CN214464200U - Movable multifunctional operation platform for tunnel construction - Google Patents

Movable multifunctional operation platform for tunnel construction Download PDF

Info

Publication number
CN214464200U
CN214464200U CN202120644973.4U CN202120644973U CN214464200U CN 214464200 U CN214464200 U CN 214464200U CN 202120644973 U CN202120644973 U CN 202120644973U CN 214464200 U CN214464200 U CN 214464200U
Authority
CN
China
Prior art keywords
fixedly connected
tunnel construction
main body
water
main part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120644973.4U
Other languages
Chinese (zh)
Inventor
张文杰
任彦伟
张志明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202120644973.4U priority Critical patent/CN214464200U/en
Application granted granted Critical
Publication of CN214464200U publication Critical patent/CN214464200U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model relates to a tunnel construction technical field especially relates to a tunnel construction is with mobilizable multi-functional operation platform. The to-be-solved technical problem of the utility model is a tunnel construction work platform does not carry out a protection to constructor, and there is the rubble at the tunnel top often to drop, injures the staff by a crashing object, and the device does not have the position of placing of construction tool, inconvenient construction. In order to solve the technical problem, the utility model provides a tunnel construction is with mobilizable multi-functional operation platform, comprising a main body, the top fixedly connected with fixed plate of main part, the middle fixedly connected with spring of fixed plate, one side fixedly connected with guard plate of fixed plate, through installing the guard plate in the main part, not only protected the device, still eliminated the rubble and dropped the potential safety hazard of injuring the staff, through installing support and water tank isotructure, improved the convenience of device, let the staff operation get up more easily.

Description

Movable multifunctional operation platform for tunnel construction
Technical Field
The utility model relates to a tunnel construction technical field specifically is a tunnel construction is with mobilizable multi-functional operation platform.
Background
With the development of economy, traffic construction among various places is increased, the tunnel construction has multiple processes and complex process, the construction speed is influenced by high construction cost, and the tunnel is higher, so that operation is carried out by means of a construction platform in the construction process.
The prior patent (publication number: CN210440043U) discloses a tunnel construction work platform, four upright posts are distributed in a rectangular shape, connecting rods are inserted between the front and back adjacent upright posts and between the left and right adjacent upright posts, the upright posts are provided with holes for penetrating the connecting rods, the connecting rods can slide along the axial direction of the holes, screws are assembled between the upright posts and the connecting rods, the connecting rods are distributed at the positions close to the top and the bottom of the upright posts, a platform structure is assembled between the front and back adjacent upright posts, and the platform structure can slide along the vertical direction of the upright posts. The inventor finds that the following problems in the prior art are not well solved in the process of implementing the scheme, namely 1, the device does not protect constructors, and broken stones often fall off from the top of a tunnel during tunnel construction to injure workers; 2. the device does not have construction tool's the position of placing, and the constructor during operation still need be through the transmission or adorn and look for in the sack, and construction tool drops carelessly, still can injure the staff of low by a crashing object, inconvenient construction.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a tunnel construction is with mobilizable multi-functional operation platform has solved the problem mentioned in the above-mentioned background.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: a movable multifunctional operation platform for tunnel construction comprises a main body, wherein a fixed plate is fixedly connected to the top of the main body, a spring is fixedly connected to the middle of the fixed plate, a protection plate is fixedly connected to one side of the fixed plate, a support column is fixedly connected to one side of the bottom of the protection plate through the fixed plate, a support is fixedly mounted in the main body, an object placing groove is formed in the upper end of the support, a water tank is fixedly mounted at the lower end of the support, the bottom of the water tank is fixedly mounted on the main body, a water pump and a water cover are fixedly connected to one side of the water tank, a water pipe is fixedly connected to one side of the water pump through a three-way water pipe joint, a spray cylinder is fixedly connected to one end of the water pipe, a fixing column is fixedly connected to the bottom of the spray cylinder, the fixing column is fixedly connected to the main body, and lifting rings are fixedly connected to the left side and the right side of the main body, the basin has all been seted up to the left and right sides of main part, the right side top fixed mounting of main part has the workstation.
Further preferably, the bottom of the main body and the bottom of the supporting column are both fixedly provided with rollers.
Preferably, the spring is movably sleeved with a telescopic rod, and the telescopic rod is fixedly connected to the middle of the fixing plate.
Further preferably, the number of the support columns is two, a cross beam is fixedly connected between the support columns, and the side face of the cross beam is fixedly connected to the workbench.
Further preferably, the length and the width of the water outlet groove are more than 1.5 times of the external dimension of the spray cylinder.
Further preferably, the protection plate is made of U-shaped wear-resistant steel.
(III) advantageous effects
The utility model provides a tunnel construction is with mobilizable multi-functional operation platform possesses following beneficial effect:
(1) this mobilizable multifunctional operation platform is used in tunnel construction has increased the protectiveness of device through installing the guard plate in the main part, and during the construction, the staff stands the operation on the workstation, has the rubble to fall when the tunnel top, pounces to the guard plate on, through spring buffering, has not only protected the device, has still eliminated the rubble and has dropped and pounded the potential safety hazard that hurts the staff.
(2) The utility model discloses a tunnel construction is with mobilizable multi-functional operation platform passes through installing support and water tank isotructure, has improved the convenience of device, can directly carry out the operation from putting the instrument of taking in the thing groove when the staff construction, and the water of water tank is through the dust that a shower nozzle sprinkled in the tunnel in having reduced the air simultaneously, lets the staff operation get up more easily.
Drawings
FIG. 1 is a front view of the structure of the present invention;
FIG. 2 is a left side view of the structure of the present invention;
FIG. 3 is an internal view of the main structure of the present invention;
fig. 4 is a partial schematic view of the structure a of the present invention.
In the figure: the device comprises a main body 1, a fixing plate 2, springs 3, a protection plate 4, a support column 5, a cross beam 6, a support 7, an object placing groove 8, a water tank 9, a water pump 10, a water pipe 11, a spraying cylinder 12, a fixing column 13, a water cover 14, a lifting ring 15, a water outlet groove 16, a telescopic rod 17, a workbench 18 and rollers 19.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a movable multifunctional operation platform for tunnel construction comprises a main body 1, a fixed plate 2 is fixedly connected to the top of the main body 1, a spring 3 is fixedly connected to the middle of the fixed plate 2, an expansion rod 17 is movably sleeved inside the spring 3, the expansion rod 17 is fixedly connected to the middle of the fixed plate 2, the expansion rod 17 is sleeved inside the spring 3 to play a role in guiding, the spring 3 is prevented from position deviation in the compression process, the stability of the device is improved, a protection plate 4 is fixedly connected to one side of the fixed plate 2, the protection plate 4 is made of U-shaped wear-resistant steel, the wear-resistant steel is good in impact resistance and capable of resisting impact of multiple times of broken stones, the service life is long, support columns 5 are fixedly connected to one side of the bottom of the protection plate 4 through the fixed plate 2, the number of the support columns 5 is two, cross beams 6 are fixedly connected between the support columns 5, and the side faces of the cross beams 6 are fixedly connected to a workbench 18, two support columns 5 are selected to increase the stability and firmness of the device, the cross beam 6 plays a role in reinforcement to enable the device to be firmer, a support 7 is fixedly arranged in the main body 1, an object placing groove 8 is formed in the upper end of the support 7 and used for placing construction tools, a water tank 9 is fixedly arranged at the lower end of the support 7, the bottom of the water tank 9 is fixedly arranged on the main body 1, a water pump 10 and a water cover 14 are fixedly connected to one side of the water tank 9, water is injected into the water tank 9 through the water cover 14, a water pipe 11 is fixedly connected to one side of the water pump 10 through a tee pipe joint, the two water pipes 11 are connected to a power source through the tee pipe joint, the cost is saved, one end of the water pipe 11 is fixedly connected with a spray cylinder 12, the bottom of the spray cylinder 12 is fixedly connected with a fixed column 13, the fixed column 13 is fixedly connected to the main body 1, the left side and the right side of the main body 1 are fixedly connected with lifting rings 15, during transportation, can carry the device through rings 15, basin 16 has all been seted up to the left and right sides of main part 1, basin 16's length width is greater than 1.5 times of spouting a 12 overall dimension, ensure to spout 12 spun hydroenergy through a basin 16 to the tunnel in, the right side top fixed mounting of main part 1 has workstation 18, the constructor during operation, stand the operation on workstation 18, the equal fixed mounting in bottom of main part 1 and support column 5 has gyro wheel 19, increase gyro wheel 19, let the device be convenient for remove.
The working principle is as follows: during the use, earlier conveniently transport the place of construction with mobilizable multi-functional operation platform for tunnel construction through rings 15, during the operation, open water pump 10, the inside water of water tank 9 flows into through water pipe 11 and spouts the wall in section of thick bamboo 12 and spray to the tunnel, reduces the dust in the tunnel air, and the staff stands and works on workstation 18, when having the rubble to drop at the staff top, drops on guard plate 4, has avoided pounding the staff.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention.

Claims (6)

1. The utility model provides a tunnel construction is with mobilizable multi-functional operation platform, includes main part (1), its characterized in that: the top of the main body (1) is fixedly connected with a fixing plate (2), the middle of the fixing plate (2) is fixedly connected with a spring (3), one side of the fixing plate (2) is fixedly connected with a protection plate (4), and one side of the bottom of the protection plate (4) is fixedly connected with a support column (5) through the fixing plate (2);
a support (7) is fixedly installed inside the main body (1), an object placing groove (8) is formed in the upper end of the support (7), a water tank (9) is fixedly installed at the lower end of the support (7), the bottom of the water tank (9) is fixedly installed on the main body (1), a water pump (10) and a water cover (14) are fixedly connected to one side of the water tank (9), a water pipe (11) is fixedly connected to one side of the water pump (10) through a three-way water pipe joint, a spraying cylinder (12) is fixedly connected to one end of the water pipe (11), a fixing column (13) is fixedly connected to the bottom of the spraying cylinder (12), and the fixing column (13) is fixedly installed on the main body (1);
the equal fixedly connected with rings (15) of the left and right sides of main part (1), basin (16) have all been seted up to the left and right sides of main part (1), the right side top fixed mounting of main part (1) has workstation (18).
2. The movable multifunctional operating platform for tunnel construction according to claim 1, characterized in that: the bottom of the main body (1) and the bottom of the supporting column (5) are fixedly provided with rollers (19).
3. The movable multifunctional operating platform for tunnel construction according to claim 1, characterized in that: the spring (3) is movably sleeved with a telescopic rod (17), and the telescopic rod (17) is fixedly connected in the middle of the fixing plate (2).
4. The movable multifunctional operating platform for tunnel construction according to claim 1, characterized in that: the quantity of support column (5) is two, and fixedly connected with crossbeam (6) between support column (5), the side fixed connection of crossbeam (6) is on workstation (18).
5. The movable multifunctional operating platform for tunnel construction according to claim 1, characterized in that: the length and the width of the water outlet groove (16) are more than 1.5 times of the external dimension of the spray cylinder (12).
6. The movable multifunctional operating platform for tunnel construction according to claim 1, characterized in that: the protection plate (4) is made of U-shaped wear-resistant steel.
CN202120644973.4U 2021-03-30 2021-03-30 Movable multifunctional operation platform for tunnel construction Expired - Fee Related CN214464200U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120644973.4U CN214464200U (en) 2021-03-30 2021-03-30 Movable multifunctional operation platform for tunnel construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120644973.4U CN214464200U (en) 2021-03-30 2021-03-30 Movable multifunctional operation platform for tunnel construction

Publications (1)

Publication Number Publication Date
CN214464200U true CN214464200U (en) 2021-10-22

Family

ID=78176147

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120644973.4U Expired - Fee Related CN214464200U (en) 2021-03-30 2021-03-30 Movable multifunctional operation platform for tunnel construction

Country Status (1)

Country Link
CN (1) CN214464200U (en)

Similar Documents

Publication Publication Date Title
CN214464200U (en) Movable multifunctional operation platform for tunnel construction
CN211950566U (en) Colliery is dust collector in pit
CN113374340A (en) Metal building encloses fender
CN210886882U (en) Laborsaving breaker of road construction
CN205314515U (en) Scaffold of building a wall
CN212494324U (en) Cleaning device is used in net cloth production
CN212983931U (en) Assembled reinforced concrete barricade
CN209397599U (en) A kind of civil construction piling equipment
CN208561400U (en) A kind of counterweight housing of elevator
CN210264174U (en) Building safety is with enclosing fender device
CN111350402A (en) Movable operation fence for channel slope
CN209741735U (en) Novel fender is enclosed to mechanical type safety for building site
CN211524358U (en) Portable closed enclosing barrier for quick socket joint
CN212406734U (en) Multifunctional tunnel construction trolley
CN210341582U (en) Concrete curing means of highway engineering construction
CN214319570U (en) Construction site dust device for building engineering
CN209780210U (en) Springboard protection device for building engineering
CN218072706U (en) General type ecological protection plant protection device
CN217439689U (en) Fence device for construction site
CN215259217U (en) Portable air compressor machine wind pressure adjusting device
CN217602569U (en) Drilling machine for highway construction
CN219587357U (en) Dust collection and dust removal surrounding baffle for mortar feeding site
CN217399433U (en) Safe operation platform for bent cap
CN110338036B (en) Support guard plate for irrigation and drainage machine
CN212950657U (en) A locomotive for placing liquefied gas storage tank

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211022