CN218406760U - Parking garage provided with intensive large-size pipeline - Google Patents
Parking garage provided with intensive large-size pipeline Download PDFInfo
- Publication number
- CN218406760U CN218406760U CN202222786337.2U CN202222786337U CN218406760U CN 218406760 U CN218406760 U CN 218406760U CN 202222786337 U CN202222786337 U CN 202222786337U CN 218406760 U CN218406760 U CN 218406760U
- Authority
- CN
- China
- Prior art keywords
- pipeline
- horizontal
- wall
- pipelines
- partition wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B30/00—Energy efficient heating, ventilation or air conditioning [HVAC]
Landscapes
- Duct Arrangements (AREA)
Abstract
The utility model discloses a set up garage parking of intensive jumbo size pipeline, including the garage parking body, this internal a plurality of partition walls that are equipped with of garage parking, the partition wall will the garage parking body is separated for a plurality of fire prevention region, adjacent two concentrate between the fire prevention region and be equipped with at least two sets of horizontal pipeline that are parallel to each other, all the interval sets up about the horizontal pipeline, be equipped with work opening, adjacent two on the pipe wall of horizontal pipeline respectively the fire prevention region is respectively with at least a set of the work opening intercommunication of horizontal pipeline. Adopt the utility model discloses an it is showing the effect, concentrate the jumbo size pipeline and arrange in the partitioned space region of partition wall to make these jumbo size pipelines serve adjacent fire prevention subregion/unit respectively. The parking garage is easier to control in floor height, beneficial influence is generated on cost control of the parking garage, and improvement of underground space quality and better use experience are brought due to the fact that the laying range of large-size pipelines is reduced.
Description
Technical Field
The utility model relates to an integrated installation of jumbo size pipeline is reformed transform, the intensive installation of jumbo size pipeline in concretely relates to parking garage.
Background
With the long-term development of new energy automobiles, people have more and more demands on parking spaces of charging piles, and higher requirements are provided for the fire prevention of parking garages; in order to better prevent and control the potential fire risk, the area of the fire-proof subareas or fire-proof units in the parking garage needs to be further reduced; however, this means that more air inlet or exhaust ducts are required to be installed, in addition to the refrigerant pipes required by the air conditioning equipment, heating and ventilation pipes required for heating are also required to be installed in parking garages in northern areas, and the number of the large-size pipelines is far more than that of the traditional parking garages, so that a large number of large-size pipelines are laid in a large area in parking garage space (the top of the parking garage), which not only affects the height of the parking garage space layer, but also affects the space impression.
SUMMERY OF THE UTILITY MODEL
In order to the above situation, the utility model provides a be provided with parking garage of intensive jumbo size pipeline, in same layer underground space, concentrate the jumbo size pipeline and arrange in partition wall divided space region to make it serve adjacent fire prevention subregion or fire prevention unit respectively, can show and reduce the parking garage floor height, be favorable to promoting underground space quality, bring better use and experience.
The utility model discloses the main technical scheme who adopts is:
including the garage parking body, this internal a plurality of partition walls that are equipped with of garage parking, the partition wall will the garage parking body is separated for a plurality of fire prevention region, adjacent two concentrate between the fire prevention region and be equipped with at least two sets of horizontal pipeline that are parallel to each other, all the horizontal pipeline sets up at interval from top to bottom, be equipped with the work opening on the pipe wall of horizontal pipeline respectively, adjacent two the fire prevention region respectively with at least a set of the work opening intercommunication of horizontal pipeline.
In practical application, the horizontal pipeline can be various large-size pipelines such as a ventilation pipe, a fire-fighting smoke exhaust pipe, a heating pipe, an air-conditioning refrigerant pipe and the like; the working opening is provided with different branch pipes according to the requirements of the application.
Drawings
FIG. 1 is a schematic structural view of example 1;
FIG. 2 is a schematic structural view of example 2;
FIG. 3 is a schematic structural view of embodiment 3;
FIG. 4 is a schematic structural diagram of embodiment 1 from a first perspective;
fig. 5 is a schematic structural diagram of embodiment 1 from a second perspective.
Detailed Description
The present invention will be further described with reference to the following examples and the accompanying drawings.
Example 1:
as shown in fig. 1, a parking garage with intensive large-size pipelines comprises a parking garage body, wherein a plurality of partition walls 1 are arranged in the parking garage body, the partition walls 1 divide the parking garage body into a plurality of fire-proof areas, at least two groups of horizontal pipelines 2 which are parallel to each other are arranged between every two adjacent fire-proof areas in a centralized manner, the two groups of horizontal pipelines 2 which are parallel to each other are respectively arranged on two sides of the partition walls 1, all the horizontal pipelines 2 are arranged at intervals from top to bottom, the two groups of horizontal pipelines 2 which are adjacent from top to bottom are overlapped in the horizontal direction, working openings are respectively arranged on the pipe walls of the horizontal pipelines 2, the two adjacent fire-proof areas are in one-to-one correspondence with the two horizontal pipelines 2, and the working openings of the horizontal pipelines 2 face the fire-proof areas corresponding to the fire-proof areas.
As a more specific technical solution, the partition wall 1 comprises a vertically arranged upper wall part 11 and a vertically arranged lower wall part 12, the upper wall part 11 and the lower wall part 12 are horizontally arranged in a staggered manner, and the lower part of the upper wall part 11 and the upper part of the lower wall part 12 are connected through a turning part 13;
an on-pipeline mounting area is formed above the turning part 13, and an off-pipeline mounting area is formed below the turning part 13; the horizontal pipeline 2 is installed in the pipeline upper installation area and the pipeline lower installation area, respectively.
Example 2:
as shown in fig. 2, a parking garage with intensive large-size pipelines comprises a parking garage body, wherein a plurality of partition walls 1 are arranged in the parking garage body, the parking garage body is divided into a plurality of fire-proof areas by the partition walls 1, at least two groups of horizontal pipelines 2 which are parallel to each other are arranged between every two adjacent fire-proof areas in a centralized manner, the two groups of horizontal pipelines 2 which are parallel to each other are respectively positioned at the same side of the partition walls 1, all the horizontal pipelines 2 are arranged at intervals from top to bottom, the two groups of horizontal pipelines 2 which are adjacent from top to bottom are overlapped in the horizontal direction, working openings are respectively arranged on the pipe walls of the horizontal pipelines 2, the two adjacent fire-proof areas are in one-to-one correspondence with the two horizontal pipelines 2, and the working openings of the horizontal pipelines 2 face the corresponding fire-proof areas.
The partition wall 1 is provided with a through hole 1a, and the through hole 1a corresponds to and is communicated with the working opening on the pipe wall of the group of horizontal pipelines 2; when the horizontal pipeline 2 is attached to the partition wall 1 and the through hole 1a is close to and closely attached to the working opening, the through hole 1a is directly communicated with the working opening correspondingly; when there is a certain distance between the horizontal pipe 2 and the partition wall 1, the through-hole 1a and the working opening are connected by a pipe.
Example 3:
as shown in fig. 3, a parking garage with intensive large-size pipelines comprises a parking garage body, wherein a plurality of partition walls 1 are arranged in the parking garage body, the parking garage body is divided into a plurality of fireproof areas by the partition walls 1, and at least two groups of horizontal pipelines 2 which are parallel to each other are arranged between two adjacent fireproof areas in a centralized manner;
A plurality of through holes 1a are formed in the wall surface of the partition wall 1, the through holes 1a respectively communicate the interior of the partition wall 1 with the fireproof areas on two sides of the partition wall 1, and are communicated with the corresponding working openings through the through holes 1 a; when the distance between the through hole 1a and the corresponding working opening is close enough, the through hole and the working opening are directly attached and communicated; when the through hole 1a is at a certain distance from the corresponding working opening, the two are communicated through a pipeline.
In the above embodiments 1, 2 and 3, the horizontal pipeline 2 is either a smoke exhaust pipe, an air inlet pipe or a heating pipe, or other large-sized pipelines; according to the specific type of the horizontal pipeline 2, the working openings are used for connecting various adaptive functional branch pipes, such as a smoke exhaust branch pipe and an air inlet branch pipe.
Example 4:
as shown in fig. 4 and 5, a parking garage with intensive large-size pipelines comprises a parking garage body, wherein a plurality of partition walls 1 are arranged in the parking garage body, the parking garage body is divided into a plurality of fire-proof areas by the partition walls 1, at least two groups of horizontal pipelines 2 which are parallel to each other are arranged between two adjacent fire-proof areas in a centralized manner, the two groups of horizontal pipelines 2 which are parallel to each other are respectively arranged on two sides of the partition walls 1, all the horizontal pipelines 2 are arranged at intervals from top to bottom, the two groups of horizontal pipelines 2 which are adjacent from top to bottom are overlapped in the horizontal direction, working openings are respectively arranged on the pipe walls of the horizontal pipelines 2, the two adjacent fire-proof areas are in one-to-one correspondence with the two horizontal pipelines 2, and the working openings of the horizontal pipelines 2 face the fire-proof areas corresponding to the fire-proof areas.
The partition wall 1 includes, but is not limited to, a broken line type partition wall, an oblique line type partition wall; take a broken line type partition wall as an example: the partition wall 1 comprises a vertically arranged wall upper part 11 and a vertically arranged wall lower part 12, the wall upper part 11 and the wall lower part 12 are horizontally arranged in a staggered manner, and the lower part of the wall upper part 11 is connected with the upper part of the wall lower part 12 through a turning part 13; an on-pipeline mounting area is formed above the turning part 13, and an under-pipeline mounting area is formed below the turning part 13; the horizontal pipeline 2 is installed in the pipeline upper installation area and the pipeline lower installation area, respectively.
The horizontal pipeline 2 positioned in the pipeline upper installation area is connected with a plurality of upper air pipes 21, all the upper air pipes 21 are distributed along the length direction of the horizontal pipeline 2, the upper air pipes 21 are horizontally arranged, and the upper air pipes 21 are positioned at the top of the parking garage body. One end of the upper air pipe 21 is connected with the corresponding working opening of the horizontal pipeline 2, and the other end of the upper air pipe 21 is provided with a ventilation window;
the horizontal pipeline 2 in the pipeline lower installation area is connected with a plurality of lower air pipes 22, all the lower air pipes 22 are distributed along the length direction of the horizontal pipeline 2, the lower air pipes 22 are vertically arranged, the lower ends of the lower air pipes 22 are connected with corresponding working openings of the horizontal pipeline 2, the upper ends of the lower air pipes 22 extend upwards to the top of the parking garage body, and the upper ends of the lower air pipes 22 are provided with ventilation windows;
according to the practical application, the upper air duct 21 and the lower air duct 22 can be smoke exhaust ducts, and corresponding ventilation windows form smoke exhaust ports;
the upper air duct 21 and the lower air duct 22 may also be air inlet ducts, and the corresponding ventilation windows form air inlets.
Has the advantages that: adopt the utility model discloses a scheme can be in same layer underground space, concentrates the jumbo size pipeline to arrange in partition wall divided space region to make these jumbo size pipelines serve adjacent fire prevention subregion/unit respectively. The parking garage layer height is easier to control, beneficial influence is generated on ground garage cost control, and improvement of underground space quality and better use experience are facilitated due to the fact that the large-size pipeline laying range is reduced.
Finally, it should be noted that the above description is only a preferred embodiment of the present invention, and those skilled in the art can make various similar representations without departing from the spirit and scope of the present invention.
Claims (7)
1. The utility model provides a set up parking garage of intensive jumbo size pipeline, includes the garage parking body, this internal a plurality of partition walls (1) that are equipped with of garage parking, partition wall (1) will the garage parking body is separated for a plurality of fire prevention regions, its characterized in that: at least two groups of horizontal pipelines (2) which are parallel to each other are arranged between two adjacent fire-proof areas in a concentrated mode, all the horizontal pipelines (2) are arranged at intervals from top to bottom, working openings are formed in the pipe walls of the horizontal pipelines (2) respectively, and the two adjacent fire-proof areas are communicated with the working openings of the horizontal pipelines (2) respectively.
2. Parking garage provided with intensive large-scale pipelines according to claim 1, characterized in that: the two groups of the horizontal pipelines (2) adjacent to each other are mutually overlapped in the horizontal direction.
3. Parking garage provided with intensive large-scale pipelines according to claim 1, characterized in that: the horizontal pipeline (2) is either a smoke exhaust pipe, an air inlet pipe, a heating pipe or an air-conditioning refrigerant pipe.
4. Parking garage provided with intensive large-scale pipelines according to claim 1, characterized in that: the partition wall (1) comprises a vertically arranged wall upper part (11) and a vertically arranged wall lower part (12), the wall upper part (11) and the wall lower part (12) are horizontally arranged in a staggered manner, and the lower part of the wall upper part (11) is connected with the upper part of the wall lower part (12) through a turning part (13);
an on-pipeline mounting area is formed above the steering part (13), and an under-pipeline mounting area is formed below the steering part (13); the horizontal pipeline (2) is respectively installed in the pipeline upper installation area and the pipeline lower installation area.
5. Parking garage according to claim 4, characterized in that: the horizontal pipeline (2) located in the pipeline upper installation area is connected with a plurality of upper air pipes (21), all the upper air pipes (21) are distributed along the length direction of the horizontal pipeline (2), the upper air pipes (21) are horizontally arranged, one ends of the upper air pipes (21) are connected with corresponding working openings of the horizontal pipeline (2), and the other ends of the upper air pipes (21) are provided with ventilation windows;
the horizontal pipeline (2) located in the pipeline lower installation area is connected with a plurality of lower air pipes (22), all the lower air pipes (22) are distributed along the length direction of the horizontal pipeline (2), the lower air pipes (22) are vertically arranged, the lower ends of the lower air pipes (22) are connected with corresponding working openings of the horizontal pipeline (2), and the upper ends of the lower air pipes (22) are provided with ventilation windows;
the upper air pipe (21) and the lower air pipe (22) are air inlet pipes;
the upper air pipe (21) and the lower air pipe (22) are smoke exhaust pipes.
6. Parking garage provided with intensive large-scale pipelines according to claim 1, characterized in that: the novel pipeline partition is characterized in that at least two groups of parallel horizontal pipelines (2) are arranged on the same side of the partition wall (1), through holes (1 a) are formed in the partition wall (1), and the through holes (1 a) correspond to and are communicated with the working openings in the pipe wall of at least one group of horizontal pipelines (2).
7. Parking garage provided with intensive large-scale pipelines according to claim 1, characterized in that: partition wall (1) is hollow wall the inside of partition wall (1) is equipped with at least two sets of horizontal pipeline (2) that are parallel to each other be equipped with perforating hole (1 a) on the wall of partition wall (1), perforating hole (1 a) will respectively the inside of partition wall (1) with the fire prevention region intercommunication of partition wall (1) both sides, perforating hole (1 a) and corresponding the work opening intercommunication.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222786337.2U CN218406760U (en) | 2022-10-22 | 2022-10-22 | Parking garage provided with intensive large-size pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222786337.2U CN218406760U (en) | 2022-10-22 | 2022-10-22 | Parking garage provided with intensive large-size pipeline |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218406760U true CN218406760U (en) | 2023-01-31 |
Family
ID=85003389
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222786337.2U Active CN218406760U (en) | 2022-10-22 | 2022-10-22 | Parking garage provided with intensive large-size pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218406760U (en) |
-
2022
- 2022-10-22 CN CN202222786337.2U patent/CN218406760U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN218406760U (en) | Parking garage provided with intensive large-size pipeline | |
CN110863513A (en) | Multifunctional integrated node of underground comprehensive pipe gallery intersection, lifting opening and ventilation opening | |
JP2013195023A (en) | House | |
CN210562294U (en) | Underground structure of open cut tunnel and piping lane built jointly | |
CN109487824A (en) | Underground comprehensive pipe gallery | |
CN111720151B (en) | Tunnel structure with rectangular cross section | |
CN211257072U (en) | Utility tunnel ventilation unit, utility tunnel and utility tunnel system | |
CN209523225U (en) | Underground comprehensive pipe gallery | |
CN211548895U (en) | Sound insulation room capable of separating sound transmission of building structure | |
CN220705319U (en) | Three-dimensional parking system | |
CN210002440U (en) | ventilation node structure at end part of pipe gallery gas cabin | |
CN217352603U (en) | Utility tunnel ventilation system | |
CN219656240U (en) | Exhaust system of underground garage of low-type non-motor vehicle | |
CN113417316A (en) | Parking garage structure capable of saving whole space by arranging sinking pipe ditches | |
CN216787961U (en) | Cross-floor parking garage and building | |
JPH0545737B2 (en) | ||
JPH062445A (en) | Structure of arrangement of installed equipment in residence | |
CN218296123U (en) | Air-conditioning pipeline system for subway station | |
CN219138536U (en) | Skip-floor garage and building | |
CN216305093U (en) | Civil engineering flue convenient to pipeline installation | |
CN218292997U (en) | Underground garage capable of reducing underground two-layer height through natural smoke discharge | |
CN107882067A (en) | A kind of design and construction structure of contignation underground garage pipe gallery | |
CN216475791U (en) | Structure of metal roof hidden process pipeline | |
CN207646758U (en) | A kind of design and construction structure of contignation underground garage pipe gallery | |
CN213015639U (en) | Vertical central tube corridor parking system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |