CN214498414U CN202120282455.2U CN202120282455U CN214498414U CN 214498414 U CN214498414 U CN 214498414U CN 202120282455 U CN202120282455 U CN 202120282455U CN 214498414 U CN214498414 U CN 214498414U
Authority
CN
China
Prior art keywords
connecting cylinder
box
rod
piece
cement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120282455.2U
Other languages
Chinese (zh)
Inventor
李义逢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Taiwei Construction Engineering Co ltd
Original Assignee
Anhui Taiwei Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Taiwei Construction Engineering Co ltd filed Critical Anhui Taiwei Construction Engineering Co ltd
Priority to CN202120282455.2U priority Critical patent/CN214498414U/en
Application granted granted Critical
Publication of CN214498414U publication Critical patent/CN214498414U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a housing construction technical field, specifically speaking relates to a cement strikes off collection device for housing construction. It is including striking off the case, collecting box and connecting rod, strike off the case and include the connecting cylinder, the inside cavity structure that is of connecting cylinder, connecting cylinder top integrated into one piece has the scraper blade, the collecting box includes the box, the box is installed in the connecting cylinder bottom, the connecting cylinder communicates with each other with the box, the connecting rod includes the slide bar, the slide bar is installed in connecting cylinder one end, the one end integrated into one piece that the connecting cylinder was kept away from to the slide bar has the installation pole, strike off case and collecting box through setting up, make the device strike off the cement mortar that fragment of brick gap department spilled over in the use, and collect inside the box, thereby influence the roughness of wall after the cement mortar that avoids fragment of brick gap department to spill over solidifies.

Description

Cement strikes off collection device for house construction
Technical Field
The utility model relates to a housing construction technical field, specifically speaking relates to a cement strikes off collection device for housing construction.
Background
The house construction refers to the construction of buildings such as houses on the land where the infrastructure construction is completed, including residential buildings, industrial plants, commercial buildings, office buildings and other special houses.
Building a wall is one of important steps in building construction, cement mortar overflows due to excessive filling of cement mortar in gaps among bricks during building of the wall, flatness of the wall surface is affected after the cement mortar is solidified, and the overflowed cement mortar needs to be scraped in time.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a house construction strikes off collection device with cement to solve the problem that proposes in the above-mentioned background art.
In order to achieve the purpose, the utility model provides a house construction strikes off collection device with cement, including striking off case, collecting box and connecting rod, strike off the case and draw together the connecting cylinder, the inside cavity structure that is of connecting cylinder, connecting cylinder top integrated into one piece has the scraper blade, the collecting box includes the box, the box is installed in the connecting cylinder bottom, the connecting cylinder communicates with each other with the box, the connecting rod includes the slide bar, the slide bar is installed in connecting cylinder one end, the one end integrated into one piece that the connecting cylinder was kept away from to the slide bar has the installation pole.
As a further improvement of the technical scheme, the two ends of the connecting cylinder are integrally formed with sliding strips, sliding grooves matched with the sliding strips in size are formed in the box body, and the connecting cylinder is connected with the box body through the sliding strips in a sliding mode.
As a further improvement of the technical scheme, one end of the connecting cylinder is integrally formed with a hinge block, an installation shaft is arranged in the hinge block, one end of the sliding rod, which is far away from the installation rod, is integrally formed with a hinge plate, a round hole matched with the size of the installation shaft is formed in the hinge plate, and the hinge plate is rotatably connected with the installation shaft.
As a further improvement of the technical scheme, the installation shaft is rotatably connected with the hinge block, a threaded rod is integrally formed at one end of the installation shaft, the outer wall of the threaded rod is connected with a shaft sleeve, an internal thread matched with the size of the threaded rod is formed inside the shaft sleeve, and the shaft sleeve is in threaded connection with the threaded rod.
As a further improvement of the technical scheme, the mounting rod is internally provided with a mounting hole matched with the size of the sliding rod, and the sliding rod is connected with the mounting rod in a sliding manner.
As a further improvement of the technical scheme, a plurality of through holes are formed in the mounting rod, bolts are arranged in the through holes, and threaded holes matched with the bolts in size are formed in the sliding rod.
Compared with the prior art, the beneficial effects of the utility model are that:
1. this collection device is struck off to cement for building construction, through case and the collecting box of striking off that sets up for the cement mortar that the device can spill over fragment of brick gap department strikes off in the use, and collects inside the box, thereby avoids the cement mortar that fragment of brick gap department spills over to influence the roughness of wall after solidifying.
Drawings
FIG. 1 is a schematic view of the entire structure of embodiment 1;
fig. 2 is a sectional view showing the structure of the scraping case of embodiment 1;
FIG. 3 is a schematic view of the structure of the collection tank of embodiment 1;
fig. 4 is an exploded view of the connecting rod structure of embodiment 1.
The various reference numbers in the figures mean: 1. a scraping box; 10. a connecting cylinder; 11. a squeegee; 12. a hinged block; 13. a slide bar; 14. installing a shaft; 15. a threaded rod; 16. a shaft sleeve;
2. a collection box; 20. a box body; 21. a chute;
3. a connecting rod; 30. a slide bar; 31. a hinge plate; 32. a threaded hole; 33. mounting holes; 34. a bolt; 35. a through hole; 36. and (5) installing a rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and to simplify the description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
Example 1
Referring to fig. 1-4, the present invention provides a cement scraping and collecting device for building construction, including a scraping box 1, a collecting box 2 and a connecting rod 3, the scraping box 1 includes a connecting cylinder 10, the interior of the connecting cylinder 10 is a cavity structure, a scraping plate 11 is integrally formed on the top end of the connecting cylinder 10, the collecting box 2 includes a box body 20, the box body 20 is installed at the bottom end of the connecting cylinder 10, the connecting cylinder 10 is communicated with the box body 20, the connecting rod 3 includes a sliding rod 30, the sliding rod 30 is installed at one end of the connecting cylinder 10, an installing rod 36 is integrally formed at one end of the sliding rod 30 away from the connecting cylinder 10, the end of the connecting cylinder 10 away from the hinge block 12 is held to be close to a wall to be scraped with cement, then the connecting cylinder 10 and the scraping plate 11 are controlled to slide upwards along the wall by the installing rod 36, the scraping plate 11 contacts with overflowed cement mortar during the sliding process, so as to fall into the connecting cylinder 10, then fall into inside box 20 through connecting cylinder 10 to avoid brick gap department to spill over cement mortar to solidify the back and influence the roughness of wall.
Besides, connecting cylinder 10 both ends integrated into one piece has draw runner 13, and box 20 is inside to be seted up with draw runner 13 size assorted spout 21, and connecting cylinder 10 passes through draw runner 13 sliding connection with box 20, after box 20 is inside to have accumulated a certain amount of cement, promotes box 20 for box 20 slides along draw runner 13, thereby makes connecting cylinder 10 and box 20 separation, thereby is convenient for clear up the inside cement mortar of box 20.
Furthermore, one end of the connecting cylinder 10 is integrally formed with a hinge block 12, an installation shaft 14 is installed inside the hinge block 12, one end of the sliding rod 30, which is far away from the installation rod 36, is integrally formed with a hinge plate 31, a circular hole matched with the size of the installation shaft 14 is formed in the hinge plate 31, the hinge plate 31 is rotatably connected with the installation shaft 14, and the connecting cylinder 10 is attached to the wall surface with the scraper 11 in the use process of the device.
Further, installation axle 14 rotates with articulated piece 12 to be connected, installation axle 14 one end integrated into one piece threaded rod 15, and threaded rod 15 outer wall is connected with axle sleeve 16, and axle sleeve 16 is inside to be seted up with 15 size assorted internal threads of threaded rod, and axle sleeve 16 and 15 threaded connection of threaded rod are convenient for fix the angle between articulated slab 31 and articulated piece 12.
In addition, the installation rod 36 is internally provided with an installation hole 33 matched with the sliding rod 30 in size, and the sliding rod 30 is connected with the installation rod 36 in a sliding manner, so that the lengths of the sliding rod 30 and the installation rod 36 can be conveniently adjusted to meet different use requirements.
Furthermore, a plurality of through holes 35 are formed in the mounting rod 36, bolts 34 are arranged in the through holes 35, and threaded holes 32 matched with the bolts 34 in size are formed in the sliding rod 30, so that the sliding rod 30 and the mounting rod 36 can be conveniently fixed.
The utility model discloses in use, at first hold installation pole 36 and press close to the wall that needs strike off cement with the one end that articulated piece 12 was kept away from to connecting cylinder 10, follow the wall through installation pole 36 control connecting cylinder 10 and scraper blade 11 and upwards slide, scraper blade 11 slides in-process and the cement mortar contact that spills over, thereby make cement mortar fall into inside connecting cylinder 10, fall into inside box 20 through connecting cylinder 10 afterwards, thereby influence the roughness of wall after the cement mortar that avoids fragment of brick gap department to spill over solidifies, after box 20 inside has accumulated a certain amount of cement, promote box 20, make box 20 slide along draw runner 13, thereby make connecting cylinder 10 and box 20 separate, thereby be convenient for clear up the inside cement mortar of box 20, after the clearance, be connected connecting cylinder 10 and box 20 again, strike off the cement of wall once more.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It should be understood by those skilled in the art that the present invention is not limited by the above embodiments, and the description in the above embodiments and the description is only preferred examples of the present invention, and is not intended to limit the present invention, and that the present invention can have various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications all fall into the scope of the claimed invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. A cement scraping and collecting device for building construction, comprising: strike off case (1), collecting box (2) and connecting rod (3), its characterized in that, strike off case (1) including connecting cylinder (10), connecting cylinder (10) inside is the cavity structure, connecting cylinder (10) top integrated into one piece has scraper blade (11), collecting box (2) include box (20), box (20) are installed in connecting cylinder (10) bottom, connecting cylinder (10) communicate with each other with box (20), connecting rod (3) include slide bar (30), slide bar (30) are installed in connecting cylinder (10) one end, the one end integrated into one piece that connecting cylinder (10) was kept away from in slide bar (30) has installation pole (36).
2. The cement scraping and collecting device for building construction according to claim 1, characterized in that: connecting cylinder (10) both ends integrated into one piece has draw runner (13), box (20) inside offer with draw runner (13) size assorted spout (21), connecting cylinder (10) pass through draw runner (13) sliding connection with box (20).
3. The cement scraping and collecting device for building construction according to claim 1, characterized in that: connecting cylinder (10) one end integrated into one piece has articulated piece (12), articulated piece (12) internally mounted has installation axle (14), slide bar (30) keep away from the one end integrated into one piece of installation pole (36) have with articulated slab (31), set up on articulated slab (31) with installation axle (14) size assorted round hole, articulated slab (31) rotate with installation axle (14) and are connected.
4. The cement scraping and collecting device for building construction according to claim 3, characterized in that: installation axle (14) rotates with articulated piece (12) to be connected, installation axle (14) one end integrated into one piece threaded rod (15), threaded rod (15) outer wall connection has axle sleeve (16), axle sleeve (16) inside offer with threaded rod (15) size assorted internal thread, axle sleeve (16) and threaded rod (15) threaded connection.
5. The cement scraping and collecting device for building construction according to claim 1, characterized in that: the mounting rod (36) is internally provided with a mounting hole (33) matched with the sliding rod (30) in size, and the sliding rod (30) is connected with the mounting rod (36) in a sliding manner.
6. The cement scraping and collecting device for building construction according to claim 5, characterized in that: the mounting rod (36) is provided with a plurality of through holes (35), the through holes (35) are internally provided with bolts (34), and the sliding rod (30) is provided with threaded holes (32) matched with the bolts (34) in size.
CN202120282455.2U 2021-02-01 2021-02-01 Cement strikes off collection device for house construction Active CN214498414U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120282455.2U CN214498414U (en) 2021-02-01 2021-02-01 Cement strikes off collection device for house construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120282455.2U CN214498414U (en) 2021-02-01 2021-02-01 Cement strikes off collection device for house construction

Publications (1)

Publication Number Publication Date
CN214498414U true CN214498414U (en) 2021-10-26

Family

ID=78217932

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120282455.2U Active CN214498414U (en) 2021-02-01 2021-02-01 Cement strikes off collection device for house construction

Country Status (1)

Country Link
CN (1) CN214498414U (en)

Similar Documents

Publication Publication Date Title
CN214498414U (en) Cement strikes off collection device for house construction
CN214404944U (en) High-rise building gas riser fixed bolster
CN217072745U (en) Pressing plate device for processing and forming of wallboard convex groove
CN202359802U (en) A component for scraping and flattening wall surface plaster layers
CN210315884U (en) Sponge formula rainwater garden overflow arrangement
CN210713837U (en) Concrete building template for civil engineering
CN209478473U (en) A kind of distribution box reserved-hole die
CN207484981U (en) Secondary structure vertical member concrete construction pours device
CN112942742B (en) Building plastering tool
CN206655402U (en) A kind of prefabricated splash pan component
CN215501716U (en) Building test module box brush
CN213174768U (en) Full-penetration construction plate structure of full-cast-in-place outer wall high-rise dwelling house
CN214695713U (en) Electric power iron tower prefabricated tubular pile foundation device
CN215210649U (en) Warning device for municipal building construction
CN221664311U (en) Tile knife for building construction
CN113107087B (en) Construction method of bottom assembled frame structure system
CN212802106U (en) Self-heat-insulation constructional column of steel plate mesh formwork concrete light steel keel
CN219946646U (en) Adjustable roof drainage ditch manufacturing die
CN212613202U (en) Cast-in-place wall body component of housing construction
CN218562371U (en) Slope reinforcing apparatus for building municipal works
CN214498572U (en) Anti-tilting device for network construction
CN218699919U (en) Precast beam mould for building construction
CN213234344U (en) Device is paintd to concrete for housing construction
CN216442815U (en) Adjustable proportioning device of raw materials for anti-crack mortar production