CN214461887U - Prefabricated house assembling interval drainage structure - Google Patents

Prefabricated house assembling interval drainage structure Download PDF

Info

Publication number
CN214461887U
CN214461887U CN202022253612.5U CN202022253612U CN214461887U CN 214461887 U CN214461887 U CN 214461887U CN 202022253612 U CN202022253612 U CN 202022253612U CN 214461887 U CN214461887 U CN 214461887U
Authority
CN
China
Prior art keywords
chute
drainage
connecting block
shaped connecting
drainage channel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022253612.5U
Other languages
Chinese (zh)
Inventor
谢光团
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Eryun Steel Structure Technology Co ltd
Original Assignee
Chongqing Eryun Steel Structure Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Eryun Steel Structure Technology Co ltd filed Critical Chongqing Eryun Steel Structure Technology Co ltd
Priority to CN202022253612.5U priority Critical patent/CN214461887U/en
Application granted granted Critical
Publication of CN214461887U publication Critical patent/CN214461887U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model belongs to the technical field of drainage structures, in particular to a movable board house assembling interval drainage structure, which comprises two movable board roof boards, a connecting piece is arranged between the two movable board roof boards, the connecting piece comprises two C-shaped connecting blocks and a drainage channel which are symmetrically arranged, the left side and the right side of the upper side of the drainage channel are respectively and fixedly connected with the lower sides of the two C-shaped connecting blocks, the lower sides of the drainage channel are respectively and uniformly provided with a plurality of transversely arranged reinforcing ribs, the opening part of the C-shaped connecting block is respectively provided with a first chute and a second chute which face the movable board roof boards, the first chute and the second chute are both filled with waterproof layers, the C-shaped connecting blocks are connected with the movable board roof boards through fixing bolts, a baffle is fixedly connected between the two C-shaped connecting blocks, and a plurality of inclined holes are uniformly formed on the baffle, and the water is drained along the site, and simultaneously, the water drainage channel can be prevented from being blocked and the temperature at the interval part can be prevented from being overhigh.

Description

Prefabricated house assembling interval drainage structure
Technical Field
The utility model belongs to the technical field of drainage structures, concretely relates to interval drainage structures is assembled to prefabricated house.
Background
The prefabricated house is an environment-friendly economical prefabricated house which takes a color steel plate as a framework, takes a sandwich plate as a building enclosure material, performs space combination by using a standard modulus series, adopts bolt connection as components and has a brand-new concept. The temporary building can be assembled and disassembled conveniently and quickly, universal standardization of temporary buildings is realized, environment-friendly, energy-saving, rapid and efficient building concepts are established, and the temporary building enters the field of a set product which is developed in series, produced in an integrated mode, supplied in a matched mode, stockable and capable of being used repeatedly.
The movable plank house has the advantages of convenient turnover and repeated utilization, but because the space after the movable plank house is assembled is fixed, a plurality of movable plank houses need to be spliced when the movable plank houses with larger space are needed, the common parts (such as clapboards) of the movable plank houses need to be dismantled and then spliced when the movable plank houses are spliced, but because the clapboards have gaps after being dismantled, the spliced movable plank houses have the gaps, the movable plank houses are generally connected by using simple connecting pieces, but the connecting effect is not good, the waterproof and drainage effects are not good, rainwater easily enters the movable plank houses from the gaps in rainy days to cause water leakage, meanwhile, because the splicing intervals of the movable plank houses are directly exposed outside, sundries are easily accumulated in the connecting pieces at the intervals, thus being not beneficial to water drainage and easily causing the blockage of the water drainage, and simultaneously because the connecting pieces at the splicing intervals are not integrated with the top plate, therefore, the heat insulation function is not provided, so that the connecting pieces at the splicing intervals are easily subjected to direct sunlight irradiation, heat is easily directly transferred into the movable board house, and the indoor temperature is unbalanced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at: aiming at providing a clearance drainage structures is assembled to activity board house, can need the concatenation to enlarge when using the place at the activity board house, splice the roof in a plurality of activity board houses effectively, prevent that the rainwater from getting into indoorly through concatenation interval department to can also prevent that debris from falling into and cause the drainage to block up in the interval, and still have certain thermal-insulated effect.
In order to realize the technical purpose, the utility model discloses a technical scheme as follows:
a movable board house assembling interval drainage structure comprises two movable board house roof boards, a connecting piece is arranged between the two movable board house roof boards, the connecting piece comprises two C-shaped connecting blocks and a drainage channel which are symmetrically arranged, the left side and the right side of the upper side of the drainage channel are respectively fixedly connected with the lower sides of the two C-shaped connecting blocks, a plurality of reinforcing ribs which are transversely arranged are uniformly arranged on the lower sides of the drainage channel, the opening of each C-shaped connecting block is matched with the thickness of the corresponding movable board house roof board in size, a first chute and a second chute which face the movable board house roof boards are arranged at the opening of each C-shaped connecting block, waterproof layers are filled in the first chute and the second chute, the C-shaped connecting blocks are connected with the movable board house roof boards through fixing bolts, a baffle is fixedly connected between the two C-shaped connecting blocks, and the baffle and the movable board house roof boards are positioned on the same horizontal plane, the baffle is evenly provided with a plurality of inclined holes.
By adopting the technical scheme of the utility model, when splicing the movable plate house, two movable plate house roof plates are connected through the connecting piece, the movable plate house roof plates are firstly placed into the C-shaped connecting block when connected, then the movable plate house roof plates are preliminarily fixed with the C-shaped connecting block through the fixing bolts, then the other movable plate house roof plate is placed into the C-shaped connecting block at the other side, and finally the movable plate house is spliced through the fixing bolts, so that the connecting piece connects the splicing intervals when the movable plate house is spliced, thereby avoiding the existence of gaps after splicing, and the reinforcing ribs can improve the stability after splicing; when the movable board house is connected by using the connecting piece, waterproof layers can be filled in the first chute and the second chute, so that rainwater can be prevented from entering the room from a gap between the connecting piece and the movable board roof plate, the waterproof effect is improved, the upper side and the lower side of the movable board roof plate are simultaneously filled, and when the waterproof layer in the outdoor first chute is aged and falls off, the waterproof layer in the indoor second chute can still play a role in preventing water; when water exists at the connecting piece of the movable plate roof in rainy days or other conditions, the water enters the drainage channel from the inclined hole at the upper side of the baffle plate and is then drained away from the movable plate roof through the drainage channel, the baffle plate can prevent impurities from entering the drainage channel to cause blockage, the smoothness of drainage is ensured, and the impurities on the baffle plate can be more easily washed away by running water because the baffle plate and the movable plate roof are positioned on the same horizontal plane; the baffle plates shield the upper side of the drainage channel, so that most of sunlight can be shielded, the phenomenon that the drainage channel is irradiated by sunlight in a large range to cause that heat enters the indoor space through the drainage channel to cause indoor temperature imbalance is avoided, and the inclined holes can greatly reduce the time that the sunlight enters the drainage channel through the inclined holes while ensuring that water can smoothly enter the drainage channel, so that the irradiation of the drainage channel by the sunlight is further reduced; the utility model has the advantages of simple and novel structure, can conveniently splice the portable house effectively, can also make concatenation interval department drainage and waterproof effectively simultaneously, avoid interval department the phenomenon of leaking to can also prevent that debris from falling into the interior department of drainage canal and causing the jam, thereby cause the drainage not smooth, and can also reduce the sunshine that drainage canal department received and penetrate directly, thereby reduce and get into indoor heat.
Further limiting, waterproof layers filled in the first chute and the second chute are made of waterproof glue. With the structure, water can be prevented from entering the room from the gap between the connecting piece and the movable plate roof plate.
Further defined, the inclination of the inclined hole is 30-45 degrees. With the structure, the sunlight can be prevented from continuously shining into the drainage channel through the inclined hole.
Further defined, the drain channel is arcuate. With this configuration, water can be smoothly discharged.
Further limited, a rubber sealing gasket is arranged in the opening of the C-shaped connecting block. Such structure can be when C shape connecting block is connected with fly leaf roof board, further improves waterproof sealing effect.
The utility model discloses have following advantage with prior art relative ratio:
the utility model has simple and novel structure, can conveniently and effectively splice the movable board house, and can effectively drain and prevent water at the splicing interval, thereby avoiding the water leakage phenomenon at the interval; and can also prevent sundries from falling into the drainage channel to cause blockage, thereby causing unsmooth drainage; and the direct sunlight on the drainage channel can be reduced, so that the heat entering the room is reduced.
Drawings
The present invention can be further illustrated by the non-limiting examples given in the accompanying drawings;
fig. 1 is a schematic structural view of an embodiment of an assembled interval drainage structure of a prefabricated house according to the present invention;
FIG. 2 is a sectional view of the structure of the present invention, which is an embodiment of the partition drainage structure assembled in the prefabricated house;
the main element symbols are as follows:
the movable plate roof plate 1, the connecting piece 2, the C-shaped connecting block 21, the first inclined groove 211, the second inclined groove 212, the drainage channel 22, the reinforcing rib 221, the fixing bolt 23, the baffle plate 3 and the inclined hole 31.
Detailed Description
In order to make the present invention better understood by those skilled in the art, the technical solutions of the present invention are further described below with reference to the accompanying drawings and examples.
As shown in fig. 1-2, a movable floor assembled interval drainage structure comprises two movable floor slabs 1, a connecting member 2 is arranged between the two movable floor slabs 1, the connecting member 2 comprises two C-shaped connecting blocks 21 and a drainage channel 22 which are symmetrically arranged, the left side and the right side of the upper side of the drainage channel 22 are respectively fixedly connected with the lower sides of the two C-shaped connecting blocks 21, the lower side of the drainage channel 22 is uniformly provided with a plurality of transversely arranged reinforcing ribs 221, the opening of the C-shaped connecting block 21 is matched with the thickness of the movable floor slab 1, the opening of the C-shaped connecting block 21 is provided with a first chute 211 and a second chute 212 facing the movable floor slab 1, the first chute 211 and the second chute 212 are filled with waterproof layers, the C-shaped connecting block 21 is connected with the movable floor slab 1 through a fixing bolt 23, and a baffle 3 is fixedly connected between the two C-shaped connecting blocks 21, the baffle 3 and the movable plate roof plate 1 are in the same horizontal plane, and the baffle 3 is uniformly provided with a plurality of inclined holes 31.
By adopting the technical scheme of the utility model, when splicing the movable plate house, two movable plate house roof plates 1 are connected through the connecting piece 2, the movable plate house roof plates 1 are firstly placed into the C-shaped connecting block 21 during connection, then the movable plate house roof plates 1 are preliminarily fixed with the C-shaped connecting block 21 through the fixing bolts 23, another movable plate house roof plate 1 is placed into the C-shaped connecting block 21 at the other side, and finally the movable plate house is spliced through the fixing bolts 23, so that the connecting piece 2 connects the splicing intervals when splicing the movable plate house, gaps are avoided after splicing, and the reinforcing ribs 221 can improve the stability after splicing; when the connecting piece 2 is used for connecting the movable board house, waterproof layers can be filled in the first chute 211 and the second chute 212, so that rainwater can be prevented from entering the room from a gap between the connecting piece 2 and the movable board house top board 1, the waterproof effect is improved, the upper side and the lower side of the movable board house top board 1 are simultaneously filled, and when the waterproof layer in the outdoor first chute 211 is aged and falls off, the waterproof layer in the indoor second chute 212 still can play a role in waterproof; when water exists in the connecting piece 2 of the movable plate roof plate 1 in rainy days or other situations, the water enters the drainage channel 22 from the inclined hole 31 on the upper side of the baffle plate 3 and then is drained away from the movable plate roof plate 1 through the drainage channel 22, the baffle plate can prevent impurities from entering the drainage channel 22 to cause blockage, the smoothness of drainage is ensured, and the impurities on the baffle plate 3 can be more easily washed away by running water because the baffle plate 3 and the movable plate roof plate 1 are positioned on the same horizontal plane; the baffle 3 shields the upper side of the drainage channel 22, so that most of sunlight can be shielded, the phenomenon that the drainage channel 22 is irradiated by the sunlight in a large range to cause that heat enters the indoor through the drainage channel 22 to cause the indoor temperature imbalance is avoided, the inclined hole 31 can greatly reduce the time that the sunlight enters the drainage channel 22 through the irradiation of the inclined hole 31 while ensuring that water can smoothly enter the drainage channel 22, and the irradiation of the drainage channel 22 by the sunlight is further reduced; the utility model has the advantages of simple and novel structure, can conveniently splice the portable house effectively, can also make concatenation interval department can drain off water and waterproof effectively simultaneously, avoid interval department the phenomenon of leaking to can also prevent that debris from falling into 22 departments in the drainage canal and causing the jam, thereby cause the drainage not smooth, and can also reduce the sunshine that drainage canal 22 department received and penetrate directly, thereby reduce and get into indoor heat.
Preferably, the waterproof layers filled in the first chute 211 and the second chute 212 are made of waterproof glue. With such a structure, water can be prevented from entering the room from the gap between the connecting member 2 and the movable floor panel 1. In fact, other structures can be considered according to specific situations, and water can be prevented from entering the room.
Preferably, the inclination of the inclined hole 31 is 30 to 50. With this structure, sunlight can be prevented from continuously entering the drain channel 22 through the inclined hole 31. In fact, other configurations are contemplated as the case may be, which prevent sunlight from continuing to shine through the angled holes 31 into the drain channel 22.
Preferably, the drain 22 is arcuate. With this configuration, water can be smoothly discharged. In fact, other configurations may be used as the case may be, and water can be discharged more smoothly.
Preferably, a rubber gasket is arranged in the opening of the C-shaped connecting block 21. With such a structure, when the C-shaped connecting block 21 is connected with the movable plate roof plate 1, the waterproof sealing effect can be further improved. In fact, other structures can be considered according to specific situations, and the waterproof sealing effect can be further improved.
The above embodiments are merely illustrative of the principles and effects of the present invention, and are not to be construed as limiting the invention. Modifications and variations can be made to the above-described embodiments by those skilled in the art without departing from the spirit and scope of the present invention. Accordingly, it is intended that all equivalent modifications or changes which may be made by those skilled in the art without departing from the spirit and technical spirit of the present invention be covered by the claims of the present invention.

Claims (5)

1. The utility model provides an interval drainage structures is assembled to portable house, includes two portable house roof boards (1), its characterized in that: two be equipped with connecting piece (2) between fly leaf roof board (1), connecting piece (2) are including two C shape connecting block (21) and drainage canal (22) that the symmetry set up, the left and right sides both sides of drainage canal (22) upside respectively with two C shape connecting block (21) downside fixed connection, drainage canal (22) downside evenly is equipped with a plurality of reinforcing ribs (221) that transversely set up, the thickness size phase-match of opening and fly leaf roof board (1) of C shape connecting block (21), C shape connecting block (21) opening part all is equipped with first chute (211) and second chute (212) towards fly leaf roof board (1), all fill in first chute (211) and second chute (212) has the waterproof layer, be connected through fixing bolt (23) between C shape connecting block (21) and the fly leaf roof board (1), two baffle (3) of fixedly connected with between C shape connecting block (21), baffle (3) and fly leaf roof board (1) are in same horizontal plane, evenly open baffle (3) has a plurality of inclined holes (31).
2. The prefabricated house assembled spaced drainage structure of claim 1, wherein: waterproof layers filled in the first chute (211) and the second chute (212) are made of waterproof glue.
3. The prefabricated house assembled spaced drainage structure of claim 1, wherein: the inclination of the inclined hole (31) is 30-50 degrees.
4. The prefabricated house assembled spaced drainage structure of claim 1, wherein: the drainage channel (22) is arc-shaped.
5. The prefabricated house assembled spaced drainage structure of claim 1, wherein: and a rubber sealing gasket is arranged in an opening of the C-shaped connecting block (21).
CN202022253612.5U 2020-10-12 2020-10-12 Prefabricated house assembling interval drainage structure Expired - Fee Related CN214461887U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022253612.5U CN214461887U (en) 2020-10-12 2020-10-12 Prefabricated house assembling interval drainage structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022253612.5U CN214461887U (en) 2020-10-12 2020-10-12 Prefabricated house assembling interval drainage structure

Publications (1)

Publication Number Publication Date
CN214461887U true CN214461887U (en) 2021-10-22

Family

ID=78107352

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022253612.5U Expired - Fee Related CN214461887U (en) 2020-10-12 2020-10-12 Prefabricated house assembling interval drainage structure

Country Status (1)

Country Link
CN (1) CN214461887U (en)

Similar Documents

Publication Publication Date Title
US8898969B2 (en) Net-zero energy curtain wall
CN214461887U (en) Prefabricated house assembling interval drainage structure
CN109610918A (en) The corrugated steel castle of shockproof anti-core
CN210067535U (en) Novel building for building engineering house convenient to installation
CN110359738B (en) Assembly type construction method for ecological industrial factory building
CN106223552A (en) A kind of flat-head type movable dwellings
CN214497877U (en) Prevent portable house of ponding
RU2293826C1 (en) Method and device for mounting of ventilated facades
CN215670102U (en) Prefabricated assembled building
CN206157975U (en) Roofing structure on roof
CN214034410U (en) Photovoltaic integrated power generation module and roof mounting structure unit built by same
CN213626212U (en) Energy-saving drainage curtain wall structure
CN219431086U (en) Assembled prevention of seepage water folk house
CN209261073U (en) A kind of movable dwellings for being not easy to leak
CN218894297U (en) Building roof waterproof structure
CN109098293A (en) A kind of assembled hermetic water-proof structure for building
CN211448339U (en) Sliding window with windproof and drainage functions
CN219080765U (en) Double T-shaped plate
CN216380094U (en) Building waterproof insulation structure
CN212866349U (en) Multifunctional T-shaped movable plank house
CN218562557U (en) Assembled concrete house structure
CN215888581U (en) Aluminum alloy structure module of block unit
CN204282534U (en) Can fast dismantling except, assembling novel house
CN215563899U (en) Anti-seepage steel framework light panel
CN211396301U (en) Light steel modularization integrated house roof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211022