CN214699518U - Pipeline installation adjusting device for construction - Google Patents

Pipeline installation adjusting device for construction Download PDF

Info

Publication number
CN214699518U
CN214699518U CN202121062958.5U CN202121062958U CN214699518U CN 214699518 U CN214699518 U CN 214699518U CN 202121062958 U CN202121062958 U CN 202121062958U CN 214699518 U CN214699518 U CN 214699518U
Authority
CN
China
Prior art keywords
fixed mounting
adjusting device
pipeline
under casing
conical gear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121062958.5U
Other languages
Chinese (zh)
Inventor
高文巧
岳书强
叶利鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Handan Hansan Construction Engineering Co ltd
Original Assignee
Handan Hansan Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Handan Hansan Construction Engineering Co ltd filed Critical Handan Hansan Construction Engineering Co ltd
Priority to CN202121062958.5U priority Critical patent/CN214699518U/en
Application granted granted Critical
Publication of CN214699518U publication Critical patent/CN214699518U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model belongs to the technical field of the piping erection, especially, be a piping erection adjusting device for construction, to current pipe laying device when using, to pipeline erection complex operation, and inconvenient highly the problem of adjusting of the pipeline after the installation, the following scheme is proposed at present, and it includes the under casing, two pivots are installed in the front side rotation of under casing, and the equal fixed mounting in front end of two pivots has the knob, and the rear end of the pivot that is located the below extends to the under casing and fixed mounting has first conical gear, all rotates on the both sides inner wall of under casing and installs the threaded rod, and the equal fixed mounting of one end that two threaded rods are close to each other has second conical gear, and first conical gear meshes with two second conical gear mutually. The utility model has the advantages of reasonable design, easy operation, it is fixed to make things convenient for in the installation to the pipeline, and is convenient for highly adjust convenient to use, and the practicality is good to the pipeline.

Description

Pipeline installation adjusting device for construction
Technical Field
The utility model relates to a piping erection technical field especially relates to a piping erection adjusting device for construction.
Background
A pipeline is a device for transporting a gas, liquid or fluid with solid particles, connected by pipes, pipe couplings, valves, etc. A large amount of polyvinyl chloride pipes, polyethylene pipes and other pipelines can be used in the current building construction, and the pipelines need to be installed and supported by using a support when being laid.
However, when the existing pipe laying device is used, the pipe installation operation is complicated, and the height of the installed pipe is inconvenient to adjust, so we propose a pipe installation adjusting device for building construction to solve the above problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving present pipe laying device when using, to pipeline installation complex operation, and inconvenient highly the shortcoming of adjusting of the pipeline after the installation, and the pipeline installation adjusting device for construction that provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a pipeline installation adjusting device for building construction comprises a bottom box, wherein two rotating shafts are rotatably arranged at the front side of the bottom box, knobs are fixedly arranged at the front ends of the two rotating shafts respectively, the rear ends of the rotating shafts positioned below extend into the bottom box and are fixedly provided with first bevel gears, threaded rods are rotatably arranged on the inner walls of the two sides of the bottom box respectively, two conical gears are fixedly arranged at the ends, close to each other, of the two threaded rods, the first bevel gears are meshed with the two second conical gears, movable plates are respectively and threadedly arranged at the outer sides of the two threaded rods, supporting plates are respectively and slidably sleeved at the outer sides of the two movable plates, clamping rings are respectively and fixedly arranged at the top sides of the two supporting plates, connecting rods are respectively and fixedly arranged at the sides, close to each other, of the two supporting plates are respectively and slidably sleeved with the same sleeve plate, the rear ends of the rotating shafts positioned above extend into the bottom box and are fixedly provided with worms, the rotating rod is rotatably installed in the bottom box, worm gears and gears are respectively and fixedly installed at the two ends of the rotating rod and meshed with each other, racks are fixedly installed at the bottom of the sleeve plate, and the gears are meshed with the racks.
Preferably, the bottom of the two sides of the bottom box is fixedly provided with a mounting plate, and the top of the two mounting plates is provided with a bolt hole, so that the bottom box can be fixedly mounted conveniently.
Preferably, two mounting holes are formed in the front side of the bottom box, the outer rings of the bearings are fixedly mounted in the two mounting holes, and the two rotating shafts are fixedly sleeved with the inner rings of the corresponding bearings, so that the two rotating shafts can be rotatably mounted conveniently.
Preferably, a threaded hole is formed in one side of the moving plate, and the moving plate is installed on the outer side of the threaded rod through threads of the threaded hole, so that the moving plate can be installed in a threaded mode conveniently.
Preferably, the bottom of backup pad has seted up the spread groove, and the backup pad passes through the spread groove sliding sleeve and establishes the outside of movable plate, and the backup pad is established to the sliding sleeve of being convenient for.
Preferably, a clamping plate is fixedly installed in the bottom box, and the rotating rod is rotatably installed on the inner side of the clamping plate and is convenient to rotate and install.
In the utility model, the pipeline installation adjusting device for building construction, through the knob that the rotating is located below, simultaneously through the meshing transmission of first conical gear and two second conical gears, can drive two threaded rods to rotate, and two threaded rods turn to opposite directions, and then can be through the threaded connection of two movable plates and corresponding threaded rods, can drive two clamp rings to move close to each other through two backup pads and clamp the pipeline tightly fixedly, easy operation, convenient installation to the pipeline is fixed;
in the utility model, the knob above the adjusting device for installing the pipeline for building construction is rotated to drive the worm to rotate, so that the height of the pipeline can be adjusted through the meshing transmission of the worm and the worm wheel and the meshing transmission of the gear and the rack;
the utility model has the advantages of reasonable design, easy operation, it is fixed to make things convenient for in the installation to the pipeline, and is convenient for highly adjust convenient to use, and the practicality is good to the pipeline.
Drawings
Fig. 1 is a schematic perspective view of a pipeline installation adjusting device for building construction according to the present invention;
fig. 2 is a schematic sectional view of a front view of the pipeline installation adjusting device for building construction according to the present invention;
FIG. 3 is a schematic structural view of a section A-A of a part of the structure of the pipeline installation adjusting device for building construction according to the present invention;
fig. 4 is a schematic structural diagram of a part B of the pipeline installation adjusting device for building construction.
In the figure: 1. a bottom box; 2. a rotating shaft; 3. a first bevel gear; 4. a threaded rod; 5. a second bevel gear; 6. moving the plate; 7. a support plate; 8. a clamping ring; 9. a connecting rod; 10. sheathing; 11. a worm; 12. rotating the rod; 13. a worm gear; 14. a gear; 15. a rack.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Unless otherwise defined, technical or scientific terms used herein shall have the ordinary meaning as understood by one of ordinary skill in the art to which this invention belongs. The use of "first," "second," and similar terms in the description and in the claims does not indicate any order, quantity, or importance, but rather is used to distinguish one element from another. Also, the use of the terms "a" or "an" and the like do not denote a limitation of quantity, but rather denote the presence of at least one.
Referring to fig. 1-4, a pipeline installation adjusting device for building construction comprises a bottom case 1, two rotating shafts 2 are rotatably installed at the front side of the bottom case 1, knobs are fixedly installed at the front ends of the two rotating shafts 2, the rear end of the rotating shaft 2 positioned below extends into the bottom case 1 and is fixedly installed with a first bevel gear 3, threaded rods 4 are rotatably installed on the inner walls of the two sides of the bottom case 1, second bevel gears 5 are fixedly installed at the mutually close ends of the two threaded rods 4, the first bevel gear 3 is meshed with the two second bevel gears 5, movable plates 6 are respectively threadedly installed at the outer sides of the two threaded rods 4, supporting plates 7 are respectively slidably sleeved at the outer sides of the two movable plates 6, clamping rings 8 are respectively fixedly installed at the top sides of the two supporting plates 7, connecting rods 9 are respectively fixedly installed at the mutually close sides of the two supporting plates 7, the outer sides of the two connecting rods 9 are slidably sleeved with the same sleeve plate 10, the rear end of the rotating shaft 2 located above extends into the bottom box 1 and is fixedly provided with a worm 11, a rotating rod 12 is rotatably arranged in the bottom box 1, two ends of the rotating rod 12 are respectively and fixedly provided with a worm wheel 13 and a gear 14, the worm 11 is meshed with the worm wheel 13, the bottom of the sleeve plate 10 is fixedly provided with a rack 15, and the gear 14 is meshed with the rack 15.
In this embodiment, the equal fixed mounting in both sides bottom of under casing 1 has the mounting panel, and the bolt hole has all been seted up at the top of two mounting panels, the fixed mounting under casing 1 of being convenient for.
In this embodiment, two mounting holes are opened to the front side of under casing 1, and equal fixed mounting has the outer lane of bearing in two mounting holes, and two pivots 2 cup joint with the inner circle of corresponding bearing is fixed, are convenient for rotate two pivots 2 of installation.
In this embodiment, a threaded hole is formed in one side of the moving plate 6, and the moving plate 6 is mounted on the outer side of the threaded rod 4 through the threaded hole, so that the moving plate 6 can be mounted in a threaded manner.
In this embodiment, the connecting groove has been seted up to the bottom of backup pad 7, and backup pad 7 passes through the connecting groove sliding sleeve and establishes backup pad 7 in the outside of movable plate 6, the sliding sleeve of being convenient for.
In this embodiment, fixed mounting has the cardboard in the under casing 1, and dwang 12 rotates and installs the inboard at the cardboard, is convenient for rotate installation dwang 12.
The utility model discloses in, when using, can be through placing the pipeline in the one side that two clamp rings 8 are close to each other, then the rotating is located the knob of below, simultaneously through first bevel gear 3 and two second bevel gear 5's meshing transmission, can drive two threaded rod 4 and rotate, and two threaded rod 4 turn to on the contrary, and then can be through two movable plate 6 and corresponding threaded rod 4's threaded connection, can drive two clamp rings 8 through two backup pads 7 and be close to each other and remove the pipe clamp with fixed, can be located the knob drive worm 11 rotation of top through the rotating afterwards, and then can be through the meshing transmission of worm 11 with worm wheel 13, and the meshing transmission of gear 14 and rack 15, can highly adjust the pipeline.

Claims (6)

1. The utility model provides a pipeline installation adjusting device for construction, includes under casing (1), its characterized in that, two pivot (2) are installed in the front side rotation of under casing (1), and the equal fixed mounting in front end of two pivot (2) has the knob, and the rear end of pivot (2) that is located the below extends to under casing (1) and fixed mounting has first conical gear (3), all rotate on the both sides inner wall of under casing (1) and install threaded rod (4), and the one end that two threaded rod (4) are close to each other all fixed mounting have second conical gear (5), and first conical gear (3) mesh with two second conical gear (5), and the equal screw thread in the outside of two threaded rod (4) is installed movable plate (6), and the outside of two movable plate (6) all slides and overlaps and is equipped with backup pad (7), and the equal fixed mounting in top side of two backup pad (7) has clamp ring (8), the equal fixed mounting in one side that two backup pads (7) are close to each other has connecting rod (9), and the outside slip cover of two connecting rods (9) is equipped with same lagging (10), and the rear end that is located pivot (2) of top extends to in bottom case (1) and fixed mounting has worm (11), dwang (12) are installed to bottom case (1) internal rotation, and the both ends difference fixed mounting of dwang (12) has worm wheel (13) and gear (14), worm (11) mesh mutually with worm wheel (13), the bottom fixed mounting of lagging (10) has rack (15), gear (14) mesh mutually with rack (15).
2. The pipeline installation adjusting device for building construction as claimed in claim 1, wherein the bottom of the two sides of the bottom box (1) are fixedly provided with mounting plates, and the top of each mounting plate is provided with a bolt hole.
3. The pipeline installation adjusting device for building construction as claimed in claim 1, wherein two installation holes are opened at the front side of the bottom box (1), the outer ring of the bearing is fixedly installed in each installation hole, and the two rotating shafts (2) are fixedly sleeved with the inner ring of the corresponding bearing.
4. The pipeline installation adjusting device for building construction as claimed in claim 1, wherein a threaded hole is opened at one side of the moving plate (6), and the moving plate (6) is threadedly installed at the outer side of the threaded rod (4) through the threaded hole.
5. The pipeline installation adjusting device for building construction as claimed in claim 1, wherein the bottom of the support plate (7) is provided with a connecting groove, and the support plate (7) is slidably sleeved on the outer side of the moving plate (6) through the connecting groove.
6. The pipeline installation adjusting device for building construction as claimed in claim 1, wherein a clamping plate is fixedly installed in the bottom box (1), and the rotating rod (12) is rotatably installed at the inner side of the clamping plate.
CN202121062958.5U 2021-05-18 2021-05-18 Pipeline installation adjusting device for construction Active CN214699518U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121062958.5U CN214699518U (en) 2021-05-18 2021-05-18 Pipeline installation adjusting device for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121062958.5U CN214699518U (en) 2021-05-18 2021-05-18 Pipeline installation adjusting device for construction

Publications (1)

Publication Number Publication Date
CN214699518U true CN214699518U (en) 2021-11-12

Family

ID=78553014

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121062958.5U Active CN214699518U (en) 2021-05-18 2021-05-18 Pipeline installation adjusting device for construction

Country Status (1)

Country Link
CN (1) CN214699518U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114235952A (en) * 2021-12-14 2022-03-25 中铁十七局集团第四工程有限公司 Tunnel detection device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114235952A (en) * 2021-12-14 2022-03-25 中铁十七局集团第四工程有限公司 Tunnel detection device

Similar Documents

Publication Publication Date Title
CN214699518U (en) Pipeline installation adjusting device for construction
CN108163700A (en) A kind of construction place tubing lifting clamping device
CN108443614B (en) Sealing device for pipeline connection
CN217618803U (en) Steel structure welding tool
CN210213662U (en) Anti-abrasion water supply pipeline installation and conveying device for water service
CN215908550U (en) A pipeline installation support base for hydraulic engineering
CN213541530U (en) Building pipeline lays fixing device among hydraulic engineering
CN210978735U (en) Pipeline installation adjusting device for construction
CN208221770U (en) A kind of clamping device applied to building pipe
CN207229906U (en) A kind of choke manifold supporter easy for installation
CN219889355U (en) Leakage-proof gas pipeline
CN216344368U (en) Sleeve anti-skid device
CN218818633U (en) Pipeline positioning support
CN219912055U (en) Large-pipe-diameter prefabricated directly-buried heat-insulating pipe
CN212986242U (en) Water supply and drainage engineering pipeline laying fixing device
CN213954556U (en) Municipal administration water supply and drainage pipeline stop device
CN218018255U (en) Portable building pipeline installation tool
CN213257980U (en) Clamping equipment for petroleum machinery
CN214301818U (en) Subway foundation stabilization strutting arrangement
CN214246009U (en) Support positioner that municipal administration plumbing construction was used
CN219912006U (en) Pipeline connecting device for water distribution project layout
CN212617009U (en) Water-proof device for indoor sewer pipe
CN218236481U (en) Heat preservation pipeline for geothermal environmental protection engineering
CN217762537U (en) Angle-adjustable corner connecting part for large pipeline
CN214063997U (en) Municipal works are pipeline fixing device for drainage works

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant