CN214577171U CN202120725059.2U CN202120725059U CN214577171U CN 214577171 U CN214577171 U CN 214577171U CN 202120725059 U CN202120725059 U CN 202120725059U CN 214577171 U CN214577171 U CN 214577171U
Authority
CN
China
Prior art keywords
construction
sets
supporting seat
tunnel
fixed mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120725059.2U
Other languages
Chinese (zh)
Inventor
游志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Rongcheng Minxing Construction Engineering Co ltd
Original Assignee
Chongqing Rongcheng Minxing Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Rongcheng Minxing Construction Engineering Co ltd filed Critical Chongqing Rongcheng Minxing Construction Engineering Co ltd
Priority to CN202120725059.2U priority Critical patent/CN214577171U/en
Application granted granted Critical
Publication of CN214577171U publication Critical patent/CN214577171U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a material conveyer for construction in tunnel relates to tunnel construction technical field. This a material conveyer for construction in tunnel, place the case including supporting seat and material, the equal fixed mounting in both sides that the case was placed to the material has two sets of connecting blocks, and the top of supporting seat is provided with the elongated roof, and the bottom fixed mounting of supporting seat has two sets of backup pads, is provided with elevating system and stabilizing mean on the supporting seat, and the top fixed mounting of supporting seat has two sets of fixed blocks. This a material transportation device for construction in tunnel uses through the cooperation of motor, first bull stick, traction wheel, first bevel gear and second bevel gear, can place the material of incasement portion with the material and hoist, carries out the transportation of material from the top in tunnel, and such reduction tunnel that sets up very big degree transports the space that the material used when the construction to the available space of construction when increasing the tunnel construction.

Description

Material conveying device for construction in tunnel
Technical Field
The utility model relates to a tunnel construction technical field specifically is a material conveyer for construction in tunnel.
Background
The tunnel needs inside transportation construction material when building the facility man-hour, and the transportation all adopts artifical shallow to carry out the material transportation when the tradition at present, because the road surface unevenness of construction, so can produce jolting at the in-process of transportation, it is very inconvenient to transport, can occupy a large amount of tunnel spaces at the in-process of transportation simultaneously to reduce tunnel inside constructor's work efficiency.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a material conveyer for construction in tunnel to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a material conveyer for construction in tunnel, places the case including supporting seat and material, the equal fixed mounting in both sides that the case was placed to the material has two sets of connecting blocks, and the top of supporting seat is provided with the elongated roof, and the bottom fixed mounting of supporting seat has two sets of backup pads, is provided with elevating system and stabilizing mean on the supporting seat, and the top fixed mounting of supporting seat has two sets of fixed blocks.
Preferably, the both sides of case are placed to the material all fixed mounting have two sets of shock absorbers, and the equipment of shock absorber can effectually carry out the shock attenuation when the case descends is placed to the material and handles to the protection material is placed the material of incasement portion.
Preferably, a set of electronic slide rail has been seted up to the bottom of elongated roof, and the equal fixed mounting in top of fixed block has electronic slide, and the quantity of electronic slide is two sets of, and two sets of electronic slide equal slidable mounting are in the inside of electronic slide rail, and the fixed block is slidable mounting with the elongated roof, and the material transportation of being convenient for of setting up of electronic slide and electronic slide rail alleviates workman's intensity of labour.
Preferably, the lifting mechanism comprises a motor, a first rotating rod, a traction wheel, a first bevel gear, a second bevel gear, vertical supporting plates, a second rotating rod and a traction steel cable, four vertical supporting plates are fixedly installed at the bottom of the supporting seat, every two vertical supporting plates are in a group, the opposite surfaces of each group of vertical supporting plates are rotatably provided with the first rotating rod, the rear side of one vertical supporting plate is fixedly provided with the motor, the output shaft of the motor is fixedly installed with one end of one group of first rotating rods through a coupler, the outer wall of the first rotating rod is fixedly provided with the first bevel gear, the adjacent side walls of the two groups of supporting plates are rotatably provided with the second rotating rod, the two ends of the second rotating rod respectively extend to one side of the two groups of supporting plates and are fixedly provided with the second bevel gear, the second bevel gear on the second rotating rod is meshed with the first bevel gear on the first rotating rod, the outer wall of the first rotating rod is fixedly provided with the traction wheel, the outer wall of traction wheel all with the one end fixed mounting of traction cable, traction cable's the other end all with the top fixed mounting of connecting block, the construction available space when setting up like this and can increasing tunnel construction.
Preferably, stabilizing mean includes hinge bar and articulated base, and the equal fixed mounting of both sides inner wall of case is placed to the material has articulated base, and articulated base's top is all articulated to be installed the hinge bar, and the top of hinge bar is all articulated to be installed the slider, and two sets of spouts have been seted up to the bottom of supporting seat, and two sets of sliders are slidable mounting respectively in the inside of two sets of spouts, and the life-span of equipment not only can be guaranteed in the setting of hinge bar, and the security when simultaneously can also increase the transportation of material improves the efficiency of its work.
Preferably, the length of spout is greater than the length of articulated arm, and the setting is so that the material placement box can be through the higher of pulling cable hoist.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) this a material transportation device for construction in tunnel, through the hinge bar, articulated base, the cooperation of slider and spout is used, can reduce the material and place the rocking that the case produced when lifting up on the one hand, thereby lead to equipment because long-time production rocks the life-span reduction that leads to equipment when using, thereby reduce the efficiency of work, on the other hand reduces rocking of equipment can effectual reduction material's stability, the in-process of avoiding the transportation of material leads to the material to drop, influence the use of material, thereby the life-span of equipment not only can be guaranteed in the setting of hinge bar, the security during the transportation of material can also be increased simultaneously, the efficiency of its work is improved.
(2) This a material transportation device for construction in tunnel uses through the cooperation of motor, first bull stick, traction wheel, first bevel gear and second bevel gear, can place the material of incasement portion with the material and hoist, carries out the transportation of material from the top in tunnel, and such reduction tunnel that sets up very big degree transports the space that the material used when the construction to the construction available space during the increase tunnel construction.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a bottom view of the support seat of the present invention;
fig. 3 is a front view of the present invention.
In the figure: the material placing box comprises a support seat 1, a material placing box 2, a lifting mechanism 3, a motor 301, a first rotating rod 302, a traction wheel 303, a first bevel gear 304, a second bevel gear 305, a vertical supporting plate 306, a second rotating rod 307, a traction steel cable 308, a connecting block 4, a stabilizing mechanism 5, a hinged rod 501, a hinged base 502, a sliding block 503, a sliding chute 504, a long top plate 6, an electric sliding seat 7, an electric sliding rail 8 and a fixed block 9.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The first embodiment is as follows:
referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a material conveyer for construction in tunnel, places case 2 including supporting seat 1 and material, and the equal fixed mounting in both sides that case 2 was placed to the material has two sets of connecting blocks 4, and the top of supporting seat 1 is provided with elongated roof 6, and the bottom fixed mounting of supporting seat 1 has two sets of backup pads, is provided with elevating system 3 and stabilizing mean 5 on the supporting seat 1, and the top fixed mounting of supporting seat 1 has two sets of fixed blocks 9.
Further, the equal fixed mounting in both sides of case 2 is placed to the material has two sets of shock absorbers, and a set of electronic slide rail 8 has been seted up to the bottom of elongated roof 6, and the equal fixed mounting in top of fixed block 9 has electronic slide 7, and the quantity of electronic slide 7 is two sets of, and two sets of electronic slide 7 equal slidable mounting are in the inside of electronic slide rail 8, and fixed block 9 is slidable mounting with elongated roof 6.
Example two:
referring to fig. 1-3, in the first embodiment, the lifting mechanism 3 includes a motor 301, a first rotating rod 302, a traction wheel 303, a first bevel gear 304, a second bevel gear 305, vertical supporting plates 306, a second rotating rod 307 and a traction cable 308, four vertical supporting plates 306 are fixedly installed at the bottom of the supporting seat 1, each two vertical supporting plates 306 are in a group, the first rotating rod 302 is rotatably installed on the opposite surface of each group of vertical supporting plates 306, the motor 301 is fixedly installed at the rear side of one of the vertical supporting plates 306, the output shaft of the motor 301 is fixedly installed with one end of one group of the first rotating rods 302 through a coupling, the first bevel gear 304 is fixedly installed on the outer wall of each first rotating rod 302, the second rotating rod 307 is rotatably installed on the adjacent side wall of the two groups of the supporting plates, the two ends of the second rotating rod 307 respectively extend to one side of the two groups of the supporting plates and are fixedly installed with the second bevel gear 305, second umbrella gear 305 on the second bull stick 307 meshes with first umbrella gear 304 on the first bull stick 302, the equal fixed mounting of outer wall of first bull stick 302 has two sets of traction wheels 303, the outer wall of traction wheel 303 all with the one end fixed mounting of traction cable 308, the other end of traction cable 308 all with the top fixed mounting of connecting block 4, control motor 301 starts, motor 301 can drive first bull stick 302 when rotating and rotate, thereby drive first umbrella gear 304 and rotate, can pack up traction cable 308 when traction wheel 303 rotates, can place the material of case 2 inside and hang up, carry out the transportation of material from the top in tunnel, such reduction tunnel that sets up very big degree transports the space that the material used when the construction, thereby increase the available space of construction during tunnel construction.
Further, the stabilizing mechanism 5 comprises a hinged rod 501 and a hinged base 502, the inner walls of the two sides of the material placing box 2 are fixedly provided with the hinged base 502, the top of the hinged base 502 is provided with the hinged rod 501 in a hinged manner, the top of the hinged rod 501 is provided with a sliding block 503 in a hinged manner, the bottom of the supporting seat 1 is provided with two groups of sliding grooves 504, the two groups of sliding blocks 503 are respectively and slidably mounted inside the two groups of sliding grooves 504, the hinged rod 501 can reduce the shaking generated when the material placing box 2 is lifted, so that the service life of the equipment is reduced due to the long-time shaking generated when the equipment is used, the working efficiency is reduced, the shaking of the equipment can be reduced, the stability of the material can be effectively reduced, the material is prevented from falling in the transportation process of the material, the use of the material is influenced, the service life of the equipment can be ensured due to the arrangement of the hinged rod 501, and the safety of the material in the transportation can be increased, the working efficiency is improved.
Still further, the length of the slide groove 504 is greater than the length of the hinge lever 501.
The working principle is as follows: during the use, install elongated roof 6 in the top in tunnel, place the inside of placing case 2 with the material in the material, control motor 301 starts, motor 301 can drive first bull stick 302 when rotating and rotate, thereby drive first umbrella type gear 304 and rotate, can pack up traction cable 308 when traction wheel 303 rotates, thereby can place case 2 with the material and rise, placing case 2 with the material through fixed block 9 and electronic slide rail 8 on elongated roof 6 and removing the transportation.

Claims (6)

1. The utility model provides a material conveyer for construction in tunnel, includes supporting seat (1) and material placement box (2), its characterized in that: the material placing box comprises a material placing box body (2), two groups of connecting blocks (4) are fixedly mounted on two sides of the material placing box body, a long top plate (6) is arranged at the top of a supporting seat (1), two groups of supporting plates are fixedly mounted at the bottom of the supporting seat (1), a lifting mechanism (3) and a stabilizing mechanism (5) are arranged on the supporting seat (1), and two groups of fixing blocks (9) are fixedly mounted at the top of the supporting seat (1).
2. A material transfer unit for use in construction within a tunnel according to claim 1, wherein: two sets of shock absorbers are fixedly mounted on two sides of the material placing box (2).
3. A material transfer unit for use in construction within a tunnel according to claim 1, wherein: a set of electronic slide rail (8) have been seted up to the bottom of elongated roof (6), and the equal fixed mounting in top of fixed block (9) has electronic slide (7), and the quantity of electronic slide (7) is two sets of, and two sets of electronic slide (7) equal slidable mounting are in the inside of electronic slide rail (8), and fixed block (9) are slidable mounting with elongated roof (6).
4. A material transfer unit for use in construction within a tunnel according to claim 1, wherein: elevating system (3) include motor (301), first bull stick (302), traction wheel (303), first umbrella gear (304), second umbrella gear (305), perpendicular backup pad (306), second bull stick (307) and traction cable (308), the bottom fixed mounting of supporting seat (1) has four perpendicular backup pads (306), every two perpendicular backup pads (306) are a set of and the opposite face of every group perpendicular backup pad (306) rotates and installs first bull stick (302), the rear side fixed mounting of one of them perpendicular backup pad (306) has motor (301), the output shaft of motor (301) passes through the shaft coupling and one end fixed mounting of one of them a set of first bull stick (302), the outer wall of first bull stick (302) all fixed mounting has first umbrella gear (304), the adjacent lateral wall of two sets of backup pads rotates and installs second bull stick (307), the both ends of second bull stick (307) extend to one side of two sets of backup pads respectively and fixed mounting has second umbrella gear (307) 305) A second bevel gear (305) on the second rotating rod (307) is meshed with a first bevel gear (304) on the first rotating rod (302), two groups of traction wheels (303) are fixedly installed on the outer wall of the first rotating rod (302), the outer wall of each traction wheel (303) is fixedly installed with one end of a traction steel cable (308), and the other end of each traction steel cable (308) is fixedly installed with the top of the connecting block (4).
5. A material transfer unit for use in construction within a tunnel according to claim 1, wherein: stabilizing mean (5) including articulated rod (501) and articulated base (502), the equal fixed mounting of both sides inner wall of case (2) is placed to the material has articulated base (502), and articulated rod (501) are all articulated to be installed at the top of articulated base (502), and slider (503) are all articulated to be installed at the top of articulated rod (501), and two sets of spouts (504) have been seted up to the bottom of supporting seat (1), and two sets of sliders (503) are respectively slidable mounting in the inside of two sets of spouts (504).
6. A material transporting device for use in construction inside a tunnel according to claim 5, wherein: the length of the sliding groove (504) is larger than that of the hinge rod (501).
CN202120725059.2U 2021-04-09 2021-04-09 Material conveying device for construction in tunnel Expired - Fee Related CN214577171U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120725059.2U CN214577171U (en) 2021-04-09 2021-04-09 Material conveying device for construction in tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120725059.2U CN214577171U (en) 2021-04-09 2021-04-09 Material conveying device for construction in tunnel

Publications (1)

Publication Number Publication Date
CN214577171U true CN214577171U (en) 2021-11-02

Family

ID=78357543

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120725059.2U Expired - Fee Related CN214577171U (en) 2021-04-09 2021-04-09 Material conveying device for construction in tunnel

Country Status (1)

Country Link
CN (1) CN214577171U (en)

Similar Documents

Publication Publication Date Title
CN202087343U (en) Feeding device of hydraulic three-roller machine
CN214780421U (en) Quick transportation lifting appliance for telescopic part
CN214577171U (en) Material conveying device for construction in tunnel
CN209905939U (en) Efficient colliery conveyer
CN212050438U (en) High-speed railway tunnel engineering excavation construction rack
CN211173166U (en) Building construction overhanging type mobile blanking platform
CN211166970U (en) Urban road lays and uses fragment of brick conveyer
CN214523982U (en) Carrying equipment for building decoration material
CN214609796U (en) Coal conveying sliding frame for coal mine tunneling
CN212403204U (en) Building construction lifting device
CN214189738U (en) Conveyor is used in soft porcelain production with shock absorber structure
CN209065351U (en) A kind of dust-proof cement device for discharging
CN213502518U (en) Hand cart
CN217477292U (en) Conveyer for railway construction
CN212475959U (en) Material lifting device for building construction
CN216269448U (en) Portable rubbish clearing device for hydraulic engineering
CN220332759U (en) Transfer device for building engineering convenient to remove and shock attenuation
CN207467722U (en) A kind of tunnel brick production automatic collecting device
CN214542155U (en) Make herbs into wool unloader convenient to remove
CN218536804U (en) Mining single hydraulic prop moving device
CN215558547U (en) Multi-functional material transport frame for architectural equipment
CN214879861U (en) Intelligent lifting device for vibrating rod of stone transfer bucket
CN220839366U (en) Nickel-phosphorus alloy steel lining plate corner polishing device
CN212685637U (en) Toughened glass production line skip car
CN212250085U (en) Reinforcing bracket for fully mechanized coal mining

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211102

CF01 Termination of patent right due to non-payment of annual fee