CN214652978U - Building prefabricated component hangs gets transfer device - Google Patents
Building prefabricated component hangs gets transfer device Download PDFInfo
- Publication number
- CN214652978U CN214652978U CN202120877471.6U CN202120877471U CN214652978U CN 214652978 U CN214652978 U CN 214652978U CN 202120877471 U CN202120877471 U CN 202120877471U CN 214652978 U CN214652978 U CN 214652978U
- Authority
- CN
- China
- Prior art keywords
- steel wire
- hoist
- hoisting
- crossbeam
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model discloses a building prefabricated component hangs and gets transfer device, including a girder steel, main steel wire and hoist and mount frame, be provided with the lug on the girder steel, the main steel wire passes the lug and is connected with lifting device, the girder steel has a plurality of through-holes along length direction evenly distributed, hoist and mount frame includes the crossbeam, the crossbeam both ends are provided with vice steel wire, vice steel wire is provided with two at least, vice steel wire one end is connected to the crossbeam on the other end connect on same lifting hook, the lifting hook is connected on the through-hole, perpendicularly downwards be provided with two at least hoist and mount chains on the crossbeam, hoist and mount chain bottom all is provided with the couple, and the security performance when strengthening the use has strengthened structural strength, protects people life safety.
Description
Technical Field
The utility model relates to a building material lifting device field especially relates to a building prefabricated component hangs and gets transfer device.
Background
In the building construction process, the concrete prefabricated part is required to be manufactured according to a pre-designed drawing. In order to meet the national requirements on the assembly rate, prefabrication rate and green buildings of buildings, the buildings with integrally assembled frame structures are more and more in recent years. Because the dead weight of precast concrete roof beam is great relatively, all can have certain problem when hoist it, if because the length of precast concrete roof beam is general longer, and the quality is great, the hoisting point often is located the both ends of precast concrete roof beam when lifting by crane, at the handling in-process, the precast concrete roof beam can appear distortion because of the influence of dead weight, and the serious person can be from the median rupture even, not only causes loss of property, also very easily causes the incident at the in-process of hoist and mount transportation moreover. Some building prefabricated components are large in length and width, and deformation of the embedded hanging ring is easily caused if an inclined pulling mode is adopted during hoisting, so that the product is damaged. The steel beam is also used for hoisting the precast concrete beam, but the length of the steel wire of each hoisting point of the precast concrete beam is often inconsistent due to inconsistent distances from the steel beam to the two ends of the precast concrete beam, so that the precast concrete beam is inclined in the hoisting and transferring process, potential safety hazards exist, and the life safety of people is seriously threatened.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome the not enough of production when hoist and mount are transported that exists among the prior art, provide a building prefabricated component hangs and gets transfer device.
The utility model discloses a realize through following technical scheme: the utility model provides a building prefabricated component hangs and gets transfer device, includes a girder steel, main steel wire and hoist and mount frame, be provided with the lug on the girder steel, main steel wire passes the lug and is connected with lifting device, the girder steel has a plurality of through-holes along length direction evenly distributed, hoist and mount frame includes the crossbeam, the crossbeam both ends are provided with vice steel wire, vice steel wire is provided with two at least, vice steel wire one end is connected to the crossbeam on the other end connect on same lifting hook, the lifting hook is connected on the through-hole, perpendicular downwards be provided with two at least hoist and mount chains on the crossbeam, hoist and mount chain bottom all is provided with the couple.
Preferably, the steel beam is provided with a reinforcing plate at the through hole.
Preferably, the lifting lug is provided with three lugs which are respectively arranged at two ends and the middle position of the steel beam.
Preferably, the hoisting frame is at least three and is arranged at the through hole of the steel beam at equal intervals.
Preferably, the beam is provided with a second through hole, the auxiliary steel wire is connected with the hoisting chain at one end of the beam and is connected in the second through hole, and the second through hole is internally provided with a protruding part.
Preferably, the hoisting chain is provided with a baffle for supporting the cross beam.
The beneficial effects of the utility model reside in that: the lifting frame has the advantages that only the lifting hook is used for lifting cargoes on a common gantry crane, the steel beam is arranged, the through holes are formed in the steel beam, lifting points are arranged, the lifting frame is provided with the lifting frames on the lower portion of the cross beam, the lifting frames can be selected according to the size of the prefabricated part, the width of the cross beam is large, the using method is flexible, the lifting frame is suitable for the prefabricated parts of various models, and the adaptability is wide. Set up the reinforcing plate in the through-hole department of girder steel, strengthened the structural strength of through-hole department, prevented in long-time use that the excessive wearing and tearing of through-hole department cause reduction in service life, reinforcing structural stability. Set up the crossbeam and change the tensile force of slant into vertical ascending tensile force to vice steel wire and hoist and mount chain lug connection carry out energy transfer with the crossbeam as well as the medium, reduce the structure setting, make the atress more stable reasonable when using. Set up through-hole two on the crossbeam, the junction setting of vice steel wire and hoist and mount chain is in through-hole two to set up the bellying in through-hole two, the bellying is circular-arc, and the bellying contacts with the junction of vice steel wire and hoist and mount chain when using, avoids the stupefied part contact in limit of direct and through-hole two places, reduces the sharp portion of the stupefied part in limit to the wearing and tearing of vice steel wire and hoist and mount chain, the life of extension structure, design benefit. Still be provided with the baffle on hoist and mount chain, under the effect of gravity when using, the crossbeam can the lapse, and the baffle not only has spacing effect can also prevent that the crossbeam from taking place the gliding downwards when hoist and mount, and then causes the incident, strengthens the security of structure greatly. Couple and prefabricated component pre-buried rings are connected when hoist and mount, and the distance between two through-holes on the crossbeam is equal with the distance between two rings, for the prefabricated component provides vertical ascending pulling force when hanging to get, has avoided rings to receive oblique pulling force and has caused the damage to the prefabricated component. And the hoisting frame can be provided with a plurality of hoisting frames on the steel beam, so that the prefabricated parts are stressed uniformly during hoisting, the phenomenon of inclination during hoisting and transferring due to different lengths of hoisting chains is avoided, the safety performance during use is enhanced, and the life safety of people is protected.
Drawings
FIG. 1 is a schematic view of the main structure of the present invention;
fig. 2 is a side view of the structure of the utility model in use:
FIG. 3 is an enlarged view of the point A of FIG. 1 according to the present invention;
wherein: 1. a main wire; 101. lifting lugs; 2. a steel beam; 201. a through hole; 3. a reinforcing plate; 4. a secondary steel wire; 401. a hook; 5. hoisting a chain; 501. a baffle plate; 6. a cross beam; 601. a boss portion; 602. a second through hole; 7. prefabricating a component; 701. a lifting ring.
Detailed Description
In the description of the present invention, it should also be noted that, unless otherwise explicitly specified or limited, the terms "disposed," "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example 1
As shown in fig. 1-3: the utility model provides a 7 hoisting and taking transfer device for building prefabricated part, includes a girder steel 2, owner's steel wire 1 and hoist and mount frame, is provided with lug 101 on the girder steel 2, and lug 101 is provided with three both ends and the intermediate position that sets up at girder steel 2 respectively, sets up the fixed part that three lug 101 increased suspension girder steel 2, has strengthened structural stability, prevents that girder steel 2 from taking place the skew when hoist and mount. Main steel wire 1 passes lug 101 and is connected with hoisting equipment, girder steel 2 has a plurality of through-holes 201 along length direction evenly distributed, all only lifting hook 401 is used for the handling goods on the navigation that uses always, set up girder steel 2 and set up a plurality of through-holes 201 on girder steel 2, the setting of hoisting point has been increased, and be equipped with a plurality of hoist and mount framves in the lower part of crossbeam 6, make hoist and mount frame can select the size of how many hoist and mount frame and crossbeam 6 width according to prefabricated component 7's size, the application method is nimble, and be applicable to the prefabricated component 7 of multiple model, adaptability is wide. Girder steel 2 is provided with reinforcing plate 3 in through-hole 201 department, and reinforcing plate 3 has two rectangle steel sheets to weld respectively in the both sides of girder steel through-hole 201 department, and it is the through-hole to get through two steel sheets in through-hole 201 department, sets up reinforcing plate 3 in the through-hole 201 department of girder steel 2, has strengthened the structural strength of through-hole 201 department, has prevented in long-time use that through-hole 201 department excessive wear causes reduction in service life, reinforcing structural stability. The hoisting frame is at least three and is hung at the through holes 201 of the steel beam 2 at equal intervals. The hoisting frame comprises a cross beam 6, the cross beam 6 is arranged to change oblique pulling force into vertical upward pulling force, the auxiliary steel wire 4 is directly connected with the hoisting chain 5, the cross beam 6 is not used as a medium to transfer energy, the structure setting is reduced, and the stress is more stable and reasonable when the hoisting frame is used. Be provided with vice steel wire 4 at crossbeam 6 both ends, vice steel wire 4 is provided with two at least, and vice steel wire 4 one end is connected to crossbeam 6 and goes up the other end and connect on same lifting hook 401, can add a vice steel wire 4 reinforcing structure pulling force at crossbeam 6 intermediate position, reinforcing stable in structure. The auxiliary steel wire 4 is connected with the hoisting chain 5 at one end of the beam 6 and is connected in the second through hole 602, the boss 601 is arranged in the second through hole 602, the second through hole 602 is arranged on the beam 6, the joint of the auxiliary steel wire 4 and the hoisting chain 5 is arranged in the second through hole 602, the boss 601 is arranged in the second through hole 602 and is arc-shaped, the boss 601 is in contact with the joint of the auxiliary steel wire 4 and the hoisting chain 5 when in use, the direct edge part at the second through hole 602 is prevented from being in contact, the abrasion of the sharp edge part of the edge part to the auxiliary steel wire 4 and the hoisting chain 5 is reduced, the service life of the structure is prolonged, and the design is ingenious. Lifting hook 401 articulates on through-hole 201, perpendicular two at least hoist and mount chains 5 of being provided with downwards on crossbeam 6, be provided with baffle 501 that is used for supporting beam 6 on the hoist and mount chain 5, hoist and mount chain 5 bottom all is provided with the couple, still be provided with baffle 501 on hoist and mount chain 5, under the effect of gravity when using, crossbeam 6 can the lapse, baffle 501 not only has spacing effect and can also prevent crossbeam 6 gliding downwards when hoist and mount, and then causes the incident, the security of reinforcing structure greatly. During hoisting, the hook is connected with the hoisting rings 701 embedded in the prefabricated part 7, the distance between the two through holes 602 on the cross beam 6 is equal to the distance between the two hoisting rings 701, vertical upward pulling force is provided for the prefabricated part 7 during hoisting, and the hoisting rings 701 are prevented from being damaged by oblique pulling force on the prefabricated part 7. And the hoist and mount can be installed a plurality ofly on girder steel 2 for atress is even between each part of prefabricated component 7 when hoist and mount, avoids taking the phenomenon that takes place the slope when transporting because of hoist and mount chain 5 length difference causes, security performance when reinforcing the use, protection people life safety.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.
Claims (6)
1. The utility model provides a transfer device is got to building prefabricated component hanging which characterized in that: including a girder steel, main steel wire and hoist and mount frame, be provided with the lug on the girder steel, the main steel wire passes the lug and is connected with lifting device, the girder steel has a plurality of through-holes along length direction evenly distributed, hoist and mount frame includes the crossbeam, the crossbeam both ends are provided with vice steel wire, vice steel wire is provided with two at least, vice steel wire one end is connected to the crossbeam on the other end connect on same lifting hook, the lifting hook is connected on the through-hole, perpendicular downwards is provided with two at least hoist and mount chains on the crossbeam, hoist and mount chain bottom all is provided with the couple.
2. The hoisting and transferring device for the building prefabricated parts according to claim 1, wherein: the steel beam is provided with a reinforcing plate at the through hole.
3. The hoisting and transferring device for the building prefabricated parts according to claim 1, wherein: the lifting lug is provided with three and sets up both ends and the intermediate position at the girder steel respectively.
4. The hoisting and transferring device for the building prefabricated parts according to claim 1, wherein: the hoisting frame is at least three and is arranged at the through hole of the steel beam at equal intervals.
5. The hoisting and transferring device for the building prefabricated parts according to claim 1, wherein: the beam is provided with a second through hole, the auxiliary steel wire is connected with the hoisting chain at one end of the beam and is connected in the second through hole, and a protruding part is arranged in the second through hole.
6. The hoisting and transferring device for the building prefabricated parts according to claim 5, wherein: and the hoisting chain is provided with a baffle for supporting the cross beam.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120877471.6U CN214652978U (en) | 2021-04-26 | 2021-04-26 | Building prefabricated component hangs gets transfer device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120877471.6U CN214652978U (en) | 2021-04-26 | 2021-04-26 | Building prefabricated component hangs gets transfer device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214652978U true CN214652978U (en) | 2021-11-09 |
Family
ID=78471819
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120877471.6U Active CN214652978U (en) | 2021-04-26 | 2021-04-26 | Building prefabricated component hangs gets transfer device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214652978U (en) |
-
2021
- 2021-04-26 CN CN202120877471.6U patent/CN214652978U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201024053Y (en) | Truss structure modular type super big mast type crane | |
CN108946475B (en) | Overturning and hoisting system and method for horizontal equipment | |
CN214652978U (en) | Building prefabricated component hangs gets transfer device | |
KR100846209B1 (en) | Trolley for tower crane | |
CN208072990U (en) | CONSTRUCTION OPERATIONS platform | |
CN214783820U (en) | Lifting point reinforced overweight underground continuous wall reinforcement cage | |
CN214059608U (en) | PC superimposed sheet transportation frame hoist | |
KR100876452B1 (en) | Mast fasteners for tower crane | |
CN218664964U (en) | A hoisting structure for lifting by crane prefabricated superimposed sheet | |
CN214031517U (en) | Construction lifting system for high aqueduct bent | |
CN220201125U (en) | Beam lifting device | |
CN219567274U (en) | Hoisting device | |
CN110980507A (en) | Lifting lug structure for hoisting thin-wall circular tube tower module | |
CN219689116U (en) | Combined lifting appliance for T-shaped beam | |
CN220098265U (en) | Assembled six-ring hanging beam for hanging offshore wind power bucket foundation | |
CN216974126U (en) | Elevator shaft construction operation platform | |
CN216664928U (en) | Combined hanging rack suitable for construction and protection of building outer vertical face based on top mold | |
CN214570249U (en) | A gallows for installing pier protective equipment | |
CN214739019U (en) | Bridge type precast concrete inner and outer shear wall | |
CN218623410U (en) | Attached discharging platform device | |
CN217399379U (en) | Hang basket type of falling T both shoulders cross arm steel suspender | |
CN219807671U (en) | Steel beam installation lifting appliance | |
CN212425113U (en) | Concrete slab combined hoisting frame | |
CN220644134U (en) | Large-span high-head gate and gate system | |
CN213356653U (en) | Hanging bracket capable of simultaneously hoisting three laminated slabs |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |