CN214658779U - Building climbing equipment - Google Patents

Building climbing equipment Download PDF

Info

Publication number
CN214658779U
CN214658779U CN202023220743.XU CN202023220743U CN214658779U CN 214658779 U CN214658779 U CN 214658779U CN 202023220743 U CN202023220743 U CN 202023220743U CN 214658779 U CN214658779 U CN 214658779U
Authority
CN
China
Prior art keywords
template
guide rail
rod
upper bracket
sleeve pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023220743.XU
Other languages
Chinese (zh)
Inventor
郭文瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Zhongxin Construction Engineering Group Co ltd
Original Assignee
Shanghai Zhongxin Construction Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Zhongxin Construction Engineering Group Co ltd filed Critical Shanghai Zhongxin Construction Engineering Group Co ltd
Priority to CN202023220743.XU priority Critical patent/CN214658779U/en
Application granted granted Critical
Publication of CN214658779U publication Critical patent/CN214658779U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model provides a building climbing equipment, include the wall body, attach wall device, first guide rail and hydraulic jack. Through setting up the bracing piece, the gag lever post, the sleeve pipe, threaded rod and slide rail cooperation are used down, when needs pour in template bottom left side, with sleeve pipe clockwise rotation, let the threaded rod stretch out left, promote sleeve pipe and slide rail right, and then drive the bracing piece bottom and remove right, then can remove the bracing piece top right, cause the focus of upper bracket and template to the left side skew, increase the pressure to cement, when cement is pour to template upper portion, with sleeve pipe anticlockwise rotation, let the threaded rod shrink, drive the sleeve pipe, slide rail and bracing piece bottom remove left, cause the focus of upper bracket and template to the right side skew, rethread observation horizon measuring apparatu, let upper bracket and template level vertical, after the pressure of template is moved up from bottom to top, the template is even gradually to the pressure of cement, be convenient for more level and smooth the cement of pouring.

Description

Building climbing equipment
Technical Field
The utility model relates to a construction equipment technical field specifically is a building climbing equipment.
Background
Climbing formwork (i.e. climbing formwork) is a formwork technology suitable for cast-in-place reinforced concrete vertical or inclined structure construction, such as walls, bridges, towers and the like. The template climbing formwork can be divided into two types, namely a scaffold climbing formwork (namely a template climbing frame and a scaffold climbing formwork) and a non-scaffold climbing formwork (namely a template climbing formwork).
The existing building climbing equipment pushes out a template when the driving template climbs to the position where cement is poured, so that the template is attached to the position where the cement is poured, the cement is poured again, but pressure is generated on the bottom of the template when the cement is poured, and the template is pressed by a hydraulic ejector rod due to the existing building climbing equipment.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a building climbing device.
In order to achieve the above object, the utility model provides a following technical scheme: a building climbing device comprises a wall body, a wall attaching device, a first guide rail and a hydraulic jack, wherein the wall attaching device is fixedly installed on the right side of the wall body, the first guide rail is fixedly installed on the right side of the wall attaching device, the hydraulic jack is arranged on the outer side of the first guide rail, a lower support is fixedly installed at the outer end of the right side of the wall attaching device through a buckle, the upper end of the left side of the lower support is fixedly connected with the top of the hydraulic jack, a supporting plate is fixedly installed at the top of the lower support, a second guide rail is fixedly installed above the supporting plate, a limiting rod is movably installed at the top of the second guide rail, an upper support is movably installed at the top of the limiting rod through a rotating shaft, an inclined support rod is fixedly installed between the bottoms of the inner walls of the upper supports, a support rod is movably connected with the right side of the bottom of the upper support through a rotating shaft, a formwork is fixedly connected with the left side of the upper support, a slide rail is embedded in the right side of the limiting rod, and the slide rail top fixedly connected with sleeve pipe, there is the threaded rod sleeve pipe inside left side through threaded connection, and threaded rod opposite side and upper bracket bottom fixed connection, the welding of gag lever post bottom has the slider, and in the slider embedding second guide rail, threaded hole has been seted up at the slider middle part, and the bolt has through the screw thread to the screw hole.
Preferably, the limiting rod slides left and right through the sliding block and the second guide rail.
Preferably, the inner side of the second guide rail is provided with a through hole corresponding to the threaded hole, and the diameter of the through hole is consistent with that of the bolt.
Preferably, the sleeve and threaded rod are aligned parallel to the stop rod and the slide rail.
Preferably, the limiting rod is provided with a long strip hole on the inner side, and the sliding rail slides left and right through the long strip hole.
Preferably, the bottom of the support rod is movably connected with the top of the right side of the slide rail through a rotating shaft, and the rotating angle of the support rod through the rotating shaft is 90-45 degrees.
Preferably, a horizontal measuring instrument is fixedly installed on the inner side of the upper bracket.
For overcoming the problem that exists among the background art, this use is novel to be provided, possesses following beneficial effect:
the building climbing equipment is characterized in that a supporting rod, a limiting rod, a sleeve, a threaded rod and a slide rail are arranged to be matched for use, when pouring is required to be carried out on the left side of the bottom of the template, the sleeve is rotated clockwise, the threaded rod is extended leftwards, the sleeve and the sliding rail are pushed rightwards, thereby driving the bottom of the supporting rod to move rightwards, rotating the top of the supporting rod rightwards, causing the gravity centers of the upper bracket and the template to shift leftwards, increasing the pressure on cement, when the cement is poured to the upper part of the template, the sleeve pipe is rotated anticlockwise, the threaded rod is contracted to drive the sleeve pipe, the slide rail and the bottom of the support rod to move leftwards, so that the gravity centers of the upper bracket and the template are shifted rightwards, then the upper bracket and the template are horizontally vertical by observing the horizontal measuring instrument, after the pressure of the template moves from bottom to top, the pressure of the template on the cement is gradually uniform, and the poured cement is more smooth.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a schematic structural diagram of a portion a in fig. 1 according to the present invention.
Fig. 3 is an enlarged schematic view of the limiting rod of the present invention.
In the figure: 1-a wall body; 2-a wall attachment device; 3-a first guide rail; 4-a hydraulic jack; 5-lower support; 6-a supporting plate; 7-a second guide rail; 8-upper support, 801-support rod, 802-diagonal support rod; 9-a limiting rod, 901-a sleeve, 9011-a threaded rod, 902-a sliding rail, 903-a sliding block, 904-a bolt and 905-a threaded hole; 10-a template; 11-level gauge.
Detailed Description
As shown in fig. 1-3, the utility model provides a technical solution: a building climbing device comprises a wall body 1, a wall attaching device 2, a first guide rail 3 and a hydraulic jack 4, wherein the wall attaching device 2 is fixedly installed on the right side of the wall body 1, the first guide rail 3 is fixedly installed on the right side of the wall attaching device 2, the hydraulic jack 4 is arranged on the outer side of the first guide rail 3, a lower support 5 is fixedly installed at the outer end of the right side of the wall attaching device 2 through a buckle, the upper end of the left side of the lower support 5 is fixedly connected with the top of the hydraulic jack 4, a support plate 6 is fixedly installed at the top of the lower support 5, a second guide rail 7 is fixedly installed above the support plate 6, a limiting rod 9 is movably installed at the top of the second guide rail 7, an upper support 8 is movably installed at the top of the limiting rod 9 through a rotating shaft, an inclined support rod 802 is fixedly installed between the bottoms of the inner walls of the upper support 8, the right side of the bottom of the upper support 8 is movably connected with a support rod 801 through a rotating shaft, a template 10 is fixedly connected with the left side of the upper support 8, the embedding of 9 right sides of gag lever post is equipped with slide rail 902, and slide rail 902 top fixedly connected with sleeve pipe 901, and there is threaded rod 9011 sleeve pipe 901 inside left side through threaded connection, and threaded rod 9011 opposite side and 8 bottom fixed connection of upper bracket, and the welding of 9 bottoms of gag lever post has slider 903, and in slider 903 embedding second guide rail 7, threaded hole 905 is seted up at the slider 903 middle part, and bolt 904 is installed through the screw thread to threaded hole 905.
The limiting rod 9 slides left and right through the sliding block 903 and the second guide rail 7, and when cement needs to be poured, the upper support 8, the limiting rod 9 and the template 10 move left along the second guide rail 7 through the sliding block 903.
Wherein, the through-hole corresponding to screw hole 905 is seted up to second guide rail 7 inboard, and the through-hole diameter is unanimous with bolt 904 diameter, and when template 10 moved to corresponding position and makes, passes through screw hole 905 and through-hole with bolt 904, fixes gag lever post 9.
The sleeve 901 and the threaded rod 9011 are aligned with the limiting rod 9 and the sliding rail 902 in parallel, when cement is poured, the sleeve 901 rotates clockwise, the threaded rod 9011 extends out leftwards, and the sleeve 901 and the sliding rail 902 are pushed out rightwards.
Wherein, the inner side of the limiting rod 9 is provided with a long hole, and the sliding rail 902 slides left and right through the long hole, and the sliding rail 902 drives the sleeve 901 to move right.
The bottom of the supporting rod 801 is movably connected with the top of the right side of the sliding rail 902 through a rotating shaft, the rotating angle of the supporting rod 801 through the rotating shaft is 90-45 degrees, and after the sliding rail 902 moves rightwards, the bottom of the supporting rod 801 is driven to move rightwards, so that the supporting rod 801 rotates through the rotating shaft, the gravity centers of the upper support 8 and the template 10 are enabled to move rightwards, and the bottom of the template 10 is enabled to shift leftwards.
Wherein, the inside of the upper bracket 8 is fixedly provided with a horizontal measuring instrument 11, the horizontal measuring instrument 11 is observed, and the upper bracket 8 and the template 10 are horizontal or not according to the measurement of the horizontal measuring instrument 11.
When the cement is poured into the bottom of the formwork 10, the sleeve 901 is rotated clockwise, the threaded rod 9011 extends out leftwards, the sleeve 901 and the sliding rail 902 are pushed rightwards through the long strip holes, the bottom of the supporting rod 801 is driven to move rightwards, the top of the supporting rod 801 is driven to rotate rightwards, the gravity center of the upper support 8 and the formwork 10 is shifted rightwards, pressure is applied leftwards to the bottom of the formwork 10, when the cement is poured into the middle of the formwork 10, the sleeve 901 rotates anticlockwise, let threaded rod 9011 shrink right, drive sleeve pipe 901 and slide rail 902 and shrink left through rectangular hole, drive bracing piece 801 bottom and remove left, cause bracing piece 801 top rotatory left, whether survey upper bracket 8 and template 10 balanced according to horizontal measuring instrument 11, when balanced back, stall sleeve pipe 901 makes template 10 up remove from down to the pressure of cement, cause template 10 to be parallel gradually to the pressure of cement, let cement pouring more level and more smooth, accomplish whole process.

Claims (7)

1. The utility model provides a building climbing equipment, includes wall body (1), attaches wall device (2), first guide rail (3) and hydraulic jack (4), its characterized in that: the wall body (1) is fixedly provided with a wall attaching device (2) on the right side, a first guide rail (3) is fixedly arranged on the right side of the wall attaching device (2), a hydraulic jack (4) is arranged on the outer side of the first guide rail (3), a lower bracket (5) is fixedly arranged on the outer end of the right side of the wall attaching device (2) through a buckle, the upper end of the left side of the lower bracket (5) is fixedly connected with the top of the hydraulic jack (4), a supporting plate (6) is fixedly arranged on the top of the lower bracket (5), a second guide rail (7) is fixedly arranged above the supporting plate (6), a limiting rod (9) is movably arranged on the top of the second guide rail (7), an upper bracket (8) is movably arranged on the top of the limiting rod (9) through a rotating shaft, an inclined support rod (802) is fixedly arranged between the bottoms of the inner walls of the upper bracket (8), and a support rod (801) is movably connected to the right side of the bottom of the upper bracket (8) through a rotating shaft, the utility model discloses a quick-witted support structure, including upper bracket (8), gag lever post (9) right side embedding is equipped with slide rail (902), and slide rail (902) top fixedly connected with sleeve pipe (901), there is threaded rod (9011) through threaded connection in the inside left side of sleeve pipe (901), and threaded rod (9011) opposite side and upper bracket (8) bottom fixed connection, gag lever post (9) bottom welding has slider (903), and in slider (903) embedding second guide rail (7), threaded hole (905) have been seted up in slider (903) middle part, and bolt (904) have been installed through the screw in threaded hole (905).
2. A building climbing apparatus according to claim 1 wherein: the limiting rod (9) slides left and right through the sliding block (903) and the second guide rail (7).
3. A building climbing apparatus according to claim 1 wherein: and a through hole corresponding to the threaded hole (905) is formed in the inner side of the second guide rail (7), and the diameter of the through hole is consistent with that of the bolt (904).
4. A building climbing apparatus according to claim 1 wherein: the sleeve (901) and the threaded rod (9011) are aligned with the limiting rod (9) and the sliding rail (902) in parallel.
5. A building climbing apparatus according to claim 1 wherein: the limiting rod (9) is provided with a long strip hole on the inner side, and the sliding rail (902) slides left and right through the long strip hole.
6. A building climbing apparatus according to claim 1 wherein: the bottom of the supporting rod (801) is movably connected with the top of the right side of the sliding rail (902) through a rotating shaft, and the rotating angle of the supporting rod (801) through the rotating shaft is 90-45 degrees.
7. A building climbing apparatus according to claim 1 wherein: and a horizontal measuring instrument (11) is fixedly arranged on the inner side of the upper bracket (8).
CN202023220743.XU 2020-12-28 2020-12-28 Building climbing equipment Active CN214658779U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023220743.XU CN214658779U (en) 2020-12-28 2020-12-28 Building climbing equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023220743.XU CN214658779U (en) 2020-12-28 2020-12-28 Building climbing equipment

Publications (1)

Publication Number Publication Date
CN214658779U true CN214658779U (en) 2021-11-09

Family

ID=78503776

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023220743.XU Active CN214658779U (en) 2020-12-28 2020-12-28 Building climbing equipment

Country Status (1)

Country Link
CN (1) CN214658779U (en)

Similar Documents

Publication Publication Date Title
CN211286622U (en) Hoop type lead screw creeping formwork system for cylindrical pier construction
CN211898338U (en) Device for preventing bored concrete pile steel reinforcement cage come-up
CN212405273U (en) Foundation pile detection device
CN214658779U (en) Building climbing equipment
CN209102068U (en) A kind of construction wall testing apparatus for verticality
CN1048065C (en) Method and equipment for construction of concrete cylinder
CN209945953U (en) Detachable portal type metal corrugated pipe bending anti-leakage performance test device
CN218382807U (en) Measuring device for architectural design
CN108179749B (en) Lattice column positioner and positioning method thereof
CN206369010U (en) A kind of construction gib frame
CN210982122U (en) Novel concrete slump detects device
CN211305351U (en) Reinforcing bar welded fastening device for building engineering
CN206523151U (en) Foundation ditch measurement servicing unit
CN113970631A (en) Concrete structure nondestructive testing equipment testing platform and method
CN220319166U (en) Steel construction post concrete placement auxiliary member
CN207598256U (en) A kind of piping lane low-cost die vehicle
CN112683124A (en) Plug-in thickness measuring device and concrete pouring thickness measuring method
CN220867975U (en) Safety type guardrail hanging bracket
CN206189875U (en) Positioner of column base crab -bolt
CN217775403U (en) Special bending device for deformed steel bar
CN220504545U (en) Cast in situ concrete roofing construction thickness control instrument
CN220377258U (en) Operation platform for rotary digging hole-forming filling pile
CN220487200U (en) Beam plate erection device for building structure
CN216141911U (en) Material lifting device for mountainous large-height bridge cylindrical pier slip form construction platform
CN113385795B (en) Positioning device for cutting elliptical groove of cable guide pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant