CN214615541U - Building engineering strutting arrangement - Google Patents

Building engineering strutting arrangement Download PDF

Info

Publication number
CN214615541U
CN214615541U CN202023110618.3U CN202023110618U CN214615541U CN 214615541 U CN214615541 U CN 214615541U CN 202023110618 U CN202023110618 U CN 202023110618U CN 214615541 U CN214615541 U CN 214615541U
Authority
CN
China
Prior art keywords
clamping plate
plate
wall body
prefabricated wall
splint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202023110618.3U
Other languages
Chinese (zh)
Inventor
王啸阳
贾虹霞
何小飞
朱丽
谢万德
郭玉刚
杨春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202023110618.3U priority Critical patent/CN214615541U/en
Application granted granted Critical
Publication of CN214615541U publication Critical patent/CN214615541U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to the technical field of prefabricated wall body support, and discloses a building engineering support device, which comprises a support plate, a clamp plate A, a clamp plate B, a prefabricated wall body, a support rod A, a support rod B and a fixed plate; the horizontal level in prefabricated wall body bottom is provided with the floor, floor top left side is provided with the backup pad, the perpendicular fixed mounting in backup pad top right side has the dead lever, the prefabricated wall body left and right sides is vertical splint B and the splint A of being provided with respectively, vertically between splint A and the splint B be provided with the fixed plate, the fixed plate middle part is rotated and is run through there is two-way threaded rod. The utility model discloses at the in-process of in-service use, need not punch fixed mounting on prefabricated wall body and floor, the damage of wall body and floor that can effectually avoid the support of prefabricated wall body to lead to, and the centre gripping is fixed to prefabricated wall body that this device can be convenient, has made things convenient for the support work of prefabricated wall body greatly.

Description

Building engineering strutting arrangement
Technical Field
The utility model relates to a prefabricated wall body supports technical field, specifically is a building engineering strutting arrangement.
Background
The prefabricated wall is a reinforced concrete plate-type member processed and manufactured in a prefabrication plant or a construction site for building assembly. The prefabricated concrete wallboard is adopted to build the assembled large-plate building, so that the factory and mechanical construction degree can be improved, the field wet operation is reduced, the field labor is saved, the seasonal influence is overcome, and the building construction period is shortened.
The in-process of installing the building in the prefabricated wall body needs earlier to support the prefabricated wall body with strutting arrangement, avoids the prefabricated wall body to collapse in the work progress, but current strutting arrangement is carrying out the in-process that supports the prefabricated wall body, need punch the installation on floor and prefabricated wall body, can cause the destruction to floor and prefabricated wall body, and the installation is not convenient enough moreover.
In order to solve the problem, the utility model provides a building engineering strutting arrangement.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building engineering strutting arrangement has solved the problem that proposes among the background art.
In order to achieve the above object, the utility model provides a following technical scheme: a supporting device for building engineering comprises a supporting plate, a clamping plate A, a clamping plate B, a prefabricated wall body, a supporting rod A, a supporting rod B and a fixing plate;
the prefabricated wall is characterized in that a floor slab is horizontally arranged at the bottom of the prefabricated wall in the transverse direction, a supporting plate is arranged on the left side of the top of the floor slab, a fixing rod is vertically and fixedly arranged on the right side of the top of the supporting plate, a clamping plate B and a clamping plate A are vertically arranged on the left side of the prefabricated wall respectively, a fixing plate is vertically arranged between the clamping plate A and the clamping plate B, a two-way threaded rod penetrates through the middle part of the top of the fixing plate in a rotating manner, the two-way threaded rod penetrates through the middle parts of the front sides of the clamping plate A and the clamping plate B in a rotating manner respectively, limiting slide rods are transversely and fixedly arranged on the left side surface and the right side surface of the fixing plate, anti-skid rubber pads are fixedly arranged on the opposite side surfaces of the clamping plate A and the clamping plate B respectively, the clamping plate A and the clamping plate B are respectively two groups, connecting plates are fixedly arranged in the middle parts of the left side surfaces of the two groups of the clamping plate B, and are respectively and rotatably connected with the right ends of a supporting rod A and a supporting rod B through a connecting shaft A, the left ends of the support rod A and the support rod B are rotatably connected with the fixed rod through a connecting shaft B.
As an optimized embodiment of the utility model, the vertical fixed mounting in backup pad top has the baffle, the baffle specifically is five groups.
As a preferred embodiment of the present invention, the two ends of the bidirectional threaded rod are fixedly installed with a turntable.
As a preferred embodiment of the present invention, the two-way threaded rod is respectively connected to the clamp plate a and the clamp plate B by threads.
As a preferred embodiment of the present invention, two sets of the limit sliding rods respectively transversely slide through the clamp plate a and the clamp plate B.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model relates to a building engineering strutting arrangement, this device is relative with current prefabricated wall body strutting arrangement, and this device need not punch fixed mounting on prefabricated wall body and floor at the in-process of in-service use, can effectually avoid the damage of the wall body that the support of prefabricated wall body leads to and floor, and what this device can be convenient fixes the centre gripping to prefabricated wall body, has made things convenient for the support work of prefabricated wall body greatly.
Drawings
Other features, objects and advantages of the invention will become more apparent upon reading of the detailed description of non-limiting embodiments with reference to the following drawings:
fig. 1 is a front view of a support device for construction works according to the present invention;
fig. 2 is a top view of a support device for construction work according to the present invention;
fig. 3 is a front sectional view of the fixing plate, the two-way threaded rod, the limiting slide rod, the clamping plate a and the clamping plate B of the supporting device for constructional engineering.
In the figure: 1. a floor slab; 2. a splint A; 3. a turntable; 4. a limiting slide bar; 5. an anti-skid rubber pad; 6. prefabricating a wall body; 7. a fixing plate; 8. a connecting plate; 9. connecting the shaft A; 10. a support rod A; 11. a support bar B; 12. a connecting shaft B; 13. fixing the rod; 14. a support plate; 15. a partition plate; 16. a bidirectional threaded rod; 17. and (4) a splint B.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
In the description of the present invention, it is to be understood that the terms "center", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are merely for convenience of description and for simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the description of the present invention, it should be noted that, unless explicitly stated or limited otherwise, the terms "mounted," "connected" and "disposed" are to be interpreted broadly, and may be, for example, fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed; the utility model discloses in the model of providing with electrical apparatus only supplies the reference, to the ordinary technical personnel in this field, can change the different models that the function is the same according to the in service use condition and use electrical apparatus, to the ordinary technical personnel in this field, can the particular case understand that above-mentioned term is in the utility model provides a concrete meaning.
Referring to fig. 1-3, the present invention provides a technical solution: a constructional engineering supporting device comprises a supporting plate 14, a clamping plate A2, a clamping plate B17, a prefabricated wall body 6, a supporting rod A10, a supporting rod B11 and a fixing plate 7;
the prefabricated wall body 6 bottom is transversely provided with floor 1 horizontally, floor 1 top left side is provided with backup pad 14, the perpendicular fixed mounting in backup pad 14 top right side has dead lever 13, prefabricated wall body 6 left and right sides is the vertical splint B17 and splint A2 of being provided with respectively, vertically between splint A2 and the splint B17 be provided with fixed plate 7, fixed plate 7 middle part is rotated and is run through two-way threaded rod 16, two-way threaded rod 16 transversely rotates respectively and runs through splint A2 and splint B17 front side middle part, fixed plate 7 left and right sides face all transversely fixed mounting has spacing slide bar 4, splint A2 and splint B17 opposite side all fixed mounting have anti-skidding rubber pad 5, splint A2 and splint B17 specifically are two sets of, two sets of splint B17 left side middle part all fixed mounting have connecting plate 8, two sets of connecting plate 8 all rotates with bracing piece A10 and bracing piece B11 right-hand member through connecting axle A9 respectively and is connected, the left ends of the supporting rod A10 and the supporting rod B11 are rotatably connected with the fixed rod 13 through a connecting shaft B12.
Please refer to fig. 1 in this embodiment, the clamping plates B17 and a2 are respectively placed on the left and right sides of the prefabricated wall 6, then the two-way threaded rod 16 is rotated by the turntable 3, the two-way threaded rod 16 drives the clamping plate a2 and the clamping plate B17 to move by rotation, so that the clamping plates a2 and B17 tightly clamp the prefabricated wall 6 through the anti-skid rubber pads 5, then sand bags or bricks are stacked between the partition plates 15 at the top of the supporting plate 14, and then the installation of the device can be completed, so that the device can support the prefabricated wall 6.
Referring to fig. 1 in this embodiment, the top of the supporting plate 14 is vertically and fixedly provided with five groups of partition plates 15, the partition plates 15 stack sand bags and bricks on the top of the supporting plate 14, and the partition plates 15 can limit and support the sand bags and the bricks.
In this embodiment, referring to fig. 1, two ends of the bidirectional threaded rod 16 are fixedly provided with the rotating discs 3, and the bidirectional threaded rod 16 can be conveniently rotated by the rotating discs 3.
In this embodiment, referring to fig. 1, the two-way threaded rod 16 is respectively in threaded connection with the clamping plate a2 and the clamping plate B17, and the rotation of the two-way threaded rod 16 can drive the clamping plate a2 and the clamping plate B17 to move.
In this embodiment, referring to fig. 1, two sets of the limiting slide bars 4 respectively transversely slide through the clamping plate a2 and the clamping plate B17, and the limiting slide bars 4 can limit the movement of the clamping plate a2 and the clamping plate B17.
The utility model relates to a supporting device for construction engineering, which comprises a supporting device 1 and a floor slab; 2. a splint A; 3. a turntable; 4. a limiting slide bar; 5. an anti-skid rubber pad; 6. prefabricating a wall body; 7. a fixing plate; 8. a connecting plate; 9. connecting the shaft A; 10. a support rod A; 11. a support bar B; 12. a connecting shaft B; 13. fixing the rod; 14. a support plate; 15. a partition plate; 16. a bidirectional threaded rod; 17. the splint B, the components are all standard or known to those skilled in the art, and their structure and principle are known to those skilled in the art through technical manuals or through routine experimentation.
Theory of operation, during the use, place splint B17 and splint A2 respectively in prefabricated wall 6's the left and right sides, then rotate two-way threaded rod 16 through carousel 3, two-way threaded rod 16 drives splint A2 and splint B17 through rotating and removes, make splint A2 and splint B17 tightly centre gripping post with prefabricated wall 6 through anti-skidding rubber pad 5, then stack sand bag or fragment of brick between the baffle 15 at backup pad 14 top, then just can accomplish the installation of this device, make this device can provide the support to prefabricated wall 6.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above, it will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, but that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (5)

1. A supporting device for constructional engineering is characterized by comprising a supporting plate (14), a clamping plate A (2), a clamping plate B (17), a prefabricated wall body (6), a supporting rod A (10), a supporting rod B (11) and a fixing plate (7);
the prefabricated wall body (6) is characterized in that a floor slab (1) is horizontally arranged at the bottom of the prefabricated wall body (6) in the transverse direction, a supporting plate (14) is arranged on the left side of the top of the floor slab (1), a fixing rod (13) is fixedly and vertically arranged on the right side of the top of the supporting plate (14), a clamping plate B (17) and a clamping plate A (2) are vertically arranged on the left side and the right side of the prefabricated wall body (6) respectively, a fixing plate (7) is vertically arranged between the clamping plate A (2) and the clamping plate B (17), a bidirectional threaded rod (16) penetrates through the middle of the fixing plate (7) in a rotating mode, the bidirectional threaded rod (16) penetrates through the middle of the front sides of the clamping plate A (2) and the clamping plate B (17) in a rotating mode respectively in the transverse mode, limiting sliding rods (4) are fixedly arranged on the left side and the right side faces of the fixing plate (7), anti-skid rubber pads (5) are fixedly arranged on opposite sides of the clamping plate A (2) and the clamping plate B (17), splint A (2) and splint B (17) specifically are two sets ofly, and are two sets of splint B (17) left surface middle part equal fixed mounting has connecting plate (8), and is two sets of connecting plate (8) all rotate with bracing piece A (10) and bracing piece B (11) right-hand member respectively through connecting axle A (9) and are connected, bracing piece A (10) and bracing piece B (11) left end all rotate with dead lever (13) through connecting axle B (12) and are connected.
2. A construction work support device according to claim 1, wherein: the vertical fixed mounting in backup pad (14) top has baffle (15), baffle (15) are specifically five groups.
3. A construction work support device according to claim 1, wherein: and two ends of the bidirectional threaded rod (16) are fixedly provided with turntables (3).
4. A construction work support device according to claim 1, wherein: the bidirectional threaded rod (16) is in threaded connection with the clamping plate A (2) and the clamping plate B (17) respectively.
5. A construction work support device according to claim 1, wherein: the two groups of limiting slide rods (4) respectively transversely slide to penetrate through the clamping plate A (2) and the clamping plate B (17).
CN202023110618.3U 2020-12-22 2020-12-22 Building engineering strutting arrangement Expired - Fee Related CN214615541U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023110618.3U CN214615541U (en) 2020-12-22 2020-12-22 Building engineering strutting arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023110618.3U CN214615541U (en) 2020-12-22 2020-12-22 Building engineering strutting arrangement

Publications (1)

Publication Number Publication Date
CN214615541U true CN214615541U (en) 2021-11-05

Family

ID=78431227

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023110618.3U Expired - Fee Related CN214615541U (en) 2020-12-22 2020-12-22 Building engineering strutting arrangement

Country Status (1)

Country Link
CN (1) CN214615541U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115162758A (en) * 2022-08-29 2022-10-11 威信广厦模块住宅工业有限公司 Assembled building wall strutting arrangement
CN115199067A (en) * 2022-07-28 2022-10-18 山东舜林建设有限公司 Strutting arrangement is used in construction of wall in assembly type structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115199067A (en) * 2022-07-28 2022-10-18 山东舜林建设有限公司 Strutting arrangement is used in construction of wall in assembly type structure
CN115162758A (en) * 2022-08-29 2022-10-11 威信广厦模块住宅工业有限公司 Assembled building wall strutting arrangement

Similar Documents

Publication Publication Date Title
CN214615541U (en) Building engineering strutting arrangement
CN210737787U (en) Assembled building embedded part
CN212863821U (en) Precast concrete wallboard lifting device
CN213595809U (en) A handling device for cement pipe removes
CN214302988U (en) Building structure design roof beam reinforced structure
CN113561292A (en) Building template capable of achieving vibration leveling and facilitating component demolding
CN211201998U (en) Template support device for sliding system upright post
CN210086838U (en) Vibration leveling device for removing concrete pouring bubbles
CN216594063U (en) Precast concrete wallboard shock resistance detection device
CN202359736U (en) Energy-dissipation vibration-reduction multi-ribbed composite wallboard made of low-yield-point steel
CN213195400U (en) A reinforcing bar bending device for civil engineering building
CN110555505B (en) High-efficient reinforcing bar counting machine
CN212294717U (en) Civil engineering fundamental mode mounting fixture
CN107642247A (en) A kind of fixture, bricklaying robot and its control method for building top skin brick
CN211676191U (en) Composite material rock climbing plate
CN202765518U (en) Steel bar support frame
CN212428121U (en) Prefabricated wall body moving and supporting device for bottom connection of prefabricated building
CN207436520U (en) A kind of fixture and its bricklaying robot for building top skin brick
CN215514956U (en) Vertical transportation support of wind-powered electricity generation prestressed anchorage board
CN217326572U (en) Pin-connected panel shear force wall fixing device for building that support nature is strong
CN217631476U (en) Reinforced structure is built in antidetonation type room
CN219840662U (en) Lining trolley
CN216000989U (en) High-efficient brick cutting machine for construction
CN219885627U (en) Turning device and whole prefabricated box culvert tipping arrangement
CN218149751U (en) Oversized template beam supporting system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211105