CN214714223U - Football training device - Google Patents

Football training device Download PDF

Info

Publication number
CN214714223U
CN214714223U CN202023014411.6U CN202023014411U CN214714223U CN 214714223 U CN214714223 U CN 214714223U CN 202023014411 U CN202023014411 U CN 202023014411U CN 214714223 U CN214714223 U CN 214714223U
Authority
CN
China
Prior art keywords
box body
box
football
gear
bevel gear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202023014411.6U
Other languages
Chinese (zh)
Inventor
徐孝孝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
City Home Suzhou Sports Development Co ltd
Original Assignee
City Home Suzhou Sports Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by City Home Suzhou Sports Development Co ltd filed Critical City Home Suzhou Sports Development Co ltd
Priority to CN202023014411.6U priority Critical patent/CN214714223U/en
Application granted granted Critical
Publication of CN214714223U publication Critical patent/CN214714223U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Toys (AREA)

Abstract

The utility model discloses a football trainer, concretely relates to football training technical field, including first box and second box, first box is fixed to be established in second box front side, first box is linked together with second box is inside, first box rear side is equipped with the motor, the motor is established in second box rear side, motor output shaft front end is fixed with the pivot. The utility model discloses a motor drive gear and first bevel gear and second bevel gear simultaneous working, at football whereabouts in-process, the second gear lasts to drive the pivot and rotates and make the pulley rotate, receive and releases the steel cable through the pulley rotation, drives through spring elastic expansion and contraction and launches the board and remove to launch away the football, not only realized the elasticity transmission to the football, and only driven the whereabouts and the transmission operation of football with a motor, with low costs, it is efficient.

Description

Football training device
Technical Field
The utility model relates to a football training technical field, the more specifically football training device that says so.
Background
Football is a sport which takes feet as main parts and controls and governs balls, and two teams attack and defend against each other on the same rectangular field according to a certain rule.
Application number is 201922444293.3's chinese patent discloses a football combined training device, comprising a base plate, the top outer wall of bottom plate is provided with the service frame, and one side outer wall of service frame opens there is fixed mouthful, one side outer wall of service frame has step motor through bolted connection, and step motor's output shaft one end is provided with the carousel, one side outer wall welding of carousel has the dead lever, and the outer wall of dead lever rotates and is connected with the movable rod, the one end outer wall of movable rod rotates through the ear seat and is connected with ejection plate, one side outer wall of service frame is opened there is the slide opening, and the inner wall sliding connection of slide opening has the slide bar, the one end outer wall welding of slide bar has the dog, and the outer wall of slide bar has cup jointed the spring, the top outer wall of service frame is opened there is the installing port. The utility model can realize the continuous ejection of the football, has better use effect, effectively realizes the automatic falling and supplement of the football, does not need to manually pick up and put the football back and forth for many times, and greatly improves the training efficiency;
football transmission elasticity in this patent is not enough, drives football whereabouts and football transmission operation respectively through positive and negative motor and step motor, and is with high costs, and launches the board displacement and be the carousel diameter to restricted football displacement, can lead to the football to influence the displacement because of elasticity is not enough.
SUMMERY OF THE UTILITY MODEL
In order to overcome the above-mentioned defect of prior art, the embodiment of the utility model provides a football training device, drive gear and first bevel gear and second bevel gear simultaneous working through the motor, in football whereabouts in-process, the second gear lasts and drives the pivot and rotate and make the pulley rotate, receive and release the steel cable through pulley rotation, it removes to launch the board through the flexible drive of spring elasticity, thereby launch the football, not only realized the elasticity transmission to the football, and only driven the whereabouts and the transmission operation of football with a motor, and is with low costs, high efficiency.
In order to achieve the above object, the utility model provides a following technical scheme: a football training device comprises a first box body and a second box body, wherein the first box body is fixedly arranged on the front side of the second box body, the first box body is communicated with the inside of the second box body, a motor is arranged on the rear side of the first box body, the motor is arranged on the rear side of the second box body, a rotating shaft is fixed on the front end of an output shaft of the motor, a gear is fixed on the outer end of the rotating shaft, one end of the rotating shaft penetrates through the gear and extends out of the front side of the gear, first movable plates are arranged at the top and the bottom of the gear, a plurality of teeth are machined on one sides of the two first movable plates close to the gear, the top and the bottom of the gear are meshed with the teeth, one sides of the two first movable plates penetrate through the second box body and extend out of one side of the second box body, a first bevel gear is arranged on the front side of the first movable plates, the rear side of the first bevel gear is fixedly connected with the front side of the rotating shaft, a second bevel gear is meshed with the bottom of the first bevel gear, the second bevel gear bottom mounting has the transfer line, inside the transfer line bottom runs through first box and extends into first box, bearing and first box inner wall swing joint are all passed through at the transfer line both ends, the transfer line outer end is fixed with two pulleys, two all the winding has the steel cable, two on the pulley steel cable one end and pulley fixed connection, two the steel cable other end is fixed with launches the board, it establishes inside first box to launch the board, it is fixed with two springs, two to launch the board near pulley one side spring one end all with first box inner wall one side fixed connection, two the spring is established respectively at pulley front side and rear side.
In a preferred embodiment, two universal wheels are fixed on the bottom of each of the first box body and the second box body.
In a preferred embodiment, a second movable plate is hinged to the bottom end of the interior of the first box body, a second telescopic rod is hinged to one side of the bottom of the second movable plate, and the bottom end of the second telescopic rod is movably connected with the inner wall of the first box body through a movable hinged support.
In a preferred embodiment, the second casing contains a plurality of soccer balls therein.
In a preferred embodiment, two limiting plates are fixed on one side of the second box body, the two limiting plates are respectively arranged at the top and the bottom of the two first movable plates, and the two limiting plates are slidably connected with the first movable plates through sliding rails.
In a preferred embodiment, a supporting column is fixed at the top of the first box, and the rotating shaft passes through the supporting column and is movably connected with the inner wall of the supporting column through a bearing.
In a preferred embodiment, the inner sides of the two springs are respectively sleeved with a first telescopic rod, one end of each of the two first telescopic rods is fixedly connected with one side of the inside of the first box body, and the other end of each of the two first telescopic rods is fixedly connected with one side of the ejection plate.
The utility model discloses a technological effect and advantage:
1. the utility model discloses a motor drive gear and first bevel gear and second bevel gear simultaneous working, at football whereabouts in-process, the second gear lasts to drive the pivot and rotates and make the pulley rotate, receive and releases the steel cable through the pulley rotation, drives through spring elastic expansion and contraction and launches the board and remove to launch away the football, not only realized the elasticity transmission to the football, and only driven the whereabouts and the transmission operation of football with a motor, with low costs, it is efficient.
2. The utility model discloses a set up the universal wheel, make the utility model provides a football training device can train in a plurality of training places, strong adaptability.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a schematic view of the structure of the pulley and the steel rope of the present invention.
Fig. 3 is a schematic view of the structure of the gear and the teeth of the present invention.
Fig. 4 is a schematic structural view of the first bevel gear and the second bevel gear of the present invention.
Fig. 5 is a schematic view of the internal structure of the first box and the second box of the present invention.
Fig. 6 is a schematic view of the structure of the spring and the first telescopic rod of the present invention.
The reference signs are: 1. a first case; 2. a second case; 3. a universal wheel; 4. a support pillar; 5. a limiting plate; 6. a first movable plate; 7. teeth; 8. a gear; 9. a first bevel gear; 10. a second bevel gear; 11. a transmission rod; 12. a pulley; 13. a spring; 14. a steel cord; 15. a first telescopic rod; 16. a second telescopic rod; 17. a second movable plate; 18. a soccer ball; 19. a motor; 20. ejecting a plate; 21. a rotating shaft.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The football training device shown in figures 1-6 comprises a first box body 1 and a second box body 2, wherein the first box body 1 is fixedly arranged at the front side of the second box body 2, the first box body 1 is communicated with the inside of the second box body 2, a motor 19 is arranged at the rear side of the first box body 1, the motor 19 is arranged at the rear side of the second box body 2, a rotating shaft 21 is fixed at the front end of an output shaft of the motor 19, a gear 8 is fixed at the outer end of the rotating shaft 21, one end of the rotating shaft 21 penetrates through the gear 8 and extends out of the front side of the gear 8, first movable plates 6 are arranged at the top and the bottom of the gear 8, a plurality of teeth 7 are processed at one sides of the two first movable plates 6 close to the gear 8, the top end and the bottom end of the gear 8 are engaged with the teeth 7, one sides of the two first movable plates 6 penetrate through the second box body 2 and extend out of the second box body 2, a first bevel gear 9 is arranged at the front side of the first movable plates 6, the rear side of the first bevel gear 9 is fixedly connected with the front end of the rotating shaft 21, the bottom of the first bevel gear 9 is engaged with a second bevel gear 10, a transmission rod 11 is fixed at the bottom end of the second bevel gear 10, the bottom end of the transmission rod 11 penetrates through the first box body 1 and extends into the first box body 1, two ends of the transmission rod 11 are movably connected with the inner wall of the first box body 1 through bearings, two pulleys 12 are fixed at the outer end of the transmission rod 11, steel ropes 14 are wound on the two pulleys 12, one ends of the two steel ropes 14 are fixedly connected with the pulleys 12, an ejection plate 20 is fixed at the other end of the two steel ropes 14, the ejection plate 20 is arranged in the first box body 1, two springs 13 are fixed on one side of the ejection plate 20 close to the pulley 12, one ends of the springs 13 are fixedly connected with one side of the inner wall of the first box body 1, and the springs 13 are arranged on the front side and the rear side of the pulley 12 respectively.
Further, first box 1 and 2 bottoms of second box all are fixed with two universal wheels 3, set up universal wheel 3 and have and remove first box 1 and second box 2.
Further, the inside bottom of first box 1 articulates there is second fly leaf 17, second fly leaf 17 bottom one side articulates there is second telescopic link 16, second telescopic link 16 bottom and first box 1 inner wall are through activity free bearing swing joint, set up second telescopic link 16 and be convenient for adjust the height of second fly leaf 17 to the adjustment launch angle.
Furthermore, a plurality of football 18 are equipped with in the second box 2, in time supply football 18, need not to pick up the ball many times.
Further, second box 2 one side is fixed with two limiting plates 5, two limiting plates 5 are established respectively in 6 tops of two first fly leafs and bottom, two limiting plate 5 passes through slide rail sliding connection with first fly leaf 6, sets up limiting plate 5 and carries out spacing and support to first fly leaf 6, avoids first fly leaf 6 unstable, influences the result of use.
Further, 1 top of first box is fixed with support column 4, pivot 21 passes support column 4 and through bearing and 4 inner wall swing joint of support column, fixes and supports pivot 21 through support column 4, is favorable to further improving first bevel gear 9's stability.
Further, two the spring 13 inboard all is equipped with first telescopic link 15, two 15 one end of first telescopic link all with the inside one side fixed connection of first box 1, two 15 other ends of first telescopic link all with launch board 20 one side fixed connection, first telescopic link 15 has the guide effect to spring 13, avoids spring 13 tensile and warp the dislocation.
The utility model discloses the theory of operation: when in use, the motor 19 is started, because one end of the motor 19 is fixed with the gear 8, the motor 19 can drive the gear 8 to rotate, because both ends of the gear 8 are engaged with the teeth 7 on the first movable plate 6, the motor 19 can drive the two first movable plates 6 to move in opposite directions, so that the football 18 falls, because the gear 8 and the first bevel gear 9 are connected through the rotating shaft 21, the motor 19 can drive the first bevel gear 9 and the gear 8 to rotate simultaneously, because the first bevel gear 9 is engaged with the second bevel gear 10, the second bevel gear 10 is driven to rotate by the first bevel gear 9, because the second bevel gear 10 is fixed with the transmission rod 11, the transmission rod 11 is driven to rotate by the second bevel gear 10, and the pulley 12 is fixed with the transmission rod 11, so the pulley 12 can rotate along with the transmission rod 11, because the steel rope 14 is wound on the pulley 12, therefore, the steel cable 14 is wound and unwound along with the rotation of the pulley 12, because the diameter of the first bevel gear 9 is larger than that of the second bevel gear 10, when the first bevel gear 9 rotates for a circle, the second bevel gear 10 can rotate for a plurality of circles, so that the moving length of the steel cable 14 is larger than that of the first movable plate 6, when the football 18 falls into the first box body 1, the steel cable 14 is rapidly released under the driving of the second bevel gear 10, at this time, the compressed spring 13 is rapidly extended, so as to push the ejector plate 20 to move, so that the football 18 is rapidly ejected, after the football 18 is ejected, the motor 19 is reversely rotated, at this time, the first movable plate 6 moves, so that the football 18 is limited between the two first movable plates 6, and cannot fall, and at the same time, under the rotation of the second bevel gear 10, the steel cable 14 is rapidly wound, the steel cable 14 pulls the ejector plate 20, so that the spring 13 is in a compressed state again, when needs are adjusted ejection angle, when the height of manual regulation second telescopic link 16 to this changes ejection angle, the utility model discloses in, realized utilizing 19 completions of a motor to the whereabouts of football 18 and the operation of transmission, need not to pick up the ball, and with low costs inefficiency height, through spring 13 elasticity compression transmission football 18, make football 18 have sufficient elasticity in the transmission process, the range is far away, trains effectually.
The points to be finally explained are: first, in the description of the present application, it should be noted that, unless otherwise specified and limited, the terms "mounted," "connected," and "connected" should be understood broadly, and may be a mechanical connection or an electrical connection, or a communication between two elements, and may be a direct connection, and "upper," "lower," "left," and "right" are only used to indicate a relative positional relationship, and when the absolute position of the object to be described is changed, the relative positional relationship may be changed;
secondly, the method comprises the following steps: in the drawings of the disclosed embodiments of the present invention, only the structures related to the disclosed embodiments are referred to, and other structures can refer to the common design, and under the condition of no conflict, the same embodiment and different embodiments of the present invention can be combined with each other;
and finally: the above description is only for the preferred embodiment of the present invention and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (7)

1. The utility model provides a football training device, includes first box (1) and second box (2), first box (1) is fixed to be established in second box (2) front side, first box (1) is linked together its characterized in that with second box (2) inside: the rear side of the first box body (1) is provided with a motor (19), the motor (19) is arranged at the rear side of the second box body (2), the front end of an output shaft of the motor (19) is fixed with a rotating shaft (21), the outer end of the rotating shaft (21) is fixed with a gear (8), one end of the rotating shaft (21) penetrates through the gear (8) and extends out of the front side of the gear (8), the top and the bottom of the gear (8) are respectively provided with a first movable plate (6), one side of each of the two first movable plates (6) close to the gear (8) is respectively processed with a plurality of teeth (7), the top and the bottom of the gear (8) are respectively meshed with the teeth (7), one side of each of the two first movable plates (6) penetrates through the second box body (2) and extends out of one side of the second box body (2), the front side of each first movable plate (6) is provided with a first bevel gear (9), the rear side of each first bevel gear (9) is fixedly connected with the front end of the rotating shaft (21), the bottom of the first bevel gear (9) is engaged with a second bevel gear (10), the bottom end of the second bevel gear (10) is fixedly provided with a transmission rod (11), the bottom end of the transmission rod (11) penetrates through the first box body (1) and extends into the first box body (1), two ends of the transmission rod (11) are movably connected with the inner wall of the first box body (1) through bearings, the outer end of the transmission rod (11) is fixedly provided with two pulleys (12), two steel ropes (14) are wound on the two pulleys (12), one ends of the two steel ropes (14) are fixedly connected with the pulleys (12), the other ends of the two steel ropes (14) are fixedly provided with ejection plates (20), the ejection plates (20) are arranged in the first box body (1), one sides of the ejection plates (20) close to the pulleys (12) are fixedly provided with two springs (13), one ends of the two springs (13) are fixedly connected with one side of the inner wall of the first box body (1), the two springs (13) are respectively arranged on the front side and the rear side of the pulley (12).
2. A football training device as claimed in claim 1, wherein: two universal wheels (3) are fixed at the bottoms of the first box body (1) and the second box body (2).
3. A football training device as claimed in claim 1, wherein: the bottom of the interior of the first box body (1) is hinged with a second movable plate (17), one side of the bottom of the second movable plate (17) is hinged with a second telescopic rod (16), and the bottom of the second telescopic rod (16) is movably connected with the inner wall of the first box body (1) through a movable hinged support.
4. A football training device as claimed in claim 1, wherein: a plurality of football balls (18) are arranged in the second box body (2).
5. A football training device as claimed in claim 1, wherein: two limiting plates (5) are fixed on one side of the second box body (2), the two limiting plates (5) are respectively arranged at the tops and the bottoms of the two first movable plates (6), and the two limiting plates (5) are connected with the first movable plates (6) in a sliding mode through sliding rails.
6. A football training device as claimed in claim 1, wherein: the top of the first box body (1) is fixed with a support column (4), and the rotating shaft (21) penetrates through the support column (4) and is movably connected with the inner wall of the support column (4) through a bearing.
7. A football training device as claimed in claim 1, wherein: two spring (13) inboard all is equipped with first telescopic link (15), two first telescopic link (15) one end all with first box (1) inside one side fixed connection, two first telescopic link (15) other end all with launch board (20) one side fixed connection.
CN202023014411.6U 2020-12-15 2020-12-15 Football training device Expired - Fee Related CN214714223U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023014411.6U CN214714223U (en) 2020-12-15 2020-12-15 Football training device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023014411.6U CN214714223U (en) 2020-12-15 2020-12-15 Football training device

Publications (1)

Publication Number Publication Date
CN214714223U true CN214714223U (en) 2021-11-16

Family

ID=78631378

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023014411.6U Expired - Fee Related CN214714223U (en) 2020-12-15 2020-12-15 Football training device

Country Status (1)

Country Link
CN (1) CN214714223U (en)

Similar Documents

Publication Publication Date Title
CN112659276B (en) Wood system cylinder drilling equipment of polishing for wood working
CN109529301A (en) A kind of table tennis training multi-angle service robot
CN112622119A (en) Processing mechanism of LED lamp
CN214714223U (en) Football training device
CN114271171A (en) Salix psammophila seedling automatic planting vehicle and planting method thereof
CN112516565A (en) Automatic ball dispenser for basketball
CN206779507U (en) A kind of casing borehole drill construction and cabinet assembly system
CN107899220B (en) A kind of efficient ball serving device of tennis training
CN109367298A (en) A kind of automatic eraser device
CN107611903B (en) High altitude cable snow removing device
CN110001955A (en) It is a kind of to be convenient for striking off the search and rescue unmanned plane of seawater based on axle center
CN106694314B (en) Full-automatic oil immersion baking line
CN215978374U (en) Safety frame for green building construction
CN115781215A (en) Assembly equipment is used in production of commercial car bumper shock absorber top gum
CN212287934U (en) A perforating device for rock wool processing
CN208663045U (en) The nose assembly of wind wheel assembling equipment
CN112386892A (en) Basketball training equipment for training ball receiving and passing ability
CN208678321U (en) A kind of volleyball service robot emitting smash
CN113253541B (en) Stop-motion animation shooting device
CN215025833U (en) A trainer for football
CN113181618B (en) Badminton serving machine and method for belt friction serving
CN110478865A (en) A kind of sport pingpong collection equipment
CN213671654U (en) Loading and unloading device for forging automobile knuckle arm accessory
CN217097898U (en) Movable cutting machine for football ball skin
CN108937500A (en) A kind of mail box device with alarm system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211116

CF01 Termination of patent right due to non-payment of annual fee