CN214531800U - Civil engineering construction support - Google Patents
Civil engineering construction support Download PDFInfo
- Publication number
- CN214531800U CN214531800U CN202120343006.4U CN202120343006U CN214531800U CN 214531800 U CN214531800 U CN 214531800U CN 202120343006 U CN202120343006 U CN 202120343006U CN 214531800 U CN214531800 U CN 214531800U
- Authority
- CN
- China
- Prior art keywords
- groove
- rod
- civil engineering
- sliding
- engineering construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 32
- 238000003780 insertion Methods 0.000 claims description 15
- 230000037431 insertion Effects 0.000 claims description 15
- 230000001681 protective effect Effects 0.000 claims description 5
- 230000009194 climbing Effects 0.000 description 5
- 238000009435 building construction Methods 0.000 description 4
- 210000001503 joint Anatomy 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Images
Abstract
The utility model discloses a civil engineering construction support, including bracing piece and screw, one side of bracing piece is seted up flutedly, the draw-in groove has been seted up at the both ends of recess, the inside of recess is provided with the bottom plate, the inside of draw-in groove is provided with the arch, bellied one side is fixed with the bottom plate, the screw runs through the bottom plate and is connected with the bracing piece, one side of bottom plate is fixed with the handle, the lag has been cup jointed in the outside of handle, one side that the handle was kept away from to the bracing piece is fixed with the support frame, one side that the bracing piece is close to the support frame is connected with the connecting rod, the outside of connecting rod is provided with the sleeve pipe. This civil engineering construction support with the outside pulling of pull rod for the fixture block breaks away from the inserting groove, slides the slide bar along the spout lapse again, when removing suitable position, loosens the pull rod, makes the spring can impel the corresponding inserting groove with the fixture block in, thereby is convenient for adjust the foot and steps on the position, makes things convenient for the staff to scramble.
Description
Technical Field
The utility model relates to a construction technical field specifically is a civil engineering construction support.
Background
During building construction, civil engineering is to build various engineering facilities, and the construction support is a working platform which is set up for ensuring that each construction process is smoothly carried out, but the stepping position of the civil engineering construction support on the current market is not easy to adjust, and the requirement on the civil engineering construction support is higher and higher, so that the working efficiency of the civil engineering construction support can be improved through innovation of the civil engineering construction support, and the civil engineering construction support can exert the maximum value.
Although the civil engineering construction support on the market is very large in variety and number, the civil engineering construction support has the following defects: constructor is comparatively difficult when climbing, and the constructor instrument is inconvenient to be put and civil engineering building construction support foot is stepped on the position and is difficult to adjust when the construction. Therefore, the prior civil engineering construction support is required to be improved.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a civil engineering construction support to it is comparatively difficult when solving the constructor climbing on the existing market that above-mentioned background art provided, constructor's instrument is inconvenient when the construction puts and civil engineering construction support foot steps on the difficult problem of adjusting of position.
In order to achieve the above object, the utility model provides a following technical scheme: a civil engineering building construction support comprises a supporting rod and a screw, wherein one side of the supporting rod is provided with a groove, two ends of the groove are provided with clamping grooves, a bottom plate is arranged inside the groove, a bulge is arranged inside the clamping groove, and one side of the bulge is fixed with the bottom plate;
the screw penetrates through the bottom plate to be connected with the supporting rod, a handle is fixed on one side of the bottom plate, a protective sleeve is sleeved on the outer side of the handle, a supporting frame is fixed on one side of the supporting rod, which is far away from the handle, a connecting rod is connected to one side of the supporting rod, which is close to the supporting frame, a sleeve is arranged on the outer side of the connecting rod, and a collecting basket is fixed on one side of the sleeve;
the utility model discloses a support frame, including bracing piece, support frame, spout, clamping bar.
Preferably, the cross section of the protrusion is semicircular, the protrusion is made of rubber, the size of the protrusion is matched with that of the clamping groove, and the protrusion forms a clamping structure between the clamping groove and the supporting rod.
Preferably, the cross section of the sleeve is in a C shape, and the connecting size of the sleeve and the connecting rod is matched.
Preferably, the diameter of the sliding rod is matched with that of the sliding groove, and the sliding rod and the ladder stand form a sliding structure through the sliding groove.
Preferably, the section of the insertion groove is U-shaped, the insertion grooves are distributed at equal intervals relative to the inner wall surface of the sliding rod, the connection sizes of the insertion grooves and the clamping blocks are matched, and the insertion grooves and the clamping blocks form insertion connection.
Preferably, the pull rod and the fixture block are vertically distributed, and the length of the pull rod is greater than the width of the fixing groove.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) when workers need to climb the device, the bottom plate is inserted into the groove in a sliding mode, and when the bulge on one side of the bottom plate is completely clamped with the clamping groove, the screw penetrates through the bottom plate and is connected with the supporting rod, so that the handle is stably installed on the supporting rod, and the climbing of the constructors is facilitated;
(2) according to the civil engineering construction support, the sleeve is clamped on the connecting rod, the sleeve is not easy to rotate after being installed due to the fact that the cross section of the connecting rod is oval, the sleeve is not easy to drop after being installed due to the fact that the length of the opening of the sleeve is smaller than the width of the connecting rod, and a worker can place a tool into the collecting basket during construction, so that the worker can place the tool during construction conveniently;
(3) this civil engineering construction support with the outside pulling of pull rod for the fixture block breaks away from the inserting groove, slides the slide bar along the spout lapse again, when removing suitable position, loosens the pull rod, makes the spring can impel the corresponding inserting groove with the fixture block in, thereby is convenient for adjust the foot and steps on the position, makes things convenient for the staff to scramble.
Drawings
FIG. 1 is a schematic structural view of a front cross section of the present invention;
FIG. 2 is a right side view of the structure of the present invention;
FIG. 3 is a schematic view of the right cross-sectional structure of the present invention;
FIG. 4 is a schematic view of a partial enlarged structure at A in FIG. 1 according to the present invention;
fig. 5 is a schematic view of a part of the enlarged structure at B in fig. 3 according to the present invention.
In the figure: 1. a support bar; 2. a groove; 3. a card slot; 4. a base plate; 5. a protrusion; 6. a screw; 7. a handle; 8. a protective sleeve; 9. a support frame; 10. a connecting rod; 11. a sleeve; 12. a collection basket; 13. climbing a ladder; 14. a chute; 15. fixing grooves; 16. a slide bar; 17. inserting grooves; 18. a clamping block; 19. a pull rod; 20. a spring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides a technical solution: a civil engineering building construction support comprises a supporting rod 1, a groove 2, a clamping groove 3, a bottom plate 4, a protrusion 5, a screw 6, a handle 7, a protective sleeve 8, a supporting frame 9, a connecting rod 10, a sleeve 11, a collecting basket 12, a ladder 13, a sliding groove 14, a fixing groove 15, a sliding rod 16, an inserting groove 17, a clamping block 18, a pull rod 19 and a spring 20, wherein the groove 2 is formed in one side of the supporting rod 1, the clamping groove 3 is formed in two ends of the groove 2, the bottom plate 4 is arranged in the groove 2, the protrusion 5 is arranged in the clamping groove 3, the cross section of the protrusion 5 is semicircular, the protrusion 5 is made of rubber, the size of the protrusion 5 is matched with that of the clamping groove 3, the protrusion 5 forms a clamping structure with the supporting rod 1 through the clamping groove 3, the protrusion 5 is connected with the clamping groove 3, and the handle 7 is convenient to be positioned and installed, one side of the bulge 5 is fixed with the bottom plate 4;
the screw 6 penetrates through the bottom plate 4 to be connected with the supporting rod 1, a handle 7 is fixed on one side of the bottom plate 4, a protective sleeve 8 is sleeved on the outer side of the handle 7, a supporting frame 9 is fixed on one side, away from the handle 7, of the supporting rod 1, a connecting rod 10 is connected to one side, close to the supporting frame 9, of the supporting rod 1, a sleeve 11 is arranged on the outer side of the connecting rod 10, the cross section of the sleeve 11 is C-shaped, the connecting size of the sleeve 11 and the connecting rod 10 is matched, the sleeve 11 is connected with the connecting rod 10, installation of the sleeve 11 on the connecting rod 10 is facilitated, and a collecting basket 12 is fixed on one side of the sleeve 11;
a ladder stand 13 is arranged on one side of the support rod 1 adjacent to the support frame 9, a sliding groove 14 is arranged in the ladder stand 13, a fixing groove 15 is arranged on one side of the sliding groove 14, a sliding rod 16 is arranged in the sliding groove 14, the diameter of the sliding rod 16 is matched with that of the sliding groove 14, the sliding rod 16 forms a sliding structure with the ladder stand 13 through the sliding groove 14, so that the sliding rod 16 can slide in the sliding groove 14, the stepping position of a constructor is convenient to adjust, an inserting groove 17 is arranged on the inner wall surface of the sliding rod 16, the section of the inserting groove 17 is in a U shape, the inserting grooves 17 are distributed at equal intervals relative to the inner wall surface of the sliding rod 16, the connecting sizes of the inserting grooves 17 and the clamping blocks 18 are matched, and the inserting groove 17 is connected with the clamping blocks 18 in an inserting mode, so that the clamping blocks 18 are connected with the inserting grooves 17, and the position of the sliding rod 16 in the sliding groove 14 is convenient to fix, a clamping block 18 is arranged inside the fixing groove 15, one end, far away from the insertion groove 17, of the clamping block 18 is connected with a pull rod 19, the pull rod 19 and the clamping block 18 are vertically distributed, the length of the pull rod 19 is larger than the width of the fixing groove 15, one end of the pull rod 19 penetrates through the ladder stand 13, the clamping block 18 is convenient to pull, and a spring 20 is sleeved outside the pull rod 19.
The working principle is as follows: when the civil engineering construction support is used, firstly, the support rod 1 is placed at a designated position, then the support frame 9 is in butt joint with the support rod 1, so that the device is not easy to topple over when in use, then the sleeve 11 is clamped on the connecting rod 10, because the cross section of the connecting rod 10 is in an oval shape, the sleeve 11 is not easy to rotate after being installed, when the sleeve 11 is completely in butt joint with the connecting rod 10, the sleeve 11 is not easy to drop after being installed due to the fact that the opening length of the sleeve 11 is smaller than the width of the connecting rod 10, then the collecting basket 12 is installed on one side far away from the opening of the sleeve 11, so that a worker can conveniently place tools during construction, then, when the worker needs to climb on the device, the bottom plate 4 at the bottom of the handle 7 is inserted into the groove 2 in a sliding manner, when the bulge 5 on one side of the bottom plate 4 is clamped with the clamping groove 3, the screw 6 penetrates through the bottom plate 4 to be connected with the support rod 1, so that the handle 7 is stably installed on the supporting rod 1, then the pull rod 19 is pulled outwards to separate the fixture block 18 from the insertion slot 17, the slide rod 16 is moved downwards along the slide slot 14 inside the ladder stand 13, when the slide rod is moved to a designated position, the pull rod 19 is released, so that the spring 20 can push the fixture block 18 into the corresponding insertion slot 17, so that the stepping position can be adjusted, thereby facilitating the climbing of workers, and the content not described in detail in the description belongs to the prior art known by the skilled person.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.
Claims (6)
1. The utility model provides a civil engineering construction support, includes bracing piece (1) and screw (6), its characterized in that: a groove (2) is formed in one side of the supporting rod (1), clamping grooves (3) are formed in two ends of the groove (2), a bottom plate (4) is arranged inside the groove (2), a protrusion (5) is arranged inside the clamping groove (3), and one side of the protrusion (5) is fixed with the bottom plate (4);
the screw (6) penetrates through the bottom plate (4) to be connected with the supporting rod (1), a handle (7) is fixed on one side of the bottom plate (4), a protective sleeve (8) is sleeved on the outer side of the handle (7), a supporting frame (9) is fixed on one side, away from the handle (7), of the supporting rod (1), a connecting rod (10) is connected on one side, close to the supporting frame (9), of the supporting rod (1), a sleeve (11) is arranged on the outer side of the connecting rod (10), and a collecting basket (12) is fixed on one side of the sleeve (11);
the supporting rod is characterized in that a ladder stand (13) is arranged on one adjacent side, close to the supporting frame (9), of the supporting rod (1), a sliding groove (14) is formed in the ladder stand (13), a fixing groove (15) is formed in one side of the sliding groove (14), a sliding rod (16) is arranged in the sliding groove (14), an insertion groove (17) is formed in the surface of the inner wall of the sliding rod (16), a clamping block (18) is arranged in the fixing groove (15), one end, far away from the insertion groove (17), of the clamping block (18) is connected with a pull rod (19), and a spring (20) is sleeved on the outer side of the pull rod (19).
2. The civil engineering construction support of claim 1, wherein: the cross-sectional shape of arch (5) is semi-circular, and arch (5) adopt the rubber material to the size phase-match of the size of arch (5) and draw-in groove (3), constitute the block structure in addition between arch (5) through draw-in groove (3) and bracing piece (1).
3. The civil engineering construction support of claim 1, wherein: the cross section of the sleeve (11) is C-shaped, and the connecting size of the sleeve (11) and the connecting rod (10) is matched.
4. The civil engineering construction support of claim 1, wherein: the diameter of the sliding rod (16) is matched with that of the sliding groove (14), and the sliding rod (16) forms a sliding structure with the ladder stand (13) through the sliding groove (14).
5. The civil engineering construction support of claim 1, wherein: the section of the insertion groove (17) is U-shaped, the insertion grooves (17) are distributed at equal intervals relative to the inner wall surface of the sliding rod (16), the connection sizes of the insertion grooves (17) and the clamping blocks (18) are matched, and the insertion grooves (17) and the clamping blocks (18) are in insertion connection.
6. The civil engineering construction support of claim 1, wherein: the pull rod (19) and the clamping block (18) are vertically distributed, and the length of the pull rod (19) is larger than the width of the fixing groove (15).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120343006.4U CN214531800U (en) | 2021-02-04 | 2021-02-04 | Civil engineering construction support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120343006.4U CN214531800U (en) | 2021-02-04 | 2021-02-04 | Civil engineering construction support |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214531800U true CN214531800U (en) | 2021-10-29 |
Family
ID=78234799
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120343006.4U Expired - Fee Related CN214531800U (en) | 2021-02-04 | 2021-02-04 | Civil engineering construction support |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214531800U (en) |
-
2021
- 2021-02-04 CN CN202120343006.4U patent/CN214531800U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN214531800U (en) | Civil engineering construction support | |
CN111659085B (en) | Electric power engineering is with climbing instrument that has automatic clamping function portable | |
CN107498625A (en) | A kind of curtain wall plate cutting device | |
CN210159345U (en) | Container formula dust remover convenient to installation is fixed | |
CN218487493U (en) | Steel material laser cutting device with roll adjustment cutting function | |
CN219704024U (en) | Pipeline welding device convenient to location | |
CN214834608U (en) | Building engineering building climbing frame | |
CN220426383U (en) | Bending scaffold tube straightening device | |
CN219138420U (en) | Edge shaping operation platform | |
CN209734786U (en) | High-rise building foundation construction is with preventing device that falls | |
CN219887952U (en) | Portable safety engineering ladder | |
CN212310444U (en) | Anaerobic copper wire drawing device | |
CN217812257U (en) | Scaffold for mounting brightening lamps | |
CN216429061U (en) | Pipe bending device with height adjusting function for constructional engineering | |
CN214423418U (en) | Portable valve well lid opening and closing tool | |
CN207155951U (en) | A kind of curtain wall plate cutting device | |
CN219023219U (en) | Spliced glass fiber reinforced plastic slide | |
CN215606361U (en) | Light gathering equipment for gynecological operation | |
CN217965888U (en) | Tool bit fixture with safeguard function | |
CN216948154U (en) | River course ecological environment protection prosthetic devices for municipal works | |
CN213143794U (en) | Portal steel pipe scaffold convenient to dismantle | |
CN219617540U (en) | Toy detects mount | |
CN210818505U (en) | Adjustable positioning mechanism for processing sightseeing vehicle parts | |
CN217590015U (en) | Stable form auxiliary threading equipment based on electrical engineering construction | |
CN216665533U (en) | Water exploration drill rod butt joint machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211029 |