CN214614374U - Water intercepting and draining device for temporary construction - Google Patents

Water intercepting and draining device for temporary construction Download PDF

Info

Publication number
CN214614374U
CN214614374U CN202023217010.0U CN202023217010U CN214614374U CN 214614374 U CN214614374 U CN 214614374U CN 202023217010 U CN202023217010 U CN 202023217010U CN 214614374 U CN214614374 U CN 214614374U
Authority
CN
China
Prior art keywords
water
floor
drainage
floor drain
water intercepting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202023217010.0U
Other languages
Chinese (zh)
Inventor
金立彬
王煜伟
王伟鉴
李树久
王剑雄
杨林
李正
黄桂林
金泰羽
赵宝
曹含光
僧国凯
张�浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuhai Huazhang Engineering Management Consulting Co ltd
Original Assignee
Zhuhai Huazhang Engineering Management Consulting Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuhai Huazhang Engineering Management Consulting Co ltd filed Critical Zhuhai Huazhang Engineering Management Consulting Co ltd
Priority to CN202023217010.0U priority Critical patent/CN214614374U/en
Application granted granted Critical
Publication of CN214614374U publication Critical patent/CN214614374U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sink And Installation For Waste Water (AREA)

Abstract

The utility model discloses an interim construction water intercepting and drainage device belongs to construction technical field, and it includes the floor, the upper surface of floor is provided with the catch basin, the left surface of catch basin is provided with the drainage hose, the positive one end of drainage hose is linked together with the back of floor drain, the floor drain joint is at the upper surface of floor. This interim construction water intercepting and drainage device, through setting up the water supply riser, the drainage riser, floor drain and drainage riser, the staff lets in the construction water to the water supply riser, make the construction water concentrated in the intercepting groove, make the construction water phenomenon that trickles wantonly can not appear, make that the staff can be safe construct, simultaneously the staff can also let in rivers through hose and floor drain in to the drainage riser, make rivers row go into in the external basement water receiving tank and then carry out the dust fall to ground, the utilization ratio of interim water has been improved, the water resource has been practiced thrift.

Description

Water intercepting and draining device for temporary construction
Technical Field
The utility model belongs to the technical field of the construction, specifically be an interim construction water intercepts water and drainage device.
Background
The modern building industry controls the safe and civilized construction in the building process more and more strictly, and the requirement on the site is higher and higher, and the traditional building site often has the phenomenon that water flows suddenly when the construction is exposed to water, so that the standard of the safe and civilized construction on the construction site is difficult to achieve. The building is soaked in water for a long time, no lower foot exists, accumulated water can slowly permeate into each floor slab, the next construction is not facilitated, the safety of the structure is not facilitated, the waste of water resources is caused, a floor drain branch pipe arranged at the bottom of the existing drainage device is easily blocked, and therefore the problems are solved by using the temporary construction water interception and drainage device.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
In order to overcome prior art's above-mentioned defect, the utility model provides an interim construction water cut water and drainage device has solved for a long time and has soaked the building in aqueous, and the nowel lower limb, and ponding can slowly permeate every layer of floor on, neither does not benefit to construction on next step, also does not benefit to the safety of structure, has caused the waste of water resource simultaneously, and the problem that the floor drain branch pipe that current drainage device bottom set up is blocked easily.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: the water intercepting and draining device for temporary construction comprises a floor slab, wherein a water intercepting groove is formed in the upper surface of the floor slab, a draining hose is arranged on the left side surface of the water intercepting groove, one end of the front surface of the draining hose is communicated with the back surface of a floor drain, the floor drain is clamped on the upper surface of the floor slab, one end of the front surface of the floor drain is communicated with the back surface of a draining vertical pipe, the draining vertical pipe is arranged on the upper surface of the floor slab, and the right side surface of the floor drain is communicated with the left end of a floor drain branch pipe.
The floor drain comprises a floor drain branch pipe, a drain hole, a mounting plate, a pull rod, a filter screen, a fixing frame, a fixing plate and a fixing plate, wherein the floor drain branch pipe is arranged on the lower surface of a floor slab, the top end of the floor drain branch pipe is communicated with the drain hole, the lower surface of the inner wall of the drain hole is lapped with the mounting plate, the filter screen is arranged in the mounting plate, the upper surface of the mounting plate is fixedly connected with the lower surface of the fixing frame, the upper surface of the fixing frame is fixedly connected with the bottom end of the pull rod, the pull rod is connected in the fixing plate in a sliding mode, and the fixing plate is connected to the left side face of the inner wall of a water intercepting groove in a clamping mode.
As a further aspect of the present invention: the outer surface of the drainage hose is sleeved with a fixing sleeve, and the fixing sleeve is clamped on the left side face of the water intercepting groove.
As a further aspect of the present invention: the drainage vertical pipe is sleeved in a first sealing sleeve, the first sealing sleeve is clamped on the lower surface of the floor slab, and the drainage vertical pipe is a U-PVC pipe.
As a further aspect of the present invention: the floor drain branch pipe is sleeved in a second sealing sleeve, and the second sealing sleeve is clamped on the lower surface of the floor slab.
As a further aspect of the present invention: the bottom of the catch basin is built by four standard coal ash bricks.
As a further aspect of the present invention: the pull rod is arranged as an adjusting rod, and the water supply vertical pipe is arranged as a PPR pipe.
(III) advantageous effects
Compared with the prior art, the beneficial effects of the utility model reside in that:
1. this interim construction water intercepting and drainage device, through setting up the water supply riser, the feed pipe, the drainage riser, the floor drain branch pipe, floor drain and drainage riser, when needs utilize the water resource, the staff lets in the construction water in to the water supply riser, make rivers in the water supply riser pass through the feed pipe and discharge into in the intercepting groove, make the construction water concentrated in the intercepting groove, make the phenomenon of wantonly trickling can not appear in the construction water, make the building can not soak in the aquatic for a long time, make that the staff can be safe construct, simultaneously the staff can also let in rivers in to the drainage riser through hose and floor drain, make rivers row go into external basement water receiving incasement and then carry out the dust fall to ground, the utilization ratio of interim water has been improved, the water resource has been practiced thrift.
2. This interim construction water intercepting and drainage device through setting up mounting panel and filter screen for the filter screen can filter the filth in the rivers in the catch basin, makes this filth can not get into in the floor drain branch pipe and then block it, makes rivers in the catch basin can be smooth arrange into the drainage riser through the floor drain branch pipe.
3. This interim construction water interception and drainage device, through setting up the fixed plate, pull rod and mount, when the filter screen is blocked, the staff upwards stimulates the pull rod, make the pull rod upwards move in the fixed plate, make the pull rod pass through the mount and drive mounting panel upward movement, when the mounting panel moves suitable position, the staff clears up the dirty on filter screen surface, the staff pushes down the pull rod, make the mounting panel move to in the drain hole, and easy operation, make the staff not need with water contact alright clear up the dirty on filter screen surface.
Drawings
Fig. 1 is a schematic front view of a cross-sectional structure of the present invention;
FIG. 2 is a schematic left-side view of the cross-sectional structure of the present invention;
fig. 3 is an enlarged schematic structural view at a position a of the present invention;
fig. 4 is a schematic structural view of the filter screen of the present invention viewed from above;
in the figure: 1 floor, 2 water intercepting grooves, 3 drainage hoses, 4 fixing sleeves, 5 floor drains, 6 drainage vertical pipes, 7 first sealing sleeves, 8 water supply vertical pipes, 9 water supply pipes, 10 floor drain branch pipes, 11 second sealing sleeves, 12 drainage holes, 13 mounting plates, 14 filter screens, 15 fixing frames, 16 pull rods and 17 fixing plates.
Detailed Description
The technical solution of the present patent will be described in further detail with reference to the following embodiments.
As shown in fig. 1-4, the utility model provides a technical solution: the utility model provides a water cut-off and drainage device for interim construction, including floor 1, the upper surface of floor 1 is provided with cut-off groove 2, through setting up cut-off groove 2, because the height of cut-off groove 2 can be adjusted, make this cut-off groove 2 can be applied to different construction places, the left surface of cut-off groove 2 is provided with drainage hose 3, the positive one end of drainage hose 3 is linked together with the back of floor drain 5, floor drain 5 joint is at the upper surface of floor 1, the positive one end of floor drain 5 is linked together with the back of drainage riser 6, drainage riser 6 sets up the upper surface at floor 1, the right flank of floor drain 5 is linked together with the left end of floor drain branch pipe 10.
The floor drain branch pipe 10 is arranged on the lower surface of the floor slab 1, the top end of the floor drain branch pipe 10 is communicated with the drain hole 12, the mounting plate 13 is lapped on the lower surface of the inner wall of the drain hole 12, the filter screen 14 is arranged in the mounting plate 13, through the arrangement of the filter screen 14, the filter screen 14 can filter dirt in the water intercepting tank 2, the upper surface of the mounting plate 13 is fixedly connected with the lower surface of the fixing frame 15, the upper surface of the fixing frame 15 is fixedly connected with the bottom end of the pull rod 16, the pull rod 16 is slidably connected in the fixing plate 17, and the fixing plate 17 is clamped on the left side surface of the inner wall of the water intercepting tank 2.
Specifically, as shown in fig. 1, a fixing sleeve 4 is sleeved on the outer surface of a drainage hose 3, the fixing sleeve 4 is arranged to fix the drainage hose 3 and seal a gap between the drainage hose 3 and a water intercepting tank 2, the fixing sleeve 4 is clamped on the left side surface of the water intercepting tank 2, a drainage vertical pipe 6 is sleeved in a first sealing sleeve 7, the first sealing sleeve 7 is clamped on the lower surface of a floor slab 1, the drainage vertical pipe 6 is a U-PVC pipe, a floor drain branch pipe 10 is sleeved in a second sealing sleeve 11, the second sealing sleeve 11 is clamped on the lower surface of the floor slab 1, the second sealing sleeve 11 is arranged to seal the gap between the floor drain branch pipe 10 and the floor slab 1 due to the fact that the shape of the second sealing sleeve 11 is a T-shape, the bottom of the water intercepting tank 2 is formed by four-skin standard fly ash bricks, a pull rod 16 is arranged to be a regulation rod, the standpipe 8 is provided as a PPR pipe.
The utility model discloses a theory of operation does:
when the water resource is utilized to needs, the staff lets in the construction water to the water supply riser 8 for rivers in 8 discharge into cut water tank 2 through feed pipe 9, make the construction water concentrated in cut water tank 2, make the construction water phenomenon that trickles wantonly can not appear, make the building can not soak in the aquatic for a long time, and the staff can also let in rivers in 6 to the drainage riser through hose and floor drain 5 simultaneously, makes rivers row go into in the external basement water receiving tank.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood by those of ordinary skill in the art through specific situations.
The above detailed description of the preferred embodiments of this patent, but the patent is not limited to the above embodiments and is well within the skill of those in the art.

Claims (6)

1. The utility model provides a water cut-off and drainage device for temporary construction, includes floor (1), its characterized in that: the floor drain is characterized in that a water intercepting groove (2) is formed in the upper surface of the floor slab (1), a drainage hose (3) is arranged on the left side surface of the water intercepting groove (2), one end of the front surface of the drainage hose (3) is communicated with the back surface of a floor drain (5), the floor drain (5) is clamped on the upper surface of the floor slab (1), one end of the front surface of the floor drain (5) is communicated with the back surface of a drainage vertical pipe (6), the drainage vertical pipe (6) is arranged on the upper surface of the floor slab (1), and the right side surface of the floor drain (5) is communicated with the left end of a floor drain branch pipe (10);
the floor drain is characterized in that the floor drain branch pipe (10) is arranged on the lower surface of a floor slab (1), the top end of the floor drain branch pipe (10) is communicated with a drain hole (12), a mounting plate (13) is lapped on the lower surface of the inner wall of the drain hole (12), a filter screen (14) is arranged in the mounting plate (13), the upper surface of the mounting plate (13) is fixedly connected with the lower surface of a fixing frame (15), the upper surface of the fixing frame (15) is fixedly connected with the bottom end of a pull rod (16), the pull rod (16) is slidably connected in a fixing plate (17), and the fixing plate (17) is clamped on the left side surface of the inner wall of a water intercepting groove (2).
2. The water intercepting and draining device for temporary construction use according to claim 1, wherein: the outer surface of the drainage hose (3) is sleeved with a fixed sleeve (4), and the fixed sleeve (4) is connected to the left side face of the water intercepting groove (2) in a clamping mode.
3. The water intercepting and draining device for temporary construction use according to claim 1, wherein: the drainage vertical pipe (6) is sleeved in a first sealing sleeve (7), the first sealing sleeve (7) is clamped on the lower surface of the floor slab (1), and the drainage vertical pipe (6) is a U-PVC pipe.
4. The water intercepting and draining device for temporary construction use according to claim 1, wherein: the floor drain branch pipe (10) is sleeved in a second sealing sleeve (11), and the second sealing sleeve (11) is clamped on the lower surface of the floor slab (1).
5. The water intercepting and draining device for temporary construction use according to claim 1, wherein: the bottom of the water intercepting tank (2) is built by four standard coal ash bricks.
6. The water intercepting and draining device for temporary construction use according to claim 1, wherein: the pull rod (16) is arranged as an adjusting rod, and the water supply vertical pipe (8) is arranged as a PPR pipe.
CN202023217010.0U 2020-12-28 2020-12-28 Water intercepting and draining device for temporary construction Expired - Fee Related CN214614374U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023217010.0U CN214614374U (en) 2020-12-28 2020-12-28 Water intercepting and draining device for temporary construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023217010.0U CN214614374U (en) 2020-12-28 2020-12-28 Water intercepting and draining device for temporary construction

Publications (1)

Publication Number Publication Date
CN214614374U true CN214614374U (en) 2021-11-05

Family

ID=78432767

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023217010.0U Expired - Fee Related CN214614374U (en) 2020-12-28 2020-12-28 Water intercepting and draining device for temporary construction

Country Status (1)

Country Link
CN (1) CN214614374U (en)

Similar Documents

Publication Publication Date Title
CN210947080U (en) Bathroom floor drain with adjustable
CN209741880U (en) Deep foundation pit drainage structure
CN214614374U (en) Water intercepting and draining device for temporary construction
CN105863032A (en) Plate falling type same-floor water draining and saving compound system for residential bathroom
CN215906826U (en) Drainage construction equipment falls in elevartor shaft foundation ditch
CN213358881U (en) Secondary drainage device for ground of sinking type toilet
CN214597479U (en) Continuous sludge water separation device
CN205475651U (en) Non - infiltration detention pond of rising to a height shape cast member
CN211499915U (en) Environment-friendly light steel villa with cadmium telluride glass power generation function
CN221142687U (en) Waterproof drainage device for hydraulic engineering construction
CN219298142U (en) Hydraulic engineering construction drainage device
CN112195946A (en) Filtering type foundation pit local dewatering device and using method thereof
CN212078186U (en) Green's building basement drainage structures
CN213572283U (en) Same-floor drainage and water collection device
CN213173784U (en) Tunnel groundwater accuse row device
CN211172280U (en) Urban building basement drainage structures
CN214574490U (en) Assembled steel escape canal that can have enough to meet need
CN216920618U (en) Water delivery tank is used in hydraulic engineering construction
CN210947103U (en) Novel urban residential rainwater collection device
CN216276035U (en) Civil engineering energy-saving drainage device
CN215617416U (en) Movable terrazzo slurry discharging device for house construction project
CN216275461U (en) A waterproof drainage device for hydraulic engineering construction
CN216949147U (en) Invisible drainage device for roof stone decorative floor
CN215441737U (en) Formula of sinking breakwater
CN208803747U (en) Structure is backfilled between a kind of double-layered anti-leakage water hygiene

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211105

CF01 Termination of patent right due to non-payment of annual fee