CN214574135U - Precast concrete inspection shaft - Google Patents
Precast concrete inspection shaft Download PDFInfo
- Publication number
- CN214574135U CN214574135U CN202120118302.4U CN202120118302U CN214574135U CN 214574135 U CN214574135 U CN 214574135U CN 202120118302 U CN202120118302 U CN 202120118302U CN 214574135 U CN214574135 U CN 214574135U
- Authority
- CN
- China
- Prior art keywords
- well lid
- precast concrete
- well
- bracing piece
- supporting block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000011178 precast concrete Substances 0.000 title claims abstract description 18
- 238000007689 inspection Methods 0.000 title claims abstract description 16
- 238000000926 separation method Methods 0.000 claims abstract description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 4
- 230000000694 effects Effects 0.000 abstract description 9
- 239000004567 concrete Substances 0.000 description 5
- 238000000034 method Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000001556 precipitation Methods 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 244000025254 Cannabis sativa Species 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 239000011449 brick Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
Images
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The utility model belongs to the technical field of city underground infrastructure and specifically relates to a precast concrete inspection shaft is related to, and it includes the well body and well lid, the well lid diapire rotates and is connected with a plurality of spinal branch vaulting poles, be equipped with on the internal wall of well and be used for dismantling the supporting shoe of being connected with the bracing piece bottom, the supporting shoe is enough to make the bracing piece can dismantle when connecting in the supporting shoe, and the well lid forms the interval of permeating water with well body separation. This application has the effect of saving artifically.
Description
Technical Field
The application relates to the field of urban underground infrastructure, in particular to a concrete prefabricated inspection well.
Background
The concrete inspection well is one of inspection well types, and is manufactured by concrete, mortar, bricks, broken stones and other materials according to corresponding regulations. The method is mainly used for various inspection operations of urban underground infrastructure.
When the precipitation exceeds the standard to cause flood disasters, the well cover needs to be opened to discharge the flood, and at least one worker is arranged beside each inspection well to wait beside the well so as to prevent pedestrians from falling into the well carelessly.
SUMMERY OF THE UTILITY MODEL
In order to save the manpower of guard inspection shaft during the flood discharge, this application provides a precast concrete inspection shaft.
The application provides a precast concrete inspection shaft adopts following technical scheme:
the utility model provides a prefabricated inspection shaft of concrete, includes the well body and well lid, the well lid diapire rotates and is connected with a plurality of spinal branch vaulting poles, be equipped with on the internal wall of well and be used for can dismantling the supporting shoe of being connected with the bracing piece bottom, the supporting shoe is enough to make the bracing piece can dismantle when connecting in the supporting shoe, and well lid and well body separation form the interval of permeating water.
Through adopting above-mentioned technical scheme, when needing the flood discharge, support the bracing piece bottom on the supporting shoe, prop up the well lid, and leave the interval between the well body, supply the rivers and flow into. After the well cover is erected, the worker can leave without watching the well body all the time, and the manhole cover has the effect of saving manpower.
Optionally, a positioning block is fixedly connected to the inner wall of the well body, a sliding groove is vertically formed in the side wall of the positioning block, and the supporting block is assembled in the sliding groove;
and the positioning block is provided with a driving piece for driving the supporting block to slide along the sliding groove.
Through adopting above-mentioned technical scheme, can be according to the precipitation size, suitably adjust the height that the supporting shoe goes up and down, and then adjust the open angle of well lid.
Optionally, the driving piece is a screw rod arranged in the vertical direction, and the screw rod penetrates through the supporting block and is in threaded connection with the supporting block;
and one end of the screw rod is rotatably connected to the side wall at the bottom end of the sliding groove, and the other end of the screw rod penetrates through the side wall at the top end of the sliding groove and penetrates out from the top surface of the positioning block.
Through adopting above-mentioned technical scheme, when needing to prop up the well lid, rotate the lead screw, drive the supporting shoe and shift up, have the effect of conveniently rotating the lead screw. The lead screw is at the pivoted in-process, through screw and supporting shoe cooperation, has the effect of location.
Optionally, the bracing piece is provided with two, two the interval is less than the well lid diameter between bracing piece and the well lid diapire tie point.
Through adopting above-mentioned technical scheme, when needing to prop up the well lid, rotate two lead screws simultaneously, two bracing pieces support the well lid simultaneously, further strengthen the stability of well lid.
Optionally, the well lid diapire is provided with the connecting plate, the bracing piece top is articulated in the connecting plate.
Through adopting above-mentioned technical scheme, use articulated mode to link together bracing piece and connecting plate, make things convenient for the bracing piece to rotate.
Optionally, the manhole cover is provided with yielding holes above the supporting blocks, and the number of the yielding holes is the same as that of the supporting blocks, and the yielding holes correspond to the supporting blocks in position one by one.
Through adopting above-mentioned technical scheme, when needing to prop up the well lid, stretch into the hole of stepping down with the hand, rotate the lead screw, drive the supporting shoe and move up, convenient operation.
Optionally, each abdication hole department all can be connected with the clamp plate by the dismantlement.
By adopting the technical scheme, the abdicating hole is formed, so that the well body is communicated with the outside, and sundries such as flowers, grass and dry branches on the roadside easily fall into the well body through the abdicating hole to block the well body and prevent the screw rod from running. Through setting up the clamp plate in the hole department of stepping down the hole, separation debris have keep the internal clean and tidy effect with the lead screw normal use of well.
Optionally, the pressing plate is embedded in the yielding hole, and a boss is arranged on the periphery of the top of the pressing plate.
Through adopting above-mentioned technical scheme, the clamp plate passes through the boss and sets up on the well lid, when needing to rotate the lead screw, easily takes off the clamp plate, has the effect of facilitating the use.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the manhole cover is supported by the supporting rods and the supporting blocks, workers do not need to be arranged beside each manhole to watch, and labor can be saved to support other flood discharge work;
2. by arranging the two support rods, the two support rods simultaneously support the well lid in the process of supporting the well lid, so that the stability of the support rods is enhanced;
3. the boss is arranged on the periphery of the pressing plate, so that the pressing plate is convenient to detach and use.
Drawings
Fig. 1 is a schematic structural diagram of a precast concrete manhole according to an embodiment of the present application.
Fig. 2 is a sectional view of a concrete prefabricated manhole according to an embodiment of the present application.
Fig. 3 is a use state diagram (the well lid is in a supported state) of the precast concrete manhole according to the embodiment of the application.
Description of reference numerals: 1. a well body; 4. a well cover; 41. reinforcing ribs; 61. positioning blocks; 62. a support block; 7. a drive member; 71. a screw rod; 72. a knob; 73. pressing a plate; 731. a boss; 74. a hole of abdication; 8. a support bar; 81. a connecting plate.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses precast concrete inspection shaft. Referring to fig. 1, a precast concrete manhole includes a well body 1 and a well cover 4.
Referring to fig. 2, the bottom wall of the manhole cover 4 is provided with a connecting plate 81, and the upper part of the connecting plate 81 and the bottom wall of the manhole cover 4
And the connection is realized through bolts. The lower portion of the connecting plate 81 is disposed obliquely and a support rod 8 is rotatably connected at the bottom end. The top end of the supporting rod 8 is provided with a through hole perpendicular to the length direction of the supporting rod 8, the bottom of the connecting plate 81 is provided with a groove for the supporting rod 8 to be embedded, and after the supporting rod 8 is embedded into the groove of the connecting plate 81, a rotating shaft is arranged to sequentially penetrate through the through holes of the connecting plate 81 and the supporting rod 8, so that the supporting rod 8 is rotatably connected with the connecting plate 81.
Referring to fig. 2, the inner wall of the well body 1 is connected with a positioning block 61 through a bolt, a sliding groove is formed in the positioning block 61 and communicated with the side wall of the positioning block 61, and a supporting block 62 is arranged in the sliding groove. The supporting block 62 is provided with a screw rod 71 in a penetrating manner for driving the supporting block 62 to ascend and descend, the screw rod 71 is in threaded fit with the supporting block 62, and the screw rod 71 penetrates out of the top wall of the positioning block 61. The bottom of the screw rod 71 is inserted into the bottom wall of the sliding chute and is in threaded connection with the bottom wall of the sliding chute. The knob 72 is welded at the top of the screw rod 71, so that the screw rod 71 is more convenient and labor-saving to rotate.
Referring to fig. 2, a support block 62 is connected to the bottom of the support bar 8. The support rod 8 is arranged obliquely, and the bottom of the support rod 8 is arranged in the vertical direction and is connected with the side wall of the support block 62 through a bolt.
Referring to fig. 2, there are two support rods 8, and accordingly, there are two support blocks 62 and two positioning blocks 61 and two screw rods 71 engaged with the support blocks 62. Two knobs 72 are correspondingly arranged at the top of each screw rod 71. The distance of the junction of the support rod 8 and the well lid 4 is smaller than the diameter of the well lid 4. Each screw rod 71 is provided with a yielding hole 74 at a position corresponding to the well lid 4, and each yielding hole 74 is communicated with the edge of the well lid 4.
Referring to fig. 2 and 3, when drainage is needed, a worker inserts hands into the two abdicating holes 74, and simultaneously rotates the knob 72 to drive the screw rod 71 to rotate, so that the supporting block 62 is lifted. The supporting shoe 62 drives the supporting rod 8 to rise, and the supporting rod 8 pushes the well lid 4 to prop up with the end connected with the well lid 4. The well lid 4 props up, and each lead screw 71 all with supporting shoe 62 screw-thread fit, can stably rotate and make the bracing piece 8 prop up, can prop up the back at well lid 4 again and keep the position unchangeable, the staff need not on duty by side, has the effect of using manpower sparingly.
Referring to fig. 3, a pressing plate 73 is arranged on the well lid 4, a boss 731 is integrally formed on the periphery of the upper portion of the pressing plate 73, the lower portion of the pressing plate 73 is located in the abdicating hole 74, and the bottom wall of the boss 731 is attached to the top wall of the well lid 4. When the well lid 4 is flatly placed on the well body 1, the pressing plate 731 blocks sundries from entering the well body 1, and the effects of preventing the sundries from blocking the well body 1 and preventing the screw rod 71 from rotating are achieved.
Referring to fig. 3, a reinforcing rib 41 is welded to the surface of the manhole cover 4 facing the outside of the manhole. The manhole cover 4 is the topmost part of the manhole, and directly bears the pressure of pedestrians, cars, heavy trucks, and the like on the road. Add strengthening rib 41 on well lid 4, alleviate the pressure of well lid 4, help prolonging the life of well lid 4.
The implementation principle of precast concrete inspection shaft of the embodiment of this application does: when the accumulated water on the road surface needs to be cleaned, the two pressing plates 73 are taken down, the screw rod 71 is rotated simultaneously, the supporting block 62 ascends along with the rotation of the screw rod 71, and meanwhile, the supporting block 62 is driven to ascend to support the well lid 4. The screw 71 stops rotating and the position remains unchanged, so that the manhole cover 4 can be stably supported above the inspection well, and the worker can leave.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.
Claims (8)
1. The utility model provides a precast concrete inspection shaft, includes well body (1) and well lid (4), its characterized in that: well lid (4) diapire rotates and is connected with a plurality of spinal branch vaulting poles (8), be equipped with on the well body (1) inner wall and be used for dismantling supporting shoe (62) of being connected with bracing piece (8) bottom, supporting shoe (62) are enough to make when bracing piece (8) can be dismantled to be connected in supporting shoe (62) to the distance of well lid (4) bottom surface, and well lid (4) and the separation of the well body (1) form the interval of permeating water.
2. The precast concrete manhole of claim 1, wherein: the inner wall of the well body (1) is fixedly connected with a positioning block (61), the side wall of the positioning block (61) is vertically provided with a sliding groove, and the supporting block (62) is assembled in the sliding groove;
and a driving piece (7) for driving the supporting block (62) to slide along the sliding groove is arranged on the positioning block (61).
3. The precast concrete manhole as recited in claim 2, wherein: the driving piece (7) is a screw rod (71) arranged in the vertical direction, and the screw rod (71) penetrates through the supporting block (62) and is in threaded connection with the supporting block (62);
and one end of the screw rod (71) is rotatably connected to the side wall at the bottom end of the sliding chute, and the other end of the screw rod penetrates through the side wall at the top end of the sliding chute and penetrates out of the top surface of the positioning block (61).
4. A precast concrete manhole as set forth in claim 3, wherein: bracing piece (8) are provided with two, two the interval is less than well lid (4) diameter between bracing piece (8) and well lid (4) diapire tie point.
5. The precast concrete manhole as recited in claim 4, wherein: well lid (4) diapire is provided with connecting plate (81), bracing piece (8) top articulates in connecting plate (81).
6. The precast concrete manhole as recited in claim 5, wherein: the manhole cover is characterized in that a yielding hole (74) located above the supporting block (62) is formed in the manhole cover (4), and the quantity of the yielding holes (74) is the same as that of the supporting block (62) and the positions of the yielding holes correspond to those of the supporting block (62) one by one.
7. The precast concrete manhole as recited in claim 6, wherein: each abdicating hole (74) is detachably connected with a pressure plate (73).
8. The precast concrete manhole as recited in claim 7, wherein: the clamp plate (73) is embedded in the abdicating hole (74), and a boss (731) is arranged on the periphery of the top of the clamp plate (73).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120118302.4U CN214574135U (en) | 2021-01-16 | 2021-01-16 | Precast concrete inspection shaft |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120118302.4U CN214574135U (en) | 2021-01-16 | 2021-01-16 | Precast concrete inspection shaft |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214574135U true CN214574135U (en) | 2021-11-02 |
Family
ID=78369163
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120118302.4U Expired - Fee Related CN214574135U (en) | 2021-01-16 | 2021-01-16 | Precast concrete inspection shaft |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214574135U (en) |
-
2021
- 2021-01-16 CN CN202120118302.4U patent/CN214574135U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN214498376U (en) | Independent supporting structure of post-cast strip template | |
CN214574135U (en) | Precast concrete inspection shaft | |
CN117364803A (en) | Rock soil slope body reinforcing structure for preventing slope deformation | |
CN211713926U (en) | Underwater dredging device for artificial pond | |
CN209759976U (en) | pavement paving device for pedestrian roads for road construction | |
CN209412965U (en) | A kind of municipal public engineering sewer trash-removal device | |
CN217870662U (en) | Drainage desilting device for road construction | |
CN208981482U (en) | Road surface drainage structure | |
CN206941657U (en) | A kind of basement post-pouring zone water sealing structure | |
CN109853322A (en) | Sponge city sectional polyurethane eco-landscape road | |
CN207960164U (en) | Prefabricated enclosure wall | |
CN209456840U (en) | A kind of pavement with compound drainage function | |
CN112359950A (en) | Garden road surface laying structure based on sponge city idea and construction method | |
CN208235680U (en) | Drainage inspection well protective device | |
CN218713183U (en) | Building construction deep basal pit drainage device | |
CN217869775U (en) | Make things convenient for prepackage type cement road structure of drainage | |
CN220150353U (en) | Rock-soil slope reinforcing device | |
CN220953759U (en) | Prevent to produce rainwater inspection shaft of deformation | |
CN219451002U (en) | Municipal road drainage device | |
CN116044245B (en) | Prefabricated enclosing wall capping and construction method for power substation | |
CN218757538U (en) | Sheet stone concrete slope protection structure | |
CN216180170U (en) | Special tool for disassembling well lid | |
CN209780329U (en) | Water-saving container board house | |
CN205875136U (en) | Manual hole digging pile water injection pouring structure | |
CN210066411U (en) | Rain sewage drainage ditch |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211102 |
|
CF01 | Termination of patent right due to non-payment of annual fee |