CN214459537U - Assembled channel for concrete finalized pouring with mud and ash receiving device - Google Patents

Assembled channel for concrete finalized pouring with mud and ash receiving device Download PDF

Info

Publication number
CN214459537U
CN214459537U CN202022893707.3U CN202022893707U CN214459537U CN 214459537 U CN214459537 U CN 214459537U CN 202022893707 U CN202022893707 U CN 202022893707U CN 214459537 U CN214459537 U CN 214459537U
Authority
CN
China
Prior art keywords
mud
concrete
channel
connect
passageway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022893707.3U
Other languages
Chinese (zh)
Inventor
马胡荣
金琳仙
胡世超
夏凤荣
赵俊浩
喻俊举
杨光啟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ycih No3 Construction Co ltd
Original Assignee
Ycih No3 Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ycih No3 Construction Co ltd filed Critical Ycih No3 Construction Co ltd
Priority to CN202022893707.3U priority Critical patent/CN214459537U/en
Application granted granted Critical
Publication of CN214459537U publication Critical patent/CN214459537U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a concrete regularization is watering with assembled passageway with connect mud to connect grey device, including the passageway body with set up in the landing leg of passageway body bottom four corners department, landing leg one end contact ground, other end connect the passageway body, the rail guard is installed to the top detachably of passageway body, still connects grey device including being provided with to connect mud, connects mud to connect grey device detachably to install in the below of passageway body, is equipped with the locating part in passageway body one end symmetry, is equipped with the fastener in passageway body other end symmetry. The utility model can largely keep standardized construction, is beneficial to the construction site construction environment to be clean and tidy, and is provided with a mud and ash receiving device, thereby completely preventing constructors from bringing the mud dust on shoes into a concrete pouring area when transporting concrete back and forth on a channel, and ensuring the quality of the poured concrete; the quality of the poured concrete is ensured to the maximum extent.

Description

Assembled channel for concrete finalized pouring with mud and ash receiving device
Technical Field
The utility model relates to a passageway, it is specific to relate to a concrete regularization is assembled passageway for watering with connect mud to connect grey device, set up the operation passageway when mainly being used for constructing present field plate face concrete placement, can avoid because of the concrete placement in-process to roof beam, the destruction of slab reinforcement, reduce the damage to steel reinforcement protective layer cushion in the operation process, effectively protect the finished product quality of reinforcing bar, belong to concrete construction and watering technical field.
Background
Generally, no temporary board surface channel exists in the conventional concrete pouring process of a construction site, and an operator walks on the board surface of the concrete to be poured, so that the construction process has great disadvantages;
on one hand, the material is easy to damage and waste; the upper layer of reinforcement is easy to fall off, so that the upper layer of reinforcement and the lower layer of reinforcement are overlapped together, the upper layer of reinforcement protection layer does not meet the standard requirement, and the potential safety hazard of large quality exists, and when workers directly walk on the bound plate face reinforcement meshes, the reinforcement meshes can be treaded and deformed; if the concrete is directly constructed in concrete, serious quality accident can be caused, the construction structure safety accident can be caused, if manual secondary repair is adopted, unnecessary manual waste can be caused, the pouring speed can be influenced, and the progress of the construction period can be restricted; on the other hand, the mat board is directly paved on the reinforcing mesh sheet, although certain damage to the reinforcing mesh sheet can be avoided; but the turnover use of the skid plate can be influenced, and the skid plate is unreasonable and economical; on the other hand, in the process of repeatedly pouring concrete back and forth, a constructor inevitably brings a lot of soil and dust on shoes, so that the soil on the shoes is inevitably brought into the concrete to be poured when the constructor returns to transport the concrete, and particularly the quality of concrete pouring is influenced in rainy days. In general, it is often inconvenient.
Therefore, the development of an assembled channel with a mud and ash receiving device for concrete shaped pouring with high working reliability is a key point for solving the technical problems.
Disclosure of Invention
Aiming at a plurality of defects and deficiencies in the prior art, the utility model improves and innovates the construction, aims to provide a device which can keep standardized construction to a large extent, is beneficial to the cleanness and tidiness of construction environment on construction site, and is provided with a mud and ash receiving device, thereby completely preventing constructors from bringing the mud and ash on shoes into a concrete pouring area when conveying concrete back and forth on a channel, and ensuring the quality of the poured concrete; the quality of the poured concrete is ensured to the maximum extent.
The utility model discloses another invention purpose can keep apart its face reinforcing bar that treats the casting concrete and the working face that the workman operates the walking at the in-process of concreting, avoids reinforcing bar net piece secondary to receive human factor and influence the quality, realizes also reducing reinforcing bar net piece and need artifical secondary to restore a series of troubles that bring because of the artificial damage when guaranteeing the construction quality of floor reinforcing bar net piece, and the most is the trouble that needs artifical secondary to restore because of the artificial damage of reinforcing bar net piece
In order to solve the above problems and achieve the above objects, the present invention provides an assembled channel for concrete shaped-pouring with a mud-receiving and ash-receiving device, which is implemented by adopting the following design structure and the following technical solutions:
as the utility model relates to an improvement of assembled passageway is used in concrete regularization watering with connect mud to connect grey device, include passageway body (1) and set up in landing leg (2) of passageway body (1) bottom four corners department, landing leg (2) one end contact ground, other end connect passageway body (1), rail guard (3) are installed to the top detachably of passageway body (1), still connect grey device (4) including being provided with to connect mud, connect mud to connect grey device (4) detachably to install in the below of passageway body (1), be equipped with locating part (5) in passageway body (1) one end symmetry, be equipped with fastener (6) in passageway body (1) other end symmetry.
As the above improvement of the utility model, connect mud to connect grey device (4) to connect grey device body (41) and push handle (42) to constitute by connecting mud, wherein, push handle (42) set up in the one end that connects mud to connect grey device body (41).
As the above further improvement of the present invention, the mud and ash receiving device body (41) is a long tray member formed by splicing a bottom plate and wing plates surrounding the bottom plate; the number of the push handles (42) is one or two.
As the above further improvement of the present invention, the push handle (42) is of a structure of a Chinese character ji or a U-shape, and the push handle (42) of the structure of the Chinese character ji or the U-shape is disposed at the middle of one side of the short edge of the mud and ash collecting device body (41) or symmetrically disposed on one side of the short edge of the mud and ash collecting device body (41).
As the utility model discloses foretell further improvement again, passageway body (1) is by two perpendicular roof beams that are parallel symmetrical arrangement each other and connect in two long ladder form component that a plurality of crossbeams interconnect between perpendicular roof beams, be fixed connection or swing joint between this long ladder form component and supporting leg (2).
As the above further improvement of the utility model, the supporting legs (2) are square steel, the upper end of the square steel is connected with the bottom of the channel body (1), and the lower end of the square steel is sleeved with an anti-skid protection pad (21); an inclined strut (22) is further arranged between the supporting leg (2) and the channel body (1), and the inclined strut (22) is made of square steel.
As the above-mentioned further improvement of the present invention, the guard rail (3) is a fence frame body formed by connecting a handrail (31) and a plurality of handrails (32) vertically connected to the handrail (31), and the fence frame body is symmetrically installed on both sides of the long edge at the top end of the channel body (1) through an installation sleeve.
As a still further improvement of the above structure of the present invention, the limiting member (5) is a nut transversely welded to the short side of one end of the channel body (1); the clamping piece (6) is an L-shaped rod-shaped body member transversely welded on the short side of the other end of the channel body (1).
As the utility model discloses the foretell still further improvement again, this assembled passageway is used in concrete regularization watering is formed by connecting according to the preface in bank a plurality of passageway bodies (1), wherein, is connected as a whole through locating part (5) and fastener (6) kiss the block of joining in marriage mutually between two adjacent passageway bodies (1).
As the utility model discloses the foretell still further improvement more, connect mud to connect ash device (4) and locating part (5) and fastener (6) on the surface all from interior to outer according to the preface spraying have injection moulding layer and antirust coat and warning layer, scribble phosphor powder on the warning layer at passageway body (1), landing leg (2), rail guard (3).
The assembled channel with the mud and ash receiving device for concrete setting pouring of the design structure needs to be installed for standby before work is carried out.
During installation, after the floor plate reinforcing mesh is bound, firstly, a route for placing the concrete modular pouring assembled channel on the template is planned, meanwhile, the total number of the concrete modular pouring assembled channels to be laid is calculated according to the route of the concrete modular pouring assembled channel, and then the concrete modular pouring assembled channels are transported to a construction working surface to be laid for standby.
When the combined type channel is paved, the combined type channel is paved from near to far in sequence, the combined type channel is placed on a main path on which structural layer concrete pouring operation is to be carried out when the combined type channel is paved, and the supporting legs (2) are placed in gaps of a floor slab reinforcing mesh which is manufactured and installed.
During operation, constructors only need to enter the channel formed by the laying of the channel bodies (1) to a construction site for corresponding pouring operation.
In the working process, particularly during construction in rainy days, soil or dust attached to shoes of constructors can fall into the mud and dust receiving device (4) below the channel body (1) through the channel body (1) in a centralized manner to be collected and stored.
Finally, along with the time, after accomplishing concrete placement operation, need will the utility model discloses remove, during the removal draw block (6) on the passageway body (1) of two adjacent blocks perpendicularly in from locating part (5) break away from can, just can break away from all devices on this passageway with same method, after the separation, constructor connects grey device body (41) to take it out and pour into not construction area with its earth dust concentration through push handle (42) with the mud that connects of each passageway body (1) below again, meanwhile after clean its each part cleaning arrangement and repair, just can store in order to have enough to meet the need the use next time.
Compared with the prior art, the utility model produced beneficial effect is:
1. the utility model has good stability, simple installation and disassembly, convenient storage and transportation after disassembly, repeated use, convenient and flexible construction, reduced constructors, reduced cost, improved working efficiency and enhanced benefit;
2. the utility model has simple structure and novel structure, is easy and convenient to operate, can isolate the plate reinforcing steel bar of the concrete to be poured from the working surface of the worker for operation and walking in the process of pouring the concrete, avoids the secondary of the reinforcing steel bar net piece from influencing the quality due to human factors, and can reduce a series of troubles caused by the need of manual secondary repair of the reinforcing steel bar net piece due to human damage while ensuring the construction quality of the floor reinforcing steel bar net piece, such as the increase of labor cost in the construction cost, and avoids the delay of the repair time from influencing the delay of the construction period;
3. the utility model can be repeatedly used for a plurality of times, can also meet the requirement of economic rationality, keeps standardized construction to the maximum extent, and is favorable for the construction environment of a construction site to be clean and tidy;
4. the utility model is used for setting up the operation channel when constructing the concrete placement of the existing field plate surface, can avoid the damage to the beam and the plate steel bar in the concrete placement process, reduce the damage to the cushion block of the steel bar protection layer in the operation process, and effectively protect the finished product quality of the steel bar;
5. The utility model discloses the material is single and economical, and the manufacturing process is simple swift. The movable type concrete pile can be flexibly transferred according to construction positions, is flexible and convenient to transfer, and can be repeatedly used for multiple times;
6. the utility model can provide a temporary passage for the operator to reduce or even prevent the deformation of the treading of the reinforcing steel bar, and is easy to be used repeatedly and ensure the construction safety;
7. the utility model has flexible installation, ensures the quality, can reduce the construction cost and the potential safety hazard of the quality;
8. the utility model discloses an scribble the anti-rust paint on the outside, consequently also prolonged the life of whole passageway when can prevent to rust, also saved the resource when realizing the environmental protection, simultaneously, scribble the fluorescent material that can self-luminous in the outside of passageway, can clearly mark the position of this passageway in night or darkroom and underground construction environment, can play the effect of safe suggestion effectively, improve the striking degree, easily people distinguish, increase the security in construction and the life;
9. the utility model is provided with the mud and dust receiving device, thereby completely preventing constructors from bringing the mud and dust on the shoes into the concrete pouring area when transporting concrete back and forth on the channel, and causing poor quality of the poured concrete; the quality of the poured concrete is ensured to the maximum extent.
Drawings
The following detailed description of embodiments of the invention is provided with reference to the accompanying drawings, in which:
fig. 1 is one of the overall structural schematic diagrams of the present invention;
fig. 2 is a second schematic view of the overall structure of the present invention;
fig. 3 is a third schematic view of the overall structure of the present invention;
FIG. 4 is a schematic view of the overall structure of the components of the mud and ash receiving device (4) of the present invention;
fig. 5 is a schematic view of the usage state of the present invention;
wherein, the reference numbers in the figures: 1-a channel body;
2-supporting legs, 21-anti-skid protection pads, 22-inclined struts;
3-protective fence, 31-handrail, 32-handrail;
4-a mud and ash receiving device, 41-a mud and ash receiving device body, and 42-a push handle;
5, a limiting part;
6-clamping piece.
Detailed Description
In order to make the technical means, the inventive features, the objectives and the functions of the present invention easy to understand, the technical solution of the present invention will be further described in detail with reference to the accompanying drawings and the following detailed description, and it should be noted that the embodiments and the features of the embodiments in the present application can be combined with each other without conflict. The present invention will be described in detail below with reference to the accompanying drawings in conjunction with embodiments.
As shown in the attached drawings of the specification, the assembled channel with the mud and ash receiving device for concrete finalized pouring comprises a channel body 1 and supporting legs 2 arranged at four corners of the bottom of the channel body 1, one ends of the supporting legs 2 are in contact with the ground, the other ends of the supporting legs are connected with the channel body 1, a protective guard 3 is detachably mounted at the top of the channel body 1, the assembled channel also comprises a mud and ash receiving device 4, the mud and ash receiving device 4 is detachably mounted below the channel body 1, limiting parts 5 are symmetrically arranged at one end of the channel body 1, and clamping parts 6 are symmetrically arranged at the other end of the channel body 1.
The utility model discloses in, connect mud to connect grey device 4 to set up in the many pairs of the link plate realization of 1 below both sides of passageway body through the symmetry will connect mud to connect grey device 4 can dismantle to take and put in 1 lower part of passageway body and be used for connecing mud to connect the ash.
Further, the mud and ash receiving device 4 is composed of a mud and ash receiving device body 41 and a push-pull hand 42, wherein the push-pull hand 42 is arranged at one end of the mud and ash receiving device body 41.
Specifically, the mud and ash receiving device body 41 is a long tray member formed by mutually splicing a bottom plate and wing plates arranged around the bottom plate; the push-pull handle 42 is one or two.
More specifically, the push-pull handle 42 is of a structure with a shape like a Chinese character 'ji' or a U-shape, and the push-pull handle 42 of the structure with the shape like a Chinese character 'ji' is disposed in the middle of one side of the short side of the mud and ash receiving device body 41 or symmetrically disposed on one side of the short side of the mud and ash receiving device body 41.
Furthermore, the channel body 1 is a long ladder-shaped member formed by connecting two vertical beams which are symmetrically arranged in parallel and a plurality of cross beams connected between the two vertical beams, and the long ladder-shaped member is fixedly or movably connected with the supporting legs 2.
Further, the supporting legs 2 are made of square steel, the upper end of the square steel is connected with the bottom of the channel body 1, and the lower end of the square steel is sleeved with an anti-skid protection pad 21; an inclined strut 22 is further arranged between the supporting leg 2 and the channel body 1, and the inclined strut 22 is made of square steel.
In the present invention, the anti-slip pad 21 is a rubber pad, and a plurality of rubber anti-slip protrusions of a connected structure are provided on the rubber pad, and the rubber anti-slip protrusions are in the form of particles or annular protrusions.
Specifically, the guard rail 3 is a fence frame body formed by mutually connecting a handrail 31 and a plurality of railings 32 vertically connected to the handrail 31, and the fence frame body is symmetrically installed on two sides of the long edge at the top end of the channel body 1 through installation sleeves.
In the present invention, the handrail 31 and the balustrade 32 are both hollow or solid tubular bodies or rod-shaped members; the whole installation sleeve is a tubular member with a hollow inner part, the tubular member is coaxially arranged in rows along two sides of the long side of the top end of the channel body 1, and the guard rail 3 is sleeved in the installation sleeve in a plugging mode.
Furthermore, the limiting piece 5 is a nut transversely welded on the short side of one end of the channel body 1; the engaging piece 6 is an L-shaped rod-shaped member transversely welded to the short side of the other end of the channel body 1.
Furthermore, the assembled channel for concrete shaped pouring is formed by connecting a plurality of channel bodies 1 in rows in sequence, wherein two adjacent channel bodies 1 are connected into a whole through matching and clamping of a limiting part 5 and a clamping part 6.
Further, all spray the layer of moulding plastics and antirust coat and warning layer in proper order from inside to outside on passageway body 1, landing leg 2, rail guard 3, connect mud to connect grey device 4 and locating part 5 and fastener 6's the surface, scribble phosphor powder on the warning layer.
Specifically, a high-molecular wear-resistant material is injected on the injection molding layer; the anti-rust layer comprises epoxy zinc-rich primer, chlorinated rubber finish paint and epoxy mica iron intermediate paint positioned between the epoxy zinc-rich primer and the chlorinated rubber finish paint; the warning layer is a yellow or black reflective warning tape or a reflective color film or reflective paint.
Meanwhile, in the utility model, the connection is fixed connection or movable connection or detachable connection, wherein the fixed connection is welded connection or directly processed into an integrated structure; the movable connection or the detachable connection is hinged connection, internal and external thread connection, bayonet connection, plug socket connection or bolt component connection or screw connection.
To sum up, the utility model discloses more specific embodiment is:
the assembled channel with the mud and ash receiving device for concrete setting pouring of the design structure needs to be installed for standby before work is carried out.
During installation, after the floor plate reinforcing mesh is bound, firstly, a route for placing the concrete modular pouring assembled channel on the template is planned, meanwhile, the total number of the concrete modular pouring assembled channels to be laid is calculated according to the route of the concrete modular pouring assembled channel, and then the concrete modular pouring assembled channels are transported to a construction working surface to be laid for standby.
When the combined type channel is paved, the combined type channel is paved from a near to a far sequence, the combined type channel is placed on a main path on which structural layer concrete pouring operation is to be carried out when the combined type channel is paved, and the supporting legs 2 are placed in gaps of a manufactured and installed floor slab reinforcing mesh, specifically, the combined type channel is formed by connecting the channel bodies 1 in rows in sequence, the clamping pieces 6 on the two adjacent channel bodies 1 are vertically placed in the limiting pieces 5, so that the two adjacent channel bodies 1 are connected into a whole through the matching clamping of the limiting pieces 5 and the clamping pieces 6, the whole assembled type channel for concrete shaped pouring can be paved by the same method, and after the combined type channel is paved in sequence, concrete pouring of a slab surface can be realized by operators.
During operation, constructors only need to enter the channel formed by paving the plurality of channel bodies 1 to a construction site for corresponding pouring operation.
In the working process, especially when the construction is carried out in rainy days, the soil or dust attached to the shoes of the constructors can fall into the mud and dust receiving device 4 below the channel body 1 through the channel body 1 to be collected and stored in a centralized manner.
Finally, along with the time, after accomplishing concrete placement operation, need will the utility model discloses remove, when removing the fastener 6 on the passageway body 1 of adjacent two blocks extract perpendicularly in from locating part 5 and break away from can, just can break away from all devices on this passageway with same method, after the separation, construction personnel connects grey device body 41 to take it out and pours its earth dust into not construction area with the mud that connects of each passageway body 1 below through push-and-pull handle 42 again, meanwhile after each part cleaning arrangement is clean and restoreed, just can store and use in order to circulate next time.
It is right above the utility model provides a concrete regularization watering with connect mud to connect grey device has carried out detailed introduction with assembled passageway, and is right here the utility model discloses a principle has been described, and the explanation of above theory of operation is only used for helping to understand the utility model discloses a core thought. It should be noted that, for those skilled in the art, the present invention can be modified and modified without departing from the principle of the present invention, and the modified and modified embodiments also fall into the protection scope of the claims of the present invention.

Claims (10)

1. The utility model provides a concrete regularization is watering and is used assembled passageway with connect mud to connect grey device, includes passageway body (1) and sets up in supporting leg (2) of passageway body (1) bottom four corners department, supporting leg (2) one end contact ground, other end connecting channel body (1), rail guard (3), its characterized in that are installed to the top detachably of passageway body (1): still including being provided with and connect mud to connect grey device (4), connect mud to connect grey device (4) detachably to install in the below of passageway body (1), be equipped with locating part (5) in passageway body (1) one end symmetry, be equipped with fastener (6) at passageway body (1) other end symmetry.
2. The assembled channel with the mud and ash receiving device for concrete finalized pouring according to claim 1, is characterized in that: connect mud to connect grey device (4) to connect grey device body (41) and push handle (42) to constitute by connecing mud, wherein, push handle (42) set up in the one end that connects mud to connect grey device body (41).
3. The assembled channel with the mud and ash receiving device for concrete finalized pouring according to claim 2, is characterized in that: the mud and ash receiving device body (41) is a long tray component formed by mutually splicing a bottom plate and wing plates arranged around the bottom plate; the number of the push handles (42) is one or two.
4. The assembled passage for concrete finalization pouring with a mud and ash receiving device according to any one of claims 2 or 3, wherein: push handle (42) are how many font or U font structures, and push handle (42) of these few font or U font structures set up in connecing mud to connect grey device body (41) minor face one side middle part or the symmetry sets up in connecing mud to connect grey device body (41) minor face one side on.
5. The assembled channel with the mud and ash receiving device for concrete finalized pouring according to claim 1, is characterized in that: the channel body (1) is a long ladder-shaped component formed by connecting two vertical beams which are symmetrically arranged in parallel and a plurality of cross beams connected between the two vertical beams, and the long ladder-shaped component is fixedly or movably connected with the supporting legs (2).
6. The assembled channel with the mud and ash receiving device for concrete finalized pouring according to claim 1, is characterized in that: the supporting legs (2) are made of square steel, the upper end of the square steel is connected with the bottom of the channel body (1), and the lower end of the square steel is sleeved with an anti-skid protection pad (21); an inclined strut (22) is further arranged between the supporting leg (2) and the channel body (1), and the inclined strut (22) is made of square steel.
7. The assembled channel with the mud and ash receiving device for concrete finalized pouring according to claim 6, is characterized in that: the protective guard (3) is a fence frame body formed by mutually connecting a handrail (31) and a plurality of handrails (32) vertically connected to the handrail (31), and the fence frame body is symmetrically arranged on two sides of the long edge at the top end of the channel body (1) through mounting sleeves.
8. The assembled channel with the mud and ash receiving device for concrete finalized pouring according to claim 1, is characterized in that: the limiting piece (5) is a nut transversely welded on the short side of one end of the channel body (1); the clamping piece (6) is an L-shaped rod-shaped body member transversely welded on the short side of the other end of the channel body (1).
9. The assembled channel with the mud and ash receiving device for concrete finalized pouring according to claim 1, is characterized in that: the assembled channel for concrete shaped pouring is formed by connecting a plurality of channel bodies (1) in rows in sequence, wherein two adjacent channel bodies (1) are connected into a whole through matching and clamping of a limiting part (5) and a clamping part (6).
10. The assembled channel with the mud and ash receiving device for concrete finalized pouring according to claim 1, is characterized in that: all from interior to exterior according to the preface spraying have injection layer and antirust coat and warning layer on passageway body (1), supporting leg (2), rail guard (3), connect mud to connect grey device (4) and locating part (5) and fastener (6) surface, scribble phosphor powder on the warning layer.
CN202022893707.3U 2020-12-04 2020-12-04 Assembled channel for concrete finalized pouring with mud and ash receiving device Active CN214459537U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022893707.3U CN214459537U (en) 2020-12-04 2020-12-04 Assembled channel for concrete finalized pouring with mud and ash receiving device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022893707.3U CN214459537U (en) 2020-12-04 2020-12-04 Assembled channel for concrete finalized pouring with mud and ash receiving device

Publications (1)

Publication Number Publication Date
CN214459537U true CN214459537U (en) 2021-10-22

Family

ID=78186608

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022893707.3U Active CN214459537U (en) 2020-12-04 2020-12-04 Assembled channel for concrete finalized pouring with mud and ash receiving device

Country Status (1)

Country Link
CN (1) CN214459537U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114293787A (en) * 2022-01-04 2022-04-08 北京建工集团有限责任公司 Channel connecting peripheral steel structure and internal concrete core barrel and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114293787A (en) * 2022-01-04 2022-04-08 北京建工集团有限责任公司 Channel connecting peripheral steel structure and internal concrete core barrel and construction method

Similar Documents

Publication Publication Date Title
CN106703834A (en) Secondary lining integral formworking construction method for tunnel with super-large cross section
CN214459537U (en) Assembled channel for concrete finalized pouring with mud and ash receiving device
CN106088478A (en) Tilt strength steel concrete cylinder construction method
CN109826233A (en) A kind of minor diameter inspection well set shaped steel formwork pouring construction method
CN203487471U (en) Movable airport taxiway bridge demolition protection device
KR100949937B1 (en) Epoxy injection equipment to both direction movement worktable of crack repair-reinforcement for concret structure
CN213063012U (en) Simple and easy construction operation face concrete placement temporary escape way
CN108842933B (en) Tower crane opening blocking method
CN106592438B (en) Twin shaft pier and middle binder truss move integrally construction method
DE102006000920A1 (en) Underground station e.g. urban railway station, building method, involves conveying excavated material that is accumulated during building of foundation pit to outweighed part and removing material through underground railway galleries
CN210589859U (en) Movable precast beam concrete cloth construction platform
CN212428741U (en) Assembled soft environment-friendly platform for workover treatment
CN210238316U (en) Bridge inverted U-shaped hanging basket device
CN210217761U (en) Device is used in movement joint construction
KR20060116405A (en) The launching and removing method of hanging scaffold for bridge slab using rail and roller type device
CN211286474U (en) Floor rubbish transport corridor
CN217232660U (en) Climbing frame convenient for clearing construction waste
CN202466352U (en) Spliced prefabricated reinforced concrete construction temporary road
CN213736962U (en) High-rise building construction floor building rubbish clearing device
CN219749869U (en) Material conveying device for stirring materials in civil construction
CN208605121U (en) A kind of foundation pit tool-type safety climbing ladder
JPH09296407A (en) Lining board
CN205918017U (en) With prefabricated staircase of guardrail integration, prefabricated air conditioner board
CN215671255U (en) Complete set is exempted from to punch and is faced limit fence
CN219195574U (en) Automatic water seepage equipment for wet joint maintenance of assembled pavement slab

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant