CN214653415U - Novel construction elevator attaches wall frame - Google Patents

Novel construction elevator attaches wall frame Download PDF

Info

Publication number
CN214653415U
CN214653415U CN202120394000.XU CN202120394000U CN214653415U CN 214653415 U CN214653415 U CN 214653415U CN 202120394000 U CN202120394000 U CN 202120394000U CN 214653415 U CN214653415 U CN 214653415U
Authority
CN
China
Prior art keywords
telescopic link
construction elevator
novel construction
wall frame
montant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120394000.XU
Other languages
Chinese (zh)
Inventor
何建升
袁旭飞
赵吉洪
黄续群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Scegc No7 Construction Engineering Group Co ltd
Original Assignee
Scegc No7 Construction Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Scegc No7 Construction Engineering Group Co ltd filed Critical Scegc No7 Construction Engineering Group Co ltd
Priority to CN202120394000.XU priority Critical patent/CN214653415U/en
Application granted granted Critical
Publication of CN214653415U publication Critical patent/CN214653415U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model discloses a novel construction elevator attaches wall frame, including montant and back framework, two the inboard equidistance welding of montant has three horizontal poles, and montant below movable mounting has two first telescopic links, the connecting rod is installed respectively to back framework both sides, and the connecting rod bottom is connected with the tailboom, connecting rod outside fixed mounting has the sleeve pipe, and the inside second telescopic link that runs through of sleeve pipe installs, the pivot is installed to second telescopic link bottom, and pivot swing joint clamping piece, the clamping piece passes through the bearing and connects the preforming. The utility model discloses an in outwards expanding the dead lever and being fixed in the elevator fixed slot, press down spacing stake after adjusting first telescopic link and second telescopic link to a position again and make the telescopic link fixed, will go up the preforming again at last and support with the outer wall, will push down the preforming and support in the inner wall, last through screwed connection upper pressing piece and lower preforming, make the device can be better fix at the distance and the wall body of various needs.

Description

Novel construction elevator attaches wall frame
Technical Field
The utility model relates to a building construction equipment technical field specifically is a novel construction elevator attaches wall frame.
Background
Construction elevators are generally referred to as construction elevators, but construction elevators comprise a broader definition and construction platforms also belong to the construction elevator series. The simple construction elevator consists of several parts, including cage, driving mechanism, standard section, wall, chassis, enclosure, electric system, etc. and is one man-carrying and cargo-carrying construction machine used in building. This approach has the following disadvantages: 1. the cantilever structure must be additionally processed and the construction period is lengthened. 2. The length of the wall attaching frame is only 4100mm, and the wall attaching frame is connected with the cantilever structure substantially and does not meet the design of the length of 4100mm, so that the safety risk exists. 3. After the construction elevator exceeds the specified wall attachment, the use height and the wall attachment distance of the construction elevator are still used according to the original design and do not accord with the original design requirement.
Through retrieval public (announcement) number CN209758781U, a novel construction elevator attaches wall frame is disclosed, includes: two anterior segments attach wall pole, its characterized in that: two anterior segments attach wall pole parallel arrangement, and two anterior segments attach the wall pole front end and are equipped with standard festival connecting piece, standard festival connecting piece front end installation is fixed on construction elevator, standard festival connecting piece rear end welded fastening is on the anterior segment attaches the wall pole, anterior segment attaches wall pole rear end welded fastening on consolidating the horizontal pole, it is equipped with the back end at the horizontal pole both ends to consolidate the horizontal pole and attaches the wall pole, the back end attaches wall pole front end welded fastening on consolidating the horizontal pole, the rear end welding has the building connecting plate, be equipped with building connection fixed orifices on the building connecting plate. However, the inventor finds that the technical scheme still has at least the following defects:
first, this technique is inconvenient to carry and can only be applied to some fixed safe distances.
Second, the rear support structure stability of this technique is biased.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a novel construction elevator attaches wall frame has solved the problem that proposes in the background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a novel construction elevator attaches wall frame, includes montant and back framework, two the inboard equidistance welding of montant has three horizontal poles, and montant below movable mounting has two first telescopic links, the connecting rod is installed respectively to back framework both sides, and the connecting rod bottom is connected with the tailboom, connecting rod outside fixed mounting has the sleeve pipe, and the inside second telescopic link that runs through of sleeve pipe installs, the pivot is installed to second telescopic link bottom, and pivot swing joint clamping piece, the clamping piece passes through the bearing and connects the preforming.
As an optimal implementation mode of the utility model, the through-hole has all been seted up to montant top and spud pile inboard, the spud pile runs through the montant through the through-hole and is connected with the bearing.
As an optimal implementation mode of the utility model, two there are spacing stake montant outside lower part and sleeve pipe outside mid-mounting.
As a preferred embodiment of the present invention, two fixing rods are installed between the rear frame body and the tail rod.
As a preferred embodiment of the present invention, the upper pressing plate is connected to the lower pressing plate through a screw thread.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model relates to a novel construction elevator attaches wall frame is through all having seted up the through-hole on montant top and spud pile inboard to run through the bearing and install in the through-hole, make the spud pile can be better connect construction elevator inboard.
2. The utility model relates to a novel construction elevator attaches wall frame through installing spacing stake in montant and sheathed tube outside, makes the position of fixing in needs that first telescopic link and second telescopic link can be better.
3. The utility model relates to a novel construction elevator attaches wall frame through installing the dead lever between back framework and tailboom, makes the connection of back framework and tailboom more firm.
4. The utility model relates to a novel construction elevator attaches wall frame connects preforming and lower preforming through using the screw, makes installing that the device can stabilize on the wall body.
Drawings
Other features, objects and advantages of the invention will become more apparent upon reading of the detailed description of non-limiting embodiments with reference to the following drawings:
fig. 1 is the utility model relates to a novel construction elevator attaches front view of wall frame.
In the figure: 1. the spud pile, 2, the bearing, 3, spacing stake, 4, montant, 5, first telescopic link, 6, back framework, 7, second telescopic link, 8, pivot, 9, clamping piece, 10, go up the preforming, 11, screw, 12, lower preforming, 13, horizontal pole, 14, connecting rod, 15, dead lever, 16, sleeve pipe, 17, the tailboom.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
(please refer to fig. 1), the present invention provides a technical solution: a novel construction elevator wall-attached frame comprises vertical rods 4 and a rear frame body 6, wherein three cross rods 4 are welded on the inner sides of the two vertical rods 4 at equal intervals, two first telescopic rods 5 are movably installed below the vertical rods 4, connecting rods 14 are respectively installed on two sides of the rear frame body 6, the bottom ends of the connecting rods 14 are connected with a tail rod 17, a sleeve 16 is fixedly installed on the outer side of each connecting rod 14, a second telescopic rod 7 is installed inside the sleeve 16 in a penetrating mode, a rotating shaft 8 is installed at the bottom of the second telescopic rod 7, the rotating shaft 8 is movably connected with a clamping piece 9, the clamping piece 9 is connected with an upper pressing piece 10 through a bearing 8, a fixing pile 1 is unfolded outwards and fixed in an elevator fixing groove, the first telescopic rods 5 and the second telescopic rods 7 are adjusted to be in place, the rear limit 3 positions are pressed to be fixed, finally the upper pressing piece 10 is pressed against an outer wall, the lower pressing piece 12 is pressed against an inner wall, and finally the upper pressing piece 10 and the lower pressing piece 12 are connected through screws 11, the device can be better fixed on various required distances and walls.
In this embodiment (please refer to fig. 1), the top end of the vertical rod 4 and the inner side of the fixing pile 1 are both provided with through holes, the fixing pile 1 penetrates through the vertical rod 4 through the through holes to be connected with the bearing 2, the top end of the vertical rod 4 and the inner side of the fixing pile 1 are both provided with through holes, and the bearing 2 is installed in the through holes in a penetrating manner, so that the fixing pile 1 can be better connected with the inner side of the construction elevator.
In this embodiment (see fig. 1), the limiting piles 3 are installed at the lower parts of the outer sides of the two vertical rods 4 and the middle part of the outer side of the sleeve 16, and the limiting piles 3 are installed at the outer sides of the vertical rods 4 and the sleeve 16, so that the first telescopic rod 5 and the second telescopic rod 7 can be better fixed at required positions.
In this embodiment (see fig. 1), two fixing rods 15 are installed between the rear frame 6 and the tail rod 17, and the fixing rods 15 are installed between the rear frame 6 and the tail rod 17, so that the rear frame 6 and the tail rod 17 are more stably connected.
In this embodiment (see fig. 1), the upper pressing plate 10 is connected to the lower pressing plate 12 through a screw 11, and the upper pressing plate 10 and the lower pressing plate 12 are connected through the screw 11, so that the device can be stably installed on a wall.
When a novel construction elevator attaches wall frame and uses, through with in 1 expandes outward and be fixed in the elevator fixed slot of spud pile, adjust first telescopic link 5 again with second telescopic link 7 to the position after press 3 positions and make the telescopic link fixed, will go up preforming 10 at last again and support in the outer wall, will press down preforming 12 and support in the inner wall, connect last preforming 10 and lower preforming 12 through screw 11 and make the device fix at certain distance and wall body.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above, it will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, but that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (5)

1. The utility model provides a novel construction elevator attaches wall frame, includes montant and back framework, its characterized in that: two montant (4) inboard equidistance welding has three horizontal poles (13), and montant (4) below movable mounting has two first telescopic links (5), connecting rod (14) are installed respectively to back framework (6) both sides, and connecting rod (14) bottom is connected with tailboom (17), connecting rod (14) outside fixed mounting has sleeve pipe (16), and sleeve pipe (16) inside runs through and installs second telescopic link (7), pivot (8) are installed to second telescopic link (7) bottom, and pivot (8) swing joint clamping piece (9), preforming (10) are connected through bearing (2) in clamping piece (9).
2. The novel construction elevator attaches wall frame of claim 1, its characterized in that: through-holes are formed in the top end of the vertical rod (4) and the inner side of the fixing pile (1), and the fixing pile (1) penetrates through the vertical rod (4) through the through-holes to be connected with the bearing (2).
3. The novel construction elevator attaches wall frame of claim 1, its characterized in that: two limiting piles (3) are arranged on the lower portion of the outer side of the vertical rod (4) and the middle portion of the outer side of the sleeve (16).
4. The novel construction elevator attaches wall frame of claim 1, its characterized in that: two fixing rods (15) are arranged between the rear frame body (6) and the tail rod (17).
5. The novel construction elevator attaches wall frame of claim 1, its characterized in that: the upper pressing plate (10) is in threaded connection with the lower pressing plate (12) through a screw (11).
CN202120394000.XU 2021-02-23 2021-02-23 Novel construction elevator attaches wall frame Active CN214653415U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120394000.XU CN214653415U (en) 2021-02-23 2021-02-23 Novel construction elevator attaches wall frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120394000.XU CN214653415U (en) 2021-02-23 2021-02-23 Novel construction elevator attaches wall frame

Publications (1)

Publication Number Publication Date
CN214653415U true CN214653415U (en) 2021-11-09

Family

ID=78448464

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120394000.XU Active CN214653415U (en) 2021-02-23 2021-02-23 Novel construction elevator attaches wall frame

Country Status (1)

Country Link
CN (1) CN214653415U (en)

Similar Documents

Publication Publication Date Title
CN214653415U (en) Novel construction elevator attaches wall frame
CN215710924U (en) Guide rail connection structure convenient to diversified adjustment installation
CN202252669U (en) Stable mounting frame
EP3716254B1 (en) Installation structure and installation method for mounted led screen
CN211081254U (en) Novel building construction is with enclosing fender device
CN215255982U (en) Climbing ladder for installing and overhauling power cable
CN219241290U (en) Fixing support for wall-attached support of climbing frame
CN216447789U (en) Slide way type multi-screen splicing support
CN111364789A (en) Combined suspension and protection device for deep foundation pit operation
CN106704333B (en) Bolt mounting structure and the top drive cable saddle rack for using the bolt mounting structure
CN216431157U (en) Adjustable power distribution rack
CN210142885U (en) Adjustable assembled support of vertical generating line
CN111287532A (en) Assembled hangar portal system
CN219451619U (en) Steel construction engineering reinforcing frame with location installation function
CN210195217U (en) Prevent stable form aluminum mould plate structure of shift
CN214887372U (en) Container generating set with air exhaust and noise reduction sheets adopting sliding rail type mounting structure
CN218091935U (en) Novel combined type aluminum alloy climbing frame
CN215807550U (en) Novel solar photovoltaic support
CN216042605U (en) Self-climbing device based on oblique giant column construction protection system
CN210101599U (en) Semitrailer landing leg reinforcing mechanism
CN218560773U (en) Platform elevator derrick structure
CN211733529U (en) Fixing device for wall attachment of ultrahigh construction elevator
CN210111516U (en) Cable testing bridge trailing arm structure
CN213597448U (en) Upright rod connecting support and upright rod connecting structure
CN219710712U (en) Connecting support member structure of high-low area stainless steel building carrier plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant