Prior art keywords
sedimentation tank
worm
pump station
thread bush
chain wheel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN202120180665.0U
Other languages
Chinese (zh)
Inventor
王姗姗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Ruifeng Construction Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202120180665.0U priority Critical patent/CN214696012U/en
Application granted granted Critical
Publication of CN214696012U publication Critical patent/CN214696012U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The utility model discloses an integration pump station desilting equipment, including the sedimentation tank, sealed sliding connection has the bearing case in the sedimentation tank, the drive chamber has been seted up on the sedimentation tank, the rotation is connected with two thread bush in the drive chamber, and equal threaded connection has the screw rod in two thread bushes, the one end of screw rod run through the drive chamber and with bear case fixed connection, the rotation is connected with the worm in the drive chamber, two the worm wheel has all been cup jointed on the thread bush. The utility model relates to a water treatment technical field, through thread bush and the screw rod that sets up, can be under the cooperation of drive mechanism and worm, worm wheel, the regulation and control thread bush rotates for the screw rod drives the bearing case and goes up and down, and then makes the bearing case can transport the silt of sedimentation tank bottom to the port department of sedimentation tank, so that the staff clears up silt, and this has facilitated the cleaning process of silt greatly, has improved cleaning efficiency.

Description

Integration pump station desilting equipment
Technical Field
The utility model belongs to the technical field of the water treatment, especially, relate to an integration pump station desilting equipment.
Background
The integration pump station can be with sewage in the sewage pipe way of simply handling the back row municipal administration, consequently, the integration pump station is the most common uses at sewage treatment plant, often can set up the sedimentation tank in the integration pump station, carries out the preliminary treatment to sewage to clear away the silt that contains in the sewage.
The sedimentation tank often needs to be handled the silt in the sedimentation tank after the operation of deposiing to the sedimentation tank carries out the later stage operation of deposiing of being convenient for, but the bottom of sedimentation tank has certain height apart from the port, makes the staff not convenient for clear up the silt of sedimentation tank bottom, and this has influenced desilting efficiency greatly.
Therefore, an integrated pump station dredging device is provided for solving the problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem, and the integrated pump station dredging equipment that provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides an integration pump station desilting equipment, includes the sedimentation tank, sealed sliding connection has the bearing case in the sedimentation tank, the drive chamber has been seted up on the sedimentation tank, the swivelling joint has two thread bush in the drive chamber, and equal threaded connection has the screw rod in two thread bushes, the one end of screw rod run through the drive chamber and with bear case fixed connection, the swivelling joint has the worm in the drive chamber, two the worm wheel has all been cup jointed on the thread bush, and worm wheel and worm mesh mutually, set up on the sedimentation tank with drive chamber matched with transmission chamber, and be provided with in the transmission chamber with worm matched with drive mechanism.
Preferably, drive mechanism includes first sprocket, second sprocket and chain, swivelling joint has the pivot in the transmission chamber, and the one end transmission of pivot is connected with servo motor, first sprocket cup joints in the pivot, the one end of worm extends to and sets up in the transmission chamber, and the second sprocket cup joints on the worm, through chain drive between first sprocket and the second sprocket.
Preferably, a supporting plate is fixedly connected in the driving cavity, and the threaded sleeve is rotatably connected with the supporting plate.
Preferably, the supporting plate is embedded with a bearing matched with the threaded sleeve, and the threaded sleeve is in interference fit with the bearing.
Preferably, the all-around lateral wall of holding case fixedly connected with scraper blade, and the scraper blade slope sets up, the scraper blade is connected with the inner wall contact of sedimentation tank.
Preferably, the second sprocket has a size smaller than the first sprocket.
Compared with the prior art, the beneficial effects of the utility model are that:
1. through the thread bush and the screw rod that set up, can be under the cooperation of drive mechanism and worm, worm wheel, regulation and control thread bush rotates for the screw rod drives and holds the case and go up and down, and then makes and hold the case and can transport the silt of sedimentation tank bottom to the port department of sedimentation tank, so that the staff clears up silt, and this clearance process of silt of having facilitated greatly has improved cleaning efficiency.
2. Can give the stable support of thread bush through the backup pad that sets up, through the bearing that sets up, both can guarantee the steadiness that thread bush and backup pad are connected, can guarantee thread bush pivoted smooth and easy nature again, through the scraper blade that sets up, can cooperate the rising of bearing case to strike off the silt of adhesion on the sedimentation tank inner wall.
Drawings
Fig. 1 is a schematic view of a front perspective structure of an integrated pump station dredging device provided by the utility model;
fig. 2 is a schematic structural view of the integrated pump station dredging device provided by the utility model, wherein the transmission cavity and the transmission mechanism are matched with each other;
fig. 3 is an enlarged schematic view of a portion a in fig. 1.
In the figure: the automatic scraper comprises a sedimentation tank 1, a bearing box 2, a driving cavity 3, a thread bush 4, a screw rod 5, a worm 6, a worm wheel 7, a transmission cavity 8, a transmission mechanism 9, a first chain wheel 91, a second chain wheel 92, a chain 93, a rotating shaft 10, a servo motor 11, a support plate 12, a bearing 13 and a scraper 14.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, an integration pump station desilting equipment, including sedimentation tank 1, sealed sliding connection has the bearing case 2 in the sedimentation tank 1, and the equal fixedly connected with scraper blade 14 of lateral wall all around of bearing case 2, and scraper blade 14 slope sets up, and scraper blade 14 is connected with the inner wall contact of sedimentation tank 1, and the scraper blade 14 that the slope set up can cooperate the rising that bears case 2, strikes off the silt of adhesion on the sedimentation tank 1 inner wall, improves the clearance effect.
The drive chamber 3 has been seted up on the sedimentation tank 1, it is connected with two thread bush 4 to rotate in the drive chamber 3, and equal threaded connection has screw rod 5 in two thread bush 4, fixedly connected with backup pad 12 in the drive chamber 3, and thread bush 4 rotates with backup pad 12 to be connected, the setting of backup pad 12, can give the stable support of thread bush 4, inlay on the backup pad 12 be equipped with thread bush 4 assorted bearing 13, and thread bush 4 and bearing 13 interference fit, through the bearing 13 that sets up, both can guarantee the steadiness that thread bush 4 and backup pad 12 are connected, can guarantee thread bush 4 pivoted smooth and easy nature again.
One end of a screw 5 penetrates through a driving cavity 3 and is fixedly connected with a receiving box 2, a worm 6 is rotatably connected in the driving cavity 3, worm wheels 7 are sleeved on two thread sleeves 4, the worm wheels 7 are meshed with the worm 6, a transmission cavity 8 matched with the driving cavity 3 is formed in a sedimentation tank 1, a transmission mechanism 9 matched with the worm 6 is arranged in the transmission cavity 8, the transmission mechanism 9 comprises a first chain wheel 91, a second chain wheel 92 and a chain 93, a rotating shaft 10 is rotatably connected in the transmission cavity 8, one end of the rotating shaft 10 is in transmission connection with a servo motor 11, the model of the servo motor 11 is 80ZFMA1, the first chain wheel 91 is sleeved on the rotating shaft 10, one end of the worm 6 extends into the transmission cavity 8 and is arranged, the second chain wheel 92 is sleeved on the worm 6, the first chain wheel 91 is in transmission with the second chain wheel 92 through the chain 93, and the first chain wheel 91, the second chain wheel 92 and the chain 93 are matched, be convenient for servo motor 11 drive worm 6 and rotate, the size of second sprocket 92 is less than the size of first sprocket 91, and the rotational speed of self can be improved to the size design of second sprocket 92, and then can improve the lifting speed who accepts case 2, improves work efficiency.
Now, the operation principle of the present invention is described as follows:
when the silt of sedimentation tank 1 bottom is clear away to needs, firstly, start servo motor 11, servo motor 11 can drive first sprocket 91 through pivot 10 and rotate, under the transmission of chain 93, first sprocket 91 can drive second sprocket 92 and rotate, second sprocket 92 can drive worm 6 and rotate, under the transmission of each worm wheel 7, worm wheel 7 can drive two thread bush 4 and rotate, thread bush 4 can drive to hold and connect case 2 through screw rod 5 and go up, it can drive the silt of sedimentation tank 1 bottom and rise to accept case 2, the process of going up the slip on case 2, scraper blade 14 can strike off the silt of adhesion on the sedimentation tank 1 inner wall, when accepting case 2 and rising to sedimentation tank 1's port department, close servo motor 11, then the staff can clear up the silt in accepting case 2. The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. An integrated pump station dredging device comprises a sedimentation tank (1) and is characterized in that, the sedimentation tank (1) is connected with a bearing box (2) in a sealing and sliding way, a driving cavity (3) is arranged on the sedimentation tank (1), two thread sleeves (4) are rotatably connected in the driving cavity (3), and the two thread sleeves (4) are both connected with a screw (5) in a thread way, one end of the screw (5) penetrates through the driving cavity (3) and is fixedly connected with the bearing box (2), a worm (6) is rotatably connected in the driving cavity (3), worm wheels (7) are sleeved on the two thread sleeves (4), the worm wheel (7) is meshed with the worm (6), a transmission cavity (8) matched with the driving cavity (3) is arranged on the sedimentation tank (1), and a transmission mechanism (9) matched with the worm (6) is arranged in the transmission cavity (8).
2. The integrated pump station dredging device according to claim 1, wherein the transmission mechanism (9) comprises a first chain wheel (91), a second chain wheel (92) and a chain (93), a rotating shaft (10) is rotatably connected in the transmission cavity (8), a servo motor (11) is connected to one end of the rotating shaft (10) in a transmission manner, the first chain wheel (91) is sleeved on the rotating shaft (10), one end of the worm (6) extends into the transmission cavity (8) and is arranged, the second chain wheel (92) is sleeved on the worm (6), and the first chain wheel (91) and the second chain wheel (92) are driven by the chain (93).
3. The integrated pump station dredging device according to claim 1, wherein a support plate (12) is fixedly connected in the driving cavity (3), and the threaded sleeve (4) is rotatably connected with the support plate (12).
4. The integrated pump station dredging device according to claim 3, wherein a bearing (13) matched with the threaded sleeve (4) is embedded in the support plate (12), and the threaded sleeve (4) is in interference fit with the bearing (13).
5. The integrated pump station dredging device according to claim 1, wherein the side walls of the periphery of the receiving box (2) are fixedly connected with scrapers (14), the scrapers (14) are obliquely arranged, and the scrapers (14) are in contact connection with the inner wall of the sedimentation tank (1).
6. The integrated pump station dredging device according to claim 2, wherein the second sprocket (92) has a smaller size than the first sprocket (91).
CN202120180665.0U 2021-01-22 2021-01-22 Integration pump station desilting equipment Withdrawn - After Issue CN214696012U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120180665.0U CN214696012U (en) 2021-01-22 2021-01-22 Integration pump station desilting equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120180665.0U CN214696012U (en) 2021-01-22 2021-01-22 Integration pump station desilting equipment

Publications (1)

Publication Number Publication Date
CN214696012U true CN214696012U (en) 2021-11-12

Family

ID=78564289

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120180665.0U Withdrawn - After Issue CN214696012U (en) 2021-01-22 2021-01-22 Integration pump station desilting equipment

Country Status (1)

Country Link
CN (1) CN214696012U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114134984A (en) * 2021-11-17 2022-03-04 惠州市弘基水利工程有限公司 Pump station forebay silt cleaning device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114134984A (en) * 2021-11-17 2022-03-04 惠州市弘基水利工程有限公司 Pump station forebay silt cleaning device

Similar Documents

Publication Publication Date Title
CN214696012U (en) Integration pump station desilting equipment
CN101660306A (en) Water energy dirt remover
CN112796406A (en) Municipal administration water conservancy pipeline mediation cleaning device
CN201010882Y (en) Water surface cleaning device
CN213508651U (en) Dredging equipment for agricultural irrigation ditch
CN200974979Y (en) Cellar well dredging machine
CN216092366U (en) Central transmission mud scraping and sucking machine
CN213952342U (en) Cleaning device of farmland irrigation channel
CN212026400U (en) River course cleaning device for hydraulic engineering
CN211143028U (en) Water environment ecological protection prosthetic devices
CN209974654U (en) A pile machine turns over for fertilizer
CN209303265U (en) A kind of external hanging type hook machine crawler belt cleaning plant
CN205935006U (en) Disc ditching machine
CN220035361U (en) Environmental protection river course device of decontaminating
CN219364763U (en) High efficiency hydraulic engineering channel dredging device
CN215977643U (en) Pipeline dredging device for municipal dredging
CN214219783U (en) Special desilting device of rural water conservancy river course engineering
CN221193493U (en) Silt dredging device for water conservancy construction
CN218091027U (en) Ditch silt clearing device
CN221143012U (en) Hydropower station flood prevention device
CN216309525U (en) Unmanned sampling vehicle for ultra-soft mud
CN218713433U (en) Dredging device for farmland channel
CN218490936U (en) Civil engineering construction waste collection device
CN215715661U (en) River course dredging device is used in municipal works construction
CN210713011U (en) Hydraulic engineering desilting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240320

Address after: 556000 Qiandongnan Miao and Dong Autonomous Prefecture, Guizhou Province, Kaili City, Xiaogaoshan Road, Yijing Gaoshan Building 6-11, 3rd to 1st floor, 2nd floor, 2nd to 5th storefront

Patentee after: Guizhou Ruifeng Construction Engineering Co.,Ltd.

Country or region after: China

Address before: 110000 No. 44, Yingchang street, Tiexi District, Shenyang City, Liaoning Province

Patentee before: Wang Panpan

Country or region before: China

AV01 Patent right actively abandoned

Granted publication date: 20211112

Effective date of abandoning: 20240617

AV01 Patent right actively abandoned

Granted publication date: 20211112

Effective date of abandoning: 20240617