CN214656767U - Flood control device for hydraulic engineering - Google Patents

Flood control device for hydraulic engineering Download PDF

Info

Publication number
CN214656767U
CN214656767U CN202120723368.6U CN202120723368U CN214656767U CN 214656767 U CN214656767 U CN 214656767U CN 202120723368 U CN202120723368 U CN 202120723368U CN 214656767 U CN214656767 U CN 214656767U
Authority
CN
China
Prior art keywords
baffle
flood
rope
control device
flood control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120723368.6U
Other languages
Chinese (zh)
Inventor
马海兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202120723368.6U priority Critical patent/CN214656767U/en
Application granted granted Critical
Publication of CN214656767U publication Critical patent/CN214656767U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/30Flood prevention; Flood or storm water management, e.g. using flood barriers

Landscapes

  • Barrages (AREA)

Abstract

The utility model discloses a flood control device for hydraulic engineering, which relates to the technical field of water conservancy flood control, and comprises a top plate, wherein frames are arranged on two sides of the top plate, a support rod is arranged on the top end of the frame, a pulley is arranged on one side of the top end of the support rod, a rope is wound on the outer wall of the pulley, a rotating shaft is arranged on two sides of one end of the top plate, a baffle is arranged on one end of the rotating shaft, one end of the baffle is arranged in a bending way, the bending angle is 90 degrees, a water flowing groove is arranged on the surface of the baffle, and one end of the water flowing groove is connected with a water discharge hole, the utility model discloses a rope and the baffle are arranged, one end of the baffle is designed into a cambered surface, the impact on the baffle in the river water surging process can be effectively reduced, when flood comes, the rope pulls up the baffle, the baffle rotates around the rotating shaft, and can effectively block partial flood, the impact of flood is relieved, and the damage of the flood to the objects such as buildings is reduced.

Description

Flood control device for hydraulic engineering
Technical Field
The utility model relates to a flood control technical field, concretely relates to flood control device for hydraulic engineering.
Background
In some regions such as basins with lower topography, flood control devices need to be installed at the edges of river water, so that damage to the range of motion of human beings caused by flood can be effectively prevented when natural disasters of the flood occur, and economic loss is reduced.
But current flood control device structural design is complicated, and is not reasonable enough, and when the river that rises moreover got into the baffle face, the river retreats the back, and the river that stays on the baffle face can produce great gravity to the baffle face, influences the life of baffle face.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
In order to overcome prior art not enough, provide a flood control device for hydraulic engineering now, in order to solve current flood control device structural design reasonable inadequately, the short economic problem inadequately of life of baffle to reach flood control device excellent in use effect, baffle long service life, more economic effect.
(II) technical scheme
The utility model discloses a following technical scheme realizes: the utility model provides a flood control device for hydraulic engineering, which comprises a top plate, the frame is all installed to the both sides of roof, the bracing piece is installed on the top of frame, the pulley is installed to top one side of bracing piece, the outer wall of pulley is around being equipped with the rope, the one end both sides of roof all are equipped with the pivot, and the one end of pivot installs the baffle, the crooked setting of one end of baffle, and crooked angle is 90 degrees.
Furthermore, the surface of the baffle is provided with a flume, one end of the flume is connected with a drainage hole, and the aperture size of the drainage hole ranges from 10 cm to 35 cm.
Further, the top surface of roof is kept away from the one end of frame and is installed the fixed block, the top of fixed block is equipped with the protective housing.
Furthermore, a driving device is arranged inside the protective shell, a wire coiling wheel is installed on one side of the driving device, and one end of a rope is wound outside the wire coiling wheel.
Furthermore, pull rings are symmetrically arranged at two ends of the top surface of the baffle plate, and the other end of the rope is wound on the surface of the outer wall of each pull ring.
Further, the support column is installed to the bottom of roof, and one side of support column installs the backup pad, the truss is installed to the top surface of backup pad.
(III) advantageous effects
Compared with the prior art, the utility model, following beneficial effect has:
1) the utility model discloses a be provided with rope and baffle, establish into the cambered surface in the one end of baffle, can effectively slow down the impact that the in-process caused the baffle at the river surge, come temporarily at flood, the rope pulls up the baffle, and the baffle revolutes the rotation of axes, can effectively block partial flood, slowly reduces the impact of flood, reduces the harm that flood caused article such as building.
2) After, for solving the river rising, the baffle receives great pressure, has shortened life's problem, the utility model discloses a be provided with tye and water drainage hole, behind the tide, the long-pending water of staying on the baffle surface can discharge through water drainage hole along the tye, has alleviateed the pressure that the baffle top surface received, has prolonged the life of baffle, has reduced economic loss.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a cross-sectional view of the present invention.
Fig. 3 is a top view of the baffle of the present invention.
1-a baffle plate; 2-a pull ring; 3-a flume; 31-a drainage hole; 4-a rotating shaft; 5, truss; 6-a support plate;
7-a top plate; 8-a support column; 9-fixing block; 10-a drive device; 11-a protective shell; 12-a pulley; 13-a support bar; 14-a frame; 15-a rope; 16-a wire coiling wheel.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
As shown in fig. 1-3, the utility model provides the following technical solutions: the utility model provides a flood control device for hydraulic engineering, including roof 7, frame 14 is all installed to roof 7's both sides, frame 14 and support column 8 all adopt concrete material to install, it is stand wear and tear, it is also corrosion-resistant simultaneously, long service life, bracing piece 13 is installed on frame 14's top, bracing piece 13's bottom is pre-buried in frame 14's inside, pulley 12 is installed to bracing piece 13's top one side, pulley 12's outer wall is around being equipped with rope 15, roof 7's one end both sides all are equipped with pivot 4, and baffle 1 is installed to pivot 4's one end, the crooked setting of baffle 1's one end, and crooked angle is 90 degrees, baffle 1's thickness is 10 centimeters at least, and stimulate baffle 1's rope 15 adoption wire rope, the bearing capacity is strong, can recycle.
Preferably, the surface of the baffle 1 is provided with a launder 3, the depth of the launder 3 is 5 cm, the width of the launder 3 is four cm, one end of the launder 3 is connected with a drainage hole 31, the aperture size range of the drainage hole 31 is between 10 cm and 35 cm, and the connection part of the launder 3 and the drainage hole 31 is provided with a slope to accelerate the water flow speed.
Preferably, the top surface of the top plate 7 is far away from one end of the frame 14 and is provided with a fixing block 9, a protective shell 11 is arranged above the fixing block 9, the outer wall of the protective shell 11 is coated with waterproof paint, the waterproof effect is good, and when the water level line is higher than the wire coiling wheel 16, the internal driving device 10 of the protective shell 16 can also work normally.
Preferably, the inside of the protective housing 11 is provided with a driving device 10, a motor is installed inside the driving device 10, a worker controls the motor to work so that the wire wheel 16 can pull the rope 15, the wire wheel 16 is installed at one side of the driving device 10, and one end of the rope 15 is wound outside the wire wheel 16.
Preferably, baffle 1's top surface both ends symmetry is equipped with pull ring 2, and rope 15's the other end around establishing the outer wall surface at pull ring 2, pull ring 2 and baffle 1's fixed surface is connected, and rope 15 adopts the double-stranded noose to establish on pull ring 2.
Preferably, a supporting column 8 is installed at the bottom of the top plate 7, a supporting plate 6 is installed at one side of the supporting column 8, a truss 5 is installed on the top surface of the supporting plate 6, the truss 5 and the supporting plate 6 are integrally formed, and the self weight of the supporting column 8 is greater than that of the baffle 1 and the frame 14.
The utility model discloses a theory of operation and use flow: when using this utility model, set up support column 8 at river bank, erection bracing board 6 after support column 8 is fixed, for the holistic intensity of improve equipment, install triangle-shaped's truss 5 between backup pad 6, build the completion back, when the river rises, the river with the baffle submergence, wait until the river descends the back, the long-pending river along the rivers basin 3 on baffle 1 surface gets into water drainage hole 31, discharge into the river through water drainage hole 31, it is interim soon to come when the flood, wire wheel 16 rotates under drive arrangement 10's drive, rope 15 winds pulley 12 pulling baffle 1, baffle 1 revolutes axle 4 and rotates, slow down the partial impact force of flood, alleviate the destruction that the flood caused equipment such as building, treat the flood back of moving back, the staff overhauls equipment, then judge whether equipment damages, in order to continue to use next time.
The above-described embodiments are merely illustrative of the preferred embodiments of the present invention and are not intended to limit the spirit and scope of the present invention. Without departing from the design concept of the present invention, various modifications and improvements made by the technical solution of the present invention by those skilled in the art should fall into the protection scope of the present invention, and the technical contents claimed by the present invention have been fully recorded in the claims.

Claims (6)

1. The utility model provides a flood control device for hydraulic engineering, includes roof (7), its characterized in that: frame (14) are all installed to the both sides of roof (7), bracing piece (13) are installed on the top of frame (14), pulley (12) are installed to top one side of bracing piece (13), the outer wall of pulley (12) is around being equipped with rope (15), the one end both sides of roof (7) all are equipped with pivot (4), and the one end of pivot (4) installs baffle (1), the one end bending of baffle (1) sets up, and crooked angle is 90 degrees.
2. The flood control device for the water conservancy project according to claim 1, characterized in that: the surface of the baffle (1) is provided with a water flowing groove (3), one end of the water flowing groove (3) is connected with a water drainage hole (31), and the aperture size range of the water drainage hole (31) is between 10 centimeters and 35 centimeters.
3. The flood control device for the water conservancy project according to claim 1, characterized in that: the top surface of roof (7) is kept away from the one end of frame (14) and is installed fixed block (9), the top of fixed block (9) is equipped with protective housing (11).
4. A flood protection device for hydraulic engineering according to claim 3, wherein: the rope winding device is characterized in that a driving device (10) is arranged in the protective shell (11), a wire winding wheel (16) is installed on one side of the driving device (10), and one end of a rope (15) is wound outside the wire winding wheel (16).
5. The flood control device for the water conservancy project according to claim 1, characterized in that: the pull rings (2) are symmetrically arranged at two ends of the top surface of the baffle (1), and the other end of the rope (15) is wound on the surface of the outer wall of each pull ring (2).
6. The flood control device for the water conservancy project according to claim 1, characterized in that: support column (8) are installed to the bottom of roof (7), and backup pad (6) are installed to one side of support column (8), truss (5) are installed to the top surface of backup pad (6).
CN202120723368.6U 2021-04-09 2021-04-09 Flood control device for hydraulic engineering Expired - Fee Related CN214656767U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120723368.6U CN214656767U (en) 2021-04-09 2021-04-09 Flood control device for hydraulic engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120723368.6U CN214656767U (en) 2021-04-09 2021-04-09 Flood control device for hydraulic engineering

Publications (1)

Publication Number Publication Date
CN214656767U true CN214656767U (en) 2021-11-09

Family

ID=78460600

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120723368.6U Expired - Fee Related CN214656767U (en) 2021-04-09 2021-04-09 Flood control device for hydraulic engineering

Country Status (1)

Country Link
CN (1) CN214656767U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114045785A (en) * 2021-12-06 2022-02-15 浙江广川工程咨询有限公司 Temporary support flood fighting dam

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114045785A (en) * 2021-12-06 2022-02-15 浙江广川工程咨询有限公司 Temporary support flood fighting dam

Similar Documents

Publication Publication Date Title
CN214656767U (en) Flood control device for hydraulic engineering
CN111852729B (en) Floating river power generation method
CN108661161A (en) A kind of amphibious movable pump station
CN213331567U (en) Prevent changeing dive axial-flow pump device
CN207109550U (en) A kind of firm flood control formula liftable bridge
CN208685580U (en) A kind of hydraulic and hydroelectric engineering dam
CN214005705U (en) Water conservancy construction drainage device
CN214784103U (en) Quick sinking-assisting device for open caisson
CN216515879U (en) Flooding-proof device for water supply pump room
CN216764462U (en) River course ecological environment protects prosthetic devices for hydraulic engineering
CN216892478U (en) Intertidal zone tubular pile core pumping device
CN211733662U (en) Concrete column hangs gets device for hydraulic engineering
CN219192512U (en) Floating body platform for water operation
CN214574068U (en) Drainage device for lifting type foundation structure
CN220505375U (en) Installation-free water pumping device
CN220150497U (en) Water conservancy hydropower construction drainage device
CN2718250Y (en) Floating hydraulic power generator
JP2007046566A (en) Drainage pump having driving tire
CN204605801U (en) A kind of water pump mobile device for tunnel counter-slope draining
CN216424696U (en) Hydraulic construction engineering is with preventing body that sinks
CN219409011U (en) Municipal administration water supply and drainage pipe network construction device
CN218931378U (en) Engineering construction vertical shaft capable of improving work safety
CN218712705U (en) Flashboard for water conservancy drainage
CN118814695A (en) Water conservancy flood prevention water retaining device
CN221399059U (en) Water supply and drainage device for deep foundation pit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211109

CF01 Termination of patent right due to non-payment of annual fee