CN112942742B - Building plastering tool - Google Patents

Building plastering tool Download PDF

Info

Publication number
CN112942742B
CN112942742B CN202110117627.5A CN202110117627A CN112942742B CN 112942742 B CN112942742 B CN 112942742B CN 202110117627 A CN202110117627 A CN 202110117627A CN 112942742 B CN112942742 B CN 112942742B
Authority
CN
China
Prior art keywords
plastering
plate
tool
mounting frame
limiting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110117627.5A
Other languages
Chinese (zh)
Other versions
CN112942742A (en
Inventor
李新明
张新
潘振冬
张骁
赵凯
赵艳波
崔婧瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
Original Assignee
China Construction First Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN202110117627.5A priority Critical patent/CN112942742B/en
Publication of CN112942742A publication Critical patent/CN112942742A/en
Application granted granted Critical
Publication of CN112942742B publication Critical patent/CN112942742B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/02Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
    • E04F21/06Implements for applying plaster, insulating material, or the like
    • E04F21/08Mechanical implements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention provides a building plastering tool, which fixes a plastering plate between a limiting groove and the limiting plate by adopting a mode of combining the limiting groove and the limiting plate, so that the front end of an installation frame can hold plastering plates with different lengths, the application range of the whole tool is improved, a plastering material feeder is arranged inside the installation frame, the front end of the plastering material feeder is arranged on a through hole of the plastering plate, the outer side of the plastering material feeder is connected with a feeding hopper, a push plate is arranged inside the plastering material feeder, the plastering material enters the plastering material feeder from the feeding hopper, the push plate is pushed by a push rod to spray the plastering material onto a wall, the tool is simple and convenient to operate, not only can prevent excessive waste of the plastering material, but also can carry out detailed plastering treatment on a certain point on the wall, and can receive the plastering material falling from the wall when the plastering plate is plastered by arranging a plastering material connecting plate, so as to prevent the plastering material from being incapable of being reused due to the ground, and the reutilization rate is improved.

Description

Building plastering tool
Technical Field
The invention relates to the technical field of building plastering, in particular to a building plastering tool.
Background
In the wall plastering construction in the building field, firstly, spaced mortar cakes are made on the wall, and after mortar of the mortar cakes collects water, a marking rib is smeared between the two mortar cakes to serve as the thickness standard of the wall plastering. After the marking ribs are collected, mortar slightly higher than the marking ribs is smeared between the two marking ribs, and the marking ribs are filled up through the mortar. Then, the mortar is scraped by a horizontal scraping rod, which is very troublesome. This kind of traditional mode of plastering can not guarantee that layer and ground of plastering are in the vertical state, and then can not guarantee the quality of plastering, and the efficiency of construction is also lower, and simultaneously, this kind of mode of plastering both wastes raw and other materials, and is more time-consuming and laboursome again, consequently, an urgent need a simple structure, convenient to use's plastering tool for building improves the quality and the efficiency of plastering.
Chinese patent CN206091231U discloses a construction plastering tool with simple operation, which structurally comprises: scraper blade, support, slider, slide rail, flexible post, base, scraper blade and support fixed connection, support and slider fixed connection, slider and slide rail swing joint, slide rail and flexible post fixed connection, flexible post and base fixed connection, the slide rail comprises motor, follow driving wheel support, follow driving frame, profile tooth piece, guide rail, hold-in range, motor and guide rail fixed connection, the motor passes through the hold-in range and follows driving wheel fixed connection, follow driving wheel and follow driving wheel support fixed connection, the profile tooth piece has been installed to the hold-in range is fixed, profile tooth piece and driving frame fixed connection. However, the plastering tool can only use a plastering plate with a certain specific size, has low applicability, inconvenient operation and serious waste of plaster.
Disclosure of Invention
The invention aims to provide a building plastering tool which is simple and convenient to operate, plastering plates with different lengths can be fixed on a limiting plate and a limiting groove, and a plastering material receiving plate is further arranged in the device and used for receiving plastering materials falling from a wall when the plastering plate is plastered, so that the phenomenon of excessive waste of the plastering materials is effectively avoided.
The utility model provides a building plastering tool, includes mounting bracket, the board of plastering and grey material feeder, be equipped with the handle on the mounting bracket, grey material feeder fixes the inside of mounting bracket, the board of plastering sets up the front end of mounting bracket, be equipped with the through-hole on the board of plastering, grey material feeder's front end is installed on the board of plastering, the bottom of the board of plastering is equipped with the spacing groove, the top of the board of plastering is equipped with the limiting plate, the spacing groove with the limiting plate is all fixed on the mounting bracket.
Furthermore, the ash material feeder comprises an ash material barrel, a feeding hopper is arranged on the ash material barrel, the feeding hopper is communicated with the ash material barrel, a push plate is arranged inside the ash material barrel, a push rod is fixedly connected to the push plate, and the push rod penetrates through a limiting hole at the tail end of the ash material barrel and is fixedly connected with the push plate.
Furthermore, be equipped with the through-hole on the board of plastering, the front end of ash cylinder is installed in the through-hole, the front end export of ash cylinder with the outside parallel and level of board of plastering, the diameter of ash cylinder front end with the diameter of through-hole is the same. The front end of the ash cylinder is contacted with the through hole more closely.
Furthermore, the inboard of mounting bracket is equipped with the bracing piece, ash material feeder passes through the bracing piece is fixed the inboard of mounting bracket.
Further, the bottom of plastering plate is equipped with the picture peg, the picture peg with the plastering plate is integrated into one piece structure, the picture peg is installed the spacing inslot, the inboard bottom of spacing groove is equipped with first rubber pad.
Further, the limiting plate on with the one end that the plastering plate contacted is equipped with the second rubber pad, be equipped with on the limiting plate one side of second rubber pad is fixed with the threaded rod, the threaded rod sets up the limiting plate with the one end that the mounting bracket contacted, the outside of mounting bracket be equipped with threaded rod complex screw hole, the threaded rod with the screw hole closes the connection soon.
Furthermore, the bottom end of the mounting frame is fixedly connected with an ash connecting plate, and a baffle on the outer side of the ash connecting plate and the outer side of the plastering plate are located on the same plane.
Further, the ash receiving plate is an arc plate with a central angle of 90 degrees. So that the arc-shaped plate forms an arc-shaped material receiving area.
Further, the handle and the mounting frame are of an integrally formed structure.
Further, the through hole is formed in the center of the plastering plate. The mortar is more beneficial to uniformly dispersing the mortar around under the action of pressure, so that the plastering is more uniform.
The technical scheme of the invention provides a building plastering tool, which comprises a mounting frame, wherein a handle is arranged on the mounting frame, the handle is more convenient to use the whole tool, the device fixes a plastering plate between a limiting groove and the limiting plate by adopting a mode of combining the limiting groove and the limiting plate, so that the front end of the mounting frame can hold plastering plates with different lengths, the application range of the whole tool is further improved, a mortar feeder is arranged inside the mounting frame, the tail end of the mortar feeder is fixed between a first supporting rod and a second supporting rod inside the mounting frame, the front end of the mortar feeder is arranged on a through hole of the plastering plate, the outer side of the mortar feeder is connected with a feeding hopper, a push plate is arranged inside the mortar feeder, mortar enters the mortar feeder from the feeding hopper, the mortar is sprayed onto a wall by pushing the push plate, this kind of mode easy operation is convenient, not only prevents the excessive waste of lime putty, also makes to carry out detailed processing of plastering to a certain point on the wall, through setting up the lime putty fishplate bar, can receive the lime putty that the board of plastering dropped from the wall when plastering, prevents to drop ground and leads to unable reuse, improves reuse rate, and this device easy operation is convenient, extensive applicability, and the utilization ratio is high.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and other drawings can be obtained by those skilled in the art without creative efforts.
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is another schematic structural view of the present invention;
FIG. 3 is a schematic view showing the construction of the ash feeder according to the present invention;
FIG. 4 is a schematic view of the overall structure of the gray material joint plate of the present invention;
description of reference numerals: 1-mounting frame, 101-handle, 102-first supporting rod, 103-second supporting rod, 2-ash feeder, 201-ash barrel, 202-hopper, 203-push rod, 204-push plate, 3-plastering plate, 301-through hole, 302-plug plate, 4-ash connecting plate, 5-limiting groove, 501-first rubber pad, 6-limiting plate, 601-threaded rod, 602-second rubber pad and 603-clamping plate;
Detailed Description
The technical solutions of the present invention will be described clearly and completely with reference to the following embodiments, and it should be understood that the described embodiments are some, but not all, embodiments of the present invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like, indicate orientations and positional relationships based on those shown in the drawings, and are used only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be considered as limiting the present invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", may explicitly or implicitly include one or more of the described features. In the description of the present invention, "a plurality" means two or more unless specifically defined otherwise. Furthermore, the terms "mounted," "connected," and "connected" are to be construed broadly and may, for example, be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
As shown in figures 1, 2, 3 and 4,
the utility model provides a building plastering tool, includes the mounting bracket 1 of U type structure, is equipped with the handle 101 that is the integrated into one piece structure with this mounting bracket 1 on mounting bracket 1, can make things convenient for the use of whole instrument and carry through setting up handle 101 on mounting bracket 1 and take, and ash material feeder 2 passes through bracing piece 102 to be fixed in the inboard at mounting bracket 1, forms fixed and supporting role to ash material feeder 2 under the combined action of bracing piece 102.
Be equipped with plastering plate 3 at the front end of mounting bracket 1, be equipped with through-hole 301 on the central point of plastering plate 3 puts, the setting is put at the central point and more is favorable to the lime-aggregate to homodisperse all around under the pressure effect, it is more even to make plaster, the front end of lime-aggregate feeder 2 is fixed in through-hole 301, the diameter of lime-aggregate cylinder 201 front end is the same with the diameter of through-hole 301, it is inseparabler to make the front end of lime-aggregate cylinder 201 and through-hole 301 contact, and the front end outlet department of lime-aggregate cylinder 201 and the outside parallel and level of plastering plate 3, avoid exceeding the outside of plastering plate 3 and influencing operating mass because of the front end of lime-aggregate cylinder 201.
A limiting groove 5 is fixedly connected to the bottom end of the right side of the mounting frame 1, an inserting plate 302 is arranged at the bottom end of the plastering plate 3, the inserting plate 302 and the plastering plate 3 are of an integrated structure, the inserting plate 302 is installed in the limiting groove 5, a first rubber pad 501 is arranged at the bottom of the limiting groove 5, the first rubber pad 501 can protect the bottom of the plastering plate 3 from being worn so as to preliminarily install and fix the plastering plate 3, a limiting plate 6 is arranged at the other end of the mounting frame 1 opposite to the limiting groove 5, a second rubber pad 602 is arranged at one end of the limiting plate 6, which is in contact with the plastering plate 3, the rubber pad can play a role of skid resistance and can protect the top end of the plastering plate 3 from being worn, a threaded rod 601 is fixed at one side of the limiting plate 6, which is provided with the second rubber pad 602, the threaded rod 601 is arranged at one end of the limiting plate 6, which is in contact with the mounting frame 1, a threaded hole matched with the threaded rod 601 is arranged at the outer side of the mounting frame 1, threaded rod 601 closes with the screw hole soon and is connected, and then fix limiting plate 6 on mounting bracket 1, it is rotatory in the inside of thread groove to drive threaded rod 601 through stirring limiting plate 6, and then adjust the distance between limiting plate 6 and the board of plastering 3, make the top of the second rubber pad 602 pressure holding board of plastering 3 on the limiting plate 6, thereby the restriction that the board of plastering 3 is stable is plastered the use on the right side of mounting bracket 1, this threaded rod 601 and limiting plate 6 are the integrated into one piece structure, also can adopt the bolt to carry out fixed connection between limiting plate 6 and the mounting bracket, make the limiting plate pressure hold the board of plastering through twisting the bolt, be equipped with the upper end swing that clamping plate 603 prevented the board of plastering on limiting plate 6, this clamping plate 603 is the integrated into one piece structure with limiting plate 6.
Lime material feeder 2 includes lime cylinder 201, be equipped with hopper 202 on the lime cylinder 201, hopper 202 and lime cylinder 201 intercommunication, put into plastering plate 3 with the lime material through hopper 202, the internally mounted of lime cylinder 201 has push pedal 204, fixedly connected with push rod 203 on the push pedal 204, push rod 203 passes spacing hole and push pedal 204 fixed connection of lime cylinder 201 tail end, this push rod 203 coincides with the central axis of push pedal 204 and plastering plate 3, promote push pedal 204 and then promote the lime material and spout forward by push rod 203 behind the lime material entering lime cylinder 201, then through plastering plate 3 with even plastering of lime material on the wall.
The bottom fixedly connected with ash material fishplate bar 4 at mounting bracket 1, the baffle in the ash material fishplate bar 4 outside is located the coplanar with the outside of plastering plate 3, and the inside of ash material fishplate bar 4 is equipped with the spring. The setting up of spring makes ash material fishplate bar 4 have the elasticity, and then prevents to hug closely when the baffle on the wall, prevents that ash material fishplate bar 4 from damaging because of receiving great resistance, and ash material fishplate bar 4 is 90 arcs for central angle, makes the arc form an curved material district that connects, and curved material district that connects more is favorable to catching the ash material that falls down, prevents to drop and leads to unable reuse to ground, and the effectual phenomenon of having avoided excessive waste produces.
The technical scheme of the invention provides a building plastering tool, the tool fixes a plastering plate 3 between a limiting groove 5 and a limiting plate 6 by adopting a mode of combining the limiting groove 5 and the limiting plate 6, so that the front end of an installation frame 1 can hold plastering plates 3 with different lengths, thereby improving the application range of the whole tool, a plastering material feeder 2 is arranged in the installation frame 1, when the device works, the plastering material is put into a plastering material barrel 201 through a feeding hopper 202, a push plate 204 is pushed by a push rod 203 to spray the plastering material onto a wall, then the plastering plate 3 is used for uniformly plastering the plastering material, the operation is simple and convenient, the excessive waste of the plastering material is prevented, a certain point on the wall can be subjected to detailed treatment, and the plastering material falling from the wall when plastering plate 3 is plastered can be received by arranging a plastering material connecting plate 4 at the bottom end of the installation frame 1, prevent to drop and lead to unable reuse to ground, improve reuse rate, this device easy operation is convenient, extensive applicability, the high-usage.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; while the invention has been described in detail and with reference to the foregoing embodiments, it will be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; and the modifications or the substitutions do not make the essence of the corresponding technical solutions depart from the scope of the technical solutions of the embodiments of the present invention.

Claims (8)

1. A building plastering tool is characterized by comprising a mounting frame, a plastering plate and a plastering material feeder, wherein a handle is arranged on the mounting frame, the plastering material feeder is fixed in the mounting frame, the plastering plate is arranged at the front end of the mounting frame, a through hole is formed in the plastering plate, the front end of the plastering material feeder is arranged on the plastering plate, a limiting groove is formed in the bottom end of the plastering plate, a limiting plate is arranged at the top end of the plastering plate, the limiting groove and the limiting plate are both fixed on the mounting frame, a plastering material connecting plate is fixedly connected to the bottom end of the mounting frame, a baffle on the outer side of the plastering material connecting plate and the outer side of the plastering plate are positioned in the same plane, a spring is arranged in the plastering material connecting plate, a supporting rod is arranged on the inner side of the mounting frame, and the plastering material feeder is fixed on the inner side of the mounting frame through the supporting rod, and a clamping plate is arranged on the limiting plate.
2. The building plastering tool as claimed in claim 1, wherein the mortar feeder comprises a mortar barrel, a hopper is arranged on the mortar barrel, the hopper is communicated with the mortar barrel, a push plate is arranged in the mortar barrel, a push rod is fixedly connected to the push plate, and the push rod passes through a limiting hole at the tail end of the mortar barrel and is fixedly connected with the push plate.
3. A building plastering tool as claimed in claim 2, wherein the outlet of the front end of the mortar barrel is flush with the outer side of the plastering plate, and the diameter of the front end of the mortar barrel is the same as that of the through hole.
4. The building plastering tool as claimed in claim 1, wherein an inserting plate is provided at the bottom end of the plastering plate, the inserting plate and the plastering plate are integrally formed, the inserting plate is installed in the limiting groove, and a first rubber pad is provided at the bottom end of the inner side of the limiting groove.
5. The building plastering tool of claim 1, wherein a second rubber pad is arranged at one end of the limiting plate, which is contacted with the plastering plate, a threaded rod is fixed at one side of the limiting plate, which is provided with the second rubber pad, the threaded rod is arranged at one end of the limiting plate, which is contacted with the mounting frame, a threaded hole matched with the threaded rod is arranged at the outer side of the mounting frame, and the threaded rod is screwed with the threaded hole.
6. A building plastering tool as claimed in claim 1, wherein the plaster receiving plate is an arc having a central angle of 90 °.
7. A construction plastering tool as claimed in claim 1, wherein the handle is of one-piece construction with the mounting bracket.
8. A construction plastering tool as claimed in claim 1, wherein the through hole is provided at a central position of the plastering plate.
CN202110117627.5A 2021-01-28 2021-01-28 Building plastering tool Active CN112942742B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110117627.5A CN112942742B (en) 2021-01-28 2021-01-28 Building plastering tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110117627.5A CN112942742B (en) 2021-01-28 2021-01-28 Building plastering tool

Publications (2)

Publication Number Publication Date
CN112942742A CN112942742A (en) 2021-06-11
CN112942742B true CN112942742B (en) 2022-06-24

Family

ID=76238620

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110117627.5A Active CN112942742B (en) 2021-01-28 2021-01-28 Building plastering tool

Country Status (1)

Country Link
CN (1) CN112942742B (en)

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1160916A (en) * 1965-12-20 1969-08-06 Aryon Apostolis Plastering Apparatus
ATE135790T1 (en) * 1993-01-22 1996-04-15 Gerhard Mendler DEVICE FOR PLASTERING BUILDING SURFACES
CN207348395U (en) * 2017-09-25 2018-05-11 李克志 A kind of wall plastering device for preventing from painting slurries water clock
CN208430745U (en) * 2018-04-27 2019-01-25 青岛中筑置业有限公司 A kind of adjustable type plastering plate strengthening mechanism
CN208486522U (en) * 2018-05-17 2019-02-12 青岛润扬环境科技有限公司 A kind of adjustable plastering mechanism of the plastering range size that applicability is high
CN109339411B (en) * 2018-11-30 2021-05-18 中国一冶集团有限公司 Quick mortar cake beating device for plastering construction and mortar cake beating method thereof
CN209841912U (en) * 2018-12-11 2019-12-24 倪秀松 Novel electric energy metering box fixing device
CN210598045U (en) * 2019-08-12 2020-05-22 鸿霖股份有限公司 Plastering device for inner wall
CN211850638U (en) * 2019-12-19 2020-11-03 周勇 Wall spraying device for building outer wall capable of spraying uniformly

Also Published As

Publication number Publication date
CN112942742A (en) 2021-06-11

Similar Documents

Publication Publication Date Title
CN112942742B (en) Building plastering tool
CN213854240U (en) Hydraulic engineering construction is with stirring material device
CN213972252U (en) A collecting hopper for compound preparator
CN207686290U (en) A kind of gypsum core model processing waste scraping device
CN218393582U (en) Granulator for feed production
CN216442815U (en) Adjustable proportioning device of raw materials for anti-crack mortar production
CN207920090U (en) A kind of removal tool of cement formwork
CN217997002U (en) Double-roller dewatering device for municipal sludge
CN216193792U (en) Feeding mechanism for asphalt paving
CN219855234U (en) Concrete pumping equipment
CN218901475U (en) Pre-preparation mixing device for mixing wet carbide slag and dry powder coal ash
CN220704956U (en) Anti-slip structure for inclined roof concrete construction
CN214498414U (en) Cement strikes off collection device for house construction
CN213412496U (en) Intelligent feeding device for processing ceramic tiles and forced-acting mortar
CN211691337U (en) Reentrant corner circular arc plastering tool
CN214440559U (en) Gluing equipment for laser etching of light guide plate mesh points
CN110637728A (en) Rabbit is bred and uses excrement and urine cleaning device
CN218509073U (en) Wall body masonry device for building engineering
CN220702067U (en) Scraper for block-removing equipment
CN214995657U (en) Wall plastering equipment in building field
CN217234627U (en) Papermaking shallow air flotation with chemicals added in front of pump
CN220433332U (en) Road concrete placement device
CN212069717U (en) Can monitor desliming fill of material level height
CN216710702U (en) Horizontal mortar conveying device
CN211313406U (en) Constructional column concrete design pouring device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant