CN214618804U - Based on whole work progress of building comprehensive management equipment - Google Patents

Based on whole work progress of building comprehensive management equipment Download PDF

Info

Publication number
CN214618804U
CN214618804U CN202120452721.1U CN202120452721U CN214618804U CN 214618804 U CN214618804 U CN 214618804U CN 202120452721 U CN202120452721 U CN 202120452721U CN 214618804 U CN214618804 U CN 214618804U
Authority
CN
China
Prior art keywords
fixed
fixed mounting
block
management equipment
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120452721.1U
Other languages
Chinese (zh)
Inventor
孙锡宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202120452721.1U priority Critical patent/CN214618804U/en
Application granted granted Critical
Publication of CN214618804U publication Critical patent/CN214618804U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Drawing Aids And Blackboards (AREA)

Abstract

The utility model relates to a construction management equipment technical field discloses a based on whole work progress of building overall management equipment, include: a fixing plate on one side of which construction management is performed; the touch screen terminal is fixedly arranged on one side of the fixing plate, and the top end of the touch screen terminal is fixedly provided with a camera; first magnetism blank and second magnetism blank, second supporting body fixed mounting is in the opposite side of fixed plate, first cell body has been seted up to second supporting body one side is fixed, first magnetism blank fixed mounting is in first cell body inner wall. This based on whole work progress of building overall management equipment through setting up touch screen terminal and camera, does benefit to and carries out the attendance to constructor and punch the card, easily makes statistics of the construction number at the scene, through setting up projection curtain and projecting apparatus, easily the department managers reports the management condition to the supervisor, makes things convenient for the supervisor to carry out the accuse to whole work progress, has improved the construction management effect.

Description

Based on whole work progress of building comprehensive management equipment
Technical Field
The utility model relates to a construction management equipment technical field, in particular to based on whole work progress of building manages equipment comprehensively.
Background
The field management in the whole construction process of the building is very important, the BIM technology is often adopted for building construction structure process simulation during building design, and the construction progress and projects are often managed according to a BIM simulation model during construction;
the existing management mode is that construction progress, project data and photos are pasted on a management column, a responsible person is equipped with a BIM simulation model display tool such as a computer, and the BIM simulation model and the data in the management column need to be compared and managed when the responsible person arrives at a project area each time;
the existing overall construction process management equipment for the building is poor in display effect of a construction process, cannot mark important events quickly, is not beneficial to overall management, and is inconvenient to move.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides a based on whole work progress of building manages equipment comprehensively, can effectively solve the present whole work progress of this kind of building and manage equipment comprehensively not good to the bandwagon effect of construction process, can't mark important incident fast, be unfavorable for comprehensive management to the inconvenient problem of removal of management equipment.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a comprehensive management device based on the whole construction process of a building comprises: a fixing plate on one side of which construction management is performed; the touch screen terminal is fixedly arranged on one side of the fixing plate, and the top end of the touch screen terminal is fixedly provided with a camera; first magnetism blank and second magnetism blank, second supporting body fixed mounting is in the opposite side of fixed plate, first cell body has been seted up to second supporting body one side is fixed, first magnetism blank fixed mounting is in first cell body inner wall, the fixed plate both sides are run through and have been seted up the second cell body, second cell body top and bottom inner wall rotate and are provided with the fly leaf, second magnetism blank fixed mounting is in fly leaf one side inner wall.
Preferably, the fixed plate bottom fixed mounting has the loading board, loading board bottom four corners edge fixed mounting has the universal wheel, loading board top fixed mounting has first fixed block, loading board bottom fixed mounting has the second fixed block, loading board top fixed mounting has the third fixed block, the fixed plate both ends are run through and are seted up the spacing groove, spacing inslot wall and third fixed block inner wall are in the coplanar.
Preferably, the inner wall of the second fixed block is movably provided with a first long block, one side of the first long block is fixedly provided with a second long block, the outer wall of the second long block is fixedly provided with a projector, the bottom end of the second long block is fixedly provided with a supporting block, and the top end of the projector is fixedly provided with a sun shield.
Preferably, the magnetite is movably arranged on one side of the first magnetic whiteboard, a first through hole is fixedly formed in the top end of the fixing plate, a movable column is movably arranged on the inner wall of the first through hole, and a movable block is fixedly arranged on the top end of the movable column.
Preferably, a second through hole is formed in the top end and the bottom end of the movable plate in a penetrating mode, the second through hole and the first through hole are of the same structure and are located on the same plane, and the structure formed by the second through hole and the first through hole is matched with the movable column.
Preferably, the fixed plate is "L" shape structure, fixed plate one side fixed mounting has first supporting body, first supporting body is "L" shape structure, fly leaf one side fixed mounting has the fourth fixed block, fly leaf opposite side fixed mounting has the projection curtain.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. according to the comprehensive management equipment based on the whole construction process of the building, due to the arrangement of the touch screen terminal and the camera, attendance and card punching of constructors are facilitated, the number of people on site is easy to count, due to the arrangement of the projection screen and the projector, department managers can easily report management conditions to supervisors, the supervisors can conveniently control the whole construction process, and the construction management effect is improved;
2. according to the comprehensive management equipment based on the whole construction process of the building, the effect of hanging and fixing articles such as project data and photos is achieved by arranging the first magnetic white board and the magnets, managers can conveniently and quickly watch the project data and the photos, the management speed is improved, construction related articles can be conveniently placed by arranging the first bearing body, and the comprehensive management equipment is convenient to use;
3. this based on whole work progress of building overall management equipment through setting up fly leaf, second magnetism blank and fourth fixed block, has realized that the staff can write the important incident on the second magnetism blank through the water pen, does benefit to the important incident that the managers learn the work progress fast, improves the managerial efficiency.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is the schematic view of the overall splitting structure of the present invention.
Fig. 3 is a schematic view of the projection screen structure of the present invention.
Fig. 4 is a schematic view of a three-dimensional structure of the first long block of the present invention.
In the figure: 1. a fixing plate; 2. a carrier plate; 3. a universal wheel; 4. a first fixed block; 5. a second fixed block; 6. a first long block; 7. a second long block; 8. a projector; 9. a first carrier; 10. a second carrier; 11. a first tank body; 12. a first magnetic whiteboard; 13. a magnet; 14. a second tank body; 15. a movable plate; 16. a second magnetic whiteboard; 17. a first through hole; 18. a movable block; 19. a sun visor; 20. a touch screen terminal; 21. a camera; 22. a support block; 23. a third fixed block; 24. a fourth fixed block; 25. a limiting groove; 26. a second through hole; 27. a movable post; 28. a projection screen.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
Referring to fig. 1 to 4, an overall management apparatus based on a whole construction process of a building includes:
a fixed plate 1, which is used for construction management on one side of the fixed plate 1;
the touch screen terminal 20 is fixedly arranged on one side of the fixing plate 1, and the top end of the touch screen terminal 20 is fixedly provided with a camera 21;
the portable whiteboard device comprises a first magnetic whiteboard 12 and a second magnetic whiteboard 16, wherein a second bearing body 10 is fixedly arranged on the other side of a fixing plate 1, a first groove 11 is fixedly formed in one side of the second bearing body 10, the first magnetic whiteboard 12 is fixedly arranged on the inner wall of the first groove 11, a second groove 14 is formed in the two sides of the fixing plate 1 in a penetrating mode, movable plates 15 are rotatably arranged on the top end and the bottom end inner wall of the second groove 14, and the second magnetic whiteboard 16 is fixedly arranged on the inner wall of one side of the movable plates 15.
As shown in fig. 1 and 2, a bearing plate 2 is fixedly mounted at the bottom end of a fixing plate 1, universal wheels 3 are fixedly mounted at four corners of the bottom end of the bearing plate 2, a first fixing block 4 is fixedly mounted at the top end of the bearing plate 2, a second fixing block 5 is fixedly mounted at the bottom end of the bearing plate 2, a third fixing block 23 is fixedly mounted at the top end of the bearing plate 2, limiting grooves 25 are formed in two ends of the fixing plate 1 in a penetrating manner, and the inner walls of the limiting grooves 25 and the inner walls of the third fixing blocks 23 are located on the same plane.
By adopting the scheme, the device is easy to move and convenient to use.
As shown in fig. 1 and 4, a first long block 6 is movably arranged on the inner wall of the second fixed block 5, a second long block 7 is fixedly installed on one side of the first long block 6, a projector 8 is fixedly installed on the outer wall of the second long block 7, a supporting block 22 is fixedly installed at the bottom end of the second long block 7, and a sun shield 19 is fixedly installed at the top end of the projector 8.
By adopting the scheme, the effect of projection of the equipment through the projector 8 is realized, and the reporting work of the position management personnel to the supervisor is facilitated.
As shown in fig. 1 and 2, a magnet 13 is movably disposed on one side of the first magnetic white board 12, a first through hole 17 is fixedly formed at the top end of the fixing board 1, a movable column 27 is movably disposed on the inner wall of the first through hole 17, and a movable block 18 is fixedly mounted at the top end of the movable column 27.
Through adopting above-mentioned scheme, realized that the device can pass through magnetite 13 and adsorb data and photo and place on first magnetism blank 12, do benefit to managers's quick reading and watch.
As shown in fig. 1 and 2, the top end and the bottom end of the movable plate 15 are provided with a second through hole 26, the second through hole 26 and the first through hole 17 are of the same structure and are located on the same plane, and the structure formed by the second through hole 26 and the first through hole 17 is matched with the movable column 27.
Through adopting above-mentioned scheme, realized the effect of the easy dismouting of fly leaf 15, the equipment is convenient.
As shown in fig. 1, the fixed plate 1 is of an "L" shaped structure, a first supporting body 9 is fixedly mounted on one side of the fixed plate 1, the first supporting body 9 is of an "L" shaped structure, a fourth fixing block 24 is fixedly mounted on one side of the movable plate 15, and a projection screen 28 is fixedly mounted on the other side of the movable plate 15.
Through adopting above-mentioned scheme, the effect that article such as relevant file are easily placed to this equipment is realized to the setting of first supporting body 9, and the setting of projection curtain 28 does benefit to the projection of projecting apparatus 8, convenient to use.
It should be noted that, the utility model relates to a based on whole work progress of building manages equipment comprehensively, during the use, at first remove the device to the entrance of construction site, open touch screen terminal 20, touch screen terminal 20 carries out the people's face through camera 21 to the constructor and beats the card, confirm the number of working people, the managers of each department place project data and photo on first magnetic white board 12, utilize magnetite 13 to fix project data and photo, the managers can write down the incident that the person in charge needs to pay attention with the water pen on second magnetic white board 16, when the department managers reports work to the person in charge, manual rotation fly leaf 15 makes projection curtain 28 and projector 8's camera lens corresponding, open projector 8 and explain, make the person in charge learn the management condition of each department fast, the convenience manages the work progress comprehensively.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a based on whole work progress of building overall management equipment which characterized in that includes:
a fixing plate (1) for performing construction management on one side of the fixing plate (1);
the touch screen terminal (20) is fixedly arranged on one side of the fixing plate (1), and a camera (21) is fixedly arranged at the top end of the touch screen terminal (20);
second supporting body (10), first magnetism blank (12) and second magnetism blank (16), second supporting body (10) fixed mounting is in the opposite side of fixed plate (1), first cell body (11) have been seted up to second supporting body (10) one side is fixed, first magnetism blank (12) fixed mounting is in first cell body (11) inner wall, fixed plate (1) both sides are run through and have been seted up second cell body (14), second cell body (14) top and bottom inner wall rotate and are provided with fly leaf (15), second magnetism blank (16) fixed mounting is in fly leaf (15) one side inner wall.
2. The overall management equipment based on the whole construction process of the building, according to claim 1, is characterized in that: fixed plate (1) bottom fixed mounting has loading board (2), loading board (2) bottom four corners edge fixed mounting has universal wheel (3), loading board (2) top fixed mounting has first fixed block (4), loading board (2) bottom fixed mounting has second fixed block (5), loading board (2) top fixed mounting has third fixed block (23), fixed plate (1) both ends are run through and have been seted up spacing groove (25), spacing groove (25) inner wall and third fixed block (23) inner wall are in coplanar.
3. The overall management equipment based on the whole construction process of the building, according to claim 2, is characterized in that: the inner wall of the second fixing block (5) is movably provided with a first long block (6), one side of the first long block (6) is fixedly provided with a second long block (7), the outer wall of the second long block (7) is fixedly provided with a projector (8), the bottom end of the second long block (7) is fixedly provided with a supporting block (22), and the top end of the projector (8) is fixedly provided with a sun shield (19).
4. The overall management equipment based on the whole construction process of the building, according to claim 1, is characterized in that: first magnetism blank (12) one side activity is provided with magnetite (13), fixed plate (1) top is fixed and has been seted up first through-hole (17), first through-hole (17) inner wall activity is provided with movable post (27), movable post (27) top fixed mounting has movable block (18).
5. The overall management equipment based on the whole construction process of the building, according to claim 4, is characterized in that: the top end and the bottom end of the movable plate (15) are provided with a second through hole (26) in a penetrating mode, the second through hole (26) and the first through hole (17) are of the same structure and are located on the same plane, and the structure formed by the second through hole (26) and the first through hole (17) is matched with the movable column (27).
6. The overall management equipment based on the whole construction process of the building, according to claim 1, is characterized in that: fixed plate (1) is "L" shape structure, fixed plate (1) one side fixed mounting has first supporting body (9), first supporting body (9) are "L" shape structure, fly leaf (15) one side fixed mounting has fourth fixed block (24), fly leaf (15) opposite side fixed mounting has projection curtain (28).
CN202120452721.1U 2021-03-02 2021-03-02 Based on whole work progress of building comprehensive management equipment Active CN214618804U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120452721.1U CN214618804U (en) 2021-03-02 2021-03-02 Based on whole work progress of building comprehensive management equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120452721.1U CN214618804U (en) 2021-03-02 2021-03-02 Based on whole work progress of building comprehensive management equipment

Publications (1)

Publication Number Publication Date
CN214618804U true CN214618804U (en) 2021-11-05

Family

ID=78392259

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120452721.1U Active CN214618804U (en) 2021-03-02 2021-03-02 Based on whole work progress of building comprehensive management equipment

Country Status (1)

Country Link
CN (1) CN214618804U (en)

Similar Documents

Publication Publication Date Title
CN205375861U (en) Novel teaching aid suitable for economic law
CN206462679U (en) A kind of multimedia show frame
CN214618804U (en) Based on whole work progress of building comprehensive management equipment
CN205722004U (en) A kind of wisdom electronics class board
CN206210156U (en) A kind of computer network teaching test device
CN215190389U (en) A effect picture show shelf for tourism building view planning
CN214847157U (en) Visual transmission teaching device of multipurpose
CN113903225A (en) Space analytic geometry teaching system
CN204833995U (en) Special publicity column of foreign language corner
CN206249697U (en) A kind of Mathematics of Economics graphic demonstrator
CN217575300U (en) Movable device for outdoor display screen
CN213534288U (en) Display device is used in teaching of higher school's financial management
CN211604461U (en) Economic management science teaching aid
CN204145619U (en) A kind of camera head
CN210155875U (en) Administrative management teaching device
CN214540372U (en) Computer application teaching device
CN213424241U (en) Teaching aid suitable for economics are given lessons and are used in practice
CN209543662U (en) A kind of Multifunctional teaching device that Science of Business Administration uses
CN212966868U (en) Wisdom campus electron class tablet
CN212088733U (en) Teacher is with dustproof strorage device of data
CN216119479U (en) Engineering progress display device for construction management construction
CN209993164U (en) Jigsaw show shelf is used in financial accounting management teaching
CN213400040U (en) Think political affairs teaching display device
CN209765812U (en) Presentation device for law teaching
CN213483135U (en) Magnetic sheet combined teaching aid

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant