CN214498928U - Modular assembly of drilling site extraction centralized pipe - Google Patents

Modular assembly of drilling site extraction centralized pipe Download PDF

Info

Publication number
CN214498928U
CN214498928U CN202022517215.4U CN202022517215U CN214498928U CN 214498928 U CN214498928 U CN 214498928U CN 202022517215 U CN202022517215 U CN 202022517215U CN 214498928 U CN214498928 U CN 214498928U
Authority
CN
China
Prior art keywords
hole
pipe
extraction
extraction module
double
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022517215.4U
Other languages
Chinese (zh)
Inventor
张超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaibei Mining Co Ltd
Original Assignee
Huaibei Mining Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaibei Mining Co Ltd filed Critical Huaibei Mining Co Ltd
Priority to CN202022517215.4U priority Critical patent/CN214498928U/en
Application granted granted Critical
Publication of CN214498928U publication Critical patent/CN214498928U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a modular assembly of a drill site extraction centralized pipe, which comprises a single-hole extraction module, a double-hole extraction module and a four-hole extraction module, wherein both ends of the single-hole extraction module, the double-hole extraction module and the four-hole extraction module are respectively provided with an assembly mechanism for assembling the centralized pipe with any hole number, and the single-hole extraction module consists of a single extraction pipe and a single-hole pipe; the double-hole extraction module consists of two extraction pipes and a double-hole pipe; the four-hole extraction module consists of four extraction pipes and a four-hole pipe. By adopting the technical scheme, the assembled centralized pipe realizes modularization, can be repeatedly disassembled and assembled, has strong adaptability and high repeated utilization rate, saves material cost and processing cost, and greatly reduces the cost; the problem of hand tension when the extraction workload is large is solved; the phenomenon that underground on-site waiting ground processing centralized pipe extraction occurs is avoided, and the working efficiency is greatly improved.

Description

Modular assembly of drilling site extraction centralized pipe
Technical Field
The utility model belongs to the field is taken out and is taken out in the drill site, more specifically says, the utility model relates to a drill site is taken out and take out centralized pipe modularization equipment.
Background
At present, as mine mining transits from a non-outburst area to a outburst area, gas treatment engineering is increasingly heavy. The number of the gas extraction drill sites is increasing, and higher requirements are put forward for the management of the gas extraction drill sites. In the actual construction process, the number of drill holes needing stubble-combining extraction is different according to different places in different drill sites. It is often necessary to measure the size of the well according to the field situation, to process the surface and then to bring it down the well for use. Time and labor are wasted, and the repeated utilization rate is not high.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that a drill site is taken out and is taken out concentrated pipe modularization equipment is provided, can make up out the concentrated pipe of arbitrary hole number according to the on-the-spot needs, can dismantle repeatedly, and reuse rate is high, improves work efficiency.
In order to realize the purpose, the utility model discloses the technical scheme who takes does: the single-hole extraction module, the double-hole extraction module and the four-hole extraction module are respectively provided with an assembling mechanism used for assembling a centralized pipe with any hole number at two ends.
According to the technical scheme, the drill site extraction centralized pipe is assembled in a modularized mode, and the single-hole extraction module consists of a single extraction pipe and a single-hole pipe; the double-hole extraction module consists of two extraction pipes and a double-hole pipe; the four-hole extraction module consists of four extraction pipes and a four-hole pipe.
According to the technical scheme, the drill site extraction centralized pipe is assembled in a modularized mode, the length of the single-hole pipe is half of that of the double-hole pipe, and the length of the double-hole pipe is half of that of the four-hole pipe; the types of the extraction pipes are the same.
According to the technical scheme, the drill site extraction centralized pipe is assembled in a modularized mode, a connecting hole is formed in the center of the top side of the single-hole pipe, and a single extraction pipe in the single-hole extraction module is fixedly connected with the connecting hole of the single-hole pipe.
According to the technical scheme, the drill site extraction centralized pipe is assembled in a modularized mode, two connecting holes are formed in the top side of the double-hole pipe, two extraction pipes in the double-hole extraction module are fixedly connected with the two connecting holes of the double-hole pipe respectively, the middle point of a connecting line of the circle centers of the two connecting holes is located in the center of the top side of the double-hole pipe, and the distance between the circle centers of the two connecting holes is half of the length of the double-hole pipe.
According to the technical scheme, four connecting holes are formed in the top side of the four-hole pipe, four extraction pipes in the four-hole extraction module are fixedly connected with the four connecting holes of the four-hole pipe respectively, the middle point of a connecting line of the centers of the four connecting holes is located in the center of the top side of the four-hole pipe, and the distance between the centers of every two adjacent connecting holes in the four connecting holes is one fourth of the length of the four-hole pipe.
According to the technical scheme, the drill site extraction centralized pipe is assembled in a modularized mode, the assembling mechanism is composed of two adaptive installation suckers, and the two adaptive installation suckers are fixedly arranged at two ends of the single-hole extraction module, the double-hole extraction module and the four-hole extraction module.
By adopting the technical scheme, the assembled centralized pipe realizes modularization, can be repeatedly disassembled and assembled, has strong adaptability and high repeated utilization rate, saves material cost and processing cost, and greatly reduces the cost; the outburst prevention area can be processed by an organizer at idle time, so that the problem of hand tension when the extraction workload is large is solved; finished products can be used all the time, the phenomenon that underground on-site waiting for ground processing centralized pipe extraction is avoided, and the working efficiency is greatly improved.
The present invention will be described in more detail with reference to the accompanying drawings and examples.
Drawings
The contents of the description and the references in the drawings are briefly described as follows:
fig. 1 is a schematic view of a concentration tube module according to the present invention;
labeled as: 1. a single-hole tube; 2. a double-bore tube; 3. a four-hole tube; 4. extracting pipes; 5. connecting holes; 6. and (6) installing a sucker.
Detailed Description
The following description of the embodiments of the present invention, with reference to the accompanying drawings, will be made in further detail to explain, by way of example, the shape and structure of the components, the mutual positions and connections between the components, the functions and operating principles of the components, the manufacturing process, and the operation and use method of the components, so as to help those skilled in the art to more completely, accurately and deeply understand the inventive concept and technical solutions of the present invention.
The modular assembly of the drill site extraction centralized pipe shown in the figure 1 comprises a single-hole extraction module, a double-hole extraction module and a four-hole extraction module, wherein two ends of the single-hole extraction module, the double-hole extraction module and the four-hole extraction module are respectively provided with an assembly mechanism for assembling the centralized pipe with any hole number.
The single-hole extraction module consists of a single extraction pipe and a single-hole pipe 1; the double-hole extraction module consists of two extraction pipes and a double-hole pipe 2; the four-hole extraction module consists of four extraction pipes and a four-hole pipe 4.
The length of the single-hole pipe 1 is half of that of the double-hole pipe 2, and the length of the double-hole pipe 2 is half of that of the four-hole pipe 4; the types of the extraction pipes are the same.
A connecting hole 5 is formed in the center of the top side of the single-hole pipe 1, and a single extraction pipe in the single-hole extraction module is fixedly connected with the connecting hole 5 of the single-hole pipe 1.
Two connecting holes 5 are formed in the top side of the double-hole pipe 2, two extraction pipes in the double-hole extraction module are fixedly connected with the two connecting holes 5 of the double-hole pipe 2 respectively, the middle point of the connecting line of the circle centers of the two connecting holes 5 is located in the center of the top side of the double-hole pipe 2, and the distance between the circle centers of the two connecting holes 5 is half of the length of the double-hole pipe 2.
Four connecting holes 5 are formed in the top side of the four-hole pipe 4, four extraction pipes in the four-hole extraction module are fixedly connected with the four connecting holes 5 of the four-hole pipe 4 respectively, the middle point of a connecting line of the centers of the four connecting holes 5 is located in the center of the top side of the four-hole pipe 4, and the distance between the centers of every two adjacent connecting holes 5 in the four connecting holes 5 is one fourth of the length of the four-hole pipe 4.
The assembly mechanism is composed of two adaptive installation suckers 6, and two adaptive installation suckers 6 are fixedly arranged at two ends of the single-hole extraction module, the double-hole extraction module and the four-hole extraction module. Different extraction modules can be correspondingly installed through different ends of the installation sucker 6.
When the underground three-hole centralized pipe pumping system is used, if three holes need to be used underground, one single-hole pumping module and one double-hole pumping module can be assembled into one three-hole centralized pipe through the mounting suckers 6 to perform pumping and pumping work, and if five holes need to be used underground, one single-hole pumping module and one four-hole pumping module can be assembled into one five-hole centralized pipe through the mounting suckers 6 to perform pumping and pumping work.
By adopting the technical scheme, the assembled centralized pipe realizes modularization, can be repeatedly disassembled and assembled, has strong adaptability and high repeated utilization rate, saves material cost and processing cost, and greatly reduces the cost; the outburst prevention area can be processed by an organizer at idle time, so that the problem of hand tension when the extraction workload is large is solved; finished products can be used all the time, the phenomenon that underground on-site waiting for ground processing centralized pipe extraction is avoided, and the working efficiency is greatly improved.
The present invention has been described above with reference to the accompanying drawings, and it is obvious that the present invention is not limited by the above-mentioned manner, and various insubstantial improvements can be made without modification to the method and technical solution of the present invention, or the present invention can be directly applied to other occasions without modification, all within the scope of the present invention.

Claims (7)

1. The utility model provides a drill site is taken out and is adopted concentrated pipe modularization equipment which characterized in that: the single-hole extraction module, the double-hole extraction module and the four-hole extraction module are respectively provided with an assembling mechanism used for assembling a centralized pipe with any hole number at two ends.
2. The modular assembly of drill site extraction concentrator pipes according to claim 1, characterized in that: the single-hole extraction module consists of a single extraction pipe and a single-hole pipe; the double-hole extraction module consists of two extraction pipes and a double-hole pipe; the four-hole extraction module consists of four extraction pipes and a four-hole pipe.
3. The modular assembly of drill site extraction concentrator pipes according to claim 2, characterized in that: the length of the single-hole pipe is half of that of the double-hole pipe, and the length of the double-hole pipe is half of that of the four-hole pipe; the types of the extraction pipes are the same.
4. The modular assembly of drill site extraction concentrator pipes according to claim 2, characterized in that: and a connecting hole is formed in the center of the top side of the single-hole pipe, and a single extraction pipe in the single-hole extraction module is fixedly connected with the connecting hole of the single-hole pipe.
5. The modular assembly of drill site extraction concentrator pipes according to claim 2, characterized in that: two connecting holes are formed in the top side of the double-hole pipe, two extraction pipes in the double-hole extraction module are fixedly connected with the two connecting holes of the double-hole pipe respectively, the middle point of the connecting line of the circle centers of the two connecting holes is located in the center of the top side of the double-hole pipe, and the distance between the circle centers of the two connecting holes is half of the length of the double-hole pipe.
6. The modular assembly of drill site extraction concentrator pipes according to claim 2, characterized in that: four connecting holes are formed in the top side of the four-hole pipe, four extraction pipes in the four-hole extraction module are fixedly connected with the four connecting holes of the four-hole pipe respectively, the middle points of connecting lines of the centers of the four connecting holes are located in the center of the top side of the four-hole pipe, and the distance between the centers of every two adjacent connecting holes in the four connecting holes is one fourth of the length of the four-hole pipe.
7. The modular assembly of drill site extraction concentrator pipes according to claim 1, characterized in that: the assembly mechanism is composed of two adaptive installation suckers, and the two adaptive installation suckers are fixedly arranged at two ends of the single-hole extraction module, the double-hole extraction module and the four-hole extraction module.
CN202022517215.4U 2020-11-04 2020-11-04 Modular assembly of drilling site extraction centralized pipe Active CN214498928U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022517215.4U CN214498928U (en) 2020-11-04 2020-11-04 Modular assembly of drilling site extraction centralized pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022517215.4U CN214498928U (en) 2020-11-04 2020-11-04 Modular assembly of drilling site extraction centralized pipe

Publications (1)

Publication Number Publication Date
CN214498928U true CN214498928U (en) 2021-10-26

Family

ID=78197304

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022517215.4U Active CN214498928U (en) 2020-11-04 2020-11-04 Modular assembly of drilling site extraction centralized pipe

Country Status (1)

Country Link
CN (1) CN214498928U (en)

Similar Documents

Publication Publication Date Title
CN214498928U (en) Modular assembly of drilling site extraction centralized pipe
CN108788183B (en) Method for processing annular groove on titanium alloy elastic sealing support
CN202327425U (en) Connector device for pipeline connection
CN104454751B (en) suspension oil cylinder
CN201407441Y (en) Embedded bolt flange
CN2789463Y (en) Pipeline type rotary spraying pump
CN205309772U (en) Processingequipment of apron
CN215701404U (en) Pipe jacking tool device of pipe jacking machine
CN210031950U (en) Large-scale modularization trash cleaning machine
CN211315427U (en) Connecting device convenient for pipeline connection for drilling engineering
CN211361472U (en) Positioning device for automatic production
CN211841124U (en) Numerical control machine tool workbench with central oil outlet structure
CN212509519U (en) Rotary sealing device of water-gas dual-purpose drill rod driving main shaft
CN220748136U (en) Modularized small-sized drilling machine
CN216872756U (en) Threading elbow pipe
CN210768629U (en) Horizontal directional drill rod joint
CN221423108U (en) Rotary square hole drilling tool
CN102699689A (en) Lathe bed structure of large-scale gantry numerically-controlled drilling machine
CN204312316U (en) A kind of novel shale gas fracturing pump pump case
CN218799355U (en) A special jig of quick location for closed area hole site
CN212241087U (en) Mechanical claw
CN212942155U (en) Environment-friendly industrial waste gas multi-stage purification device
CN216298615U (en) Efficient tight pulley frock that rises
CN211974920U (en) Marine drilling riser guider
CN214146861U (en) Welded type connecting water pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant