CN214692403U - Hysteresis lag type water pipe winding drum - Google Patents

Hysteresis lag type water pipe winding drum Download PDF

Info

Publication number
CN214692403U
CN214692403U CN202120540905.3U CN202120540905U CN214692403U CN 214692403 U CN214692403 U CN 214692403U CN 202120540905 U CN202120540905 U CN 202120540905U CN 214692403 U CN214692403 U CN 214692403U
Authority
CN
China
Prior art keywords
water pipe
reel
winding drum
pile
hysteresis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120540905.3U
Other languages
Chinese (zh)
Inventor
曾斌
苏叶广
林锦城
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Offshore Power Operation And Maintenance Technology Co ltd
Original Assignee
Fujian Haidian Operation And Maintenance Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Haidian Operation And Maintenance Technology Co ltd filed Critical Fujian Haidian Operation And Maintenance Technology Co ltd
Priority to CN202120540905.3U priority Critical patent/CN214692403U/en
Application granted granted Critical
Publication of CN214692403U publication Critical patent/CN214692403U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Storing, Repeated Paying-Out, And Re-Storing Of Elongated Articles (AREA)

Abstract

The utility model discloses a hysteresis lag formula water pipe reel, the on-line screen storage device comprises a base, the speed reducer is installed at the base top, and the hysteresis lag shaft coupling is installed at the top of speed reducer, and the motor is installed at the top of hysteresis lag shaft coupling, and rotary joint is installed to the both sides of speed reducer, installs the reel on the rotary joint, and the electrical control box is installed to one side of reel. Compared with the prior art, the utility model the advantage lie in: according to the basic principle that the existing power equipment of the platform is utilized as much as possible without changing the stability of the platform according to the problems of the existing platform pile punching system, the pile punching system of the platform is adaptively modified from the aims of reducing pile pulling difficulty, reducing pile pulling load and improving pile pulling efficiency and platform structure safety, and the original manual butt joint pile punching system is modified into an automatic reel pile punching system.

Description

Hysteresis lag type water pipe winding drum
Technical Field
The utility model relates to the field of large machinery, specifically indicate a hysteresis lag formula water pipe reel.
Background
Before the self-elevating operation platform shifts, pile pulling operation is required, namely pile legs supported on the seabed are pulled out. The characteristics of seabed soil layers of operation sites at each time are different, and the complicated stratum, the geological porosity degree and the clay-containing degree of part of the local stratum cause that pile legs are too deep into mud when a platform is inserted, and soil bodies damaged by inserted piles are re-slurried and back-silted to form new attached soil bodies which are stabilized on the pile legs, so that pile pulling resistance of the platform is too large and pile pulling is difficult. Personnel intensity of labour is big, very easily misses the tide and seriously influences the high-efficient operation of platform, reforms transform the current towards stake system of platform in order to guarantee platform operation safety, improve platform operating efficiency and enlarge the operating range.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to provide one kind to above problem can guarantee platform operation safety, improve platform operating efficiency and enlarge the range of operation and to the current pile system that dashes of platform.
In order to solve the technical problem, the utility model provides a technical scheme does: the utility model provides a hysteresis lag formula water pipe reel, includes the base, the speed reducer is installed at the base top, and the hysteresis lag shaft coupling is installed at the top of speed reducer, and the motor is installed at the top of hysteresis lag shaft coupling, and rotary joint is installed to the both sides of speed reducer, installs the reel on the rotary joint, and the electrical control box is installed to one side of reel.
Compared with the prior art, the utility model the advantage lie in: according to the basic principle that the existing power equipment of the platform is utilized as much as possible without changing the stability of the platform according to the problems of the existing platform pile punching system, the pile punching system of the platform is adaptively modified from the aims of reducing pile pulling difficulty, reducing pile pulling load and improving pile pulling efficiency and platform structure safety, and the original manual butt joint pile punching system is modified into an automatic reel pile punching system.
As an improvement, flat pipes are arranged on the reel.
As an improvement, the hysteresis type water pipe winding drum has two mounting structures, wherein the first mounting structure is a pile winding drum, and the other mounting structure is a non-pile winding drum.
As the improvement, the non-pile-winding reel comprises a water pipe reel, a winch base is installed at the bottom of the water pipe reel, a control valve group is installed on one side of the winch base and connected to the water pipe reel, a first high-pressure hose and a second high-pressure hose are further installed on the water pipe reel, a bracket is installed at one end, away from the water pipe reel, of the second high-pressure hose, and a top hard pipe is fixed on the bracket.
As the improvement, the winding pile reel comprises a water pipe reel, a winch shared base is installed at the bottom of the water pipe reel, a shelving platform is arranged at the bottom of the winch shared base, a control valve group is arranged on one side of the winch shared base, a first high-pressure hose and a second high-pressure hose are installed on the water pipe reel, a round-top and square-bottom guide is installed on the water pipe reel, a pile leg guide is connected to one side of the round-top and square-bottom guide, a bracket is installed at one end, away from the water pipe reel, of the second high-pressure hose, and a top hard pipe is fixed on the bracket.
Drawings
Fig. 1 is a schematic view of a hysteresis type water pipe reel.
Fig. 2 is a side view of a hysteresis type water pipe reel.
Fig. 3 is a structure view of a non-winding pile reel installation structure of a hysteresis type water pipe reel.
Fig. 4 is a view showing a construction of a hysteresis type water pipe reel installed around a pile reel.
As shown in the figure: 1. the device comprises a base, 2, a speed reducer, 3, a hysteresis coupling, 4, a motor, 5, a rotary joint, 6, a reel, 7, an electric control box, 8, a water pipe reel, 9, a winch base, 10, a control valve group, 11, a first high-pressure hose, 12, a second high-pressure hose, 13, a bracket, 14, a top hard pipe, 15, a placing platform, 16, a sky-circle-place guide, 17, a pile leg guide, 18 and a winch shared base.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
The utility model discloses when concrete implementation, a hysteresis lag formula water pipe reel, including base 1, speed reducer 2 is installed at base 1 top, and hysteresis coupling 3 is installed at speed reducer 2's top, and motor 4 is installed at hysteresis coupling 3's top, and rotary joint 5 is installed to speed reducer 2's both sides, installs reel 6 on the rotary joint 5, and electrical control box 7 is installed to one side of reel 6.
The reel 6 is provided with a flat pipe.
Hysteresis lag formula water pipe reel has two kinds of mounting structure, and first kind is for winding a reel, and another kind is for not winding a reel.
The non-winding pile winding drum comprises a water pipe winding drum 8, a winch base 9 is installed at the bottom of the water pipe winding drum 8, a control valve group 10 is installed on one side of the winch base 9, the control valve group 10 is connected to the water pipe winding drum 8, a first high-pressure hose 11 and a second high-pressure hose 12 are further installed on the water pipe winding drum 8, a bracket 13 is installed at one end, far away from the water pipe winding drum 8, of the second high-pressure hose 12, and a top hard pipe 14 is fixed on the bracket 13.
As an improvement, the pile winding drum comprises a water pipe drum 8, a winch sharing base 18 is installed at the bottom of the water pipe drum 8, a shelving platform 15 is arranged at the bottom of the winch sharing base 18, a control valve group 10 is arranged on one side of the winch sharing base 18, a first high-pressure hose 11 and a second high-pressure hose 12 are installed on the water pipe drum 8, a round-top and square-shaped guide 16 is installed on the water pipe drum 8, a pile leg guide 17 is connected to one side of the round-top and square-shaped guide 16, a bracket 13 is installed at one end, far away from the water pipe drum 8, of the second high-pressure hose 12, and a top hard pipe 14 is fixed on the bracket 13.
The utility model discloses a theory of operation: when the winding drum works, the motor always rotates towards the cable winding direction (if necessary, the motor can be powered off when the pipe is discharged).
The motor transmits power to the coupler, and then transmits amplified torque to the water pipe reel after being decelerated by the gear box. When the platform pile leg is lifted vertically upwards, the dragging force of the pile leg on the water pipe is larger than the torque transmitted by the coupler, the water pipe reel rotates towards the cable releasing direction, and the water pipe is released. The water pipe reel keeps the water pipe in a tensioning state all the time in the pipe releasing process. When the platform pile leg descends vertically, the water pipe reel rotates towards the cable retracting direction due to the elimination of the dragging force of the pile leg on the water pipe, and the water pipe is wound back. When the machine is stopped, the reverse braking action of the one-way backstop on the motor shaft ensures that the water pipe cannot slide off the reel under the action of gravity.
TABLE 1 budget TABLE for automatic pile-punching reconstruction
Figure BDA0002977995560000031
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature, and in the description of the invention, "plurality" means two or more unless explicitly specifically defined otherwise.
In the present invention, unless otherwise expressly specified or limited, the terms "mounted," "connected," and "fixed" are to be construed broadly and may include, for example, fixed connections, detachable connections, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
In the present disclosure, unless expressly stated or limited otherwise, the first feature "on" or "under" the second feature may comprise direct contact between the first and second features, or may comprise contact between the first and second features not directly. Also, the first feature being "on," "above" and "over" the second feature includes the first feature being directly on and obliquely above the second feature, or merely indicating that the first feature is at a higher level than the second feature. A first feature being "under," "below," and "beneath" a second feature includes the first feature being directly above and obliquely above the second feature, or simply meaning that the first feature is at a lesser level than the second feature.
In the description herein, references to the description of the term "one embodiment," "some embodiments," "an example," "a specific example," or "some examples," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
Although embodiments of the present invention have been shown and described, it is to be understood that the above embodiments are exemplary and should not be construed as limiting the present invention, and that changes, modifications, substitutions and alterations can be made to the above embodiments by those of ordinary skill in the art without departing from the principles and spirit of the present invention.

Claims (5)

1. The utility model provides a hysteresis lag formula water pipe reel, includes base (1), its characterized in that: speed reducer (2) are installed at base (1) top, and hysteresis coupling (3) are installed at the top of speed reducer (2), and motor (4) are installed at the top of hysteresis coupling (3), and rotary joint (5) are installed to the both sides of speed reducer (2), install reel (6) on rotary joint (5), and electrical control box (7) are installed to one side of reel (6).
2. A hysteresis type water pipe reel as claimed in claim 1, wherein: the reel (6) is provided with a flat pipe.
3. A hysteresis type water pipe reel as claimed in claim 1, wherein: hysteresis lag formula water pipe reel has two kinds of mounting structure, and first kind is for winding a reel, and another kind is for not winding a reel.
4. A hysteresis type water pipe reel as claimed in claim 3, wherein: the non-winding pile winding drum comprises a water pipe winding drum (8), a winch base (9) is installed at the bottom of the water pipe winding drum (8), a control valve group (10) is installed on one side of the winch base (9), the control valve group (10) is connected to the water pipe winding drum (8), a first high-pressure hose (11) and a second high-pressure hose (12) are further installed on the water pipe winding drum (8), a bracket (13) is installed at one end, away from the water pipe winding drum (8), of the second high-pressure hose (12), and a top hard pipe (14) is fixed on the bracket (13).
5. A hysteresis type water pipe reel as claimed in claim 3, wherein: the winding pile winding drum comprises a water pipe winding drum (8), a winch sharing base (18) is installed at the bottom of the water pipe winding drum (8), a shelving platform (15) is arranged at the bottom of the winch sharing base (18), a control valve group (10) is arranged on one side of the winch sharing base (18), a first high-pressure hose (11) and a second high-pressure hose (12) are installed on the water pipe winding drum (8), a sky-circle local guide (16) is installed on the water pipe winding drum (8), a pile leg guide (17) is connected to one side of the sky-circle local guide (16), a bracket (13) is installed at one end, far away from the water pipe winding drum (8), of the second high-pressure hose (12), and a top hard pipe (14) is fixed on the bracket (13).
CN202120540905.3U 2021-03-16 2021-03-16 Hysteresis lag type water pipe winding drum Active CN214692403U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120540905.3U CN214692403U (en) 2021-03-16 2021-03-16 Hysteresis lag type water pipe winding drum

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120540905.3U CN214692403U (en) 2021-03-16 2021-03-16 Hysteresis lag type water pipe winding drum

Publications (1)

Publication Number Publication Date
CN214692403U true CN214692403U (en) 2021-11-12

Family

ID=78571435

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120540905.3U Active CN214692403U (en) 2021-03-16 2021-03-16 Hysteresis lag type water pipe winding drum

Country Status (1)

Country Link
CN (1) CN214692403U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115254304A (en) * 2022-09-15 2022-11-01 江苏安航船舶设备有限公司 Intelligent ship sewage receiving device based on VITS

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115254304A (en) * 2022-09-15 2022-11-01 江苏安航船舶设备有限公司 Intelligent ship sewage receiving device based on VITS
CN115254304B (en) * 2022-09-15 2024-04-26 江苏安航船舶设备有限公司 Ship sewage intelligent receiving device based on VITS

Similar Documents

Publication Publication Date Title
KR101266913B1 (en) Construction method of shore wind power generation facility
CN214692403U (en) Hysteresis lag type water pipe winding drum
KR101046649B1 (en) Marine wind power generation facility for automatically amending slope in operation
JP2014504697A (en) Offshore wind power generator connection configuration and tower system
KR101046648B1 (en) Marine wind power generation facility for automatically controlling movements in ultimate loads
CN108677995B (en) Offshore wind turbine single pile foundation with suction caisson and tensioning mooring system
CN207089589U (en) It is distributed widely in the gravity anchor of calcic rock marine site pipe laying barge mooring
WO2022127466A1 (en) Novel offshore wind turbine foundation suitable for shallow covering layer and construction method therefor
CN208441122U (en) A kind of underwater pile anchoring system of floatation type photovoltaic plant
CN103423093B (en) Platform floating type wind driven generator provided with suction caissons and used for sea surface of deep sea
CN104340776B (en) A kind of hawser withdraws system and method
CN204251100U (en) One fixedly drags for oily device
CN211257052U (en) Pile-first method offshore wind power jacket foundation hoisting underwater auxiliary positioning device
CN205062771U (en) Hawser pulls herringbone water -stop dam
KR20130123047A (en) Single complex hybrid foundation type offshore wind tower
CN213390063U (en) Soil pressure testing device suitable for deep silt layer
CN212797217U (en) Ocean engineering exhibition wing anchor
CN202543952U (en) Offshore wind power rock-socketed single pile foundation
CN213062072U (en) Construction device for pile foundation engineering
JP5395626B2 (en) Rehabilitation material drawing jig
CN106759201B (en) Wind-powered electricity generation and the embedding rock jack up operation platform of bridge
CN104499484A (en) Positioning device applied to installation of ocean wind power foundation and working method of positioning device
CN207283063U (en) A kind of laying apparatu of high-voltage undersea cable
CN111912562A (en) Soil pressure testing device and method suitable for deep sludge layer
CN202055747U (en) Punching machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: Room 2-53b, No.27 Huli Road, Mawei District, Fuzhou City, Fujian Province

Patentee after: Fujian Offshore Power Operation and Maintenance Technology Co.,Ltd.

Address before: Floor 4, Qinting building, 321 Wusi Road, Gulou District, Fuzhou City, Fujian Province 350000

Patentee before: Fujian Haidian operation and Maintenance Technology Co.,Ltd.

CP03 Change of name, title or address