CN214618227U - Pipeline integration frame - Google Patents

Pipeline integration frame Download PDF

Info

Publication number
CN214618227U
CN214618227U CN202120243055.0U CN202120243055U CN214618227U CN 214618227 U CN214618227 U CN 214618227U CN 202120243055 U CN202120243055 U CN 202120243055U CN 214618227 U CN214618227 U CN 214618227U
Authority
CN
China
Prior art keywords
sleeve
transverse plate
plate
mounting frame
diaphragm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120243055.0U
Other languages
Chinese (zh)
Inventor
丁欣欣
周东珊
丁泽成
王文广
安海洋
李金名
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yasha Decoration Co Ltd
Original Assignee
Zhejiang Yasha Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Yasha Decoration Co Ltd filed Critical Zhejiang Yasha Decoration Co Ltd
Priority to CN202120243055.0U priority Critical patent/CN214618227U/en
Application granted granted Critical
Publication of CN214618227U publication Critical patent/CN214618227U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model provides an integrated frame of pipeline relates to decoration technical field, the fruit pick-up device comprises a frame body, the mounting bracket, sleeve and apron, the mounting bracket includes first mounting bracket, second mounting bracket and connecting bolt, first mounting bracket includes the first riser, first diaphragm and second diaphragm, the second mounting bracket includes the second riser, third diaphragm and fourth diaphragm, first diaphragm, the second diaphragm, third diaphragm and fourth diaphragm all are connected with the framework lateral wall through connecting screw, the sleeve lateral wall is equipped with the cardboard, the cardboard has at least partly to be located between first riser and the second riser, be equipped with on the apron and pass the hole. The utility model has the advantages of simple structure, set up the framework on the wall, with the bushing installation on the mounting bracket in the framework, rather than directly carry out pre-buried with the sleeve pipe, the construction is simple, and wall stability is good, can set up sheathed tube size and quantity wantonly in the framework, and the sleeve pipe detachability is strong, and the position is adjustable after the bushing installation, can be applicable to the installation of all kinds of pipelines.

Description

Pipeline integration frame
Technical Field
The utility model relates to the technical field of decoration design,
especially, the utility model relates to an integrated frame of pipeline.
Background
The current decoration industry is developing towards the direction of industrialized modularized installation, generally speaking, wall decoration is a decoration method commonly adopted in indoor design, and can increase the layering sense of indoor space and play a role in beautifying decoration.
The wall decoration can separate space, and can support the decoration structure, such as the arrangement of pipelines, the pipeline installation process of the current multi-connected air conditioning system is mature, the current national standard drawing set can be referred to, and the installation can be executed according to the installation instructions provided by various suppliers, and at the positions where the pipelines (refrigerant pipes, condensation pipes, power lines, signal lines) and the like pass through the wall body, the beam and the like, the current traditional method is to reserve (pre-embed) sleeves on the wall or the beam separately, and fill flexible non-combustible materials or flexible waterproof materials in the gaps between the sleeves and the pipelines according to the actual working conditions, for example, the Chinese patent invention patent CN106295019A relates to a BIM-based heating ventilation air conditioning system installation method, which comprises the following steps: establishing professional three-dimensional models of the heating, ventilating and air conditioning system, integrating the professional three-dimensional models of the heating, ventilating and air conditioning system, and planning and distributing the functions and the sizes of the heating, ventilating and air conditioning system in the integrated three-dimensional models; accurately positioning the sleeve, the reserved hole and the embedded part of the pipeline by using the adjusted three-dimensional model, and deriving the sizes of the sleeve, the reserved hole and the embedded part; arranging pipeline brackets according to design specifications by using a three-dimensional model; simulating a circulation process of a heating, ventilating and air conditioning system in the three-dimensional model, checking whether a problem occurs in the operation process of the heating, ventilating and air conditioning system, if the problem occurs in the simulation operation, sorting and summarizing the found problems, and then modifying the three-dimensional model. The invention improves the installation precision and efficiency of the related components of the heating, ventilating and air conditioning system and avoids reworking.
However, the pipeline integrated structure still has the following problems: the method is characterized in that (pre-buried) sleeves are reserved on masonry walls or beams, various air conditioner pipelines penetrate into the sleeves in an installation link, although the installation requirements can be met, in the field of assembly decoration, in the face of a scene that an assembly partition wall touches an original top partition space of a building floor, at the moment, holes are formed in the partition wall one by one through pipelines, adverse effects are brought to the stability of the partition wall, the partition wall is blocked one by one, construction is complicated, and once a pre-buried hole is set, the size and the position of the sleeves cannot be changed, and the sleeves cannot adapt to the installation of new pipelines which are different in the day, new and month.
Therefore, in order to solve the above problems, it is necessary to design a reasonably efficient pipeline integration block.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a simple structure sets up the framework on the wall, with the bushing installation on the mounting bracket in the framework, rather than directly carry out pre-buried with the sleeve pipe, the construction is simple, and wall stability is good, can set up sheathed tube size and quantity wantonly in the framework, and the sleeve pipe detachability is strong, and the position is adjustable after the bushing installation, can be applicable to the pipeline integration frame of the installation of all kinds of pipelines.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a pipeline integration frame comprises a frame body, a mounting frame arranged in the frame body, a sleeve arranged on the mounting frame and a cover plate arranged at the end part of the frame body, wherein the mounting frame comprises a first mounting frame, a second mounting frame and a connecting bolt for connecting the first mounting frame and the second mounting frame, the first mounting frame comprises a first vertical plate, a first transverse plate arranged at the end part of the first vertical plate and a second transverse plate arranged at one end of the first vertical plate far away from the first transverse plate, the second mounting frame comprises a second vertical plate, a third transverse plate arranged at the end part of the second vertical plate and a fourth transverse plate arranged at one end of the second vertical plate far away from the third transverse plate, the first transverse plate, the second transverse plate, the third transverse plate and the fourth transverse plate are connected with the side wall of the frame body through connecting screws, and the side wall of the sleeve is provided with a clamping plate, at least one part of the clamping plate is positioned between the first vertical plate and the second vertical plate, and the cover plate is provided with a through hole for the sleeve to pass through conveniently.
As the utility model discloses a preferred, the sleeve inboard is provided with the cotton layer of heat preservation.
As the utility model discloses a preferred, the inboard packing of framework has flexible fire-retardant piece.
As the utility model discloses a preferred, the sleeve includes first sleeve, second sleeve and third sleeve, the internal diameter of first sleeve is not less than the telescopic internal diameter of second, the telescopic internal diameter of second is not less than the telescopic internal diameter of third.
As the utility model discloses a preferred, all be provided with on first riser and the second riser and be used for the convenience connecting bolt passes the connecting hole, the connecting bolt outside is provided with the external screw thread, the connecting hole inboard be provided with thread fit's internal thread.
As the utility model discloses a preferred, the quantity of connecting hole is one at least.
As the utility model discloses a preferred, all be provided with on first diaphragm, second diaphragm, third diaphragm and the fourth diaphragm and be used for the convenience the screw hole that connecting screw passed.
As the utility model discloses a preferred, it is used for the convenience all to be provided with on first riser and the second riser the spread groove that connecting bolt passed, connecting bolt is connected with the nut, the connecting bolt outside is provided with the external screw thread, the nut inboard be provided with external screw thread complex internal thread.
As a preferred aspect of the present invention, the number of the connecting grooves is at least one.
As the utility model discloses a preferred, all be provided with on first diaphragm, second diaphragm, third diaphragm and the fourth diaphragm and be used for the convenience the screw groove that connecting screw passed.
The utility model relates to an integrated frame of pipeline's beneficial effect lies in: simple structure sets up the framework on the wall, with the bushing installation on the mounting bracket in the framework, rather than directly carry out pre-buried with the sleeve pipe, the construction is simple, and wall stability is good, can set up sheathed tube size and quantity wantonly in the framework, and sleeve pipe detachability is strong, and the position is adjustable after the bushing installation, can be applicable to the installation of all kinds of pipelines.
Drawings
Fig. 1 is a schematic perspective view of an embodiment of a pipeline integration frame according to the present invention;
fig. 2 is a schematic view illustrating a cover plate of an embodiment of a pipeline assembly frame according to the present invention;
fig. 3 is a schematic perspective view of a sleeve in an embodiment of a pipeline assembly frame according to the present invention;
fig. 4 is a schematic perspective view of a mounting frame in an embodiment of a pipeline assembly frame according to the present invention;
fig. 5 is a schematic perspective view of a mounting frame in another embodiment of a pipeline assembly frame according to the present invention;
in the figure: 11. the framework, 12, the sleeve, 121, first sleeve, 122, the second sleeve, 123, the third sleeve, 124, the cotton layer that keeps warm, 125, the cardboard, 13, the apron, 131, pass the hole, 14, first mounting bracket, 141, the first riser, 142, first diaphragm, 143, the second diaphragm, 15, the second mounting bracket, 151, the second riser, 152, the third diaphragm, 153, the fourth diaphragm, 16, connecting bolt, 161, the connecting hole, 162, the external screw thread, 163, the connecting groove, 17, connecting screw, 171, the screw hole, 172, the screw groove.
Detailed Description
The following are specific embodiments of the present invention, and the technical solutions of the present invention are further described, but the present invention is not limited to these embodiments.
Various exemplary embodiments of the present invention will now be described in detail with reference to the accompanying drawings. It should be noted that: the relative arrangement of modules and steps and the steps set forth in these embodiments do not limit the scope of the present invention unless specifically stated otherwise.
Meanwhile, it should be understood that the flows in the drawings are not merely performed individually for convenience of description, but a plurality of steps are performed alternately with each other.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. indicate the position or positional relationship based on the position or positional relationship shown in the drawings, or the position or positional relationship which the product of the present invention is usually placed when in use, and are only for convenience of description of the present invention and simplification of description, but do not indicate or imply that the device or element referred to must have a specific position, be constructed and operated in a specific orientation, and therefore, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and the like are used merely to distinguish one description from another, and are not to be construed as indicating or implying relative importance.
The following description of at least one exemplary embodiment is merely illustrative in nature and is in no way intended to limit the invention, its application, or uses.
Techniques, methods, and systems known to those of ordinary skill in the relevant art may not be discussed in detail, but are intended to be part of the specification where appropriate.
The first embodiment is as follows: as shown in fig. 1 to 4, which are only one embodiment of the present invention, a pipeline integrated frame includes a frame body 11, a mounting frame disposed in the frame body 11, a sleeve 12 disposed on the mounting frame, and a cover plate 13 disposed at an end of the frame body 11, wherein the mounting frame includes a first mounting frame 14, a second mounting frame 15, and a connecting bolt 16 for connecting the first mounting frame 14 and the second mounting frame 15, the first mounting frame 14 includes a first vertical plate 141, a first transverse plate 142 disposed at an end of the first vertical plate 141, and a second transverse plate 143 disposed at an end of the first vertical plate 141 far from the first transverse plate 142, the second mounting frame 15 includes a second vertical plate 151, a third transverse plate 152 disposed at an end of the second vertical plate 151, and a fourth transverse plate 153 disposed at an end of the second vertical plate 151 far from the third transverse plate 152, the first horizontal plate 142, the second horizontal plate 143, the third horizontal plate 152 and the fourth horizontal plate 153 are all connected with the side wall of the frame body 11 through connecting screws 17, the side wall of the sleeve 12 is provided with a clamping plate 125, at least a part of the clamping plate 125 is located between the first vertical plate 141 and the second vertical plate 151, and the cover plate 13 is provided with a through hole 131 for facilitating the sleeve 12 to pass through.
The utility model discloses in, predetermine the frame hole of enough installation framework size on the wall (or on the roof beam), then install framework 11 to the frame hole in, can directly fix framework 11 this moment, after whole wall installation is accomplished, when needing the wiring, can directly carry out the pipeline in framework 11 and concentrate the line of walking.
First, a mounting bracket including a first mounting bracket 14, a second mounting bracket 15, and a coupling bolt 16 for coupling the first and second mounting brackets 14 and 15.
Here, the first mounting frame 14 includes a first vertical plate 141, a first horizontal plate 142 disposed at an end portion of the first vertical plate 141, and a second horizontal plate 143 disposed at an end portion of the first vertical plate 141 away from the first horizontal plate 142, and the second mounting frame 15 includes a second vertical plate 151, a third horizontal plate 152 disposed at an end portion of the second vertical plate 151, and a fourth horizontal plate 153 disposed at an end portion of the second vertical plate 151 away from the third horizontal plate 152.
In fact, the first mounting frame 14 and the second mounting frame 15 are both U-shaped members, and the first mounting frame 14 and the second mounting frame 15 are disposed oppositely, the first horizontal plate 142, the second horizontal plate 143, the third horizontal plate 152 and the fourth horizontal plate 153 are all connected to the side wall of the frame body 11 through the connecting screw 17, and two ends of the U-shaped member are respectively connected to the side wall of the frame body 11, as shown in fig. 1.
Then be the structure of sleeve 12, sleeve 12 lateral wall is provided with cardboard 125, cardboard 125 has at least a part to be located between first riser 141 and second riser 151, can be provided with various pipelines in the sleeve 12, for example refrigerant pipe, condenser pipe, power cord spool and signal line spool etc. sleeve 12's lateral wall is provided with the cardboard 125 of sleeve 12 vertical setting, cardboard 125 extends to between first riser 141 and the second riser 151, is pressed from both sides tightly by first riser 141 and second riser 151 to accomplish fixedly with sleeve 12.
The structure of apron 13 is last, be provided with on apron 13 and be used for the convenience the sleeve 12 passes through hole 131, and the quantity of apron 13 has two in fact, covers the both ends of framework 11 respectively, and apron 13 size and framework 11 cooperate, are used for covering framework 11 after the sleeve 12 in framework 11 is installed, prevent that the mistake from touching mounting bracket and sleeve 12 in framework 11, and of course, the pipeline that passes hole 131 on the apron 13 and set up in sleeve 12 makes things convenient for sleeve 12 to extend through.
Of course, the through holes 131 of the cover plate 13 are made according to the number, size and position of the sleeves 12 to be installed, so that the sleeves 12 can pass through the through holes 131 when the cover plate 13 is covered to the two ends of the frame body 11.
The specific pipeline installation mode is that the mounting frame is installed firstly, the two ends of the mounting frame are connected with the side wall of the frame body 11 through the connecting screws 17, then the sleeve 12 is installed, the clamping plate 125 of the sleeve 12 extends to a position between the first vertical plate 141 of the first mounting frame 14 and the second vertical plate 151 of the second mounting frame 15, the first vertical plate 141 and the second vertical plate 151 are tightened through the connecting bolts 16, the clamping plate 125 is clamped to enable the sleeve 12 to be fixed, then the various types of pipelines are passed through the inside of the sleeve 12, and finally the end portion of the frame body 11 is covered by the cover plate 13.
Here, the connecting screw 17 is a self-tapping screw, and is used for fixing the mounting frame to the side wall of the frame body 11, the number of the mounting frame is also multiple, the sleeve 12 can be arranged between any two adjacent mounting frames, the distance between two adjacent mounting frames is set according to the sleeve 12 which needs to be mounted, the setting height of the sleeve 12 can be set at will, the sleeves 12 with different sizes and positions can be mounted, after the sleeves 12 are mounted, the sleeve 12 can be adjusted at will, only the cover plate 13 needs to be opened, the connecting bolt 16 can be unscrewed, the position of the sleeve 12 can be adjusted, and after the adjustment is completed, the connecting bolt 16 is screwed again, and the cover plate 13 is covered.
It should be noted that the first riser 141 and the first cross plate 142, etc. are merely for convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, such as when the mounting bracket is horizontal, the first riser 141 is horizontal, instead the first cross plate 142 is vertical.
The utility model relates to an integrated frame of pipeline's simple structure sets up the framework on the wall, with the bushing pipe mounting on the mounting bracket in the framework, rather than directly carry out pre-buried with the sleeve pipe, the construction is simple, and wall stability is good, can set up sheathed tube size and quantity wantonly in the framework, and the sleeve pipe detachability is strong, and the position is adjustable after the bushing pipe mounting, can be applicable to the installation of all kinds of pipelines.
Embodiment two, as shown in fig. 1 to 5, which is only one embodiment of the present invention, on the basis of embodiment one, in the present invention, the sleeve 12 includes a first sleeve 121, a second sleeve 122 and a third sleeve 123, the inner diameter of the first sleeve 121 is not smaller than the inner diameter of the second sleeve 122, the inner diameter of the second sleeve 122 is not smaller than the inner diameter of the third sleeve 123, that is, the sleeves 12 with various specifications may be disposed on the frame 11.
Here, the plurality of sets of the mounting brackets are arranged in parallel or in non-parallel, generally speaking, the plurality of sets of the mounting brackets are arranged in parallel, so that a plurality of sleeves 12 of the same specification can be arranged between two adjacent sets of the mounting brackets, and the sleeves 12 of different specifications are arranged between two adjacent mounting brackets with different distances.
In addition, the inner side of the sleeve 12 is provided with a heat insulation cotton layer 124. Generally, when the refrigerant pipe and the condenser pipe are installed in the jacket 12, the insulating cotton layer 124 is required to be provided inside the jacket 12. The power line pipe and the signal line pipe have corresponding fireproof performance, and the heat insulation cotton layer 124 is not needed.
It should be noted that the structure of the mounting frame is of two types:
first, as shown in fig. 4, all be provided with on first riser 141 and the second riser 151 and be used for the convenience connecting hole 161 that connecting bolt 16 passed, the connecting bolt 16 outside is provided with external screw thread 162, connecting hole 161 inboard be provided with external screw thread 162 complex internal thread, the quantity of connecting hole 161 is one at least, all be provided with on first diaphragm 142, second diaphragm 143, third diaphragm 152 and the fourth diaphragm 153 and be used for the convenience the screw hole 171 that connecting screw 17 passed.
Secondly, as shown in fig. 5, the first vertical plate 141 and the second vertical plate 151 are respectively provided with a connecting groove 163 for facilitating the connection of the connecting bolt 16, the connecting bolt 16 is connected with a nut, the outer side of the connecting bolt 16 is provided with an external thread 162, the inner side of the nut is provided with an internal thread matched with the external thread 162, the connecting groove 163 is at least one in number, the first transverse plate 142, the second transverse plate 143, the third transverse plate 152 and the fourth transverse plate 153 are respectively provided with a screw groove 172 for facilitating the connection of the connecting bolt 17, and the obvious screw grooves 172 and the connecting grooves 163 are vertically arranged, so that the installation position of the installation frame and the installation position of the sleeve 12 can be adjusted in two directions.
With the first solution, the mounting stability of the mounting frame and the sleeve 12 is better; with the second solution, the adjustability of the mounting frame and of the sleeve 12 is better, the structure of the mounting frame of the corresponding solution being chosen according to the type of pipeline to be installed and the location of installation.
Finally, the inner side of the frame body 11 is filled with a flexible flame retardant member. After all pipelines, sleeves 12 and mounting frames are installed, all gaps in the frame 11 need to be densely filled with flexible non-combustible materials with the same fire-proof grade as that of the partition filling materials outside the range of the pipelines in the frame 11, so that the fire-proof performance in the frame 11 is ensured.
The utility model relates to an integrated frame of pipeline's simple structure sets up the framework on the wall, with the bushing pipe mounting on the mounting bracket in the framework, rather than directly carry out pre-buried with the sleeve pipe, the construction is simple, and wall stability is good, can set up sheathed tube size and quantity wantonly in the framework, and the sleeve pipe detachability is strong, and the position is adjustable after the bushing pipe mounting, can be applicable to the installation of all kinds of pipelines.
The present invention is not limited to the above-described specific embodiments, and various modifications and changes are possible. Any modification, equivalent replacement, improvement and the like made to the above embodiments according to the technical spirit of the present invention should be included in the scope of protection of the present invention.

Claims (10)

1. A manifold assembly frame, comprising: comprises a frame body (11), a mounting frame arranged in the frame body (11), a sleeve (12) arranged on the mounting frame and a cover plate (13) arranged at the end part of the frame body (11), wherein the mounting frame comprises a first mounting frame (14), a second mounting frame (15) and a connecting bolt (16) used for connecting the first mounting frame (14) and the second mounting frame (15), the first mounting frame (14) comprises a first vertical plate (141), a first transverse plate (142) arranged at the end part of the first vertical plate (141) and a second transverse plate (143) arranged at one end of the first vertical plate (141) far away from the first transverse plate (142), the second mounting frame (15) comprises a second vertical plate (151), a third transverse plate (152) arranged at the end part of the second vertical plate (151) and a fourth transverse plate (153) arranged at one end of the second vertical plate (151) far away from the third transverse plate (152), the first transverse plate (142), the second transverse plate (143), the third transverse plate (152) and the fourth transverse plate (153) are connected with the side wall of the frame body (11) through connecting screws (17), clamping plates (125) are arranged on the side wall of the sleeve (12), at least one part of each clamping plate (125) is located between the first vertical plate (141) and the second vertical plate (151), and the cover plate (13) is provided with through holes (131) for allowing the sleeve (12) to pass conveniently.
2. The pipeline integration box of claim 1, wherein: the inner side of the sleeve (12) is provided with a heat insulation cotton layer (124).
3. The pipeline integration box of claim 1, wherein: the inner side of the frame body (11) is filled with a flexible flame-retardant piece.
4. The pipeline integration box of claim 1, wherein: the sleeve (12) comprises a first sleeve (121), a second sleeve (122) and a third sleeve (123), wherein the inner diameter of the first sleeve (121) is not smaller than that of the second sleeve (122), and the inner diameter of the second sleeve (122) is not smaller than that of the third sleeve (123).
5. The pipeline integration box of claim 1, wherein: all be provided with on first riser (141) and second riser (151) and be used for the convenience connecting hole (161) that connecting bolt (16) passed, the connecting bolt (16) outside is provided with external screw thread (162), connecting hole (161) inboard be provided with external screw thread (162) complex internal thread.
6. The pipeline integration box of claim 5, wherein: the number of the connecting holes (161) is at least one.
7. The pipeline integration box of claim 1, wherein: the first transverse plate (142), the second transverse plate (143), the third transverse plate (152) and the fourth transverse plate (153) are all provided with screw holes (171) for allowing the connecting screws (17) to pass conveniently.
8. The pipeline integration box of claim 1, wherein: all be provided with on first riser (141) and second riser (151) and be used for the convenience connecting groove (163) that connecting bolt (16) passed, connecting bolt (16) are connected with the nut, the connecting bolt (16) outside is provided with external screw thread (162), the nut inboard be provided with external screw thread (162) complex internal thread.
9. The pipeline integration box of claim 8, wherein: the number of the connecting grooves (163) is at least one.
10. The pipeline integration box of claim 1, wherein: the first transverse plate (142), the second transverse plate (143), the third transverse plate (152) and the fourth transverse plate (153) are all provided with screw grooves (172) for allowing the connecting screws (17) to pass conveniently.
CN202120243055.0U 2021-01-28 2021-01-28 Pipeline integration frame Active CN214618227U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120243055.0U CN214618227U (en) 2021-01-28 2021-01-28 Pipeline integration frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120243055.0U CN214618227U (en) 2021-01-28 2021-01-28 Pipeline integration frame

Publications (1)

Publication Number Publication Date
CN214618227U true CN214618227U (en) 2021-11-05

Family

ID=78439131

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120243055.0U Active CN214618227U (en) 2021-01-28 2021-01-28 Pipeline integration frame

Country Status (1)

Country Link
CN (1) CN214618227U (en)

Similar Documents

Publication Publication Date Title
CN215368022U (en) Pipeline integrated installation device
CN113356409B (en) Pipeline integrated installation device and method
CN214618227U (en) Pipeline integration frame
CN1179161C (en) Air conditioner
CN216844956U (en) Air conditioner air supply device for tall and big space
CN215829706U (en) Mounting structure of pipeline integration frame
CN214368224U (en) Pipeline mounting structure for central air conditioning
CN2285439Y (en) Double-room shared separating type air conditioner
CN209782841U (en) Heat pump assistant
JPH0545737B2 (en)
JP3185564B2 (en) Branch unit for multi-room air conditioner
CN208794694U (en) A kind of used in nuclear power station Anti-seismic wall hole installing type heat exchanger
CN217785312U (en) Assembled electromechanical pipeline integrated module
CN219643478U (en) Electric shaft and block terminal foundation mounting structure
CN215683060U (en) Ventilation device for weak current machine room
KR20120047018A (en) A heat exchanger
US3677285A (en) Duct assembly unit for air-water induction system of air conditioning in multi-story buildings
CN214949840U (en) Wall-mounted boiler mounting rack
CN108592376A (en) Heating,Ventilating and Air Conditioning mounting structure
CN220707670U (en) Composite air pipe externally coated with fireproof plate
JP6445763B2 (en) Thermal insulation installation structure of air conditioner
CN219874887U (en) Comprehensive bridge four-way device
JP3411141B2 (en) Wind tunnel device for hanging equipment
CN218406760U (en) Parking garage provided with intensive large-size pipeline
CN210421467U (en) Building outer wall ventilation unit that insulates against heat

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant