CN214575725U - Anchor clamps for construction - Google Patents

Anchor clamps for construction Download PDF

Info

Publication number
CN214575725U
CN214575725U CN202120762677.4U CN202120762677U CN214575725U CN 214575725 U CN214575725 U CN 214575725U CN 202120762677 U CN202120762677 U CN 202120762677U CN 214575725 U CN214575725 U CN 214575725U
Authority
CN
China
Prior art keywords
fixedly connected
anchor clamps
threaded rod
main part
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120762677.4U
Other languages
Chinese (zh)
Inventor
孙伟栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Yingxiang Herui Construction Group Co ltd
Original Assignee
Qingdao Yingxiang Herui Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Yingxiang Herui Construction Group Co ltd filed Critical Qingdao Yingxiang Herui Construction Group Co ltd
Priority to CN202120762677.4U priority Critical patent/CN214575725U/en
Application granted granted Critical
Publication of CN214575725U publication Critical patent/CN214575725U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses an anchor clamps for construction, including the anchor clamps main part, the middle part of anchor clamps main part is provided with first installation piece, the equal fixedly connected with second installation piece in both ends of anchor clamps main part, the inside chamber that all is provided with slides in both sides of anchor clamps main part, the inside in slide chamber all slides and is provided with and removes the seat, the equal threaded connection in middle part has the threaded rod in the removal seat, the second installation piece all runs through at the both ends of threaded rod, the equal fixedly connected with bolt in top middle part of removing the seat, the equal threaded connection in upper portion of bolt has the grip block. The utility model discloses in, rotate the threaded rod through the handle, the threaded rod makes and removes the seat and move to the inboard, removes the seat and passes through the bolt and drive the grip block and move to the inboard, and in the time of removing, the building templates is hugged closely to the slipmat, realizes building templates's inseparable centre gripping, satisfies the required precision of building, is worth wideling popularize.

Description

Anchor clamps for construction
Technical Field
The utility model relates to an anchor clamps field for the construction especially relates to an anchor clamps for construction.
Background
The development of Chinese economy is rapid, the Chinese infrastructure industry enjoys the full name all over the world, the Chinese infrastructure is good in quality and high in speed, the Chinese building industry develops rapidly, the building development enables the building construction equipment to develop rapidly, clamps can be widely used in building construction at present, the clamps are mainly used as building templates, a large number of templates can be used in the pouring of wall ring beams, the templates need to be set up and clamped by a large number of clamps in the installation process, and the good pouring can be carried out after the clamping.
When the building template is built, the old-fashioned anchor clamps are generally L-shaped, one end of the old-fashioned anchor clamps hooks the template, the other end of the old-fashioned anchor clamps is sleeved with a fixing piece, the fixing piece is hit with a hammer, the anchor clamps tightly clamp the template, the template is hit absolutely in the knocking process, the template is deformed absolutely, the template deformation probably leads to the poured building not to conform to the drawing requirement, and the building precision is reduced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a fixture for building construction.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides an anchor clamps for construction, includes the anchor clamps main part, the middle part of anchor clamps main part is provided with first installation piece, the equal fixedly connected with second installation piece in both ends of anchor clamps main part, the inside slip chamber that all is provided with in both sides of anchor clamps main part, the inside in slip chamber all slides and is provided with the removal seat, the equal threaded connection in middle part has the threaded rod in the removal seat, the second installation piece all runs through at the both ends of threaded rod, the equal fixedly connected with bolt in top middle part of removal seat, the equal threaded connection in upper portion of bolt has the grip block.
As a further description of the above technical solution:
the two adjacent ends of the threaded rod are fixedly connected with bearings, and the bearings are fixedly connected to the middle portions of the two sides of the first mounting block.
As a further description of the above technical solution:
the equal fixedly connected with spacing sliding sleeve in middle part of the interior of second installation piece, the periphery at the threaded rod is all established to spacing sliding sleeve.
As a further description of the above technical solution:
and the two ends of the threaded rod which are separated from each other are fixedly connected with grips.
As a further description of the above technical solution:
the equal fixedly connected with boss in middle part both sides of the one side lower part that the grip block kept away from mutually, the boss is the equal laminating of lower part of triangular prism shape and boss and slides in anchor clamps main part roof both sides.
As a further description of the above technical solution:
the equal fixedly connected with slipmat of grip block upper end inboard, the slipmat is iron and the slipmat inboard all is provided with the bump.
As a further description of the above technical solution:
the equal fixedly connected with dust cover in both sides of removing the seat upper end, the equal fixed connection in both ends of dust cover is at the roof of sliding chamber both sides lateral wall.
The utility model discloses following beneficial effect has:
the utility model discloses in, at first make the grip block centre gripping in the both sides of building templates, in the time of centre gripping, rotate the threaded rod through the handle, the threaded rod makes and removes the seat and remove to the inboard, it passes through the bolt and drives the grip block and remove to the inboard, in the time of removing, building templates is hugged closely to the slipmat, realize building templates's inseparable centre gripping, in the time of centre gripping, guarantee the powerful of grip block through the boss, such setting, make in the time to the template centre gripping, need not use the hammer to strike, avoid making the template displacement because the vibrations of striking, it can not take place the slope to have guaranteed that building templates can not take place in the centre gripping, can satisfy the drawing requirement when guaranteeing the building pouring, satisfy the required precision of building, be worth wideling popularize.
Drawings
Fig. 1 is a perspective view of a jig for building construction according to the present invention;
fig. 2 is a front view of the utility model provides a fixture for building construction.
Illustration of the drawings:
1. a first mounting block; 2. a clamp body; 3. a second mounting block; 4. a limiting sliding sleeve; 5. a grip; 6. a threaded rod; 7. a dust cover; 8. a reinforcing block; 9. a clamping block; 10. a non-slip mat; 11. a movable seat; 12. a bearing; 13. a sliding cavity; 14. and (4) bolts.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention; the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance, and furthermore, unless otherwise explicitly stated or limited, the terms "mounted," "connected," and "connected" are to be construed broadly and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-2, the present invention provides an embodiment: a clamp for building construction comprises a clamp main body 2, wherein a first installation block 1 is arranged in the middle of the clamp main body 2, second installation blocks 3 are fixedly connected to two ends of the clamp main body 2, sliding cavities 13 are arranged in two sides of the clamp main body 2, a movable seat 11 is arranged in each sliding cavity 13 in a sliding manner, a threaded rod 6 is in threaded connection with the inner middle of the movable seat 11, two ends of the threaded rod 6 penetrate through the second installation blocks 3, a bolt 14 is fixedly connected to the middle of the top end of the movable seat 11, and a clamping block 9 is in threaded connection with the upper portion of the bolt 14, so that when the clamp for building construction is used, the clamping blocks 9 are firstly clamped on two sides of a building template, when the threaded rod 6 is rotated through a handle 5, the movable seat 11 is moved to the inner side through the threaded rod 6, and the movable seat 11 drives the clamping blocks 9 to move to the inner side through the bolt 14, when the building template is moved, the anti-slip mat 10 is tightly attached to the building template, so that the building template is tightly clamped, and in clamping, the building template is not required to be knocked by a hammer when being clamped, so that the template is prevented from being displaced due to knocking vibration, the building template is prevented from being inclined in clamping, the drawing requirement can be met when the building is poured, and the precision requirement of the building is met.
The two close ends of the threaded rod 6 are fixedly connected with bearings 12, the bearings 12 are fixedly connected with the middle parts of the two sides of the first installation block 1, the threaded rod 6 can be installed in the clamp main body 2 through the arrangement of the bearings 12, the threaded rod 6 can be ensured to rotate easily when the threaded rod 6 is rotated through the handle 5, the inner middle part of the second installation block 3 is fixedly connected with a limiting sliding sleeve 4, the limiting sliding sleeve 4 is sleeved on the periphery of the threaded rod 6, the limiting sliding sleeve 4 ensures that the threaded rod 6 slides in the clamp main body 2 well, the two separated ends of the threaded rod 6 are fixedly connected with handles 5, the two middle parts of the lower part of one separated side of the clamping block 9 are fixedly connected with reinforcing blocks 8, the reinforcing blocks 8 are triangular prism-shaped, the lower parts of the reinforcing blocks 8 are attached to slide on the two sides of the top wall of the clamp main body 2, the strength of the clamping block 9 is ensured through the reinforcing blocks 8, the clamping block 9 can be stably clamped when being stressed, can not make the crooked slope of grip block 9, the equal fixedly connected with slipmat 10 of grip block 9 upper end inboard, slipmat 10 is iron and the slipmat 10 inboard all is provided with the bump, the bump makes slipmat 10 and template have fine frictional force, firm centre gripping template, the equal fixedly connected with dust cover 7 in both sides of removing 11 upper ends, the equal fixed connection in both ends of dust cover 7 is at the roof of 13 both sides lateral walls in slip chamber, dust cover 7 avoids the inside ash that advances in slip chamber 13, the assurance is removed 11 fine slides.
The working principle is as follows: when using anchor clamps for construction, rotate handle 5 and make it rotate threaded rod 6, threaded rod 6 makes and removes seat 11 and move to the inboard, remove seat 11 and drive grip block 9 through bolt 14 and move to the inboard, when moving, building templates is hugged closely to slipmat 10, realize building templates's inseparable centre gripping, when to template centre gripping, need not use the hammer to strike, avoid making the template displacement because of the vibrations of striking, it can not take place the slope to have guaranteed building templates in the centre gripping, can satisfy the drawing requirement when guaranteeing the building pouring, satisfy the required precision of building, be worth wideling popularize.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.

Claims (7)

1. The utility model provides a anchor clamps for construction, includes anchor clamps main part (2), its characterized in that: the middle part of anchor clamps main part (2) is provided with first installation piece (1), the equal fixedly connected with second installation piece (3) in both ends of anchor clamps main part (2), the inside slip chamber (13) that all is provided with in both sides of anchor clamps main part (2), the inside of slip chamber (13) all slides and is provided with and removes seat (11), the equal threaded connection in middle part has threaded rod (6) in the interior of removing seat (11), second installation piece (3) all runs through at the both ends of threaded rod (6), the equal fixedly connected with bolt (14) in top middle part of removing seat (11), the equal threaded connection in upper portion of bolt (14) has grip block (9).
2. The jig for building construction as claimed in claim 1, wherein: the two adjacent ends of the threaded rod (6) are fixedly connected with bearings (12), and the bearings (12) are fixedly connected to the middle portions of the two sides of the first mounting block (1).
3. The jig for building construction as claimed in claim 1, wherein: the equal fixedly connected with spacing sliding sleeve (4) in middle part of second installation piece (3), the periphery at threaded rod (6) is all established in spacing sliding sleeve (4).
4. The jig for building construction as claimed in claim 1, wherein: and the two ends of the threaded rod (6) which are separated from each other are fixedly connected with grips (5).
5. The jig for building construction as claimed in claim 1, wherein: the equal fixedly connected with boss (8) in middle part both sides of one side lower part that grip block (9) kept away from mutually, the lower part that boss (8) are triangular prism shape and boss (8) all laminates the slip in anchor clamps main part (2) roof both sides.
6. The jig for building construction as claimed in claim 1, wherein: the clamping block (9) is characterized in that the inner side of the upper end of the clamping block (9) is fixedly connected with an anti-slip pad (10), the anti-slip pad (10) is made of iron, and salient points are arranged on the inner side of the anti-slip pad (10).
7. The jig for building construction as claimed in claim 1, wherein: the two sides of the upper end of the movable seat (11) are fixedly connected with dust covers (7), and the two ends of each dust cover (7) are fixedly connected to the top walls of the side walls of the two sides of the sliding cavity (13).
CN202120762677.4U 2021-04-14 2021-04-14 Anchor clamps for construction Expired - Fee Related CN214575725U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120762677.4U CN214575725U (en) 2021-04-14 2021-04-14 Anchor clamps for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120762677.4U CN214575725U (en) 2021-04-14 2021-04-14 Anchor clamps for construction

Publications (1)

Publication Number Publication Date
CN214575725U true CN214575725U (en) 2021-11-02

Family

ID=78326042

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120762677.4U Expired - Fee Related CN214575725U (en) 2021-04-14 2021-04-14 Anchor clamps for construction

Country Status (1)

Country Link
CN (1) CN214575725U (en)

Similar Documents

Publication Publication Date Title
CN214575725U (en) Anchor clamps for construction
CN109397492A (en) It is a kind of for producing the vertical die of prefabricated components
CN209633293U (en) It is a kind of for producing the vertical die of prefabricated components
CN215331551U (en) A vibration device for concrete bubble is got rid of
CN207431381U (en) A kind of cylinder movable type metallic plate grooving mechanism
CN109693304A (en) It is a kind of for producing the side form fixing means of prefabricated components
CN214236015U (en) Firm multi-functional shaped steel muscle bending machine
CN213801439U (en) Remove appurtenance for brick
CN213350904U (en) Notebook aluminium alloy plate is with drilling auxiliary frame
CN212607356U (en) A fixture component for founding equipment of zirconia corundum brick is used
CN212885148U (en) Perforating device is used in water conservancy construction pipe machining
CN210586956U (en) Stainless steel center forging and pressing work hardening tool
CN209021179U (en) A kind of casting mould sand separating apparatus
CN216421617U (en) Round platform nut dismounting device
CN211464908U (en) Drilling equipment is used in new energy automobile accessory processing
CN211218565U (en) Universal combined clamp capable of clamping arbitrary type loam cores
CN212174244U (en) Motor lifting appliance assembled on new energy pure electric transmission assembly
CN218752840U (en) Building block clamp
CN210850745U (en) Concrete mould
CN216238295U (en) Concrete anticollision wall health preserving cloth fixing tool card
CN209633364U (en) It is a kind of for fixing the positioning tool of side form
CN214214166U (en) Assembled building element mould fixing device
CN213532461U (en) Split pin splitting device
CN216858304U (en) Drilling device for machining wind power tower structural member
CN213875170U (en) Cement mortar plain bumper

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211102

CF01 Termination of patent right due to non-payment of annual fee