CN214459737U - Hanging basket for bridge engineering - Google Patents

Hanging basket for bridge engineering Download PDF

Info

Publication number
CN214459737U
CN214459737U CN202022606593.XU CN202022606593U CN214459737U CN 214459737 U CN214459737 U CN 214459737U CN 202022606593 U CN202022606593 U CN 202022606593U CN 214459737 U CN214459737 U CN 214459737U
Authority
CN
China
Prior art keywords
sides
hanging basket
motors
steel wire
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022606593.XU
Other languages
Chinese (zh)
Inventor
张立新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Longxing Changda Construction Engineering Co ltd
Original Assignee
Tianjin Longxing Changda Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Longxing Changda Construction Engineering Co ltd filed Critical Tianjin Longxing Changda Construction Engineering Co ltd
Priority to CN202022606593.XU priority Critical patent/CN214459737U/en
Application granted granted Critical
Publication of CN214459737U publication Critical patent/CN214459737U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a hanging basket for bridge engineering, which comprises a cross beam, the bottom of the cross beam is provided with support frames by both sides, and the bottom of the two support frames is provided with a bridge floor, the bottom of the bridge floor is provided with a fixing frame by both sides, and the bottom of the bridge floor is provided with a pressing plate by the middle end, the front end of the pressing plate is provided with a guardrail, the upper part of the inner side of the cross beam is provided with a fixed plate by the front end, four motors are arranged at the upper end of the fixed plate, the wire shafts are arranged at the opposite sides of the two sets of motors, the outer sides of the two sets of wire shafts are provided with steel wire ropes, and the top of the fixed plate is provided with fixed pulleys by the front and back ends of the two sets of wire shafts; a bridge engineering with hanging basket, when workman's construction, constructor when removing, does not need constructor manual adjustment safety rope position when removing, hangs basket safety rope flexibility good to improve the operating efficiency, simultaneously convenient transport constructor to hanging the basket lower extreme.

Description

Hanging basket for bridge engineering
Technical Field
The utility model relates to a bridge engineering field, in particular to bridge engineering is with hanging basket.
Background
The bridge is an important traffic infrastructure in the current urban construction, a main beam of the bridge is generally made of concrete materials, the hanging basket cantilever cast-in-place construction is the most common concrete bridge construction method, and the hanging basket for the bridge construction is a main device used in the bridge cantilever construction;
however, the existing cradle for bridge engineering has certain disadvantages to be improved, the cradle safety rope has poor flexibility when in use, and when in movement, constructors need to manually adjust the position of the safety rope while moving, so that the operation efficiency is reduced; the existing hanging basket for bridge engineering can not conveniently transport constructors to the lower end of the hanging basket when in use, can not meet the requirements of users, and brings certain influence on actual use.
SUMMERY OF THE UTILITY MODEL
The utility model mainly aims at providing a hanging basket for bridge engineering, which effectively solves the problems that the hanging basket for bridge engineering has poor flexibility of a safety rope when in use, and when in movement, a constructor needs to manually adjust the position of the safety rope while in movement, thereby reducing the operation efficiency; the technical problem that the existing hanging basket for bridge engineering cannot conveniently transport constructors to the lower end of the hanging basket when in use is solved.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a hanging basket for bridge engineering comprises a cross beam, wherein support frames are installed at the bottom of the cross beam by means of two sides, a bridge deck is installed at the bottoms of the two support frames, fixing frames are installed at the bottom of the bridge deck by means of two sides, a pressing plate is installed at the bottom of the bridge deck by means of a middle end, a guardrail is installed at the front end of the pressing plate, a fixing plate is installed at the upper portion of the inner side of the cross beam by means of the front end, four motors are installed at the upper end of the fixing plate, bobbins are installed on the opposite sides of the two groups of motors, steel wire ropes are arranged on the outer sides of the two groups of bobbins, fixed pulleys are installed at the top of the fixing plate by means of the front ends and the rear ends of the two groups of bobbins, a hanging basket is installed at the bottom of the steel wire ropes, a fixing rod is installed at the lower portion of the inner side of the cross beam by means of the rear end, a plurality of movable pulleys are installed at the top of the fixing rod, a sleeve frame is arranged on the inner side of the movable pulleys, and a safety rope is arranged at the bottom of the sleeve frame, and the outer sides of the two motors positioned on the same side are provided with connecting plates.
As a further aspect of the utility model, the bottom of crossbeam and the top fixed connection of two support frames, and two support frames run through bridge floor and two mount fixed connection through drilling.
As a further aspect of the present invention, the two sides of the pressing plate are respectively fixedly connected to one side of the two supporting frames, and the bottom of the guardrail is fixedly connected to the top of the pressing plate.
As a further aspect of the present invention, four the bottom of the steel wire rope leans on four corners fixed connection with the top of the hanging basket respectively, and the outside sliding connection of the steel wire rope is in the fixed pulley, and the steel wire rope is coiled in the outside of the bobbin.
As a further aspect of the present invention, the relative one side fixed connection of two sets of motors is in the one side that separates of two sets of spools, and wherein the front and back ends of a set of motors pass through connecting plate fixed connection, and four motors are synchronous operation.
As a further scheme of the utility model, the both sides of fixed plate and dead lever respectively with the inside both sides fixed connection of crossbeam, and the bottom sliding connection of a plurality of activity pulley in the top of dead lever, and the inboard of activity pulley and the upper end outside fixed connection of cover frame, and the top fixed connection of safety rope in the bottom of cover frame, and the lower extreme fixed mounting of safety rope has the couple.
Compared with the prior art, the utility model discloses following beneficial effect has:
the utility model discloses a set up motor, spool and wire rope cooperation fixed plate, fixed pulley and hanging flower basket, because four motors are synchronous operation, because four motors and four spool fixed connection, so drive the spool through four motors and rotate, because wire rope coils in the outside of spool, so the spool can drive wire rope receive and release, fixed pulley and fixed plate fixed connection simultaneously, and the top of fixed pulley and wire rope sliding connection, so can protect wire rope through fixed pulley and prevent wire rope and fixed plate friction damage, and bring the potential safety hazard, and wire rope and hanging flower basket fixed connection, so wire rope drives the hanging flower basket and reciprocates, thereby convenient transport constructor to hanging the basket lower extreme and carry out the construction;
through setting up dead lever and safety rope cooperation movable pulley and cover frame, lower extreme fixed mounting through the safety rope has the couple, fix safety rope on constructor's one's body, because the both sides fixed connection of dead lever is in the inboard both ends of crossbeam, and movable pulley sliding connection is in the top of dead lever, and the inboard of movable pulley and the upper end outside fixed connection of cover frame, the top fixed connection of safety rope is in the bottom of cover frame, make constructor drive movable pulley when removing and remove, thereby do not need constructor manual adjustment safety rope position when removing, it is good to hang basket safety rope flexibility, thereby operating efficiency has been improved.
Drawings
Fig. 1 is a schematic view of the overall structure of a hanging basket for bridge engineering of the present invention;
FIG. 2 is a front cross-sectional view of a cross beam of the hanging basket for bridge engineering of the present invention;
FIG. 3 is a cross beam cross-sectional top view of the hanging basket for bridge engineering of the present invention;
figure 4 is the utility model relates to a bridge engineering is with crossbeam side cut-away view of hanging basket.
In the figure: 1. a cross beam; 2. a support frame; 3. a bridge deck; 4. a fixed mount; 5. a guardrail; 6. a compression plate; 7. a wire rope; 8. a movable pulley; 9. a safety cord; 10. a hanging basket; 11. fixing the rod; 12. a fixing plate; 13. a motor; 14. a connecting plate; 15. a bobbin; 16. fixing the pulley; 17. and (5) sleeving a frame.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
As shown in fig. 1-4, a hanging basket for bridge engineering comprises a beam 1, wherein support frames 2 are respectively installed at the bottom of the beam 1 by two sides, a bridge deck 3 is installed at the bottoms of the two support frames 2, fixing frames 4 are respectively installed at the bottom of the bridge deck 3 by two sides, a pressing plate 6 is installed at the bottom of the bridge deck 3 by the middle end, a guardrail 5 is installed at the front end of the pressing plate 6, a fixing plate 12 is installed at the upper part of the inner side of the beam 1 by the front end, four motors 13 are installed at the upper end of the fixing plate 12, bobbins 15 are installed at the opposite sides of the two sets of motors 13, steel wire ropes 7 are arranged at the outer sides of the two sets of bobbins 15, fixed pulleys 16 are installed at the top of the fixing plate 12 by the front and rear ends of the two sets of bobbins 15, a hanging basket 10 is installed at the bottom of the steel wire ropes 7, a fixed rod 11 is installed at the lower part of the inner side of the beam 1 by the rear end, and a plurality of movable pulleys 8 are installed at the top of the fixed rod 11, and the inner side of the movable pulley 8 is provided with a sleeve frame 17, the bottom of the sleeve frame 17 is provided with a safety rope 9, and the outer sides of the two motors 13 positioned on the same side are provided with a connecting plate 14.
The bottom of crossbeam 1 and the top fixed connection of two support frames 2, and two support frames 2 run through bridge floor 3 and two mount 4 fixed connection through the drilling.
The two sides of the pressing plate 6 are respectively fixedly connected with the opposite sides of the two support frames 2, and the bottom of the guardrail 5 is fixedly connected with the top of the front end of the pressing plate 6.
The bottoms of the four steel wire ropes 7 are fixedly connected with the top of the hanging basket 10 close to four corners respectively, the outer sides of the steel wire ropes 7 are connected to the fixed pulleys 16 in a sliding mode, the steel wire ropes 7 are coiled on the outer side of the spool 15, and the steel wire ropes 7 are conveniently driven to be wound and unwound through rotation of the spool 15.
The opposite sides of the two groups of motors 13 are fixedly connected to the opposite sides of the two groups of bobbins 15, the front ends and the rear ends of the one group of motors 13 are fixedly connected through the connecting plate 14, and the four motors 13 run synchronously, so that the four steel wire ropes 7 can be conveniently wound and unwound simultaneously, and the balance of the hanging basket 10 is maintained.
Both sides of fixed plate 12 and dead lever 11 respectively with the inside both sides fixed connection of crossbeam 1, and the bottom sliding connection of a plurality of movable pulley 8 in the top of dead lever 11, and the inboard of movable pulley 8 and the upper end outside fixed connection of cover frame 17, and the top fixed connection of safety rope 9 in the bottom of cover frame 17, and the lower extreme fixed mounting of safety rope 9 has the couple.
It should be noted that, the utility model relates to a hanging basket for bridge engineering, when in use, firstly, a constructor stands in the hanging basket 10, because four motors 13 are in synchronous operation, because four motors 13 are fixedly connected with four bobbins 15, the bobbins 15 are driven by the four motors 13 to rotate, and because the steel wire rope 7 is coiled outside the bobbins 15, the bobbins 15 can drive the steel wire rope 7 to be wound and unwound, meanwhile, the fixed pulley 16 is fixedly connected with the fixed plate 12, and the top of the fixed pulley 16 is slidably connected with the steel wire rope 7, so the steel wire rope 7 can be protected by the fixed pulley 16 to prevent the steel wire rope 7 from being damaged by friction with the fixed plate 12, and bringing potential safety hazards, and the steel wire rope 7 is fixedly connected with the hanging basket 10, so the steel wire rope 7 drives the hanging basket 10 to move up and down, thereby the constructor can be conveniently transported to the lower end of the hanging basket for construction, a hook is fixedly installed at the lower end of the safety rope 9, fix safety rope 9 at constructor's on one's body, because the both sides fixed connection of dead lever 11 is in the inboard both ends of crossbeam 1, and 8 sliding connection of movable pulley in the top of dead lever 11, and the inboard of movable pulley 8 and the upper end outside fixed connection of cover frame 17, the top fixed connection of safety rope 9 is in the bottom of cover frame 17, make constructor drive movable pulley 8 when removing and remove, thereby do not need constructor manual adjustment safety rope 9 positions when removing, hang basket safety rope 9 flexibility is good, thereby operating efficiency has been improved.
The utility model is provided with the motor 13, the bobbin 15 and the steel wire rope 7 which are matched with the fixed plate 12, the fixed pulley 16 and the hanging basket 10, the constructor stands in the hanging basket 10, because the four motors 13 are operated synchronously, because the four motors 13 are fixedly connected to the four spools 15, the spool 15 is driven to rotate by the four motors 13, and because the wire rope 7 is coiled outside the spool 15, so the spool 15 can drive the steel wire rope 7 to be wound and unwound, meanwhile, the fixed pulley 16 is fixedly connected with the fixed plate 12, the top of the fixed pulley 16 is connected with the steel wire rope 7 in a sliding way, therefore, the steel wire rope 7 can be protected by the fixed pulley 16 to prevent the steel wire rope 7 from being damaged by friction with the fixed plate 12, which brings potential safety hazard, and the steel wire rope 7 is fixedly connected with the hanging basket 10, the steel wire rope 7 drives the hanging basket 10 to move up and down, so that constructors can be conveniently transported to the lower end of the hanging basket for construction; through setting up dead lever 11 and 9 cooperation movable pulley 8 of safety rope and cover frame 17, lower extreme fixed mounting through safety rope 9 has the couple, fix safety rope 9 on constructor's one's body, because the both sides fixed connection of dead lever 11 is in the inboard both ends of crossbeam 1, and 8 sliding connection in the top of dead lever 11 of movable pulley, and the inboard upper end outside fixed connection with cover frame 17 of movable pulley 8, the top fixed connection of safety rope 9 is in the bottom of cover frame 17, make constructor drive movable pulley 8 and remove when removing, thereby do not need constructor manual adjustment safety rope 9 positions in the removal, 9 flexibilities of basket safety rope are good, thereby operating efficiency has been improved.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a bridge engineering is with hanging basket which characterized in that: comprises a crossbeam (1), wherein support frames (2) are installed at the bottom of the crossbeam (1) by both sides, a bridge deck (3) is installed at the bottoms of the two support frames (2), a fixing frame (4) is installed at the bottom of the bridge deck (3) by both sides, a pressing plate (6) is installed at the bottom of the bridge deck (3) by the middle end, a guardrail (5) is installed at the front end of the pressing plate (6), a fixing plate (12) is installed at the upper part of the inner side of the crossbeam (1) by the front end, four motors (13) are installed at the upper end of the fixing plate (12), bobbins (15) are installed at the opposite sides of the two groups of motors (13), steel wire ropes (7) are arranged at the outer sides of the two groups of bobbins (15), fixed pulleys (16) are installed at the top of the fixing plate (12) by the front end and the rear end of the two groups of bobbins (15), and hanging baskets (10) are installed at the bottom of the steel wire ropes (7), the fixing rod (11) is installed by the rear end on the lower portion of the inner side of the cross beam (1), a plurality of movable pulleys (8) are installed at the top of the fixing rod (11), sleeve frames (17) are arranged on the inner sides of the movable pulleys (8), safety ropes (9) are arranged at the bottoms of the sleeve frames (17), and two connecting plates (14) are installed on the outer side of the motor (13).
2. The hanging basket for bridge engineering according to claim 1, wherein: the bottom of the cross beam (1) is fixedly connected with the tops of the two support frames (2), and the two support frames (2) penetrate through the bridge deck (3) through drilling holes to be fixedly connected with the two fixing frames (4).
3. The hanging basket for bridge engineering according to claim 1, wherein: the two sides of the pressing plate (6) are fixedly connected with the opposite sides of the two support frames (2) respectively, and the bottom of the guardrail (5) is fixedly connected with the top of the front end of the pressing plate (6).
4. The hanging basket for bridge engineering according to claim 1, wherein: the bottoms of the four steel wire ropes (7) are fixedly connected with the top of the hanging basket (10) close to four corners respectively, the outer sides of the steel wire ropes (7) are connected to the fixed pulleys (16) in a sliding mode, and the steel wire ropes (7) are coiled on the outer side of the bobbin (15).
5. The hanging basket for bridge engineering according to claim 1, wherein: the opposite sides of the two groups of motors (13) are fixedly connected to the opposite sides of the two groups of bobbins (15), the front ends and the rear ends of one group of motors (13) are fixedly connected through a connecting plate (14), and the four motors (13) run synchronously.
6. The hanging basket for bridge engineering according to claim 1, wherein: the both sides of fixed plate (12) and dead lever (11) respectively with the inside both sides fixed connection of crossbeam (1), and the bottom sliding connection of a plurality of movable pulley (8) in the top of dead lever (11), and the inboard of movable pulley (8) and the upper end outside fixed connection of cover frame (17), and the top fixed connection of safety rope (9) in the bottom of cover frame (17), and the lower extreme fixed mounting of safety rope (9) has the couple.
CN202022606593.XU 2020-11-12 2020-11-12 Hanging basket for bridge engineering Expired - Fee Related CN214459737U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022606593.XU CN214459737U (en) 2020-11-12 2020-11-12 Hanging basket for bridge engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022606593.XU CN214459737U (en) 2020-11-12 2020-11-12 Hanging basket for bridge engineering

Publications (1)

Publication Number Publication Date
CN214459737U true CN214459737U (en) 2021-10-22

Family

ID=78182386

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022606593.XU Expired - Fee Related CN214459737U (en) 2020-11-12 2020-11-12 Hanging basket for bridge engineering

Country Status (1)

Country Link
CN (1) CN214459737U (en)

Similar Documents

Publication Publication Date Title
CN210973630U (en) Shipbuilding gantry crane
CN214459737U (en) Hanging basket for bridge engineering
CN213171204U (en) Construction equipment hoisting device
CN220245368U (en) Electric hoist gantry crane
CN109346996B (en) Electric power construction line tightening device and method
CN108751004A (en) A kind of high security car lift
CN212863765U (en) Anti-swing shockproof electromagnetic hoisting machine
CN211255027U (en) Large-piece equipment long-distance translation hoisting auxiliary device
CN210286537U (en) Four-point crane for hoisting bin cover of transport ship
CN111532959A (en) Anti-swing shockproof electromagnetic hoisting machine
CN216336235U (en) Bridge crane convenient to change electric block
CN216359547U (en) BOSA optical device dismounting device
CN219906495U (en) Wire rope and cable winding device
CN221796171U (en) Lifting mechanism of hanging rail type aerial logistics trolley
CN219408854U (en) Electric power construction cable hangs hoist device
CN220148828U (en) Pay-off rack for electric power construction
CN217555640U (en) Large-tonnage bridge crane
CN221094885U (en) Construction hanging basket convenient to pass
CN218174601U (en) Quick opening device of well lid
CN221420615U (en) Maintenance work platform for construction engineering machinery
CN117303120B (en) Cable construction exhibition puts device
CN214456321U (en) Mechanical equipment hoisting frame
CN221644412U (en) Double-beam bridge crane for hoisting tubular parts
CN220723343U (en) Mobile gantry crane hovering positioning and installing equipment
CN210163040U (en) Movable hoisting frame for installing power distribution cabinet

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211022