CN214575641U - Whole mobile device of concrete wall body template is contained to apron - Google Patents

Whole mobile device of concrete wall body template is contained to apron Download PDF

Info

Publication number
CN214575641U
CN214575641U CN202120198440.8U CN202120198440U CN214575641U CN 214575641 U CN214575641 U CN 214575641U CN 202120198440 U CN202120198440 U CN 202120198440U CN 214575641 U CN214575641 U CN 214575641U
Authority
CN
China
Prior art keywords
template
construction
shaped bottom
bottom support
concrete wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120198440.8U
Other languages
Chinese (zh)
Inventor
曲云龙
刘广迎
苗旺
李泽辉
张志藩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Engineering Co Ltd
Original Assignee
CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Engineering Co Ltd filed Critical CCCC First Highway Engineering Co Ltd
Priority to CN202120198440.8U priority Critical patent/CN214575641U/en
Application granted granted Critical
Publication of CN214575641U publication Critical patent/CN214575641U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a cover plate culvert concrete wall template integral moving device, which comprises a wall side template, a handle, a deformed steel bar, a bearing, universal wheels and a U-shaped bottom support; the wall body side template comprises a left template and a right template, and the left template and the right template are symmetrically fixed on the U-shaped bottom support; two through holes are arranged along the length direction of the U-shaped bottom support, and the width of a concrete wall to be poured is arranged between the left template and the right template; two screw-thread steel poles are installed respectively in two through-holes of U type collet, and the whole lateral migration construction technique of universal wheel concrete cast-in-place wall body side form is installed to the bottom of U type collet, adopts universal pulley and the common channel-section steel of job site, can make the construction save time more, laborsaving, forms through universal wheel and simple and easy steel sheet welding, does not need too many expenses, but manifold cycles uses, can accurately move the template position of pouring required. The construction time of the culvert can be greatly shortened, the working efficiency is improved, the construction period is shortened, and more construction cost is saved for the project.

Description

Whole mobile device of concrete wall body template is contained to apron
Technical Field
The utility model discloses a whole lateral migration construction equipment of cast-in-place wall body side form board of concrete belongs to culvert construction technical field.
Background
The cast-in-place concrete wall body comprises: culvert walls, retaining wall walls, and the like. Taking a cover plate culvert as an example: the common small-sized structures in the roadbed engineering have the characteristics of simple structure, easy maintenance, low manufacturing cost and the like, and generally have the functions of water passing, pedestrian movement, vehicle movement and the like. The span is generally less than 5 meters, the height of the wall body is generally 4-5 meters, the culvert length is generally 20-30 meters, the high backfill section is even up to 40 meters or more, most construction organizations consider the structural characteristics, the on-site pouring conditions, the utilization rate of turnover materials and the like, and the construction is generally divided into multi-section construction. Therefore, the construction period of the culvert engineering as a control engineering has certain influence on the whole construction period of the roadbed.
The traditional construction method of the cover plate culvert cast-in-situ wall side form comprises the following steps: the method comprises the following steps of hoisting a formwork block in place by a crane, reinforcing and splicing by matching with manual work, installing and fixing an end formwork after an inner formwork and an outer formwork are assembled, and disassembling the formwork block and installing the next section by matching with the crane and the manual work when the concrete to be poured reaches a certain condensation strength. The traditional construction and assembly cycle is long, the high-altitude operation is accompanied, and the dangerous working procedure is large.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a concrete cast-in-place wall side form whole lateral migration device in order to solve in the concrete cast-in-place wall work progress that reasons such as support, template repeated dismantlement, construction site are narrow and small slow, support, template consumption are big, and personnel drop into greatly, technical problem such as dangerous great process, specially provide a concrete cast-in-place wall side form to solved above-mentioned a series of problems, realized quick, high efficiency, safe construction. The time for installing and detaching the template construction among the segments is reduced, and the construction period is saved; the working efficiency is improved, and the cost of the machine tool is reduced; effectively avoid the aerial work and the construction of continuous hoisting operation, increase construction operation security.
The utility model discloses a technical scheme for apron culvert concrete wall template whole mobile device, hold 6 including wall side form 1, handle 2, screw-thread steel pole 3, bearing 4, universal wheel 5 and U type end. The wall body side template 1 comprises a left template and a right template, and the left template and the right template are symmetrically fixed on the U-shaped bottom bracket 6; two through holes are arranged along the length direction of the U-shaped bottom support 6, and the width of the concrete wall to be poured is arranged between the left template and the right template. Two screw-thread steel poles 3 are respectively arranged in two through holes of a U-shaped bottom support 6, and universal wheels 5 are arranged at the bottom of the U-shaped bottom support 6. One end of each screw steel rod 3 is provided with a handle 2, and the other end is provided with a bearing 4.
Furthermore, the screw steel rod 3 and the inner ring of the bearing 4 are welded on the U-shaped bottom support 6, and the inner ring and the outer ring of the bearing 4 are in sliding fit.
Further, the U-shaped bottom bracket 6 is a channel steel.
The utility model is characterized in that: the side mold integral transverse moving device can integrally move the combined steel template.
The utility model has the advantages that:
1. simple manufacture, flexible installation and disassembly, low cost and repeated use.
2. And the mounting and dismounting construction period of the template among the segments is shortened.
3. The operation is convenient, and the construction cost is saved.
4. The high-altitude operation and the hoisting operation are reduced, and the construction safety of the template is improved.
Drawings
Fig. 1 is a schematic top view of the present invention.
Fig. 2 is a schematic side view of the present invention.
Fig. 3 is a schematic sectional view of the present invention.
In the figure: 1. wall body side form board, 2, handle, 3, screw-thread steel, 4, bearing, 5, universal wheel, 6, U type collet.
Detailed Description
The present invention will be described in detail with reference to the accompanying drawings:
as shown in fig. 1-3, the device for moving the whole slab culvert concrete wall form comprises a wall side form 1, a handle 2, a threaded steel rod 3, a bearing 4, a universal wheel 5 and a U-shaped bottom support 6. The wall body side template 1 comprises a left template and a right template, and the left template and the right template are symmetrically fixed on the U-shaped bottom bracket 6; two through holes are arranged along the length direction of the U-shaped bottom support 6, and the width of the concrete wall to be poured is arranged between the left template and the right template. Two screw-thread steel poles 3 are respectively arranged in two through holes of a U-shaped bottom support 6, and universal wheels 5 are arranged at the bottom of the U-shaped bottom support 6. One end of each screw steel rod 3 is provided with a handle 2, and the other end is provided with a bearing 4. The handle 2 is used to push the whole structure.
Furthermore, on the screw-thread steel rod 3 and the inner ring of the bearing 4, the outer ring of the bearing 4 is welded on the U-shaped bottom support 6, and the inner ring and the outer ring of the bearing 4 are in sliding fit for adjusting the pushing direction.
Further, the U-shaped bottom bracket 6 is a channel steel.
Firstly, one section of the wall body is constructed, the template and the inner steel tube support frame of the section of the wall body are only assembled, after the section of the wall body concrete is poured, the template and the inner frame are loosened, the template and the inner frame are moved to the next section, and the concrete is poured after the reinforcement and adjustment are carried out. The cover plate culvert integral formwork moving construction technology comprises the following steps: the template moves integrally without disassembly and quick installation.
The whole lateral migration construction technology of concrete cast-in-place wall body side form adopts universal pulley and the common channel-section steel of job site, can make the construction save time more, laborsaving, forms through universal pulley and simple and easy steel sheet welding, does not need too many expenses, but manifold cycles uses, can accurately move the template position of pouring to needs.
The conventional method is that after a foundation is made, the longitudinal and transverse axes are laid, and two sets of templates and steel pipe frames are needed to ensure construction progress and design optimization of construction organization. The steel pipe frame is erected to every section of culvert body, the template is assembled and the reinforcement needs 3 days, the split bolts are installed and finally the reinforcement is carried out for 1 day, the pump truck pumping is adopted for pouring concrete, the manual matching method consumes 1 day, the template is disassembled every other day, the full frame and the template are completely separated and conveniently moved during the template disassembly so as to be assembled again, the time is consumed for 2 days, and the construction process of every section of culvert body is 7 days in total.
Use the utility model discloses a concrete cast-in-place wall body engineering overall form removes construction back, also need not dismantle steel-pipe frame, template, also need not the crane installation, saves a crane platform shift fee and crane installation time and crane safener alone, and the couple two people. Originally, the culvert template needs 7 days for moving and pouring once, and the moving and pouring time of the template is greatly shortened to 4 days. The whole process saves about 10 shifts of manpower and about 2 shifts of the crane.
Therefore, the concrete cast-in-place wall engineering integral template moving construction technology is used, the culvert construction time can be greatly shortened, the working efficiency is improved, the construction period time is shortened, and more construction cost is saved for projects.

Claims (3)

1. The whole moving device of the slab culvert concrete wall template is characterized in that: the wall body side template comprises a left template and a right template, and the left template and the right template are symmetrically fixed on the U-shaped bottom support; two through holes are arranged along the length direction of the U-shaped bottom support, and the width of a concrete wall to be poured is arranged between the left template and the right template; the two threaded steel rods are respectively arranged in two through holes of the U-shaped bottom support, and universal wheels are arranged at the bottom of the U-shaped bottom support; one end of each screw steel rod is provided with a handle, and the other end is provided with a bearing.
2. The device for integrally moving the slab culvert concrete wall form as claimed in claim 1, wherein: the screw-thread steel rod and the inner ring of the bearing are welded on the U-shaped bottom support, and the inner ring and the outer ring of the bearing are in sliding fit.
3. The device for integrally moving the slab culvert concrete wall form as claimed in claim 1, wherein: the U-shaped bottom support is a channel steel.
CN202120198440.8U 2021-01-25 2021-01-25 Whole mobile device of concrete wall body template is contained to apron Active CN214575641U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120198440.8U CN214575641U (en) 2021-01-25 2021-01-25 Whole mobile device of concrete wall body template is contained to apron

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120198440.8U CN214575641U (en) 2021-01-25 2021-01-25 Whole mobile device of concrete wall body template is contained to apron

Publications (1)

Publication Number Publication Date
CN214575641U true CN214575641U (en) 2021-11-02

Family

ID=78371073

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120198440.8U Active CN214575641U (en) 2021-01-25 2021-01-25 Whole mobile device of concrete wall body template is contained to apron

Country Status (1)

Country Link
CN (1) CN214575641U (en)

Similar Documents

Publication Publication Date Title
CN101538939B (en) Construction method for preset nut type steel-reinforced concrete compound pier template fixing device
CN109972655B (en) Prefabricated pipe gallery mechanical and hydraulic combined type integrally-installed and disassembled steel template and installation method
CN106013233A (en) Slippage system used for underground pipe rack cast-in-place construction and construction method of slippage system
CN111608662B (en) Shaft oversized-diameter integral moving metal template
CN103206226A (en) Multifunctional variable cross-section lining trolley for tunnel
CN203130096U (en) Multifunctional variable-cross-section lining trolley of tunnel
CN203583380U (en) Movable cast-in-situ culvert cover plate template support
CN208950298U (en) A kind of new structure circular cross section cylinder mould
CN214575641U (en) Whole mobile device of concrete wall body template is contained to apron
CN212054734U (en) A template that is used for quick lining cutting of city portal tunnel
CN203200664U (en) Slip-form construction device for variable cross-section hollow high pier
CN209082555U (en) A kind of prefabricated piping lane machinery and Combined hydraulic type, which are integrally pacified, tears steel form open
CN205934962U (en) A system of sliding for underground pipe gallery cast -in -situ construction
CN106013234A (en) Construction method for underground comprehensive pipe rack
CN214828502U (en) Prefabricated steel reinforcement cage hoist and mount construction equipment of culvert
CN108930406A (en) Construction method for large-formwork narrow-space wall based on integral assembly
CN211897857U (en) Device for mounting or dismounting longitudinal beam in beam-column type support construction
CN220409137U (en) Box girder internal mold convenient to disassemble
CN217580198U (en) Concrete structure unilateral template structure with narrow distance from support pile
CN112479027A (en) Gantry crane prefabricated foundation and installation method thereof
CN216884492U (en) Box girder hogging moment stretch-draw notch quick detach template
CN217299021U (en) Prefabricated portal frame assembled box culvert
CN221722816U (en) Connecting structure of tunnel open cut tunnel corrugated steel plate and prefabricated inverted arch
CN216892072U (en) Novel movable culvert platform mold
CN218758810U (en) Integral self-propelled ditch template trolley

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant