CN214499078U - Anti-collapse supporting device for highway tunnel construction - Google Patents

Anti-collapse supporting device for highway tunnel construction Download PDF

Info

Publication number
CN214499078U
CN214499078U CN202120021880.6U CN202120021880U CN214499078U CN 214499078 U CN214499078 U CN 214499078U CN 202120021880 U CN202120021880 U CN 202120021880U CN 214499078 U CN214499078 U CN 214499078U
Authority
CN
China
Prior art keywords
support
layer
supporting
tunnel construction
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120021880.6U
Other languages
Chinese (zh)
Inventor
柴建宾
李剑锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Laizhou Xingqiang Construction Engineering Co ltd
Tian Weixing
Wang Yaqiang
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202120021880.6U priority Critical patent/CN214499078U/en
Application granted granted Critical
Publication of CN214499078U publication Critical patent/CN214499078U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model provides a highway tunnel construction is used prevents strutting arrangement that collapses, includes the support, support fixed connection inoxidizing coating, and the inoxidizing coating is inside to be established the buffer layer, is equipped with damping spring in the buffer layer, buffer layer fixed connection supporting layer, supporting layer welding support column, the one end welding backup pad of supporting layer are kept away from to the support column, and the backup pad both ends are equipped with the pipe groove of decontaminating, and the pipe inslot of decontaminating dismantles and connects the pipe of decontaminating, and backup pad both sides bottom is equipped with the dead lever, and the spliced pole is dismantled to the backup pad bottom, spliced pole threaded connection sleeve, the utility model discloses the beneficial effect who reaches is: this device is underground when using, when the face has the operation rack, can directly support the backup pad and fill up on the rack, through sleeve extension spliced pole on the ground base pole, adaptable not co-altitude's tunnel, the reducible support of buffer layer causes itself to produce deformation because of long-time atress on the support, and the dead lever distributes in the support both sides, plays the supporting role to the support.

Description

Anti-collapse supporting device for highway tunnel construction
Technical Field
The utility model relates to a tunnel construction field, concretely relates to collapse-preventing supporting device that highway tunnel construction used.
Background
The original surrounding rock condition and the ground stress state are destroyed during the excavation of the highway tunnel, the surrounding rock of the excavated surface is loosened after the excavation, and the ground stress is changed into the two-dimensional state from the three-dimensional state. If the surrounding rock is poor, the surrounding rock on the excavation surface is extremely loose, so that the surrounding rock is easy to fall off, and workers are dare not to be close to the excavation surface of the support; if the rock face is exposed for too long, the deformation of surrounding rocks is aggravated, and then collapse occurs. After excavation, the device supports the excavation face temporarily, workers can use anchor rods (cables) in the supporting device to reinforce the surrounding rock, the stress state of the surrounding rock is improved, deformation is reduced, then, operation such as arch center installation is carried out, construction safety can be greatly guaranteed, the risk of face collapse caused by untimely supporting can be reduced, and further normal construction is guaranteed.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is, the anti-collapse supporting device volume that highway tunnel construction that exists was used is great, be not convenient for installation dismantlement, the holding power distributes inequality, easily cause device deformation itself, the device drainage effect is not good, influence the construction, provide an anti-collapse supporting device that highway tunnel construction was used for this reason, in order to reach the installation dismantlement of being convenient for, adaptable not co-altitude's tunnel, have the shock attenuation buffering, the device is difficult for producing deformation because of long-time effort and causing the damage, the effect that has the drainage.
The utility model provides a technical scheme that technical problem adopted is: the utility model provides a supporting device that prevents collapsing that highway tunnel construction used, includes the support, support fixed connection inoxidizing coating, the inside buffer layer of establishhing of inoxidizing coating, be equipped with damping spring in the buffer layer, buffer layer fixed connection supporting layer, supporting layer welding support column, the one end welding backup pad of supporting layer is kept away from to the support column, the backup pad both ends are equipped with the pipe box of decontaminating, the pipe box of decontaminating is dismantled to the pipe box of decontaminating and is connected the pipe of decontaminating, backup pad both sides bottom is equipped with the dead lever, the spliced pole is dismantled to the backup pad bottom, spliced pole threaded connection sleeve, the one end threaded connection ground base rod of spliced pole is kept away from to the sleeve, be equipped with spread groove and connecting block on the inoxidizing coating.
As an optimized technical scheme of the utility model, support and inoxidizing coating are built as an organic whole, be equipped with the infiltration groove on the inoxidizing coating, the netted range of infiltration groove is on the inoxidizing coating.
As an optimized technical scheme of the utility model, shock-absorbing layer and supporting layer are built as an organic whole, damping assembly is established to damping spring inside.
As an optimized technical scheme of the utility model, backup pad fixed surface connects the workstation, the dead lever has four, every the equal symmetric distribution of dead lever is in the support both sides.
As a preferred technical scheme of the utility model, the ground base pole has two, every equal threaded connection sleeve of ground base pole one end, the connecting block grafting spread groove.
The utility model has the advantages of it is following: this device is underground when using, and through sleeve extension spliced pole, adaptable not high tunnel on the ground base pole, the reducible support of shock-absorbing layer on the support leads to the fact itself to produce deformation because of long-time atress, and the dead lever distributes in the support both sides, plays the supporting role to the support, has reduced the whole effort to the spliced pole of support, and the clear dirty pipe of infiltration groove connection can effectively reduce infiltration in the tunnel.
Drawings
Fig. 1 is a schematic front structural view of an anti-collapse supporting device for road tunnel construction according to a preferred embodiment of the present invention;
fig. 2 is a schematic top view of an anti-collapse supporting device for road tunnel construction according to a preferred embodiment of the present invention;
fig. 3 is a schematic structural view of the anti-collapse supporting device connecting column, sleeve and foundation rod for road tunnel construction according to a preferred embodiment of the present invention.
Description of reference numerals: 1. a support; 2. a protective layer; 3. a water seepage tank; 4. a shock-absorbing layer; 5. a damping spring; 6. a support layer; 7. a support pillar; 8. a support plate; 9. cleaning a sewage pipe; 10. cleaning a pipe groove; 11. fixing the rod; 12. connecting columns; 13. a sleeve; 14. a foundation pole; 15. connecting grooves; 16. connecting blocks; 17. a work bench.
Detailed Description
The technical solution of the present invention will be clearly and completely described with reference to the accompanying drawings. In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying a relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The present invention will be further explained with reference to the accompanying drawings.
Please refer to fig. 1-3 in combination, an anti-collapse supporting device for highway tunnel construction comprises a support 1, a fixed connection protective layer 2 of the support 1, a damping layer 4 is arranged inside the protective layer 2, a damping spring 5 is arranged in the damping layer 4, a supporting layer 6 is fixedly connected with the damping layer 4, a supporting layer 6 is welded with the supporting column 7, one end of the supporting layer 6 is far away from the supporting column 7 is welded with a supporting plate 8, two ends of the supporting plate 8 are provided with a dirt cleaning pipe groove 10, a dirt cleaning pipe 9 is detachably connected in the dirt cleaning pipe groove 10, bottom ends of two sides of the supporting plate 8 are in contact connection with a fixing rod 11, a connecting column 12 is detachably connected at the bottom end of the supporting plate 8, the connecting column 12 is in threaded connection with a sleeve 13, one end of the sleeve 13 far away from the connecting column 12 is in threaded connection with a ground base rod 14, and the protective layer 2 is provided with a connecting groove 15 and a connecting block 16.
The device comprises two foundation rods 14, wherein one end of each foundation rod 14 is in threaded connection with a sleeve 13, the foundation rods 14 can be implanted underground and support the support 1, a connecting block 16 is inserted into a connecting groove 15, the support 1 is divided into a plurality of parts and is convenient to disassemble and assemble through the connecting block 16 and the connecting groove 15, a worktable 17 is fixedly connected to the surface of a support plate 8, the worktable 17 is convenient for workers to construct, four fixing rods 11 are symmetrically distributed on two sides of the support 1, the fixing rods 11 can support the whole support 1 to enable the support 1 to be more stable, a damping layer 4 and a support layer 6 are integrally constructed, a damping component is arranged inside a damping spring 5, the damping layer 4 can buffer the stress of the support 1, the deformation and damage of the device caused by the overlarge stress of the support 1 for a long time are avoided, the support 1 and the protection layer 2 are integrally constructed, and the protection layer 2 has a good protection effect, can drop to tunnel inner wall rubble and play the protecting effect, do not influence the construction, be equipped with infiltration groove 3 on inoxidizing coating 2, the netted range on inoxidizing coating 2 of infiltration groove 3, infiltration meeting flows into sewage pipe 9 along infiltration groove 3 in the tunnel, then discharges outside the tunnel.
Specifically, when the device is used, the width of the support is determined according to the tunnel excavation section, generally about 12m, and specifically adjusted according to the excavation section, the length of the support is 1m, the device is assembled firstly, the ground base rod 14 and the connecting column 12 are connected through the sleeve 13, the ground base rod 14 with the corresponding height is connected according to the height in the tunnel, the ground base rod 14 is implanted underground, then the fixing rods 11 are implanted into two sides of the inner wall of the tunnel, the fixing rods 11 are symmetrically distributed on two sides of the support 1, the bottom end of the supporting plate 8 is provided with a sliding groove, the fixing rods 11 are slidably placed in the sliding groove, the fixing rods 11 can be conveniently contracted inwards, soil can be conveniently inserted and taken out, the whole ground base rod 14 and the fixing rods 11 play a supporting role on the support 1, the support 1 can be assembled and lengthened according to the length of the tunnel, one end of the protective layer 2 is provided with the connecting groove 15, the other end of the support is provided with the connecting block 16, two supports 1 can be assembled through the connecting groove 15 and the connecting block 16 in an inserting connection way, the protective layer 2 is provided with a quincunx window, the size of the window is 25x25cm, the circumferential distance is 100cm, the longitudinal distance is 50cm, a water seepage groove 3 is arranged in the protective layer 2, the water seepage groove 3 is communicated with a sewage cleaning pipe 9, seepage water on the inner wall of the tunnel can flow into the sewage cleaning pipe 9 through the water seepage groove 3 and then is discharged through the sewage cleaning pipe 9, the sewage cleaning pipe 9 is detachably connected in the sewage cleaning pipe groove 10, the sewage cleaning pipe 9 can be detached, cleaned and replaced after being used for a period of time to prevent blockage, the damping layer 4 is provided with a damping spring 5, the support 1 is easy to deform under the action force in the tunnel for a long time, so that the device is damaged, the damping spring 5 in the damping layer 4 has good damping effect, so that the support 1 has elastic deformation effect, the support is not easy to deform, the support 7 plays a supporting role on the support 1, one end of the support 7 is connected on the support plate 8, the other end of the support 6 is connected with the support layer, the tunnel can disperse the whole action force of the support 1 through the support 7 and the support plate 8 of the support 7, be equipped with workstation 17 in the backup pad 8, make things convenient for the workman to stand and operate on it, this device integral erection dismantles conveniently, has fine stability, infiltration in the dischargeable tunnel, also can adjust ground basic pole 14 according to altitude mixture control in the tunnel, is applicable to the tunnel of co-altitude not.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of improvements and decorations can be made without departing from the principle of the present invention, and these improvements and decorations should also be regarded as the protection scope of the present invention.
Other parts not described in detail in the present invention belong to the prior art, and are not described herein again.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention.

Claims (5)

1. The utility model provides an anti-collapse supporting device that highway tunnel construction used which characterized in that includes: the support (1), the support (1) is fixedly connected with the protective layer (2), a shock absorption layer (4) is arranged in the protective layer (2), a damping spring (5) is arranged in the damping layer (4), the damping layer (4) is fixedly connected with a supporting layer (6), the supporting layer (6) is welded with a supporting column (7), one end of the supporting column (7) far away from the supporting layer (6) is welded with a supporting plate (8), two ends of the supporting plate (8) are provided with a sewage cleaning pipe groove (10), the sewage cleaning pipe groove (10) is internally detachably connected with a sewage cleaning pipe (9), the bottom ends of the two sides of the supporting plate (8) are provided with fixed rods (11), the bottom end of the supporting plate (8) is detachably connected with a connecting column (12), the connecting column (12) is in threaded connection with a sleeve (13), one end of the sleeve (13) far away from the connecting column (12) is in threaded connection with a ground base rod (14), and the protective layer (2) is provided with a connecting groove (15) and a connecting block (16).
2. The collapse prevention supporting device for the road tunnel construction according to claim 1, wherein the supporting frame (1) and the protection layer (2) are integrally constructed, the protection layer (2) is provided with a water seepage groove (3), and the water seepage groove (3) is arranged on the protection layer (2) in a net shape.
3. The collapse prevention supporting device for the road tunnel construction according to claim 1, wherein the shock absorbing layer (4) and the supporting layer (6) are integrally constructed, and the damping member is installed inside the shock absorbing spring (5).
4. The collapse prevention supporting device for the road tunnel construction according to claim 1, wherein the supporting plate (8) is fixedly connected with the working table (17) on the surface, the number of the fixing rods (11) is four, and each fixing rod (11) is symmetrically distributed on two sides of the bracket (1).
5. The collapse prevention supporting device for the road tunnel construction according to claim 1, wherein the number of the foundation rods (14) is two, one end of each foundation rod (14) is connected with the sleeve (13) in a threaded manner, and the connecting block (16) is inserted into the connecting groove (15).
CN202120021880.6U 2021-01-06 2021-01-06 Anti-collapse supporting device for highway tunnel construction Active CN214499078U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120021880.6U CN214499078U (en) 2021-01-06 2021-01-06 Anti-collapse supporting device for highway tunnel construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120021880.6U CN214499078U (en) 2021-01-06 2021-01-06 Anti-collapse supporting device for highway tunnel construction

Publications (1)

Publication Number Publication Date
CN214499078U true CN214499078U (en) 2021-10-26

Family

ID=78214200

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120021880.6U Active CN214499078U (en) 2021-01-06 2021-01-06 Anti-collapse supporting device for highway tunnel construction

Country Status (1)

Country Link
CN (1) CN214499078U (en)

Similar Documents

Publication Publication Date Title
CN111827310B (en) Protection device for slope deformation prevention and cure
CN110332436B (en) Engineering mapping device convenient to remove
CN214499078U (en) Anti-collapse supporting device for highway tunnel construction
CN213296374U (en) Subway construction foundation ditch excavation supporting construction
CN211873943U (en) Ancient building antidetonation reinforcing apparatus
KR102057248B1 (en) Sewage Pipe Support Structure
CN211006686U (en) Deep foundation pit supporting structure
CN113494096B (en) Splicing type reinforcing device for gravel soil of steep slope in mountain area
CN215052671U (en) Protective structure of hydraulic and hydroelectric engineering side slope
CN112575737B (en) Construction method of river bank protection structure
CN115012429A (en) Supporting structure for exposing foundation pit for long time and construction method thereof
CN112709585B (en) Blocking device and method for preventing mud outburst and water inrush of tunnel
CN211849400U (en) Anti-seismic building pile for construction engineering
CN210529622U (en) Ecological slope protection structure of hydraulic engineering
CN111794248B (en) Spliced deep foundation pit slope protection device
CN211690168U (en) Ecological supporting construction of hydraulic engineering
CN210262920U (en) Multi-functional water conservancy slope protection net
CN216787180U (en) Novel karst water guide device
CN215669313U (en) Slope collapse-preventing supporting device for hydraulic engineering
CN220057679U (en) Landslide arresting device
CN215329969U (en) Cofferdam reinforced structure for hydraulic engineering
KR20210082732A (en) Building demolition structure
CN220099952U (en) Soil cofferdam construction protection structure
CN220599814U (en) Tunnel portal structure for shield construction
CN220746959U (en) Highway side slope protector for municipal construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240122

Address after: 261400 No. 2 Guangzhou Road, Wenchang Road Street, Laizhou City, Yantai City, Shandong Province

Patentee after: Laizhou Xingqiang Construction Engineering Co.,Ltd.

Country or region after: China

Address before: No. 174 Tianjia Village, Wenfeng Road Street, Laizhou City, Yantai City, Shandong Province, 261400

Patentee before: Tian Weixing

Country or region before: China

Patentee before: Wang Yaqiang

Effective date of registration: 20240122

Address after: No. 174 Tianjia Village, Wenfeng Road Street, Laizhou City, Yantai City, Shandong Province, 261400

Patentee after: Tian Weixing

Country or region after: China

Patentee after: Wang Yaqiang

Address before: 730000 No. 677, Nanchang Road, Chengguan District, Lanzhou City, Gansu Province

Patentee before: Chai Jianbin

Country or region before: China