CN214456149U - Municipal administration rainwater pipeline reinforced concrete pipe hoist - Google Patents
Municipal administration rainwater pipeline reinforced concrete pipe hoist Download PDFInfo
- Publication number
- CN214456149U CN214456149U CN202120245958.2U CN202120245958U CN214456149U CN 214456149 U CN214456149 U CN 214456149U CN 202120245958 U CN202120245958 U CN 202120245958U CN 214456149 U CN214456149 U CN 214456149U
- Authority
- CN
- China
- Prior art keywords
- steel sheet
- hoist
- hoist steel
- position department
- reinforced concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model discloses a municipal administration rainwater pipeline reinforced concrete pipe hoist, including the hoist steel sheet, the position department of hoist steel sheet bottom is provided with first hoist steel sheet, the hoist steel sheet with first hoist steel sheet formula structure as an organic whole, the position department between first hoist steel sheet and the hoist steel sheet has formed the pipe fitting draw-in groove, the position department that the hoist steel sheet surface is close to the upper left corner is provided with first lewis hole, the position department that the hoist steel sheet surface is close to the upper right corner is provided with the second lewis hole, the position department of hoist steel sheet rear end face is provided with a plurality of card line devices; the device is easy operation in hoist and mount concrete pipe, and is convenient, can reduce the destruction to the concrete mouth of pipe simultaneously, the cyclic utilization between the different building sites of being convenient for, the very big artificial rate of utilization that has reduced of this device increases work efficiency, and this device cost is low, efficient fast, reduce cost, can cyclic utilization, the manufacturing process is uncomplicated (only need operate alone the davit can).
Description
Technical Field
The utility model relates to a municipal administration downspout line reinforced concrete pipe hoist.
Background
Along with the city constantly builds in china, urbanization develops more and more fast, the frequent meeting of municipal construction engineering all kinds of pipeline construction operation, it is the key problem to adopt what kind of construction technology and how to guarantee construction quality, to municipal rainwater pipeline reinforced concrete pipe hoist, traditional wire rope, the method of band-type hoist and mount need use a large amount of manpowers, work efficiency also can reduce thereupon simultaneously, and can cause unnecessary to destroy, based on the aforesaid problem, need provide a municipal rainwater pipeline reinforced concrete pipe hoist that can solve the problem.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that a municipal administration rainwater pipeline reinforced concrete pipe hoist is provided.
The utility model discloses a realize through following technical scheme:
the utility model provides a municipal administration rainwater pipeline reinforced concrete pipe hoist, includes the hoist steel sheet, the position department of hoist steel sheet bottom is provided with first hoist steel sheet, the hoist steel sheet with first hoist steel sheet formula structure as an organic whole, first hoist steel sheet with position department between the hoist steel sheet has formed the pipe fitting draw-in groove, the position department that the hoist steel sheet surface is close to the upper left corner is provided with first lewis hole, the position department that the hoist steel sheet surface is close to the upper right corner is provided with the second lewis hole, the position department of hoist steel sheet rear end face is provided with a plurality of card line devices.
Preferably, the top surface of the first sling steel plate is provided with a bevel.
Preferably, the hanger steel plate and the first hanger steel plate are both made of manganese steel plates, and the thickness of the manganese steel plates is 40 mm.
Preferably, the wire clamping device comprises a connecting rod, fixing rods are arranged at the two ends of the connecting rod, and the other ends of the fixing rods are welded on the hanger steel plate.
Preferably, the connecting rod is provided with a non-slip bump at the position of the surface.
Preferably, a stiffening plate is arranged at the position, on the right side of the first lifting hole, of the front end face of the hanger steel plate.
Preferably, a rubber skin is arranged on the surface of the first sling steel plate.
The utility model has the advantages that: this device easy operation in hoist and mount concrete pipe, it is convenient, can reduce the orificial destruction of concrete simultaneously, the cyclic utilization between the different building sites of being convenient for, the very big artificial rate of utilization that has reduced of this device increases work efficiency, and this device cost is low, efficient fast, reduce cost, can cyclic utilization, the process of manufacture is uncomplicated (only need operate alone the davit can).
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a front view of the present invention;
fig. 2 is a rear view of the present invention;
fig. 3 is a use view of the present invention.
Detailed Description
All of the features disclosed in this specification, or all of the steps in any method or process so disclosed, may be combined in any combination, except combinations of features and/or steps that are mutually exclusive.
Any feature disclosed in this specification (including any accompanying claims, abstract and drawings), may be replaced by alternative features serving equivalent or similar purposes, unless expressly stated otherwise. That is, unless expressly stated otherwise, each feature is only an example of a generic series of equivalent or similar features.
In the description of the present invention, it is to be understood that the terms "one end", "the other end", "the outside", "upper", "inside", "horizontal", "coaxial", "central", "end", "length", "outer end", etc. indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Furthermore, in the description of the present invention, "a plurality" means at least two, e.g., two, three, etc., unless specifically limited otherwise.
In the present invention, unless otherwise explicitly specified or limited, the terms "set", "coupled", "connected", "penetrating", "plugging", and the like are to be understood in a broad sense, and may be, for example, fixedly connected, detachably connected, or integrated; can be mechanically or electrically connected; they may be directly connected or indirectly connected through intervening media, or they may be connected internally or in any other suitable relationship, unless expressly stated otherwise. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
As shown in fig. 1, 2 and 3, the municipal rainwater pipeline reinforced concrete pipe hanger comprises a hanger steel plate 101, a first hanger steel plate 102 is arranged at the bottom of the hanger steel plate 101, the hanger steel plate 101 and the first hanger steel plate 102 are of an integrated structure, a pipe fitting clamping groove 103 is formed at a position between the first hanger steel plate 102 and the hanger steel plate 101, a first hanging hole 105 is formed at a position on the surface of the hanger steel plate 101, which is close to the upper left corner, a second hanging hole 106 is formed at a position on the surface of the hanger steel plate 101, which is close to the upper right corner, and a plurality of wire clamping devices are arranged at positions on the rear end surface of the hanger steel plate 101.
In a preferred embodiment of the present invention, the top surface of the first hanger steel plate 102 has a slope 104.
The inclined plane is arranged, so that the pipe fitting can be hoisted more conveniently.
The utility model discloses in the embodiment of a preferred, hoist steel sheet 101 with first hoist steel sheet 102's material is the manganese steel sheet, and its thickness is 40 mm.
The utility model discloses in the embodiment of a preferred, the card line device includes connecting rod 201, the position department at connecting rod 201 both ends all is provided with dead lever 202, the welding of the dead lever 202 other end is in on the hoist steel sheet 101.
The connecting rod can pass the lifting rope, plays more firm effect.
In the preferred embodiment of the present invention, the connecting rod 201 is provided with an anti-slip bump 203 at the position of the surface.
Increasing the friction force.
The utility model discloses in the embodiment of a preferred, the terminal surface is located before hoist steel sheet 101 the position department on first lewis hole 105 right side is provided with stiffening plate 204.
In a preferred embodiment of the present invention, a rubber sheet is disposed at a position on the surface of the first hanger steel plate 102.
The rubber skin can serve the purpose of the pipe fitting.
When the pipe is not hoisted, one end of each of the two steel wire ropes on the device is fixed on a lifting hook of a crane or a hook machine (the operation can be selected according to the field environment and the pipe diameter by using the crane or the hook machine), and the other end of each of the two steel wire ropes is fixed at the position of the lifting hole through a lifting ring, so that the balance can be kept when the lifting piece is lifted.
When the pipe needs to be hung, an operator is matched with machinery to align the pipe fitting clamping groove to the pipe orifice to insert and lean against, then the hanging ring at the first hanging hole is opened, the steel wire rope connected with the first hanging hole is not stressed any more, and only the steel wire rope at the second hanging hole is stressed, the pipe orifice can be successfully hung, the hanging ring and the steel wire rope at the first hanging hole are connected after the pipe is installed, and the next pipe is hung after the hanging ring and the steel wire rope at the first hanging hole are removed from the pipe.
The above description is only for the specific embodiments of the present invention, but the scope of the present invention is not limited thereto, and any changes or substitutions that are not thought of through the creative work should be covered within the scope of the present invention. Therefore, the protection scope of the present invention should be subject to the protection scope defined by the claims.
Claims (7)
1. The utility model provides a municipal administration rainwater pipeline reinforced concrete pipe hoist which characterized in that: including hoist steel sheet (101), the position department of hoist steel sheet (101) bottom is provided with first hoist steel sheet (102), hoist steel sheet (101) with first hoist steel sheet (102) formula structure as an organic whole, first hoist steel sheet (102) with position department between hoist steel sheet (101) has formed pipe fitting draw-in groove (103), the position department that hoist steel sheet (101) surface is close to the upper left corner is provided with first lifting hole (105), the position department that hoist steel sheet (101) surface is close to the upper right corner is provided with second lifting hole (106), the position department of hoist steel sheet (101) rear end face is provided with a plurality of card line devices.
2. The municipal rainwater pipeline reinforced concrete pipe hanger of claim 1, wherein: the top surface of the first hanger steel plate (102) is provided with a bevel (104).
3. The municipal rainwater pipeline reinforced concrete pipe hanger of claim 1, wherein: the lifting appliance steel plate (101) and the first lifting appliance steel plate (102) are both made of manganese steel plates, and the thickness of the manganese steel plates is 40 mm.
4. The municipal rainwater pipeline reinforced concrete pipe hanger of claim 1, wherein: the wire clamping device comprises a connecting rod (201), fixing rods (202) are arranged at the positions of the two ends of the connecting rod (201), and the other ends of the fixing rods (202) are welded on the hanger steel plate (101).
5. The municipal rainwater pipeline reinforced concrete pipe hanger of claim 4, wherein: and the surface of the connecting rod (201) is provided with an anti-skid lug (203).
6. The municipal rainwater pipeline reinforced concrete pipe hanger of claim 1, wherein: and a stiffening plate (204) is arranged at the position, on the right side of the first lifting hole (105), of the front end surface of the lifting appliance steel plate (101).
7. The municipal rainwater pipeline reinforced concrete pipe hanger of claim 1, wherein: and a rubber skin is arranged at the surface of the first hanger steel plate (102).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120245958.2U CN214456149U (en) | 2021-01-28 | 2021-01-28 | Municipal administration rainwater pipeline reinforced concrete pipe hoist |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120245958.2U CN214456149U (en) | 2021-01-28 | 2021-01-28 | Municipal administration rainwater pipeline reinforced concrete pipe hoist |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214456149U true CN214456149U (en) | 2021-10-22 |
Family
ID=78141317
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120245958.2U Active CN214456149U (en) | 2021-01-28 | 2021-01-28 | Municipal administration rainwater pipeline reinforced concrete pipe hoist |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214456149U (en) |
-
2021
- 2021-01-28 CN CN202120245958.2U patent/CN214456149U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2022111218A1 (en) | Pile casing hoisting arm | |
CN201260050Y (en) | 220KV bracket for replacing bus bar column insulator | |
CN214456149U (en) | Municipal administration rainwater pipeline reinforced concrete pipe hoist | |
CN219362994U (en) | Self-locking type large-diameter pipeline lifting device | |
CN202988556U (en) | Special lifting appliance for angle-steel type frame body | |
CN207079898U (en) | Outer hanging basket structure | |
CN202164037U (en) | Adjustable plate hook | |
CN211998435U (en) | Tool type aerated brick hopper | |
CN202089683U (en) | Three-leg hoisting device | |
CN205973449U (en) | Jack -up handling rigging of buffering pulley | |
CN211226031U (en) | Pipe fitting stone tongs for construction | |
CN208948679U (en) | Assembled hanger | |
CN211056518U (en) | Wheel hub hoist | |
CN204096924U (en) | Concrete pumping pipe connector anchor fitting | |
CN202575684U (en) | Prefabricated-slab hoisting tool | |
CN207986495U (en) | A kind of Bridge High-pier main reinforcement hanging apparatus | |
CN213011858U (en) | Timber overhead hoist for housing construction | |
CN205134923U (en) | Adjustable distance of encorbelmenting hang mechanism | |
CN218174400U (en) | Clamp for cement brick production | |
CN212101631U (en) | Forklift is with facing lifting mast | |
CN218754505U (en) | Cement electric pole production hoisting equipment | |
CN208054718U (en) | A kind of U-shaped hanging apparatus for lifting Large-diameter Steel reinforced concrete pipe | |
CN216038140U (en) | Assembly type house PC hoisting stair structure | |
CN204643580U (en) | Cement pole lifting chuck device | |
CN213265376U (en) | Steel plate hoisting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |