CN214498639U - Make things convenient for steel construction corridor construction of constructor business turn over to use rail - Google Patents

Make things convenient for steel construction corridor construction of constructor business turn over to use rail Download PDF

Info

Publication number
CN214498639U
CN214498639U CN202120368221.XU CN202120368221U CN214498639U CN 214498639 U CN214498639 U CN 214498639U CN 202120368221 U CN202120368221 U CN 202120368221U CN 214498639 U CN214498639 U CN 214498639U
Authority
CN
China
Prior art keywords
rod
protection frame
fence
constructors
stand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120368221.XU
Other languages
Chinese (zh)
Inventor
卫中宁
胡野
陈克荣
姜�远
王俊
王晓进
彭霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU SHUANGLOU CONSTRUCTION GROUP CO Ltd
Original Assignee
JIANGSU SHUANGLOU CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU SHUANGLOU CONSTRUCTION GROUP CO Ltd filed Critical JIANGSU SHUANGLOU CONSTRUCTION GROUP CO Ltd
Priority to CN202120368221.XU priority Critical patent/CN214498639U/en
Application granted granted Critical
Publication of CN214498639U publication Critical patent/CN214498639U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The application relates to a steel structure corridor construction fence convenient for constructors to get in and out, which comprises a plurality of stand columns, wherein a protection frame is arranged between every two adjacent stand columns, one end of each protection frame is fixedly provided with a mounting sleeve, and the mounting sleeves are axially arranged along the vertical direction; one side of the upright post is fixedly provided with an installation post for sleeving an installation sleeve; one side that the erection column was kept away from to the stand is provided with the locating plate that can with the lateral wall butt of protection frame thickness direction one side, the stand rotates along the up-down direction to be provided with can with the locating plate cooperation in order to press from both sides the butt pole of tight protection frame. Constructors only need drive the butt rod to rotate, and the guard frame is rotated to pass in and out the fence, the structure is simple, and the operation is convenient.

Description

Make things convenient for steel construction corridor construction of constructor business turn over to use rail
Technical Field
The utility model relates to a field of rail is used in the engineering construction, especially relates to a make things convenient for rail is used in steel construction vestibule construction of constructor business turn over.
Background
The steel structure corridor is a channel structure arranged between two adjacent buildings so as to facilitate personnel flow or cargo transportation between the two buildings. The steel structure corridor is generally arranged at a high place; when the steel structure vestibule is installed, a construction unit generally needs to use the fence to seal a channel below a construction position so as to prevent objects falling off in the installation process of the steel structure vestibule from damaging pedestrians or vehicles.
The prior Chinese patent with publication number CN211776462U discloses a fence for road construction, which comprises a plurality of upright posts, wherein two sides of each upright post are fixedly provided with mounting seats; the side wall of the mounting seat, which is far away from one side of the upright post, is provided with a mounting groove along the up-down direction; a shielding plate is arranged between two adjacent upright columns, one end of the shielding plate is in inserted fit with the mounting groove of one upright column, and the other end of the shielding plate is in inserted fit with the mounting groove of the other upright column; each end of the shielding plate is provided with a connecting hole in a penetrating way along the thickness direction of the shielding plate, and the mounting seat is provided with a through hole aligned with the connecting hole in a penetrating way; a screw rod is arranged between the shielding plate and the mounting seat, and one end of the screw rod, which is far away from the head of the screw rod, is in threaded connection with a manual nut. After the shielding plate is in butt joint with the mounting groove, inserting one end of the screw rod, which is far away from the head of the screw rod, into the through hole; one end of the screw rod inserted into the through hole can pass through the connecting hole and penetrate out of the other through hole; and finally, the manual nut is connected with the screw rod, so that the shielding plate can be fixed with the mounting seat, and the mounting of the fence is completed.
In view of the above-mentioned related art, the inventor believes that when a constructor needs to get in and out of a fence, one of the shielding plates needs to be disassembled; when constructors enter the fence or go out of the fence, the disassembled shielding plate needs to be installed and fixed again, and the operation is troublesome, so that improvement is needed.
SUMMERY OF THE UTILITY MODEL
Can pass in and out the rail in order to improve constructor needs to tear open, adorn the shielding plate side and lead to the more troublesome problem of operation, this application provides a make things convenient for steel construction of constructor business turn over rail for corridor construction.
The application provides a pair of make things convenient for steel construction enclosure construction of constructor business turn over to adopt following technical scheme:
a fence for steel structure corridor construction convenient for constructors to get in and out comprises a plurality of stand columns, wherein a protection frame is arranged between every two adjacent stand columns, one end of each protection frame is fixedly provided with a mounting sleeve, and the mounting sleeves are axially arranged along the vertical direction; one side of the upright post is fixedly provided with an installation post for sleeving an installation sleeve; one side that the erection column was kept away from to the stand is provided with the locating plate that can with the lateral wall butt of protection frame thickness direction one side, the stand rotates along the up-down direction to be provided with can with the locating plate cooperation in order to press from both sides the butt pole of tight protection frame.
By adopting the technical scheme, the fixed sleeve is matched with the mounting column, and one end of the protection frame is rotationally connected with the corresponding upright column; the abutting rod is matched with the positioning plate to clamp the free end of the protective frame. When constructors need to enter and exit the fence, only the abutting rod needs to be driven to rotate; after the abutting rod is completely separated from the protection frame, constructors can rotate the protection frame to enter and exit the fence, and the structure is simple and the operation is convenient. The protective frame does not need to be carried, and the operation is more labor-saving. The installation sleeve is matched with the installation column, so that the guard rail can be conveniently disassembled and assembled and the fence can be conveniently transported.
Optionally, the abutting rods are sequentially provided with a plurality of abutting rods along the vertical direction.
Through adopting above-mentioned technical scheme, the different positions of a plurality of butt pole butt protection frame free ends along upper and lower direction have improved the stability of protection frame with the locating plate contact to the stability that protection frame and stand are fixed has been improved.
Optionally, the free ends of all the abutting rods are connected with an operating rod in a rotating mode.
Through adopting above-mentioned technical scheme, remove the action bars, can drive whole butt pole and rotate, it is more convenient, swift to operate.
Optionally, the operating rod is connected with a locking rod in a sliding manner along the thickness direction of the protection frame, and the protection frame is provided with a fixing groove for inserting one end of the locking rod.
Through adopting above-mentioned technical scheme, the solid pole of lock cooperates with fixed slot in order to fix the action bars, simple structure, the operation.
Optionally, an elastic member capable of driving the locking rod to move towards the fixing groove is arranged between the locking rod and the operating rod.
Through adopting above-mentioned technical scheme, after the locking pole aligns with the fixed slot, loosen the locking pole, the elastic component can automatic drive the locking pole to remove to the fixed slot direction and make the locking pole insert in the fixed slot. The elastic piece can drive the end wall of one end of the locking rod inserted into the fixing groove to be tightly propped against the bottom wall of the fixing groove, and the possibility that the locking rod is separated from the fixing groove is reduced.
Optionally, the two sides of the upright column along the thickness direction of the protection frame are both provided with a support rod capable of being abutted against the ground in a rotating manner along the up-down direction; the bracing piece rotates and is connected with the connecting rod, be provided with the mounting that is used for fixed link between connecting rod and the stand.
Through adopting above-mentioned technical scheme, the ground butt of bracing piece has improved the stability of stand, has reduced the possibility that the stand topples over.
Optionally, the support rod is provided with a limiting block capable of abutting against the connecting rod, and the stand column is provided with an embedding groove for accommodating the support rod and the connecting rod.
Through adopting above-mentioned technical scheme, upwards rotate the connecting rod and offset rather than with the stopper, then rotate the bracing piece, the stopper can drive the connecting rod and rotate to the embedding inslot, has reduced the volume of stand, the transportation and the storage of the stand of being convenient for.
Optionally, the support rod is fixedly provided with a magnetic part, and an adsorption part magnetically attracted with the magnetic part is arranged on the inner side wall of the embedding groove.
Through adopting above-mentioned technical scheme, magnetism spare and adsorption component magnetism attract mutually with fixed support rod, have improved bracing piece and embedding groove complex stability.
In summary, the present application includes at least one of the following beneficial technical effects:
1. constructors only need to drive the abutting rods to rotate and rotate the protection frame, and can enter and exit the fence, so that the operation is convenient and labor-saving;
2. the connecting rod is fixed so that bracing piece and ground butt have improved the stability of stand with the stand to the rail possibility of empting has been reduced.
Drawings
Fig. 1 is an overall structure schematic diagram of a steel structure corridor construction fence facilitating access of constructors in an embodiment of the application.
FIG. 2 is a schematic view for showing the fitting relationship between the protection rack and the upright post.
Fig. 3 is an exploded view for illustrating the connection relationship between the locking bar and the fixing groove.
Fig. 4 is a schematic view for showing a connection structure between the support bar and the pillar.
Description of reference numerals: 1. a column; 11. a counterweight base; 12. mounting a column; 121. mounting a plate; 13. positioning a plate; 14. a butting rod; 15. a support bar; 151. a connecting rod; 1511. a fixing member; 152. a limiting block; 153. a magnetic member; 16. a butt joint block; 17. an embedding groove; 171. an adsorbing member; 2. a protective frame; 21. installing a sleeve; 22. a bearing block; 23. fixing grooves; 3. an operating lever; 31. a fixing hole; 311. a locking bar; 3111. an elastic member.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
The embodiment of the application discloses make things convenient for rail is used in steel construction vestibule construction of constructor business turn over. Referring to fig. 1, a make things convenient for rail is used in steel construction vestibule construction of constructor business turn over includes a plurality of stands 1, and stand 1 is rectangular rod-shaped, and the lower extreme of every stand 1 all is through bolt fixedly connected with counter weight base 11. Be provided with protection frame 2 between two adjacent stands 1, protection frame 2 is made by crisscross square tube welding anyhow, and protection frame 2 is used for blockking non-constructor or vehicle.
Referring to fig. 1 and 2, one end of the protection frame 2 is welded and fixed with a mounting sleeve 21, the mounting sleeve 21 is cylindrical, the mounting sleeve 21 is axially arranged along the vertical direction, the number of the mounting sleeves 21 is multiple, all the mounting sleeves 21 are sequentially arranged at intervals along the vertical direction, and all the mounting sleeves 21 are located on the same straight line. One side of the upright post 1 close to the mounting sleeve 21 is provided with a plurality of mounting posts 12, the lower end of each mounting post 12 is welded and fixed with a mounting plate 121, and the mounting plates 121 and the upright post 1 are welded and fixed. All the mounting columns 12 and all the mounting sleeves 21 are arranged in one-to-one correspondence; each mounting sleeve 21 can be sleeved on the outer side wall of the corresponding mounting column 12 from top to bottom. The mounting sleeve 21 is matched with the mounting column 12, and one end of the protection frame 2 is rotatably connected with the corresponding upright column 1.
Referring to fig. 2, a positioning plate 13 is fixedly welded on one side of the upright post 1 away from the mounting post 12, the positioning plate 13 is a rectangular plate, and the length direction of the positioning plate 13 is arranged along the vertical direction; one of the side walls of the protective frame 2 in the thickness direction may abut against the positioning plate 13. A butting rod 14 is arranged on one side, provided with a positioning plate 13, of the upright post 1, the butting rod 14 is a rectangular rod, and one end of the butting rod 14 is rotatably connected with the upright post 1 through a pin shaft; the pin shaft is axially arranged along the thickness direction of the protective frame 2, and the abutting rod 14 can rotate up and down. A gap is arranged between the abutting rod 14 and the positioning plate 13; after the protection frame 2 rotates to abut against the positioning plate 13, the abutting rod 14 rotates downwards, and the abutting rod 14 can abut against the side wall of the protection frame 2 far away from one side of the positioning plate 13. The abutting rod 14 is matched with the positioning plate 13, and can clamp the protection frame 2, so that the free end of the protection frame 2 is fixed with the corresponding upright post 1.
Referring to fig. 2, a receiving block 22 is fixed to a side wall of the protection frame 2 abutting against the abutting rod 14 in a welding manner, the receiving block 22 is a rectangular block, and an upper surface of the receiving block 22 can support the abutting rod 14 to ensure stability of the abutting rod 14 abutting against the protection frame 2. A plurality of abutting rods 14 are sequentially arranged along the vertical direction, the free ends of all the abutting rods 14 are commonly connected with the operating rod 3, and the operating rod 3 is positioned on one side of the abutting rods 14, which is far away from the positioning plate 13; the operating rod 3 is a rectangular rod, and each abutting rod 14 is rotatably connected with the operating rod 3 through a pin shaft. Through reciprocating the action bars 3, can drive whole butt pole 14 and rotate simultaneously to make whole butt pole 14 and protection frame 2 butt or break away from convenient operation, swift.
Referring to fig. 2 and 3, a fixing hole 31 is formed in a side wall of the operating rod 3 on the side far away from the protection frame 2 in a penetrating manner along the thickness direction of the protection frame 2, and a locking rod 311 is connected to the inner side wall of the fixing hole 31 in a sliding manner; the side wall of the protection frame 2 facing the direction of the operating rod 3 is provided with a fixing groove 23. One end of the locking rod 311 close to the fixing groove 23 can be inserted into the fixing groove 23 to limit the movement of the operation rod 3, thereby improving the stability of the abutting rod 14 abutting against the protection frame 2. An elastic part 3111 is arranged between the locking rod 311 and the operating rod 3, the elastic part 3111 is a spring, and the elastic part 3111 is sleeved on the outer side wall of the locking rod 311; the elastic member 3111 is located at an end of the locking lever 311 away from the fixing groove 23. One end of the elastic member 3111 is welded and fixed with the side wall of the operating rod 3 far away from the fixing groove 23, and the other end of the elastic member 3111 is welded and fixed with the outer side wall of the locking rod 311; the elastic member 3111 is in a stretching state, and the elastic member 3111 can drive the locking rod 311 to move towards the fixing groove 23, so that the end wall of the locking rod 311 can be tightly abutted against the bottom wall of the fixing groove 23, and the stability of the locking rod 311 matching with the fixing groove 23 is improved.
Referring to fig. 1 and 4, two sides of the upright post 1 along the thickness direction of the protection frame 2 are respectively provided with a support rod 15, and one end of each support rod 15 is rotatably connected with the upright post 1 through a pin shaft; the support rod 15 can rotate in the up-and-down direction, and the free end of the support rod 15 can be abutted against the ground, so that the stability of the upright post 1 is improved. The support rod 15 is rotatably connected to a connecting rod 151 through a pin, and the connecting rod 151 is located on one side of the support rod 15 in the width direction. A fixing piece 1511 is arranged between the connecting rod 151 and the upright 1, the fixing piece 1511 is a bolt, and the upright is fixedly welded with the butt joint block 16; when the support rod 15 abuts against the ground, the free end of the connecting rod 151 is fixed to the docking block 16 through the fixing member 1511. The connection rod 151 may support the support rod 15.
Referring to fig. 4, the sidewall of the upright post 1 provided with the support rod 15 is provided with an embedding groove 17 along the thickness direction of the protection frame 2, the embedding groove 17 is a rectangular groove, and both the support rod 15 and the connecting rod 151 can be embedded in the embedding groove 17. The side wall of the support rod 15 provided with the connecting rod 151 is welded and fixed with a stopper 152. When the upright column 1 needs to be carried, the connecting rod 151 can be rotated upwards, and the connecting rod 151 is abutted to the limiting block 152; then, the supporting rod 15 is rotated, and the limiting block 152 can drive the connecting rod 151 to rotate to the embedding groove 17 along with the supporting rod 15. The side wall of the support rod 15 is fixedly bonded with a magnetic part 153, and the bottom wall of the embedding groove 17 is fixedly bonded with an adsorption part 171; the magnetic member 153 is a magnet, the adsorption member 171 is an iron sheet, and the magnetic member 153 and the adsorption member 171 are magnetically attracted to fix the support rod 15, so that the connection stability of the support rod 15 and the embedding groove 17 is improved.
The implementation principle of the steel structure corridor fence for construction, which facilitates access of constructors, is as follows:
when in use, the fence is placed between two buildings to seal a channel between the two buildings; when a constructor needs to enter or exit the fence, the constructor only needs to pull the locking rod 311 to separate the locking rod 311 from the fixing groove 23, and then lift the operating rod 3 upwards until the butting rod 14 is separated from the protection frame 2; after the abutting rod 14 is separated from the protection frame 2, a constructor can rotate the protection frame 2, and a gap is formed between the protection frame 2 and the upright post 1 so that an constructor can go in and out. Constructor only need rotate protection frame 2 until protection frame 2 offsets with locating plate 13, then make butt rod 14 rotate downwards, until butt rod 14 butt protection frame 2 can fix protection frame 2. Constructors only need to drive the abutting rod 14 to rotate and rotate the protection frame 2, and then can get in and out of the fence, and the operation is convenient and labor-saving.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a make things convenient for rail is used in steel construction vestibule construction of constructor business turn over, includes a plurality of stands (1), adjacent two be provided with protection frame (2), its characterized in that between stand (1): one end of the protection frame (2) is fixedly provided with a mounting sleeve (21), and the mounting sleeve (21) is axially arranged along the vertical direction; one side of the upright post (1) is fixedly provided with a mounting post (12) which can be sleeved by a mounting sleeve (21); one side that erection column (12) was kept away from in stand (1) is provided with locating plate (13) that can with the lateral wall butt of protection frame (2) thickness direction one side, stand (1) rotates along the up-down direction and is provided with butt pole (14) that can with locating plate (13) cooperation in order to press from both sides tight protection frame (2).
2. The fence for the steel structure corridor construction convenient for constructors to get in and out of according to claim 1, characterized in that: the abutting rods (14) are sequentially arranged in the vertical direction.
3. The fence for the steel structure corridor construction convenient for constructors to get in and out of according to claim 2, characterized in that: the free ends of all the abutting rods (14) are connected with an operating rod (3) in a rotating mode.
4. The fence for the steel structure corridor construction convenient for constructors to get in and out of according to claim 3, characterized in that: the operating rod (3) is connected with a locking rod (311) in a sliding mode along the thickness direction of the protection frame (2), and the protection frame (2) is provided with a fixing groove (23) into which one end of the locking rod (311) can be inserted.
5. The fence for the steel structure corridor construction convenient for constructors to get in and out of according to claim 4, characterized in that: an elastic piece (3111) capable of driving the locking rod (311) to move towards the fixing groove (23) is arranged between the locking rod (311) and the operating rod (3).
6. The fence for the steel structure corridor construction convenient for constructors to get in and out of according to claim 1, characterized in that: two sides of the upright post (1) along the thickness direction of the protective frame (2) are respectively provided with a support rod (15) which can be abutted against the ground in a rotating way along the up-and-down direction; the bracing piece (15) rotate and be connected with connecting rod (151), be provided with between connecting rod (151) and stand (1) and be used for fixed connection pole (151) mounting (1511).
7. The fence for the steel structure corridor construction convenient for constructors to get in and out of according to claim 6, characterized in that: the bracing piece (15) are provided with the stopper (152) that can with connecting rod (151) butt, stand (1) are provided with embedding groove (17) that can supply bracing piece (15) and connecting rod (151) to hold.
8. The fence for the steel structure corridor construction convenient for constructors to get in and out of according to claim 7, characterized in that: the supporting rod (15) is fixedly provided with a magnetic part (153), and the inner side wall of the embedding groove (17) is provided with an adsorption part (171) which can be magnetically attracted with the magnetic part (153).
CN202120368221.XU 2021-02-07 2021-02-07 Make things convenient for steel construction corridor construction of constructor business turn over to use rail Active CN214498639U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120368221.XU CN214498639U (en) 2021-02-07 2021-02-07 Make things convenient for steel construction corridor construction of constructor business turn over to use rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120368221.XU CN214498639U (en) 2021-02-07 2021-02-07 Make things convenient for steel construction corridor construction of constructor business turn over to use rail

Publications (1)

Publication Number Publication Date
CN214498639U true CN214498639U (en) 2021-10-26

Family

ID=78220110

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120368221.XU Active CN214498639U (en) 2021-02-07 2021-02-07 Make things convenient for steel construction corridor construction of constructor business turn over to use rail

Country Status (1)

Country Link
CN (1) CN214498639U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114135148A (en) * 2021-11-04 2022-03-04 国网福建省电力有限公司 Safety fence

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114135148A (en) * 2021-11-04 2022-03-04 国网福建省电力有限公司 Safety fence

Similar Documents

Publication Publication Date Title
CN214498639U (en) Make things convenient for steel construction corridor construction of constructor business turn over to use rail
CN112160476B (en) Curtain wall beam column connecting structure and construction method
CN111733902B (en) Efficient pile foundation bearing capacity detection device
CN112833846B (en) Road level detector used stably
CN214383899U (en) Road isolated column for municipal works
CN213710664U (en) A safety protective guard for building engineering
CN211143308U (en) Steel construction braced system of high stability
CN214576186U (en) Assembled enclosure with stable structure
CN209887447U (en) Frock clamp is used in installation of outdoor transformer
CN220701221U (en) Magnetic adsorption force adjusting mechanism for Mecanum wheel wall climbing robot
CN216610855U (en) Excavator oil pipe bracket
CN212689546U (en) I-beam and connecting device and scaffold between support upright rods thereof
CN218116961U (en) Steel construction convenient to dismantle
CN220960620U (en) Test bed for vehicle body
CN213896707U (en) Steel structure bridge mounting structure
CN218405216U (en) Net is prevented throwing by reassembling type of being convenient for that highway anticollision barrier was used
CN214384092U (en) Construction guardrail is built in room
CN214875415U (en) Auxiliary device for installing binding pieces
CN219993358U (en) Fence reinforcement device
CN210263841U (en) Spacing bearing structure of ground nail
CN217870972U (en) Steel structural support convenient to install
CN211201110U (en) Overhanging type scaffold
CN217800091U (en) Hydraulic fastening device for bearing adapter sleeve
CN219604846U (en) Positioning device for sliding adjusting bolt fastening cantilever outer frame vertical rod
CN213843546U (en) Solenoid support frame and solenoid device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant