CN214570357U - Pipeline transportation device for heating and ventilation construction - Google Patents

Pipeline transportation device for heating and ventilation construction Download PDF

Info

Publication number
CN214570357U
CN214570357U CN202120881676.1U CN202120881676U CN214570357U CN 214570357 U CN214570357 U CN 214570357U CN 202120881676 U CN202120881676 U CN 202120881676U CN 214570357 U CN214570357 U CN 214570357U
Authority
CN
China
Prior art keywords
wall
supporting plate
pipeline
transportation device
supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120881676.1U
Other languages
Chinese (zh)
Inventor
王超
步宪冰
卢旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Engineering Group Co Ltd
Original Assignee
China Railway Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Engineering Group Co Ltd filed Critical China Railway Construction Engineering Group Co Ltd
Priority to CN202120881676.1U priority Critical patent/CN214570357U/en
Application granted granted Critical
Publication of CN214570357U publication Critical patent/CN214570357U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model provides a pipeline transportation device for heating and ventilation construction, which comprises a first supporting plate and two second supporting plates, wherein the outer walls of the bottoms of the first supporting plate and the two second supporting plates are respectively provided with four universal wheels, the outer wall of the top of the second supporting plate is provided with a balancing weight and an L-shaped supporting plate, the outer wall of one side of the L-shaped supporting plate is provided with an electric hoist and two side baffles, the outer wall of the electric hoist is provided with a traction rope, and the outer wall of the bottom of the traction rope is provided with a clamping frame; this device is through setting up first layer board and second layer board, use electric block to adjust the centre gripping frame to suitable height, then promote the second layer board forward, let clamp splice card down on the inner wall of pipeline, after two clamp splices on two second layer boards all blocked on the inner wall at pipeline both ends, two electric block in two L type backup pads of staff control upwards hoist two centre gripping frames respectively, thereby hoist pipeline whole from ground, roll the bottom in pipeline middle section with first layer board this moment again.

Description

Pipeline transportation device for heating and ventilation construction
Technical Field
The utility model relates to a pipeline transportation technical field, in particular to pipeline transportation device is used in warm logical construction.
Background
Warm logical pipeline transportation is comparatively general at the job site, and warm logical pipeline hoist and mount transportation work is mostly accomplished by hoist and trailer at the job site, and single pipe transportation can use fork truck occasionally, and fork truck's working range restriction is in small-bore pipeline or the less heavy-calibre pipeline of length, when the construction of somewhere needs to be changed or increases one section longer heavy-calibre pipeline, because partial section large-scale equipment can't get into to it is relatively more difficult to lead to heavy-calibre pipeline transportation.
Through the retrieval, chinese patent application number is CN 201922006166.5's patent, discloses a pipeline transportation device for warm construction that leads to, and above-mentioned device includes crossbeam post, flexible post, gyro wheel, electric block, couple, shaft, removal wheel, axle sleeve, short stand and stay cord, the both ends of crossbeam post are pegged graft and are had flexible post, flexible post top is supported and is fixed with electric block, but above-mentioned device only uses two couples to directly collude the pipeline, does not set up corresponding can carry out spacing mechanism to the pipeline, consequently still exists when transporting the pipeline, and the whole easy production of pipeline rocks, influences the whole problem of normally transporting of pipeline, for this reason, provides a pipeline transportation device for warm construction that leads to.
SUMMERY OF THE UTILITY MODEL
In view of this, the embodiment of the present invention is intended to provide a pipe transportation device for heating and ventilation construction, so as to solve or alleviate the technical problems existing in the prior art, and at least provide a beneficial choice.
The embodiment of the utility model provides a technical scheme is so realized: including first layer board and two second layer boards, first layer board and two second layer board bottom outer walls are provided with four universal wheels respectively, second layer board top outer wall is provided with balancing weight and L type backup pad, L type backup pad one side outer wall is provided with electric block and two side shields, the electric block outer wall is provided with the haulage rope, haulage rope bottom outer wall is provided with the centre gripping frame, L type backup pad one side outer wall is opened there is first direction spout, centre gripping frame sliding connection is on the inner wall of first direction spout, second layer board top outer wall is provided with the traction block, centre gripping frame one side outer wall is provided with down the clamp splice, first layer board top outer wall is provided with two collateral branch faggings, two collateral branch fagging one side outer walls are provided with the supporting shoe more than three.
In some embodiments, the outer wall of one side of the clamping frame is provided with two second guide sliding chutes, the inner walls of the two second guide sliding chutes are slidably connected with an upper clamping plate, the outer walls of two sides of the upper clamping plate are provided with two clamping blocks, and the outer walls of the clamping frame and the two clamping blocks are respectively provided with two threaded through holes.
In some embodiments, the outer walls of the upper clamping plate and the lower clamping block are respectively provided with an elastic friction block.
In some embodiments, the second layer board both sides outer wall is provided with two fixed blocks, and two rectangle through-holes have been opened respectively to two fixed block top outer walls, and two rectangle through-hole inner walls are provided with the fixed frame of two directions, and two fixed frame inner walls sliding connection of direction have two sliding support pole, and the outer wall of sliding support pole one side is opened there is the screw hole more than three, and sliding support pole bottom outer wall is provided with the supporting seat.
In some embodiments, eight hanging rings are respectively arranged on two L-shaped supporting plates and one side outer wall of two side supporting plates.
In some embodiments, the top outer wall of the L-shaped supporting plate is provided with a warning light, one side outer wall of the L-shaped supporting plate is provided with two stiffening ribs, and the bottom outer wall of the two stiffening ribs is arranged on the top outer wall of the second supporting plate.
In some embodiments, the outer wall of the bottom of the supporting block is provided with two sliding blocks, the outer wall of the bottom of the two sliding blocks is provided with four elastically contractible rods, the four elastically contractible rods are respectively arranged on the outer wall of the top of the first supporting plate, and the two sliding blocks are respectively connected to the outer wall of one side of the two side supporting plates in a sliding manner.
In some embodiments, the outer wall of the bottom of the supporting block is provided with a positioning block, and the outer wall of the top of the first supporting plate is provided with a plug board.
The embodiment of the utility model provides a owing to adopt above technical scheme, it has following advantage:
1. the clamping frame is adjusted to a proper height by arranging the first supporting plate and the second supporting plate and using the electric hoist, then the second supporting plate is pushed forwards to enable the lower clamping blocks to be clamped on the inner wall of the pipeline, when the two lower clamping blocks on the two second supporting plates are clamped on the inner walls at the two ends of the pipeline, the worker controls the two electric hoists on the two L-shaped supporting plates to respectively hoist the two clamping frames upwards, thereby hoisting the whole pipeline from the ground, rolling the first supporting plate to the bottom of the middle section of the pipeline, then the electric hoist is controlled to drive the clamping frame to move downwards for a proper distance, the outer wall of the pipeline is contacted with a plurality of supporting blocks at the top of the first supporting plate, the supporting blocks support the middle section of the pipeline, the two ends and the middle section of the pipeline are respectively supported and fixed through the supporting block and the two lower clamping blocks, so that the fixing effect of the conveying device on the pipeline is improved, and the pipeline can be more stable when the conveying device moves.
2. Through setting up the punch holder and pressing from both sides tight piece, when the inner wall of clamp holder card income pipeline down, staff's accessible second direction spout upper plate that slides downwards lets the punch holder card on the outer wall of pipeline, then will press from both sides tight piece through screw or bolt and fix on the outer wall of centre gripping frame to let lower clamp holder and punch holder block respectively on the inner wall and the outer wall of pipeline, improved the device to the holistic fixed effect of pipeline.
3. Through setting up sliding block and elastic shrinkage pole, when the conveyer transported the pipeline, can produce vibrations because of various reasons when removing, the elastic shrinkage pole can cushion the pipeline that produces vibrations this moment, avoids the pipeline to produce hard contact with the device when vibrations and leads to device or the impaired problem of pipeline to appear.
The foregoing summary is provided for the purpose of description only and is not intended to be limiting in any way. In addition to the illustrative aspects, embodiments, and features described above, further aspects, embodiments, and features of the present invention will be readily apparent by reference to the drawings and following detailed description.
Drawings
In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings needed to be used in the embodiments or technical descriptions will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present application, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
FIG. 1 is a front view structural diagram of the present invention;
FIG. 2 is a structural view of the L-shaped supporting plate of the present invention;
FIG. 3 is a side view of the L-shaped supporting plate of the present invention;
FIG. 4 is a view of the structure of the holding frame of the present invention;
fig. 5 is a first pallet structure diagram of the present invention.
Reference numerals: 1-first supporting plate, 2-second supporting plate, 3-balancing weight, 4-side baffle, 5-warning light, 6-L-shaped supporting plate, 7-side supporting plate, 8-hanging ring, 9-stiffening rib, 10-universal wheel, 11-guiding fixing frame, 12-sliding supporting rod, 13-supporting seat, 14-fixing block, 15-clamping frame, 16-pulling rope, 17-first guiding chute, 18-electric hoist, 19-pulling block, 20-clamping block, 21-upper clamping plate, 22-elastic friction block, 23-lower clamping block, 24-positioning block, 25-insertion plate, 26-elastic contraction rod, 27-sliding block, 28-supporting block and 29-second guiding chute.
Detailed Description
In the following, only certain exemplary embodiments are briefly described. As those skilled in the art will recognize, the described embodiments may be modified in various different ways, all without departing from the spirit or scope of the present invention. Accordingly, the drawings and description are to be regarded as illustrative in nature, and not as restrictive.
In the description of the present invention, it is to be understood that the terms "length," "width," "thickness," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like are used in the orientation or positional relationship indicated in the drawings for convenience in describing the present invention and for simplicity in description, and are not intended to indicate or imply that the device or element so referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus should not be construed as limiting the present invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically limited otherwise.
In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "connected," and "fixed" are to be construed broadly and may, for example, be fixedly connected, detachably connected, or integrally formed; the connection can be mechanical connection, electrical connection or communication; either directly or indirectly through intervening media, either internally or in any other relationship. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
In the present disclosure, unless expressly stated or limited otherwise, the first feature "on" or "under" the second feature may comprise direct contact between the first and second features, or may comprise contact between the first and second features not directly. Also, the first feature being "on," "above" and "over" the second feature includes the first feature being directly on and obliquely above the second feature, or merely indicating that the first feature is at a higher level than the second feature. A first feature being "under," "below," and "beneath" a second feature includes the first feature being directly above and obliquely above the second feature, or simply meaning that the first feature is at a lesser level than the second feature.
Embodiments of the present invention will be described in detail below with reference to the accompanying drawings.
Example 1:
as shown in fig. 1 to 5, a pipe transportation device for heating and ventilating construction includes a first supporting plate 1 and two second supporting plates 2, the outer walls of the bottoms of the first supporting plate 1 and the two second supporting plates 2 are respectively provided with four universal wheels 10, the outer wall of the top of each second supporting plate 2 is provided with a balancing weight 3 and an L-shaped supporting plate 6, the outer wall of one side of each L-shaped supporting plate 6 is provided with an electric hoist 18 and two side baffles 4, the outer wall of the electric hoist 18 is provided with a traction rope 16, the outer wall of the bottom of each traction rope 16 is provided with a clamping frame 15, the outer wall of one side of each L-shaped supporting plate 6 is provided with a first guide chute 17, each clamping frame 15 is connected to the inner wall of the corresponding first guide chute 17 in a sliding mode, the outer wall of the top of each second supporting plate 2 is provided with a traction block 19, the outer wall of one side of each clamping frame 15 is provided with a lower clamping block 23, the outer wall of the top of the first supporting plate 1 is provided with two side supporting plates 7, and the outer wall of one side of each two side supporting plates 7 is provided with more than three supporting blocks 28; support and fix the both ends and the middle section of pipeline respectively through supporting shoe 28 and two lower clamp splice 23, improved the fixed effect of conveyer to the pipeline, let the pipeline can be more stable when the conveyer removes, link to each other with the trailer wagon through traction block 19 again this moment, can stimulate conveyer area pipeline and remove, the staff can support the pipeline according to the quantity that concrete pipeline length increased first layer board 1.
In the embodiment, in order to further improve the fixing effect of the device on the pipeline; as shown in fig. 4, two second guide sliding grooves 29 are formed in the outer wall of one side of the clamping frame 15, the inner walls of the two second guide sliding grooves 29 are slidably connected with an upper clamping plate 21, two clamping blocks 20 are arranged on the outer walls of two sides of the upper clamping plate 21, and two threaded through holes are formed in the outer walls of the clamping frame 15 and the two clamping blocks 20 respectively; through setting up punch holder 21 and pressing from both sides tight piece 20, when the inner wall of clamp holder 23 card income pipeline down, staff's accessible second direction spout 29 lapse punch holder 21 lets punch holder 21 card on the outer wall of pipeline, then will press from both sides tight piece 20 through screw or bolt and fix on the outer wall of centre gripping frame 15 to let punch holder 23 and punch holder 21 block respectively on the inner wall and the outer wall of pipeline, improved the device to the holistic fixed effect of pipeline.
In the embodiment, in order to improve the clamping effect of the upper clamping plate 21 and the lower clamping block 23 on the pipeline; as shown in fig. 4, the outer walls of the upper clamping plate 21 and the lower clamping block 23 are respectively provided with an elastic friction block 22; through setting up elasticity clutch blocks 22, can improve the frictional force of punch holder 21 and lower clamp splice 23 and pipeline contact surface to let punch holder 21 and clamp splice 23 can be better carry out the centre gripping to the pipeline.
In the embodiment, in order to stably fix the second supporting plate 2 on the ground; as shown in fig. 2, two fixing blocks 14 are arranged on the outer walls of two sides of the second supporting plate 2, two rectangular through holes are respectively formed in the outer walls of the tops of the two fixing blocks 14, two guiding fixing frames 11 are arranged on the inner walls of the two rectangular through holes, two sliding support rods 12 are slidably connected to the inner walls of the two guiding fixing frames 11, more than three threaded holes are formed in the outer wall of one side of each sliding support rod 12, and a support base 13 is arranged on the outer wall of the bottom of each sliding support rod 12; through setting up sliding support pole 12 and supporting seat 13, when lifting up the pipeline, the staff can slide sliding support pole 12 through the fixed frame 11 lapse of direction, lets supporting seat 13 can support subaerial, then fixes sliding support pole 12's position through the screw to let sliding support pole 12 wholly fix second layer board 2, improved the holistic stability of device when lifting up the pipeline.
In the embodiment, in order to make the whole device move more stably; as shown in fig. 1, eight hanging rings 8 are respectively arranged on the outer walls of one side of the two L-shaped supporting plates 6 and one side of the two side supporting plates 7; through setting up link 8, after fixing the pipeline on the device, can use the rope to bind two second layer boards 2 and first layer board 1 together through link 8 to improve the holistic stability of device.
In the present embodiment, in order to improve the functionality of the entire apparatus; as shown in fig. 1, a warning light 5 is arranged on the outer wall of the top of the L-shaped support plate 6, two stiffening ribs 9 are arranged on the outer wall of one side of the L-shaped support plate 6, and the outer walls of the bottoms of the two stiffening ribs 9 are arranged on the outer wall of the top of the second supporting plate 2; through setting up warning light 5 and stiffening rib 9, when transporting the pipeline, the staff can open warning light 5, and warning light 5 lights the back and can warn people around dodging, and stiffening rib 9 can improve the holistic firm degree of L type backup pad 6 simultaneously.
When the utility model works, the worker firstly pushes the two second supporting plates 2 to the two ends of the pipeline placed on the ground through the universal wheels 10, then adjusts the clamping frames 15 to proper height through the electric hoist 18, then pushes the second supporting plates 2 forwards to lead the lower clamping blocks 23 to be clamped on the inner wall of the pipeline, after the two lower clamping blocks 23 on the two second supporting plates 2 are both clamped on the inner walls of the two ends of the pipeline, the worker controls the two electric hoists 18 on the two L-shaped supporting plates 6 to respectively hoist the two clamping frames 15 upwards so as to hoist the whole pipeline from the ground, at the moment, the first supporting plate 1 is rolled to the bottom of the middle section of the pipeline, then the electric hoist 18 is controlled to drive the clamping frames 15 to move downwards for proper distance, the outer wall of the pipeline is contacted with the plurality of supporting blocks 28 at the top of the first supporting plate 1, the supporting blocks 28 support the middle section of the pipeline, support and fix the both ends and the middle section of pipeline respectively through supporting shoe 28 and two lower clamp splice 23, improved the fixed effect of conveyer to the pipeline, let the pipeline can be more stable when the conveyer removes, link to each other with the trailer wagon through traction block 19 again this moment, can stimulate conveyer area pipeline and remove, the staff can support the pipeline according to the quantity that concrete pipeline length increased first layer board 1.
When the lower clamping block 23 is clamped into the inner wall of the pipeline, a worker can slide the upper clamping plate 21 downwards through the second guide sliding groove 29 to clamp the upper clamping plate 21 on the outer wall of the pipeline, then fix the clamping block 20 on the outer wall of the clamping frame 15 through screws or bolts, so that the lower clamping block 23 and the upper clamping plate 21 are respectively clamped on the inner wall and the outer wall of the pipeline, the friction force between the upper clamping plate 21 and the contact surface of the lower clamping block 23 and the pipeline can be improved through the arrangement of the elastic friction block 22, when the pipeline is lifted, the worker can slide the sliding support rod 12 downwards through the guide fixing frame 11 to enable the support seat 13 to be abutted against the ground, then fix the position of the sliding support rod 12 through the screws, so that the sliding support rod 12 fixes the second supporting plate 2 integrally, through the arrangement of the hanging ring 8, after the pipeline is fixed on the device, the two second supporting plates 2 and the first supporting plate 1 can be bound together through the hanging ring 8 by using a rope, when transporting the pipeline, the staff can open warning light 5, can warn people around after warning light 5 lights dodge, and stiffening rib 9 can improve the holistic firm degree of L type backup pad 6 simultaneously.
Example 2:
in order to improve the supporting effect of the first supporting plate 1 on the pipeline, the present embodiment improves the following on the basis of embodiment 1, as shown in fig. 2 and fig. 3, two sliding blocks 27 are arranged on the outer wall of the bottom of the supporting block 28, four elastically contractible rods 26 are arranged on the outer wall of the bottom of the two sliding blocks 27, the four elastically contractible rods 26 are respectively arranged on the outer wall of the top of the first supporting plate 1, and the two sliding blocks 27 are respectively connected to the outer wall of one side of the two side supporting plates 7 in a sliding manner; through setting up sliding block 27 and elastic shrinkage pole 26, when the conveyer transported the pipeline, can produce vibrations because of various reasons when removing, elastic shrinkage pole 26 can cushion the pipeline that produces vibrations this moment, avoids the pipeline to produce hard contact with the device when vibrations and leads to device or the impaired problem of pipeline to appear.
In this embodiment, the outer wall of the bottom of the supporting block 28 is provided with a positioning block 24, and the outer wall of the top of the first supporting plate 1 is provided with a plug board 25; through setting up locating piece 24 and plugboard 25, when pipeline extrusion supporting shoe 28 passed through sliding block 27 lapse, locating piece 24 can insert inside plugboard 25 to it is spacing to carry out the removal of supporting shoe 28, avoids supporting shoe 28 directly to collide with the top outer wall of first layer board 1.
The utility model discloses at the during operation, when conveyer transports the pipeline, can produce vibrations because of various reasons when removing, elastic shrinkage pole 26 can cushion the pipeline that produces vibrations this moment, when pipeline extrusion supporting shoe 28 passes through sliding block 27 lapse, inside locating piece 24 can insert plugboard 25 to it is spacing to remove supporting shoe 28, avoids supporting shoe 28 direct and first layer board 1's top outer wall to bump.
The above description is only for the specific embodiments of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art can easily think of various changes or substitutions within the technical scope of the present invention, which should be covered by the scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (8)

1. The utility model provides a pipeline transportation device is used in warm construction that leads to, includes first layer board (1) and two second layer boards (2), its characterized in that: the outer wall of the bottom of the first supporting plate (1) and the two second supporting plates (2) is provided with four universal wheels (10) respectively, the outer wall of the top of the second supporting plate (2) is provided with a balancing weight (3) and an L-shaped supporting plate (6), one side of the L-shaped supporting plate (6) is provided with an electric hoist (18) and two side baffles (4), the outer wall of the electric hoist (18) is provided with a traction rope (16), the outer wall of the bottom of the traction rope (16) is provided with a clamping frame (15), one side of the L-shaped supporting plate (6) is provided with a first guide sliding chute (17), the clamping frame (15) is slidably connected onto the inner wall of the first guide sliding chute (17), the outer wall of the top of the second supporting plate (2) is provided with a traction block (19), one side of the clamping frame (15) is provided with a lower clamping block (23), the outer wall of the top of the first supporting plate (1) is provided with two side supporting plates (7), and one side of the two side supporting plates (7) is provided with more than three supporting blocks (28).
2. The pipe transportation device for heating and ventilation construction according to claim 1, wherein: the outer wall of one side of the clamping frame (15) is provided with two second guide sliding grooves (29), the inner walls of the two second guide sliding grooves (29) are connected with an upper clamping plate (21) in a sliding mode, the outer walls of the two sides of the upper clamping plate (21) are provided with two clamping blocks (20), and the outer walls of the clamping frame (15) and the two clamping blocks (20) are provided with two threaded through holes respectively.
3. The pipe transportation device for heating and ventilation construction according to claim 2, wherein: and elastic friction blocks (22) are respectively arranged on the outer walls of the upper clamping plate (21) and the lower clamping block (23).
4. The pipe transportation device for heating and ventilation construction according to claim 3, wherein: the outer wall of second layer board (2) both sides is provided with two fixed blocks (14), and two rectangle through-holes have been opened respectively to two fixed block (14) top outer walls, and two rectangle through-hole inner walls are provided with the fixed frame of two directions (11), and the fixed frame of two directions (11) inner wall sliding connection has two sliding support pole (12), and the screw hole more than three is opened to sliding support pole (12) one side outer wall, and sliding support pole (12) bottom outer wall is provided with supporting seat (13).
5. The pipe transportation device for heating and ventilation construction according to claim 4, wherein: the two L-shaped supporting plates (6) and the two side supporting plates (7) are respectively provided with eight hanging rings (8) on the outer wall on one side.
6. The pipe transportation device for heating and ventilation construction according to claim 5, wherein: the outer wall of the top of the L-shaped supporting plate (6) is provided with a warning lamp (5), the outer wall of one side of the L-shaped supporting plate (6) is provided with two stiffening ribs (9), and the outer walls of the bottoms of the two stiffening ribs (9) are arranged on the outer wall of the top of the second supporting plate (2).
7. The pipe transportation device for heating and ventilation construction according to claim 6, wherein: supporting shoe (28) bottom outer wall is provided with two sliding blocks (27), and two sliding blocks (27) bottom outer walls are provided with four elastic shrinkage poles (26), and four elastic shrinkage poles (26) set up respectively on the top outer wall of first layer board (1), and two sliding blocks (27) sliding connection respectively are on the outer wall of one side of two collateral branch faggings (7).
8. The pipe transportation device for heating and ventilation construction according to claim 7, wherein: the outer wall of the bottom of the supporting block (28) is provided with a positioning block (24), and the outer wall of the top of the first supporting plate (1) is provided with a plug board (25).
CN202120881676.1U 2021-04-27 2021-04-27 Pipeline transportation device for heating and ventilation construction Active CN214570357U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120881676.1U CN214570357U (en) 2021-04-27 2021-04-27 Pipeline transportation device for heating and ventilation construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120881676.1U CN214570357U (en) 2021-04-27 2021-04-27 Pipeline transportation device for heating and ventilation construction

Publications (1)

Publication Number Publication Date
CN214570357U true CN214570357U (en) 2021-11-02

Family

ID=78361506

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120881676.1U Active CN214570357U (en) 2021-04-27 2021-04-27 Pipeline transportation device for heating and ventilation construction

Country Status (1)

Country Link
CN (1) CN214570357U (en)

Similar Documents

Publication Publication Date Title
CN212503731U (en) Boiler installation overhead hoist
CN211685258U (en) Chemical storage barrel transfer device
JP2020152500A (en) Block carrier installation device with swing preventive mechanism
CN214570357U (en) Pipeline transportation device for heating and ventilation construction
CN111293617A (en) Transfer device for power distribution cabinet
CN113636450A (en) Construction method for quickly installing ALC (autoclaved lightweight concrete) plate
CN211731366U (en) Steel coil transfer trolley
CN211076006U (en) Transfer device for power distribution cabinet
CN210604160U (en) Resistance to compression detection device for computer display screen
CN218313884U (en) Pyrocondensation pipe loading attachment
CN216111912U (en) Automatic change fixing device for industrial processing equipment
CN207892329U (en) A kind of adjustable guide rail bearing of vertical circulating garage
CN217320447U (en) A transfer frame for cooperating transfer car (buggy)
CN216102249U (en) Transfer device
CN216235517U (en) Elevator car decorates furred ceiling
CN210592041U (en) Auxiliary frame for assisting office furniture cabinet to move
CN211389404U (en) Aerated concrete block brick clamping machine
JP3168872B2 (en) Longitudinal tacking device for hull blocks
JP2000143145A (en) On-stair heavy cargo conveying device
CN211648036U (en) Casing operation trolley for geothermal well
CN217674805U (en) Carrying device for large-flow cleaning equipment
CN219823486U (en) Comprehensive pipeline lifting device
CN210260961U (en) Auxiliary mounting device for distribution box
CN207877181U (en) A kind of automatic brick laying machine system
CN210793212U (en) Small-size train booster

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant