on the steel structure hanger as claimed in claim 1, further comprising a second hoisting device for hoisting the pipe, the second hoisting device being located at a side of the first hoisting device remote from the plurality of hangers.
3. The large-diameter pipe threading construction structure based on the steel structure hanger as claimed in claim 2, wherein the second hoisting device is an electric hoist.
4. The large-diameter pipe threading construction structure based on the steel structure hanger as claimed in claim 1, wherein the first hoisting means and the traction means are hoists.
5. The large-diameter pipe threading construction structure based on the steel structure hanger as claimed in claim 1, wherein the traction device is disposed on the lower floor, a pulley fixed on the upper floor is disposed above the traction device, the traction device includes a winding mechanism and a pulling cable that is retracted and extended by the winding mechanism, the pulling cable is slidably disposed on the pulley and then passes through the hanger to drag the pipe.
6. The large-diameter pipeline threading construction structure based on the steel structure hanger frame as claimed in claim 1, wherein hooks for connecting the first hoisting device and the traction device are respectively fixedly arranged at both ends of the pipeline.
CN202120051193.9U 2021-01-08 2021-01-08 Major diameter pipeline poling construction structures based on steel construction gallows Active CN214734060U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120051193.9U CN214734060U (en) 2021-01-08 2021-01-08 Major diameter pipeline poling construction structures based on steel construction gallows

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120051193.9U CN214734060U (en) 2021-01-08 2021-01-08 Major diameter pipeline poling construction structures based on steel construction gallows

Publications (1)

Publication Number Publication Date
CN214734060U true CN214734060U (en) 2021-11-16

Family

ID=78638285

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120051193.9U Active CN214734060U (en) 2021-01-08 2021-01-08 Major diameter pipeline poling construction structures based on steel construction gallows

Country Status (1)

Country Link
CN (1) CN214734060U (en)

Similar Documents

Publication Publication Date Title
CN216235734U (en) Vertical transportation hoisting structure for curtain wall unit plate
CN214734060U (en) Major diameter pipeline poling construction structures based on steel construction gallows
CN203021241U (en) Banner lifting device
CN211712446U (en) Special lifting device for tubular pile production
CN205916957U (en) Light piping erection hoisting frame
CN204675726U (en) Purlin lifting auxiliary device
CN111711131A (en) Cable guiding device in bridge and cable laying method
CN208603617U (en) A kind of handling apparatus of vertical shaft construction of concrete lining material
CN212198198U (en) Pipeline installation device in crane beam
CN207030735U (en) Prefabricated balcony lifts servicing unit
CN212924195U (en) Hoisting accessory of steel reinforcement cage
CN107675892A (en) A kind of glass curtain wall monorail hoisting structure
CN201665484U (en) Net rack bulk part suspending device
CN110805576B (en) Automatic coupling device of submersible electric pump
CN210393401U (en) Hoisting and positioning device for stand column
CN208054723U (en) A kind of Pipe installing application c-type suspension hook
CN207484991U (en) A kind of glass curtain wall monorail hoisting structure
CN208666878U (en) Small space profile hoisting device
CN212222248U (en) Riser hoisting device
CN216889743U (en) Sewage treatment pond, underwater operation equipment and under water collude system of hanging
CN218088712U (en) Steel hoisting device for iron tower installation
CN211081059U (en) Hoisting device for unit plate of curtain wall with curved outer vertical surface
CN210976647U (en) Assembled component hoist and mount auxiliary device
CN218520974U (en) Construct indoor hoist and mount point quick installation device of building
CN213707572U (en) Hanging equipment used outside closed space

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant