CN214531805U - Quick detach formula scaffold frame is used in building engineering construction - Google Patents

Quick detach formula scaffold frame is used in building engineering construction Download PDF

Info

Publication number
CN214531805U
CN214531805U CN202120926872.6U CN202120926872U CN214531805U CN 214531805 U CN214531805 U CN 214531805U CN 202120926872 U CN202120926872 U CN 202120926872U CN 214531805 U CN214531805 U CN 214531805U
Authority
CN
China
Prior art keywords
scaffold
supporting frame
limiting rod
fixed
building engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120926872.6U
Other languages
Chinese (zh)
Inventor
王芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Zhongwu Construction Group Co ltd
Original Assignee
Anhui Jielin Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Jielin Construction Engineering Co ltd filed Critical Anhui Jielin Construction Engineering Co ltd
Priority to CN202120926872.6U priority Critical patent/CN214531805U/en
Application granted granted Critical
Publication of CN214531805U publication Critical patent/CN214531805U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a quick-dismantling scaffold for building engineering construction, which belongs to the field of building engineering, and comprises a fixed base, wherein a limiting rod is firstly drawn out from the inside of the fixed base, a supporting plate is taken out, the supporting frame is respectively rotated on two sides, in the rotating process of the supporting frame, the supporting frame is limited by a baffle plate, the drawn limiting rod is embedded into the inner side of the upper end of the supporting frame through a fixed groove to limit, the stability of the scaffold is improved, finally the supporting plate is embedded into and limited and fixed on the upper end of the supporting frame through a limiting groove, and the supporting plate is supported by the limiting rod, thereby ensuring the stress support of the supporting plate, being convenient for quickly carrying out the dismounting operation on the scaffold, ensuring the stability of the scaffold after being installed, and simultaneously ensuring the integrity of the whole structure of the scaffold after being dismounted, is convenient for constructors to carry.

Description

Quick detach formula scaffold frame is used in building engineering construction
Technical Field
The utility model relates to a building engineering field, more specifically say, relate to a quick detach formula scaffold frame for building engineering construction.
Background
The building engineering refers to an engineering entity formed by the construction of various building constructions and auxiliary facilities thereof and the installation activities of lines, pipelines and equipment matched with the building constructions, wherein the house building refers to a project which has a top cover, a beam column, a wall, a foundation and can form an internal space and meet the requirements of production, living, learning and public activities of people, civil engineering, building environment and energy application engineering, water supply and drainage science and engineering, building electrical and intellectualization, architecture, urban and rural planning, landscape and garden, engineering management and engineering cost, real estate development and management and property management 9 subject professional guidance committees (hereinafter referred to as professional guidance committees), corresponding to 11 professions such as earth and wood, buildings, management science and engineering (parts) and industrial and commercial management (parts) in the 'professional catalogs of this department of higher school'.
Traditional scaffold is at the in-process of using, and its scaffold is convenient for carry out the split, and is great because of the whole volume of scaffold, inconvenient constructor's transport.
SUMMERY OF THE UTILITY MODEL
1. Technical problem to be solved
Aiming at the problems in the prior art, the utility model aims to provide a quick-dismantling scaffold for construction engineering, firstly, a limiting rod is drawn out from the inside of a fixed base, a supporting plate is taken out, then a supporting frame is respectively rotated on two sides, the supporting frame is limited by a baffle in the rotating process of the supporting frame, the drawn limiting rod is embedded in the inner side of the upper end of the supporting frame through a fixed groove for limiting, the stability of the scaffold is improved, finally, the supporting plate is embedded in and limited and fixed on the upper end of the supporting frame through a limiting groove, and the supporting plate is supported by the limiting rod, the stress support of the supporting plate is ensured, after the scaffold is assembled, a constructor moves to the upper part of the supporting plate through a climbing rod for construction operation, the rapid disassembly and assembly operation of the scaffold can be realized, and the stability of the scaffold after the scaffold is installed is ensured, and meanwhile, after the scaffold is detached, the integrity of the whole structure of the scaffold is ensured, and the scaffold is convenient for constructors to carry.
2. Technical scheme
In order to solve the above problems, the utility model adopts the following technical proposal.
A quick-release scaffold for construction engineering comprises a fixed base, wherein a supporting plate is embedded in the lower end of the fixed base, a limiting rod is embedded in the outer end of the fixed base, the supporting plate is fixedly embedded at the lower end of the fixed base through the limiting rod, an embedding groove is formed in the outer end of the supporting plate, a limiting groove is formed in the corner of the supporting plate, two ends of the upper surface of the fixed base are rotatably connected with a supporting frame, a climbing rod is clamped and fixed in the inner side of the supporting frame, a fixing groove is formed in the inner side of the upper end of the supporting frame, two ends of the upper surface of the fixed base are fixedly provided with a baffle, the baffle is positioned on the outer side of the supporting frame, the limiting rod is firstly drawn out from the inside of the fixed base, the supporting plate is taken out, the supporting frame is respectively rotated towards two sides, and the supporting frame is limited through the baffle in the rotating process, the gag lever post that takes out passes through the fixed slot, the embedding is spacing in braced frame's upper end inboard, improve the stability of scaffold, at last pass through the spacing groove embedding with the layer board and spacing the upper end of fixing at braced frame, and the layer board carries out the bearing through the gag lever post, the atress of guarantee layer board is supported, after scaffold assembly finishes, constructor removes the top to the layer board through the pole of climbing and carries out the construction operation, can realize being convenient for carry out the dismouting operation fast to scaffold, guarantee scaffold installation's stability after, guarantee scaffold frame is after dismantling simultaneously, its overall structure's integrality, the constructor of being convenient for carries.
Further, gomphosis groove and braced frame's upper end phase-match, the both ends and the fixed slot phase-match of gag lever post, the bearing through fixed slot cooperation gag lever post carries out spacing fixed to the layer board in braced frame's upper end, and the quick installation and the dismantlement of the layer board of being convenient for ensure the stability of layer board installation.
Furthermore, the outer end of the fixed base is fixedly provided with an embedding opening, the embedding opening is matched with the embedding groove, the outer circumferential surface of the embedding opening is in threaded connection with a cover cap, the inserting of the limiting rod can be sealed and limited, after the scaffold is disassembled, the integrity of the whole structure is guaranteed, and the phenomenon that the limiting rod falls off in the carrying process is prevented.
Furthermore, the fixed base is fixedly provided with a lifting block at the upper end, a supporting frame and the lifting block at one position form a rotating connection, the supporting frame and the fixed base form a cavity after being folded and stored through the lifting block, the supporting frame at the other position is convenient to fold and store, and the attractiveness of the overall structure of the scaffold after being folded and stored is guaranteed.
Furthermore, the lower extreme bonding of braced frame has the extrusion layer, the component that the extrusion layer adopted the rubber material to make, braced frame carries out the pivoted in-process to both sides, through laminating mutually between extrusion layer and the baffle, prevents that braced frame from taking place rigid collision when rotating and between the baffle.
3. Advantageous effects
Compared with the prior art, the utility model has the advantages of:
(1) the proposal firstly draws out the limiting rod from the inside of the fixed base, takes out the supporting plate, then rotates the supporting frames respectively at two sides, in the process of rotating the supporting frame, the supporting frame is limited by the baffle plate, the extracted limiting rod is embedded into the inner side of the upper end of the supporting frame for limiting through the fixed groove, the stability of the scaffold is improved, finally, the supporting plate is embedded into and limited and fixed at the upper end of the supporting frame through the limiting groove and is supported through the limiting rod, so that the stressed support of the supporting plate is ensured, after the scaffold is assembled, the constructor moves to the upper part of the supporting plate through the climbing rod to carry out construction operation, can realize the convenient and fast disassembly and assembly operation of the scaffold, ensure the stability of the scaffold after installation, and meanwhile, after the scaffold is detached, the integrity of the whole structure of the scaffold is ensured, and the scaffold is convenient for constructors to carry.
(2) The gomphosis groove matches with braced frame's upper end, and the both ends and the fixed slot phase-match of gag lever post, and the bearing through fixed slot cooperation gag lever post carries out spacing fixed to the layer board in braced frame's upper end, and the quick installation and the dismantlement of the layer board of being convenient for ensure the stability of layer board installation.
(3) The outer end fixed mounting of unable adjustment base has the embedding mouth, inlays to be identical between entry and the gomphosis groove, inlays the outer periphery threaded connection who enters the mouth and has the block, can seal spacing to inserting of gag lever post and establish, when scaffold frame dismantles the back, ensures overall structure's integrality, prevents that the phenomenon that drops appears in the in-process gag lever post of transport.
(4) The lifting block is fixedly mounted at the upper end of the fixed base, the supporting frame and the lifting block are rotatably connected, the supporting frame is folded to form a cavity between the folded and stored back and the fixed base through the lifting block, the supporting frame at the other position is convenient to fold and store, and the attractiveness of the overall structure of the scaffold is guaranteed after the scaffold is folded and stored.
(5) The lower extreme bonding of braced frame has the extrusion layer, and the component that the extrusion layer adopted the rubber material to make, braced frame carries out the pivoted in-process to both sides, through laminating mutually between extrusion layer and the baffle, prevents that braced frame from taking place the rigidity collision when rotating and between the baffle.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the structure of the present invention showing the separated state of the integral supporting board;
FIG. 3 is a schematic structural view of the overall installation state of the present invention;
fig. 4 is an enlarged schematic view of a portion a in fig. 3.
The reference numbers in the figures illustrate:
the device comprises a fixed base 1, an embedding opening 101, a cap 102, a lifting block 103, a supporting plate 2, a limiting rod 3, a embedding groove 4, a limiting groove 5, a supporting frame 6, an extrusion layer 601, a climbing rod 7, a fixing groove 8 and a baffle 9.
Detailed Description
The technical solution in the embodiment of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiment of the present invention; obviously, the described embodiments are only a part of the embodiments of the present invention, and not all embodiments, and all other embodiments obtained by those skilled in the art without any inventive work are within the scope of the present invention based on the embodiments of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "top/bottom", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "sleeved/connected", "connected", and the like are to be understood in a broad sense, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Example (b):
referring to fig. 1-4, a quick-release scaffold for construction of building engineering, comprising a fixing base 1, a supporting plate 2 embedded in the lower end of the fixing base 1, a limiting rod 3 embedded in the outer end of the fixing base 1, a supporting plate 2 fixed on the lower end of the fixing base 1 through the limiting rod 3, an embedding groove 4 formed in the outer end of the supporting plate 2, a limiting groove 5 formed in the corner of the supporting plate 2, a supporting frame 6 rotatably connected to both ends of the upper surface of the fixing base 1, a climbing rod 7 clamped and fixed in the inner side of the supporting frame 6, a fixing groove 8 formed in the inner side of the upper end of the supporting frame 6, a baffle 9 fixedly mounted at both ends of the upper surface of the fixing base 1, the baffle 9 located at the outer side of the supporting frame 6, wherein the limiting rod 3 is firstly drawn out from the inside of the fixing base 1, the supporting plate 2 is taken out, the supporting frame 6 is rotated on both sides, and during the rotation of the supporting frame 6, carry on spacingly to braced frame 6 through baffle 9, gag lever post 3 that takes out passes through fixed slot 8, the embedding is carried on spacingly in braced frame 6's upper end inboard, improve scaffold's stability, at last with layer board 2 through 5 imbeds of spacing groove and spacing upper end of fixing at braced frame 6, and layer board 2 carries out the bearing through gag lever post 3, guarantee layer board 2's atress is supported, after scaffold assembly finishes, constructor removes to layer board 2's top through climbing pole 7 and carries out the construction operation, can realize being convenient for carry out the dismouting operation fast to scaffold, guarantee scaffold installation's stability after, guarantee scaffold is in the dismantlement back simultaneously, its overall structure's integrality, the constructor of being convenient for carries.
Referring to fig. 2-3, an inserting port 101 is fixedly installed at the outer end of a fixing base 1, the inserting port 101 is matched with an inserting groove 4, a cap 102 is connected to the outer circumferential surface of the inserting port 101 in a threaded manner, the inserting of a limiting rod 3 can be sealed and limited, after the scaffold is disassembled, the integrity of the whole structure is guaranteed, the phenomenon that the limiting rod 3 falls off in the carrying process is prevented, a lifting block 103 is fixedly installed at the upper end of the fixing base 1, a supporting frame 6 and the lifting block 103 form a rotary connection, a cavity is formed between the supporting frame 6 and the fixing base 1 after the scaffold is folded and stored through the lifting block 103, the supporting frame 6 at the other position is convenient to fold and store, the attractiveness of the whole structure of the scaffold after the scaffold is folded and stored is guaranteed, an extrusion layer 601 is bonded to the lower end of the supporting frame 6, and the extrusion layer 601 is made of rubber material, in the process that the supporting frame 6 rotates towards two sides, the extrusion layer 601 is attached to the baffle 9, so that the supporting frame 6 is prevented from rigidly colliding with the baffle 9 during rotation.
Referring to fig. 4, the fitting groove 4 is matched with the upper end of the supporting frame 6, the two ends of the limiting rod 3 are matched with the fixing grooves 8, and the supporting plate 2 is limited and fixed at the upper end of the supporting frame 6 through the fixing grooves 8 matched with the limiting rod 3, so that the supporting plate 2 can be mounted and dismounted quickly, and the mounting stability of the supporting plate 2 is guaranteed.
In the utility model, when the related technicians use the device, firstly, the limiting rod 3 is drawn out from the inside of the fixed base 1, the supporting plate 2 is taken out, then the supporting frame 6 is respectively rotated towards two sides, in the process of rotating the supporting frame 6, the supporting frame 6 is limited by the baffle 9, the drawn limiting rod 3 is embedded in the inner side of the upper end of the supporting frame 6 through the fixed slot 8 for limiting, the stability of the scaffold is improved, finally, the supporting plate 2 is embedded in and limited and fixed at the upper end of the supporting frame 6 through the limiting slot 5, and the supporting plate 2 is supported by the limiting rod 3, the stress support of the supporting plate 2 is ensured, after the scaffold is assembled, constructors move to the upper part of the supporting plate 2 through the climbing rod 7 for construction operation, the rapid disassembly and assembly operation of the scaffold can be realized, the stability after the scaffold is installed is ensured, and meanwhile, after the scaffold is detached, the integrity of the whole structure of the scaffold is ensured, and the scaffold is convenient for constructors to carry.
The above description is only the preferred embodiment of the present invention; the scope of the present invention is not limited thereto. Any person skilled in the art should also be able to cover the technical scope of the present invention by replacing or changing the technical solution and the improvement concept of the present invention with equivalents and modifications within the technical scope of the present invention.

Claims (5)

1. The utility model provides a building engineering construction is with quick detach formula scaffold, includes unable adjustment base (1), its characterized in that: the utility model discloses a fixing device for fixing base, including unable adjustment base (1), limiting rod (3), the lower extreme in unable adjustment base (1) is inlayed to the lower extreme inside of unable adjustment base (1), limiting rod (3) are installed in unable adjustment base (1) outer end embedding, limiting rod (2) are fixed to inlay through limiting rod (3) and are established at the lower extreme of unable adjustment base (1), gomphosis groove (4) have been seted up to the outer end of layer board (2), spacing groove (5) have been seted up to the edge of layer board (2), the upper surface both ends of unable adjustment base (1) all rotate and are connected with braced frame (6), braced frame (6) inboard centre gripping is fixed with pole (7) of climbing, fixed slot (8) have been seted up to the upper end inboard of braced frame (6), the equal fixed mounting in upper surface both ends of unable adjustment base (1) has baffle (9), baffle (9) are located the outside of braced frame (6).
2. The quick-release scaffold for building engineering construction according to claim 1, characterized in that: the embedded groove (4) is matched with the upper end of the supporting frame (6), and the two ends of the limiting rod (3) are matched with the fixing groove (8).
3. The quick-release scaffold for building engineering construction according to claim 1, characterized in that: the outer end of the fixed base (1) is fixedly provided with an embedding opening (101), the embedding opening (101) is matched with the embedding groove (4), and the outer circumferential surface of the embedding opening (101) is in threaded connection with a cap (102).
4. The quick-release scaffold for building engineering construction according to claim 1, characterized in that: the upper end of the fixed base (1) is fixedly provided with a lifting block (103), and one part of the fixed base is rotatably connected with the lifting block (103) through the supporting frame (6).
5. The quick-release scaffold for building engineering construction according to claim 1, characterized in that: the lower end of the supporting frame (6) is bonded with an extrusion layer (601), and the extrusion layer (601) is a member made of rubber.
CN202120926872.6U 2021-04-30 2021-04-30 Quick detach formula scaffold frame is used in building engineering construction Active CN214531805U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120926872.6U CN214531805U (en) 2021-04-30 2021-04-30 Quick detach formula scaffold frame is used in building engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120926872.6U CN214531805U (en) 2021-04-30 2021-04-30 Quick detach formula scaffold frame is used in building engineering construction

Publications (1)

Publication Number Publication Date
CN214531805U true CN214531805U (en) 2021-10-29

Family

ID=78276264

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120926872.6U Active CN214531805U (en) 2021-04-30 2021-04-30 Quick detach formula scaffold frame is used in building engineering construction

Country Status (1)

Country Link
CN (1) CN214531805U (en)

Similar Documents

Publication Publication Date Title
CN207600456U (en) Building detection instrument
CN214531805U (en) Quick detach formula scaffold frame is used in building engineering construction
CN102277982A (en) Yurt applicable to astronomical phenomenon observation
CN213573365U (en) A warning guardrail for building engineering construction
CN104345357A (en) Real-time meteorological parameter acquisition device
CN214034101U (en) Splicing type movable board house
CN213263687U (en) Building pipe fitting rack for civil engineering
CN205692519U (en) New tourism management drop loss propaganda board
CN211736657U (en) Building safety device that stability is good
CN208704741U (en) A kind of multifunctional engineering surveying instrument
CN210066566U (en) Night electric energy indication board capable of being used for evacuation traffic
CN212203905U (en) Temperature instrument mounting structure that stability is good
CN213337259U (en) Outer wall check out test set for building engineering convenient to remove
CN214481640U (en) Public safety uses outdoor watertight fittings
CN217820879U (en) Beidou building deformation monitoring device
CN206687522U (en) Portable voice exhibiting device
CN215832664U (en) Foundation detection device for building engineering
CN218095310U (en) Surveying and mapping engineering tripod
CN220865349U (en) Reflector license plate support convenient to install
CN213269059U (en) Building engineering strutting arrangement
CN214886040U (en) Dust screen for building engineering
CN214554596U (en) Portable panel spraying platform for building engineering
CN217924076U (en) Municipal works ventilates and builds structure
CN203982193U (en) A kind of intelligent mobile robot universal developing platform
CN218179898U (en) Double-shaft driving positioning device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220907

Address after: No. 381, Shiji Village, Zhuji Township, Huaiyang County, Zhoukou City, Henan Province 466700

Patentee after: Chen Chunguang

Address before: 242000 e-commerce building, Hongdong Road, Honglin Town, Xuanzhou District, Xuancheng City, Anhui Province

Patentee before: Anhui Jielin Construction Engineering Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220928

Address after: No. 1696, Floor 12, Unit 2, Building 1, No. 9, Science Avenue, Zhengzhou Hi tech Development Zone, 450000 Henan Province

Patentee after: Henan Zhongwu Construction Group Co.,Ltd.

Address before: No. 381, Shiji Village, Zhuji Township, Huaiyang County, Zhoukou City, Henan Province 466700

Patentee before: Chen Chunguang