CN214614627U - Civil engineering construction pre-buried equipment - Google Patents

Civil engineering construction pre-buried equipment Download PDF

Info

Publication number
CN214614627U
CN214614627U CN202120588844.8U CN202120588844U CN214614627U CN 214614627 U CN214614627 U CN 214614627U CN 202120588844 U CN202120588844 U CN 202120588844U CN 214614627 U CN214614627 U CN 214614627U
Authority
CN
China
Prior art keywords
block
buried
sides
fixed
civil engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120588844.8U
Other languages
Chinese (zh)
Inventor
沈小芹
朱菁
肖长永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202120588844.8U priority Critical patent/CN214614627U/en
Application granted granted Critical
Publication of CN214614627U publication Critical patent/CN214614627U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a civil engineering construction pre-buried equipment, including main part, pre-buried pipe, built-in plate and fixed block, the pre-buried pipe is all installed to the both sides of main part bottom, the top of pre-buried pipe all is provided with fixed knot constructs, fixed knot constructs including settling tank, fastening screw rod, block rubber, expanding spring and connecting block, the top at the pre-buried pipe is all installed to the settling tank, expanding spring is all installed to the both sides on the inside top of settling tank, and expanding spring's top and bottom all are fixed with the block rubber, the connecting block is all installed to the inside of settling tank, and fastening screw rod is all installed to the both sides of connecting block. The utility model discloses a handle at installation of main part top both sides, rotatory handle, including under the effect of screw thread, the threaded rod removes about the internal screw thread direction to can adjust the position of fixed block, make things convenient for the equipment fixing of different widths, easy operation is convenient for adjust.

Description

Civil engineering construction pre-buried equipment
Technical Field
The utility model relates to a civil engineering technical field specifically is a civil engineering pre-buried equipment.
Background
Along with the rapid development of civil engineering construction trade, the demand to various equipment instrument also constantly increases, in the civil engineering construction, in order to guarantee the safety and stability, need fix the inside at the concrete earlier with the built-in fitting, then install required equipment on the built-in fitting, can increase the stability of this equipment like this, common is to use the built-in panel to carry out pre-buried operation:
traditional pre-buried equipment is not convenient for fix during the use, influences the installation and the dismantlement of built-in fitting, has reduced the installation effectiveness of built-in fitting to a certain extent, has reduced the result of use.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a civil engineering pre-buried equipment to it is not convenient for fixed problem to provide pre-buried equipment in solving above-mentioned background.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a pre-buried equipment of civil engineering, includes main part, pre-buried pipe, pre-buried board and fixed block, the pre-buried pipe is all installed to the both sides of main part bottom, the top of pre-buried pipe all is provided with fixed knot and constructs, fixed knot constructs including resettlement groove, fastening screw column, block rubber, expanding spring and connecting block, the resettlement groove is all installed at the top of pre-buried pipe, the expanding spring is all installed to the both sides of the inside top of resettlement groove, and the block rubber is all fixed with to top and the bottom of expanding spring, the inside of resettlement groove all is installed the connecting block, and the fastening screw column is all installed to the both sides of connecting block, the both sides of one end of pre-buried pipe are all fixed with the draw-in groove, the pre-buried board is all installed to the bottom of pre-buried pipe, and the both sides of pre-buried board top are all articulated to have the auxiliary rod, the top of auxiliary rod one side all is installed the fixture block, the top of main part is connected with the spout, the fixed block is all installed to the both sides on main part top, and the bottom of fixed block all is fixed with the slider, one side of fixed block all is provided with the regulation structure.
Preferably, adjust the structure including handle, stopper, threaded rod and internal thread, one side at the fixed block is all installed to the threaded rod, one side of threaded rod all is connected with the handle, the stopper is all installed in the outside of threaded rod, the internal thread is evenly installed to the inside of stopper.
Preferably, the bottom end of the limiting block is connected with the top end of the main body, and the limiting blocks are symmetrically distributed about the vertical center of the main body.
Preferably, the clamping block is arranged in a J shape, and the clamping block and the clamping groove form a clamping structure.
Preferably, the extension springs are symmetrically arranged, and the extension springs and the embedded pipes form an extension structure.
Preferably, the outer diameter of the sliding block is smaller than the inner diameter of the sliding groove, and the sliding block and the sliding groove form a sliding structure.
Compared with the prior art, the beneficial effects of the utility model are that: this pre-buried equipment of civil engineering is rational in infrastructure, has following advantage:
(1) the connecting block can fix the embedded pipe through the connecting block arranged at the top end of the embedded pipe, the embedded pipe is inserted into the arranging groove, the embedded pipe penetrates through the connecting block, the rubber block and the telescopic spring are mutually contracted, the fastening screw rod is screwed up, the connecting block is clamped on the embedded pipe, and the embedded pipe can be fixed at the bottom end of the main body;
(2) the handles are arranged on the two sides of the top end of the main body, the handles are rotated, and the threaded rod moves left and right along the direction of the internal thread under the action of the internal thread, so that the position of the fixed block can be adjusted, equipment with different widths can be conveniently installed, the operation is simple, and the adjustment is convenient;
(3) through the draw-in groove at buried tub one end both sides installation in advance, draw-in groove and auxiliary rod block, alright fix the auxiliary rod, reduce the space, convenient storage pulls the auxiliary rod, and the auxiliary rod loosens each other with the draw-in groove and takes off, alright put down the auxiliary rod, can increase the area of contact of buried plate concrete in advance, reinforcing stability.
Drawings
Fig. 1 is a schematic front view of the present invention;
fig. 2 is a schematic view of the front cross-sectional structure of the adjusting structure of the present invention;
FIG. 3 is a schematic view of a partial structure of the fixing structure of the present invention;
fig. 4 is an enlarged schematic structural diagram of a in fig. 1 according to the present invention.
In the figure: 1. an adjustment structure; 101. a handle; 102. a limiting block; 103. a threaded rod; 104. an internal thread; 2. a main body; 3. pre-burying a pipe; 4. a clamping block; 5. pre-burying a plate; 6. an auxiliary lever; 7. a card slot; 8. a fixed structure; 801. a placing groove; 802. a fastening screw rod; 803. a rubber block; 804. a tension spring; 805. connecting blocks; 9. a slider; 10. a chute; 11. and (5) fixing blocks.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides an embodiment: a civil engineering construction embedded device comprises a main body 2, an embedded pipe 3, an embedded plate 5 and a fixing block 11, wherein the embedded pipe 3 is arranged on two sides of the bottom end of the main body 2, the top end of the embedded pipe 3 is provided with a fixing structure 8, the fixing structure 8 comprises an arranging groove 801, a fastening screw hole 802, a rubber block 803, an expansion spring 804 and a connecting block 805, the arranging groove 801 is arranged on the top end of the embedded pipe 3, the expansion spring 804 is arranged on two sides of the top end in the arranging groove 801, the rubber block 803 is fixed on the top end and the bottom end of the expansion spring 804, the connecting block 805 is arranged in the arranging groove 801, the fastening screw hole 802 is arranged on two sides of the connecting block 805, the expansion spring 804 is symmetrically arranged, the expansion spring 804 and the embedded pipe 3 form an expansion structure, the embedded pipe 3 is inserted into the arranging groove 801, the embedded pipe 3 penetrates through the connecting block 805, and the rubber block 803 and the expansion spring 804 are mutually contracted, the fastening screw 802 is screwed down to clamp the connecting block 805 on the embedded pipe 3, so that the embedded pipe 3 can be fixed at the bottom end of the main body 2;
clamping grooves 7 are fixed on two sides of one end of the pre-buried pipe 3, a pre-buried plate 5 is installed at the bottom end of the pre-buried pipe 3, auxiliary rods 6 are hinged to two sides of the top end of the pre-buried plate 5, clamping blocks 4 are installed at the top end of one side of each auxiliary rod 6, the clamping blocks 4 are arranged in a J shape, the clamping blocks 4 and the clamping grooves 7 form a clamping structure, when the pre-buried plate 5 is installed, the auxiliary rods 6 are pulled, the auxiliary rods 6 and the clamping grooves 7 are mutually loosened, the auxiliary rods 6 can be put down, the contact area of concrete of the pre-buried plate 5 can be increased, and the stability is enhanced;
the top end of the main body 2 is connected with a sliding chute 10, the two sides of the top end of the main body 2 are respectively provided with a fixed block 11, the bottom ends of the fixed blocks 11 are respectively fixed with a sliding block 9, the outer diameter of the sliding block 9 is smaller than the inner diameter of the sliding chute 10, and the sliding block 9 and the sliding chute 10 form a sliding structure so as to be convenient to move;
one side of fixed block 11 all is provided with adjusts structure 1, adjust structure 1 including handle 101, stopper 102, threaded rod 103 and internal thread 104, one side at fixed block 11 is all installed to threaded rod 103, one side of threaded rod 103 all is connected with handle 101, stopper 102 is all installed in the outside of threaded rod 103, stopper 102's inside evenly installed has internal thread 104, stopper 102's bottom is connected with the top of main part 2, stopper 102 is about the vertical center symmetric distribution of main part 2, rotatory handle 101, under the effect of internal thread 104, threaded rod 103 moves about the direction of internal thread 104, thereby can adjust the position of fixed block 11, make things convenient for the equipment fixing of different width.
The working principle is as follows: when in use, firstly, the embedded pipe 3 is inserted into the placing groove 801, the embedded pipe 3 passes through the connecting block 805, the rubber block 803 and the extension spring 804 are mutually contracted, the fastening screw 802 is screwed down, the connecting block 805 is clamped on the embedded pipe 3, and the embedded pipe 3 can be fixed at the bottom end of the main body 2;
then, when the embedded plate 5 is installed, the auxiliary rod 6 is pulled, the auxiliary rod 6 and the clamping groove 7 are loosened, the auxiliary rod 6 can be put down, the contact area of the concrete of the embedded plate 5 can be increased, and the stability is enhanced;
finally, the handle 101 is rotated, and under the action of the internal thread 104, the threaded rod 103 moves left and right along the direction of the internal thread 104, so that the position of the fixed block 11 can be adjusted, and equipment with different widths can be conveniently installed.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a pre-buried equipment of civil engineering, includes main part (2), buried pipe (3), pre-buried board (5) and fixed block (11), its characterized in that: the embedded pipe is characterized in that the embedded pipes (3) are mounted on two sides of the bottom end of the main body (2), the top ends of the embedded pipes (3) are provided with fixing structures (8), each fixing structure (8) comprises a placement groove (801), a fastening screw hole (802), a rubber block (803), an expansion spring (804) and a connecting block (805), the placement grooves (801) are mounted at the top ends of the embedded pipes (3), the expansion springs (804) are mounted on two sides of the top end inside the placement grooves (801), the rubber blocks (803) are fixed at the top ends and the bottom ends of the expansion springs (804), the connecting blocks (805) are mounted inside the placement grooves (801), the fastening screw holes (802) are mounted on two sides of the connecting blocks (805), clamping grooves (7) are fixed on two sides of one end of each embedded pipe (3), and embedded plates (5) are mounted at the bottom ends of the embedded pipes (3), and the both sides on pre-buried board (5) top all articulate there is auxiliary rod (6), fixture block (4) are all installed on the top of auxiliary rod (6) one side, the top of main part (2) is connected with spout (10), fixed block (11) are all installed to the both sides on main part (2) top, and the bottom of fixed block (11) all is fixed with slider (9), one side of fixed block (11) all is provided with adjusts structure (1).
2. The civil engineering pre-buried equipment of claim 1, characterized in that: adjust structure (1) including handle (101), stopper (102), threaded rod (103) and internal thread (104), one side at fixed block (11) is all installed in threaded rod (103), one side of threaded rod (103) all is connected with handle (101), stopper (102) are all installed in the outside of threaded rod (103), the inside evenly mounted of stopper (102) has internal thread (104).
3. The civil engineering pre-buried equipment of claim 2, characterized in that: the bottom end of the limiting block (102) is connected with the top end of the main body (2), and the limiting block (102) is symmetrically distributed relative to the vertical center of the main body (2).
4. The civil engineering pre-buried equipment of claim 1, characterized in that: the clamping block (4) is arranged in a J shape, and the clamping block (4) and the clamping groove (7) form a clamping structure.
5. The civil engineering pre-buried equipment of claim 1, characterized in that: the telescopic springs (804) are symmetrically arranged, and the telescopic springs (804) and the embedded pipe (3) form a telescopic structure.
6. The civil engineering pre-buried equipment of claim 1, characterized in that: the outer diameter of the sliding block (9) is smaller than the inner diameter of the sliding groove (10), and the sliding block (9) and the sliding groove (10) form a sliding structure.
CN202120588844.8U 2021-03-23 2021-03-23 Civil engineering construction pre-buried equipment Expired - Fee Related CN214614627U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120588844.8U CN214614627U (en) 2021-03-23 2021-03-23 Civil engineering construction pre-buried equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120588844.8U CN214614627U (en) 2021-03-23 2021-03-23 Civil engineering construction pre-buried equipment

Publications (1)

Publication Number Publication Date
CN214614627U true CN214614627U (en) 2021-11-05

Family

ID=78396292

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120588844.8U Expired - Fee Related CN214614627U (en) 2021-03-23 2021-03-23 Civil engineering construction pre-buried equipment

Country Status (1)

Country Link
CN (1) CN214614627U (en)

Similar Documents

Publication Publication Date Title
CN203755117U (en) Equipment device for improving slip-form paver
CN213710365U (en) Connecting and locking device for building template
CN214614627U (en) Civil engineering construction pre-buried equipment
CN103669850B (en) A kind of fastening devices of external angle formwork
CN113882438B (en) Buried water stop fixing device in deformation joint of end of pipe gallery bottom plate and construction method
CN209370791U (en) A kind of communication apparatus mounting rack
CN213653730U (en) Drainage pipeline dredging device
CN115370141B (en) Water pipe well reservation sleeve pipe positioning die in building
CN209979626U (en) Soil and water conservation water erosion monitoring device convenient to fix and monitoring angle is adjustable
CN210420937U (en) Highway bridge is with adjustable limit for width limit for height device
CN209384469U (en) A kind of Curtain wall frame fixation kit
CN216239836U (en) Device for high-precision positioning of embedded part of reinforced concrete structure
CN215482152U (en) Highway engineering concrete placement is with strutting arrangement
CN207435906U (en) For the bracket of bridge construction
CN212691068U (en) A mount pad for FRP pipe installation
CN206971267U (en) The mobile device of underground pipe gallery formwork
CN218405102U (en) Box culvert pouring supporting structure
CN215789494U (en) Reinforcing apparatus for bridge construction equipment
CN214845953U (en) Optical cable wiring device of underground communication optical cable trench
CN218912359U (en) Support device for subway building construction
CN218814205U (en) Municipal pipe network fluting pipe laying structure
CN219102230U (en) Pipeline stabilizing device for municipal works
CN219794650U (en) Adjustable lintel formwork device
CN219888893U (en) Pipeline supporting device for water supply and drainage
CN217678475U (en) Slip form construction device for engineering super-high ditch

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211105

CF01 Termination of patent right due to non-payment of annual fee